CN112881166A - Device and method for testing stability of foundation in mining overall process and mining subsidence area - Google Patents

Device and method for testing stability of foundation in mining overall process and mining subsidence area Download PDF

Info

Publication number
CN112881166A
CN112881166A CN202110127694.5A CN202110127694A CN112881166A CN 112881166 A CN112881166 A CN 112881166A CN 202110127694 A CN202110127694 A CN 202110127694A CN 112881166 A CN112881166 A CN 112881166A
Authority
CN
China
Prior art keywords
sand
goaf
foundation
loading
subsidence area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110127694.5A
Other languages
Chinese (zh)
Other versions
CN112881166B (en
Inventor
宋修广
李怀剑
庄培芝
程俊伟
岳红亚
孔令弟
崔文杰
杨功增
杨鹤
张建亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lanlin Expressway Co ltd
Shandong University
Original Assignee
Shandong Lanlin Expressway Co ltd
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Lanlin Expressway Co ltd, Shandong University filed Critical Shandong Lanlin Expressway Co ltd
Priority to CN202110127694.5A priority Critical patent/CN112881166B/en
Publication of CN112881166A publication Critical patent/CN112881166A/en
Application granted granted Critical
Publication of CN112881166B publication Critical patent/CN112881166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/06Special adaptations of indicating or recording means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0001Type of application of the stress
    • G01N2203/0003Steady
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0019Compressive
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a device and a method for testing the stability of a foundation in a mining overall process and a mining subsidence area, and the technical scheme is as follows: the device comprises a model groove, wherein the interior of the model groove is used for filling foundation soil similar fillers; the model groove is connected to the inner side of the support frame, a reaction beam with adjustable height is arranged at the top of the support frame, and the reaction beam is connected with the sand drenching device or the loading device; a sand filling recovery device is arranged at the bottom of the model tank; wherein, the model tank bottom sets up a plurality of backup pads, and a plurality of adjacent backup pads link together and bottom installation electric lift pole, goes up and down in order to realize ground uplift or settlement simulation through electric lift pole control backup pad. The invention realizes real-time monitoring of foundation displacement of the whole goaf and the surrounding foundation soil in the mineral mining and goaf loading processes, and can realize test simulation of the influence of uneven settlement at the bottom of the goaf on the upper roadbed soil and the earth surface caused by earthquake load and the like.

Description

Device and method for testing stability of foundation in mining overall process and mining subsidence area
Technical Field
The invention relates to the field of mining engineering, in particular to a device and a method for testing the stability of a foundation in a mining overall process and a mining subsidence area.
Background
China is a large country of mineral resources, and is rich in variety and wide in distribution. With the continuous development of economy, the demand of mineral resources is increasing. Besides a small amount of coal resources belonging to strip mine, most of mineral resources, especially coal resources with rich reserves, are located underground, and have the characteristics of large depth range span and complex geological environment. In the process of mining, due to the sudden release of the ground stress, the foundation at the top of the goaf is settled and deformed, and particularly for a broken stratum area, if the support is not timely, collapse accidents are easily caused. In addition, after mining, a large number of cavities, separation layers, cracks and under-pressure density phenomena exist in the underground, and under the influence of various internal and external factors, such as underground water erosion, additional load caused by ground structures (such as buildings and road engineering), weathering of residual coal pillars and the like, the foundation and the ground surface generate serious settlement deformation, internal stress is redistributed, the safe use of the structures above is seriously threatened, and the normal life and safe production of residents are influenced. Therefore, the development of the research on the stability of the goaf foundation in the mineral mining process and after mining has important reference values for mastering the catastrophe mechanism, guiding the design of the goaf reinforcement scheme, optimizing the construction scheme and the like.
The model test has the advantages of strong intuition, easy control, low cost, solving the irreversibility of the field test and the like, and is widely applied to the research of mining engineering, particularly goafs. Although the conventional test device for goaf research can monitor the deformation and stress of the foundation, the following problems still exist: firstly, most of the existing devices aim at the ground stability research in the goaf range after mining, and the ground deformation and stability research is less in the mining process of mineral products; secondly, although the visual model groove is combined with the photographing technology in the deformation monitoring of the goaf at present, continuous deformation monitoring of the foundation soil in the whole observation window range cannot be obtained; in addition, for supporting of a goaf in a foundation filling process, a rubber air cushion is usually adopted as a temporary goaf support, but the air cushion is made of a flexible material, so that irregular deformation is inevitably generated, the modulus of the air cushion is not coordinated with the surrounding foundation filling, the goaf is easy to generate initial deformation, and the bottom of the conventional test device is fixed and restrained, so that the non-uniform settlement simulation of the bottom of the goaf cannot be realized.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a device and a method for testing the stability of the foundation in the whole mining process and the mining subsidence area, which realize the real-time monitoring of the foundation displacement of the whole goaf and the surrounding foundation soil in the mineral mining and goaf loading processes and can realize the test simulation of the influence of the uneven settlement at the bottom of the goaf on the upper roadbed soil and the ground surface caused by earthquake load and the like.
In order to achieve the purpose, the invention is realized by the following technical scheme:
in a first aspect, the embodiment of the invention provides a device for testing the stability of a foundation in a mining overall process and a mining subsidence area, which comprises a model groove, wherein similar fillers of foundation soil are filled in the model groove; the model groove is connected to the inner side of the support frame, a reaction beam with adjustable height is arranged at the top of the support frame, and the reaction beam is connected with the sand drenching device or the loading device; a sand filling recovery device is arranged at the bottom of the model tank;
wherein, the model tank bottom sets up a plurality of backup pads, and a plurality of adjacent backup pads link together and bottom installation electric lift pole, goes up and down in order to realize ground uplift or settlement simulation through electric lift pole control backup pad.
As a further implementation mode, flanges are mounted at the bottoms of the supporting plates and are connected through connecting beams; the settlement or uplift range of the foundation is adjusted by the number of the connecting beams connecting the supporting plates.
As a further implementation mode, the sand filling recovery device comprises a sand leaking pipe and a sand collecting box connected with the sand leaking pipe, the sand leaking pipe vertically penetrates through the mold groove, and the sand collecting box is located below the mold groove.
As a further implementation manner, the sand leakage pipe extends to the goaf, and the extending end of the sand leakage pipe is connected with the trapezoid joint; one end of the sand leakage pipe connected with the sand collecting box is provided with a switch.
As a further implementation mode, the sand spraying device comprises a sand filling funnel, a transparent hose and a sand spraying pipe, wherein the sand filling funnel is connected with one end of the transparent hose through a trapezoid joint, the other end of the transparent hose is connected with the sand spraying pipe through a trapezoid joint, and the sand spraying pipe is connected with a turning joint.
As a further implementation mode, a plurality of sand leakage plates are arranged between the sand spraying pipe and the turning joint, and a valve is arranged between the sand filling funnel and the trapezoid joint.
As a further implementation manner, the loading device includes a servo jack, a pressure dispersing device, and a bearing plate, and the pressure dispersing device is disposed between the servo jack and the bearing plate.
As a further implementation mode, the servo jack is provided with a pressure sensor, and a soil pressure gauge is arranged in the foundation soil similar filler during a loading test.
As a further implementation mode, the front side and the rear side of the mold groove are made of tempered glass, and the tempered glass on the front side is provided with a plurality of rows of reference points.
In a second aspect, an embodiment of the present invention further provides a method for testing stability of a foundation in a mining overall process and a mining subsidence area, where the test apparatus includes:
determining the shape of the goaf, and determining the size and the burial depth of the goaf by combining with the similarity ratio design; determining the modulus of similar fillers of the foundation soil, the mix proportion design of similar materials and the sand spraying compactness in the goaf;
installing a test device; closing the switch and simultaneously placing a sand collecting box;
filling foundation similar soil filler into the model groove to the bottom of the goaf, and installing a soil pressure gauge; erecting a goaf template according to the shape of the goaf, and fixing front and rear toughened glass by adopting temporary support;
filling the top filler of the goaf, installing a soil pressure gauge according to a design position, and removing the temporary support and the template after the top filler reaches a set strength;
a sand spraying device is adopted to spray sand into the goaf until the whole goaf is filled; continuously filling foundation soil filler to the design height;
installing a digital camera and a light supplement lamp, adjusting the position, the focal length and the light supplement intensity, connecting the soil pressure acquisition system, starting a photographing switch and the soil pressure acquisition system, and turning on the switch;
after the sand filling of the goaf is completely leaked out, adjusting the counter-force beam to a loading height, installing a loading device, starting a stress acquisition system, and carrying out vertical loading;
if the uneven settlement test working condition caused by the earthquake is simulated, the settlement or uplift range is designed in advance, the electric lifting rod is opened to enable the supporting plate to reach the designed settlement or uplift amount, and meanwhile, foundation soil displacement and internal stress data are monitored;
DIC software is adopted to process and collect photos, and foundation soil displacement and strain change in the loading process are obtained.
The beneficial effects of the above-mentioned embodiment of the present invention are as follows:
(1) according to one or more embodiments of the invention, through filling sand fillers in the goaf and installing the soil pressure gauge, the whole process simulation of the mineral mining process and the real-time monitoring of the deformation and soil pressure of the foundation soil are realized.
(2) According to one or more embodiments of the invention, by arranging the sand spraying device, the matching design of the modulus of the filler inside the goaf and the foundation soil is realized, and the problem that the foundation is easy to settle unevenly when the air bag is used as temporary support of the goaf at present is solved.
(3) According to one or more embodiments of the invention, the supporting plate is driven by the electric lifting rod to move up and down, so that the experimental simulation of the influence of the uneven settlement at the bottom of the goaf caused by earthquake load and the like on the upper roadbed soil and the ground surface is realized.
(4) One or more embodiments of the invention adopt DIC data processing software to realize real-time monitoring of foundation displacement of the whole goaf and the surrounding foundation soil in the mineral mining and goaf loading processes.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the invention and not to limit the invention.
FIG. 1 is a schematic diagram of the construction of a sand drenching device according to one or more embodiments of the invention;
FIG. 2 is a schematic diagram of a configuration of an installation loading unit according to one or more embodiments of the present disclosure;
the device comprises a counter-force beam 1, a counter-force beam 2, a hoisting device 3, a sand filling funnel 4, a valve 5, a trapezoidal joint 6, a transparent hose 7, a sand spraying pipe 8, a sand leakage plate 9, a turning joint 10, a vertical beam 11, a frame 12, a connecting member 13, a reference point 14, a goaf 15, a sand leakage pipe 16, a switch 17, a sand collecting box 18, an electric lifting rod 19, a support plate 20, a flange 21, foundation soil similar filler 22, a bottom beam 23, a soil pressure gauge 24, a servo jack 25, a pressure sensor 26, a pressure dispersing device 27 and a bearing plate.
Detailed Description
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the disclosure. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application. As used herein, the singular forms "a", "an", and/or "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof;
for convenience of description, the words "up", "down", "left" and "right" in this application, if any, merely indicate that the directions of movement are consistent with those of the figures themselves, and are not limiting in structure, but merely facilitate the description of the invention and simplify the description, rather than indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting in this application.
The terms "mounted", "connected", "fixed", and the like in the present application should be understood broadly, and for example, the terms "mounted", "connected", and "fixed" may be fixedly connected, detachably connected, or integrated; the two components can be connected directly or indirectly through an intermediate medium, or the two components can be connected internally or in an interaction relationship, and the terms can be understood by those skilled in the art according to specific situations.
The first embodiment is as follows:
the embodiment provides a mining overall process and mining subsidence area ground stability test device, including mould groove, similar filler 21 of foundation soil, loading device, data acquisition system, drench sand device, fill sand recovery unit, drench sand device and fill sand recovery unit and constitute the collecting space area and fill and recovery unit, the model groove sets up in the support frame.
Furthermore, the model groove is of a cuboid structure, and the size of the model groove can be set according to actual test requirements. The top of the mould groove is provided with an opening, the front side and the rear side of the mould groove are respectively provided with toughened glass, and the toughened glass at the front side is provided with a plurality of rows of reference points 13; the left side and the right side of the die-shaped groove are steel plates. In the present embodiment, the reference points 13 are arranged in five rows, each row having a plurality.
The bottom of the mould groove is formed by splicing a plurality of supporting plates 19 along the length direction, and flanges 20 are arranged at the bottoms of the supporting plates 19; the flanges 20 of adjacent support plates 19 are connected by connecting beams, so that the support plates 19 form a multi-segment structure. An electric lifting rod 18 is arranged at the bottom of each section of connecting beam, and a supporting plate 19 can be lifted through the electric lifting rod 18. The number of the connected supporting plates 19 is adjusted by changing the length of the connecting beam, so that the settlement or uplift range of the foundation is adjusted.
In this example, the dimensions of the model groove were 2.5m × 0.25m × 1.6m (length × width × height), the thickness of the tempered glass was 19mm, and the thickness of the steel plate was 20 mm; the supporting plate 19 is made of a steel plate, and the thickness of the supporting plate is 20 cm; the connecting beam is a steel beam.
Further, two ends of the mold groove are respectively provided with a frame 11, and the mold groove is supported by the frame 11. The frame 11 is adjacent to the support frame by a connecting member 12.
The support frame comprises a bottom beam 22 and two vertical beams 10, wherein two ends of the bottom beam 22 are respectively connected with one vertical beam 10. A plurality of connecting members 12 arranged at intervals are connected between the frame 11 and the vertical beams 10; the motorized lift pins 18 are secured above the bottom beams 22.
Further, a reaction beam 1 is arranged between the two vertical beams 10, the reaction beam 1 is used for installing a sand drenching device or a loading device, and the reaction beam 1 is higher than the loading device when the sand drenching device is installed. In this embodiment, the reaction cross beam 1 is an i-beam with a height of 15cm, and is connected to the vertical beam 10 by a high-strength bolt.
Further, as shown in fig. 1, the sand-spraying device is connected below the reaction beam 1 through a hoisting device 2, and the hoisting device 2 is an existing structure, such as a hook.
Drench the sand device including dress sand funnel 3, trapezoidal joint 5, transparent hose 6, drench sand pipe 7, leak sand board 8 and turn round joint 9, dress sand funnel 3 connects the one end of transparent hose 6 through trapezoidal joint 5, and the other end of transparent hose 6 is connected through trapezoidal joint 5 and is drenched sand pipe 7, it connects to turn round joint 9 to drench sand pipe 7. The installation direction of the trapezoid joint 5 connected with the sand filling funnel 3 is opposite to that of the trapezoid joint 5 connected with the sand spraying pipe 7.
A plurality of sand leakage plates 8 are arranged between the sand spraying pipe 7 and the turning joint 9, and a valve 4 is arranged between the sand filling funnel 3 and the trapezoid joint 5. In the embodiment, the sand spraying pipe 7 is an organic glass pipe; the sand leakage plate 8 is a round steel plate with the thickness of 2mm and the diameter equal to the inner diameter of the sand spraying pipe 7, the sand leakage plate 8 is provided with a round hole with the porosity of 20 percent, and the diameter of the round hole is 2.5 mm; the sand spraying compactness is controlled to be within the range of 0-98% by adjusting the size of the valve 4, the number and the spacing of the sand leakage plates 8, the sand spraying height and other variables, and the specific variable combination is determined according to the modulus of foundation soil around the goaf.
Further, the sand filling recovery device comprises a sand leaking pipe 15 and a sand collecting box 17, wherein the sand collecting box 17 is arranged below the mold groove, one end of the sand leaking pipe 15 is communicated with the sand collecting box 17, and a switch 16 is arranged at the connecting end of the sand leaking pipe 15 and the sand collecting box 17; the sand leakage pipe 15 vertically penetrates the support plate 19, and the other end thereof extends to the gob 14.
In this embodiment, the sand leaking pipe 15 is a PVC pipe with a diameter of 2cm, and the bottom of the gob 14 is connected with a trapezoidal joint for collecting the sand filled in the gob 14. A plurality of sand leaking pipes 15 can be arranged according to actual conditions, and the size of the sand leaking pipes is adjusted by adjusting a switch 16 to simulate the mining speed.
Further, as shown in fig. 2, the loading device includes a plurality of servo jacks 24, a pressure dispersing device 26, and a pressure bearing plate 27, the servo jacks 24 are detachably connected below the reaction beam 1, the servo jacks 24 are provided with pressure sensors 25, and pressure information is collected by the pressure sensors 25. When a loading test is carried out, a soil pressure gauge 23 is arranged in the foundation soil similar filler 21; in the present embodiment, an earth pressure gauge 23 is provided on the side of each reference point 13.
In this embodiment, the pressure sensor 25 has a spoke structure, a measuring range of 200kN and an accuracy of 20N; the soil pressure gauge 23 is a strain type soil pressure cell, and acquires the internal stress change of the foundation soil through a dynamic strain acquisition instrument and a matching system. It is understood that in other embodiments, the pressure sensor 25 and the soil pressure gauge 23 may be in other forms. Preferably, the maximum load of the servo jacks 24 is 15 tons.
The pressure bearing plate 27 is arranged above the model groove, and a pressure dispersing device 26 is arranged between the servo jack 24 and the pressure bearing plate 27; the bearing plate 27 is enabled by the servo jacks 24 to load the matrix-like fill 21 inside the mould groove. In this embodiment, the pressure dispersion device 26 is a metal block having a frustum shape.
The data acquisition system comprises a digital camera and a light supplement lamp besides the pressure sensor 25 and the soil pressure gauge 23, the pixels of the digital camera are not less than 2000 ten thousand, and photos in the mineral mining and loading process are processed through DIC software to obtain data such as instantaneous and accumulated displacement, instantaneous and accumulated strain of foundation soil in the whole observation window range.
Further, the foundation soil similar filler 21 is arranged inside the mold groove and is designed according to the test similarity ratio and is prepared from different materials; the similarity ratio is designed as follows:
(1) geometric similarity constant:
CL=Lm/Lp=1/50 (1)
in the above formula CLFor geometric similarity of model to prototype, LmIs the size of the model, LpIs the prototype size.
(2) Time similarity constant:
Figure BDA0002924024270000091
in the above formula CTFor model to prototype time similarity ratio, TmIs the model process time, TpThe prototype process time is in units of s.
(3) Density similarity constant:
Cρ=ρmp==1/1.5 (3)
in the above formula CρThe density similarity ratio of the model to the prototype, ρmAs density of model material, ppIs the prototype material density.
(4) Intensity similarity constant:
Cσ=σmp=CL·Cρ=1/75 (4)
in the above formula CσFor the model to prototype strength similarity ratio, σmAs strength of the model material, σpIs the prototype material strength.
In this embodiment, the foundation soil-like filler 21 comprises aggregate river sand, lime, gypsum and fly ash, and a certain proportion of blending water is added. A cubic compressive strength test specimen of 100mm multiplied by 100mm is manufactured by trial mixing of mass ratios of different admixtures, the compressive strength and the modulus are tested after standard condition curing, the final material ratio is determined according to the test result, and different foundation fillers are prepared.
The embodiment is used for monitoring the deformation and stress distribution of the mining and post-mining subsidence area, and solves the limitation of the existing test device in application scenes, control technology and monitoring technology.
Example two:
the embodiment provides a mining overall process and goaf subsidence area foundation stability test method, and the device of the first embodiment comprises the following steps:
and determining the shape of the gob 14 according to the field geological conditions or research contents of the gob, and determining the size and the burial depth of the gob 14 by combining with the similarity ratio design.
And determining the modulus of the similar foundation soil filler 21, the design of the similar material mixing ratio and the sand spraying compactness in the goaf according to the field rock stratum strength and the similar ratio of the goaf 14.
Installing a model groove, and connecting the model groove with the bottom beam 22 and the vertical beam 10; the position and number of the sand leaking pipes 15 are set according to the size and shape of the gob 14, and the switch 16 is closed while the flask 17 is placed.
Filling foundation similar soil filler 21 into the model groove to the bottom of the goaf 14, and installing a soil pressure gauge 23 according to a design position; and then erecting a goaf template according to the shape of the goaf 14 and fixing the goaf template on the front and rear toughened glass plates by adopting temporary support.
Filling the top filler of the gob 14, installing a soil pressure gauge 23 according to a designed position, removing the temporary support and the template after the top filler reaches certain strength, and spraying sand into the gob 14 by adopting a sand spraying device according to the designed relative compactness until the whole gob 14 is filled; and then continuously filling the foundation soil filler 21 to the design height.
Installing a digital camera and a light supplement lamp, adjusting the position, the focal length and the light supplement intensity, connecting a soil pressure acquisition system (comprising a strain type soil pressure box, a dynamic strain acquisition instrument and a matching system), starting a photographing switch and the soil pressure acquisition system, and turning on a switch 16.
After the sand filling of the goaf 14 is completely leaked out, the reaction beam 1 is adjusted to a proper loading height, a loading device is installed, and a stress acquisition system is started to perform vertical loading.
If the uneven settlement test working condition caused by earthquake is simulated, firstly, the settlement or uplift range is designed, the electric lifting rod 18 is opened to enable the supporting plate 19 at the bottom of the model tank to reach the designed settlement or uplift amount, and the displacement and internal stress data of the foundation soil are monitored in the period.
DIC software is adopted to process and collect photos, and foundation soil displacement and strain change in the loading process are obtained.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (10)

1.一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,包括模型槽,模型槽内部用于填筑地基土相似填料;所述模型槽连接于支撑架内侧,支撑架顶部安装高度可调的反力横梁,所述反力横梁连接淋砂装置或加载装置;所述模型槽底部设置填砂回收装置;1. a whole process of mining and a ground stability test device in a goaf subsidence area, is characterized in that, comprises a model groove, and the inside of the model groove is used to fill the similar filling of foundation soil; The model groove is connected to the inner side of the support frame, and the support frame A height-adjustable reaction beam is installed on the top, and the reaction beam is connected to a sand shower device or a loading device; a sand filling recovery device is installed at the bottom of the model tank; 其中,模型槽底部设置若干支撑板,多个相邻的支撑板连接在一起且底部安装电动升降杆,通过电动升降杆控制支撑板升降以实现地基隆起或沉降模拟。Among them, a number of support plates are arranged at the bottom of the model tank, a plurality of adjacent support plates are connected together, and an electric lifting rod is installed at the bottom, and the lifting and lowering of the supporting plate is controlled by the electric lifting rod to realize the simulation of foundation uplift or settlement. 2.根据权利要求1所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述支撑板底部安装法兰,法兰之间通过连接梁相连;通过连接梁连接支撑板的个数调整地基沉降或隆起范围。2. A kind of whole mining process and ground stability test device in goaf subsidence area according to claim 1, characterized in that, flanges are installed at the bottom of the support plate, and the flanges are connected by connecting beams; The number of connecting support plates adjusts the range of foundation settlement or uplift. 3.根据权利要求1所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述填砂回收装置包括漏砂管、与漏砂管相连的集砂箱,漏砂管垂直穿过模型槽,集砂箱位于模型槽下方。3. The whole mining process and the ground stability test device in the goaf subsidence area according to claim 1, wherein the sand filling recovery device comprises a sand leakage pipe and a sand collecting box connected with the sand leakage pipe, The sand leakage pipe vertically passes through the model groove, and the sand collecting box is located under the model groove. 4.根据权利要求3所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述漏砂管延伸至采空区,且漏砂管的延伸端连接梯形接头;漏砂管与集砂箱相连的一端安装开关。4. The whole mining process and the ground stability test device in the goaf subsidence area according to claim 3, wherein the sand leakage pipe extends to the goaf, and the extended end of the sand leakage pipe is connected to a trapezoidal joint ; A switch is installed at the end of the sand leakage pipe connected to the sand collecting box. 5.根据权利要求1所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述淋砂装置包括装砂漏斗、透明软管、淋砂管,装砂漏斗通过梯形接头连接透明软管的一端,透明软管的另一端通过梯形接头连接淋砂管,所述淋砂管连接拐弯接头。5. A kind of whole mining process and ground stability test device in goaf subsidence area according to claim 1, is characterized in that, described sand shower device comprises sand loading funnel, transparent hose, sand shower pipe, sand loading funnel One end of the transparent hose is connected through a trapezoidal joint, and the other end of the transparent hose is connected to a sand shower pipe through a trapezoidal joint, and the sand shower pipe is connected to a corner joint. 6.根据权利要求5所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述淋砂管与拐弯接头之间安装若干漏砂板,装砂漏斗与梯形接头之间安装阀门。6. A kind of whole mining process and ground stability test device in goaf subsidence area according to claim 5, it is characterized in that, between the described sand shower pipe and the turning joint, a number of sand leakage plates are installed, and the sand loading funnel and trapezoid are installed. Install the valve between the fittings. 7.根据权利要求1所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述加载装置包括伺服千斤顶、压力分散装置和承压板,压力分散装置设置于伺服千斤顶与承压板之间。7. The whole mining process and the ground stability test device in the goaf subsidence area according to claim 1, wherein the loading device comprises a servo jack, a pressure dispersing device and a bearing plate, and the pressure dispersing device is arranged on the Between the servo jack and the bearing plate. 8.根据权利要求7所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述伺服千斤顶安装有压力传感器,进行加载试验时,地基土相似填料内设有土压力计。8. The whole mining process and the ground stability test device in the goaf subsidence area according to claim 7, wherein the servo jack is equipped with a pressure sensor, and when the loading test is carried out, the similar filling of the foundation soil is provided with a pressure sensor. earth pressure gauge. 9.根据权利要求1所述的一种采矿全过程及采空塌陷区地基稳定性试验装置,其特征在于,所述模型槽的前后两侧采用钢化玻璃,前侧的钢化玻璃设置有若干行参考点。9. A kind of whole mining process and ground stability test device in goaf subsidence area according to claim 1, characterized in that, the front and rear sides of the model groove are made of tempered glass, and the tempered glass on the front side is provided with several rows reference point. 10.一种采矿全过程及采空塌陷区地基稳定性试验方法,其特征在于,采用如权利要求1-9任一所述的试验装置,包括:10. A whole process of mining and a method for testing the stability of ground in a goaf subsidence area, characterized in that the test device according to any one of claims 1-9 is adopted, comprising: 确定采空区形状,结合相似比设计确定采空区尺寸和埋深;确定地基土相似填料的模量、相似材料配合比设计和采空区内淋砂密实度;Determine the shape of the goaf, determine the size and burial depth of the goaf in combination with the design of the similarity ratio; determine the modulus of the similar filler of the foundation soil, the design of the mix ratio of similar materials, and the density of the sand pouring in the goaf; 安装试验装置;关闭开关,同时放置集砂箱;Install the test device; turn off the switch, and place the sand collection box at the same time; 向模型槽内填筑地基相似土填料至采空区底部,并安装土压力计;根据采空区形状架设采空区模板并采用临时支撑固定在前后钢化玻璃;Fill the model groove with similar soil filler to the bottom of the goaf, and install the earth pressure gauge; set up the gob template according to the shape of the goaf and use temporary supports to fix it on the front and rear tempered glass; 填筑采空区顶部填料,根据设计位置安装土压力计,当顶部填料达到设定强度之后,拆除临时支撑和模板;Fill the top fill in the goaf, install the earth pressure gauge according to the design position, and remove the temporary support and formwork when the top fill reaches the set strength; 采用淋砂装置向采空区内淋砂,直至充满整个采空区;继续填筑地基土填料至设计高度;Use sand spraying device to spray sand into the goaf until it fills the entire goaf; continue to fill the foundation soil to the design height; 安装数码相机和补光灯并调整位置、焦距和补光强度,连接土压力采集系统,启动拍照开关和土压力采集系统,打开开关;Install digital camera and fill light and adjust the position, focal length and fill light intensity, connect the earth pressure acquisition system, start the camera switch and earth pressure acquisition system, and turn on the switch; 待采空区填砂全部漏完后,将反力横梁调整至加载高度,安装加载装置,启动应力采集系统,进行竖向加载;After all the sand filling in the gob has been leaked, adjust the reaction beam to the loading height, install the loading device, start the stress acquisition system, and carry out vertical loading; 如果模拟地震引起的不均匀沉降试验工况,预先设计沉降或隆起范围,打开电动升降杆使支撑板达到设计沉降或隆起量,同时监测地基土位移和内部应力数据;If the uneven settlement test conditions caused by earthquakes are simulated, the settlement or uplift range is pre-designed, the electric lifting rod is opened to make the support plate reach the design settlement or uplift amount, and the foundation soil displacement and internal stress data are monitored at the same time; 采用DIC软件处理采集照片,获取加载过程中地基土位移和应变变化。The DIC software was used to process the collected photos to obtain the displacement and strain changes of the foundation soil during the loading process.
CN202110127694.5A 2021-01-29 2021-01-29 A kind of whole mining process and ground stability test device and method in goaf subsidence area Active CN112881166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110127694.5A CN112881166B (en) 2021-01-29 2021-01-29 A kind of whole mining process and ground stability test device and method in goaf subsidence area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110127694.5A CN112881166B (en) 2021-01-29 2021-01-29 A kind of whole mining process and ground stability test device and method in goaf subsidence area

Publications (2)

Publication Number Publication Date
CN112881166A true CN112881166A (en) 2021-06-01
CN112881166B CN112881166B (en) 2022-07-05

Family

ID=76053743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110127694.5A Active CN112881166B (en) 2021-01-29 2021-01-29 A kind of whole mining process and ground stability test device and method in goaf subsidence area

Country Status (1)

Country Link
CN (1) CN112881166B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356228A (en) * 2021-06-18 2021-09-07 武汉理工大学 Mixing test device for foundation pit supporting structure simulation
CN114703886A (en) * 2022-04-27 2022-07-05 浙江国进建设有限公司 Oil refining irrigation area civil construction method
CN114755391A (en) * 2022-04-15 2022-07-15 长沙矿山研究院有限责任公司 Method for simulating complex goaf of mine based on physical model test
CN115112482A (en) * 2022-07-29 2022-09-27 深圳康佳电子科技有限公司 Pressure testing device for elastic materials

Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201034997Y (en) * 2007-05-11 2008-03-12 交通部公路科学研究院 test box for simulating roads earth base or foot layer structure partial inhomogeneous deformation
JP2009299304A (en) * 2008-06-11 2009-12-24 Toray Ind Inc Sand movement preventing method, and vegetation forming-improving method on sand ground using the same
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN102127908A (en) * 2011-04-18 2011-07-20 中交四航工程研究院有限公司 Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion
CN102226335A (en) * 2011-04-18 2011-10-26 中交四航工程研究院有限公司 Foundation treatment method for controlling post-construction settlement and deformation of soft soil
CN202182846U (en) * 2011-07-20 2012-04-04 西南交通大学 Model relative settlement control equipment for soil engineering centrifugal machine tests
CN103364124A (en) * 2013-06-27 2013-10-23 天津大学 Measuring device for soil resistance stressed on subsea oil and gas pipeline during horizontal movement
CN203960849U (en) * 2014-06-26 2014-11-26 山东大学 A kind of assemble type soft foundation charge preloading consolidation device
CN104564048A (en) * 2015-01-20 2015-04-29 西南石油大学 Large-size and multi-crack simulation device and method for propping agent transportation
CN104819898A (en) * 2015-05-14 2015-08-05 中国矿业大学(北京) Mining rock crack extension test device and test method
CN105527389A (en) * 2016-03-02 2016-04-27 山东交通学院 Jack-based experiment model and method for simulating uneven settlement of foundation
CN105696632A (en) * 2016-02-01 2016-06-22 河南理工大学 Transparent soil model test device for mining area pile foundation bearing force and test method
CN105738145A (en) * 2016-04-12 2016-07-06 天津大学 Shield Tunnel Leakage Test System Under the Joint Action of Elastic Gasket, Soil and Water
CN106284436A (en) * 2016-06-28 2017-01-04 河南理工大学 A kind of minery subsidence single pile dead load model test apparatus and test method
AU2016208375A1 (en) * 2015-07-28 2017-02-16 Pascal Tech Pty Ltd System and Method for Managing Pressure of Gases in Coal Mines
CN106709211A (en) * 2017-01-24 2017-05-24 江苏昌泰建设工程有限公司 Method for using tailings mold bag wall to fill ore pillar recovery under pit
CN107179396A (en) * 2017-07-07 2017-09-19 东北大学 Multifunctional built-up formula Geotechnical Engineering physics similar test system
CN108291377A (en) * 2015-09-18 2018-07-17 世纪工程有限公司 Temporary facility water-proof type soil-baffling structure body and its construction method
CN108801793A (en) * 2018-09-11 2018-11-13 山东大学 One kind drenches with rain method sanding device and its test method
CN110044715A (en) * 2019-05-15 2019-07-23 东北大学 A kind of visualization damage of soil body models capture device
CN110409518A (en) * 2019-07-12 2019-11-05 河南理工大学 A model test device and method for pseudodynamic loading of foundation in goaf of high-speed railway
CN110438966A (en) * 2019-08-20 2019-11-12 桂林电子科技大学 A kind of relative settlement precise control device of modular
CN110646280A (en) * 2019-09-03 2020-01-03 山东大学 Test system and method suitable for coal seam mining and filling simulation
CN110715896A (en) * 2019-11-18 2020-01-21 宁夏大学 A test model and test method for simulating multi-point uneven settlement of foundation
CN111379203A (en) * 2020-04-23 2020-07-07 山东高速股份有限公司 Geogrid reinforcement and membrane bag grouting combined sedimentation device, sedimentation method and application
CN111829894A (en) * 2020-06-24 2020-10-27 山东大学 A kind of geotechnical multi-field measurement test system and method

Patent Citations (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201034997Y (en) * 2007-05-11 2008-03-12 交通部公路科学研究院 test box for simulating roads earth base or foot layer structure partial inhomogeneous deformation
JP2009299304A (en) * 2008-06-11 2009-12-24 Toray Ind Inc Sand movement preventing method, and vegetation forming-improving method on sand ground using the same
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN102127908A (en) * 2011-04-18 2011-07-20 中交四航工程研究院有限公司 Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion
CN102226335A (en) * 2011-04-18 2011-10-26 中交四航工程研究院有限公司 Foundation treatment method for controlling post-construction settlement and deformation of soft soil
CN202182846U (en) * 2011-07-20 2012-04-04 西南交通大学 Model relative settlement control equipment for soil engineering centrifugal machine tests
CN103364124A (en) * 2013-06-27 2013-10-23 天津大学 Measuring device for soil resistance stressed on subsea oil and gas pipeline during horizontal movement
CN203960849U (en) * 2014-06-26 2014-11-26 山东大学 A kind of assemble type soft foundation charge preloading consolidation device
CN104564048A (en) * 2015-01-20 2015-04-29 西南石油大学 Large-size and multi-crack simulation device and method for propping agent transportation
CN104819898A (en) * 2015-05-14 2015-08-05 中国矿业大学(北京) Mining rock crack extension test device and test method
AU2016208375A1 (en) * 2015-07-28 2017-02-16 Pascal Tech Pty Ltd System and Method for Managing Pressure of Gases in Coal Mines
CN108291377A (en) * 2015-09-18 2018-07-17 世纪工程有限公司 Temporary facility water-proof type soil-baffling structure body and its construction method
CN105696632A (en) * 2016-02-01 2016-06-22 河南理工大学 Transparent soil model test device for mining area pile foundation bearing force and test method
CN105527389A (en) * 2016-03-02 2016-04-27 山东交通学院 Jack-based experiment model and method for simulating uneven settlement of foundation
CN105738145A (en) * 2016-04-12 2016-07-06 天津大学 Shield Tunnel Leakage Test System Under the Joint Action of Elastic Gasket, Soil and Water
CN205875234U (en) * 2016-06-28 2017-01-11 河南理工大学 Adopt livestock farm subsidence single pile dead load model test device
CN106284436A (en) * 2016-06-28 2017-01-04 河南理工大学 A kind of minery subsidence single pile dead load model test apparatus and test method
CN106709211A (en) * 2017-01-24 2017-05-24 江苏昌泰建设工程有限公司 Method for using tailings mold bag wall to fill ore pillar recovery under pit
CN107179396A (en) * 2017-07-07 2017-09-19 东北大学 Multifunctional built-up formula Geotechnical Engineering physics similar test system
CN108801793A (en) * 2018-09-11 2018-11-13 山东大学 One kind drenches with rain method sanding device and its test method
CN110044715A (en) * 2019-05-15 2019-07-23 东北大学 A kind of visualization damage of soil body models capture device
CN110409518A (en) * 2019-07-12 2019-11-05 河南理工大学 A model test device and method for pseudodynamic loading of foundation in goaf of high-speed railway
CN110438966A (en) * 2019-08-20 2019-11-12 桂林电子科技大学 A kind of relative settlement precise control device of modular
CN110646280A (en) * 2019-09-03 2020-01-03 山东大学 Test system and method suitable for coal seam mining and filling simulation
CN110715896A (en) * 2019-11-18 2020-01-21 宁夏大学 A test model and test method for simulating multi-point uneven settlement of foundation
CN111379203A (en) * 2020-04-23 2020-07-07 山东高速股份有限公司 Geogrid reinforcement and membrane bag grouting combined sedimentation device, sedimentation method and application
CN111829894A (en) * 2020-06-24 2020-10-27 山东大学 A kind of geotechnical multi-field measurement test system and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
QINGXIN MA等: "《Effect of spraying on coal dust diffusion in a coal mine based on a umerical simulation》", 《ENVIRONMENTAL POLLUTION》 *
孟庆宇等: "《基于室内模型试验的锚拉式挡土墙力学特性研究》", 《建筑科学与工程学报》 *
孟庆宇等: "《锚拉式挡土墙沉降力学特性模型试验研究》", 《公路》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356228A (en) * 2021-06-18 2021-09-07 武汉理工大学 Mixing test device for foundation pit supporting structure simulation
CN113356228B (en) * 2021-06-18 2022-04-29 武汉理工大学 Mixing test device for foundation pit supporting structure simulation
CN114755391A (en) * 2022-04-15 2022-07-15 长沙矿山研究院有限责任公司 Method for simulating complex goaf of mine based on physical model test
CN114703886A (en) * 2022-04-27 2022-07-05 浙江国进建设有限公司 Oil refining irrigation area civil construction method
CN114703886B (en) * 2022-04-27 2024-05-17 浙江国进建设有限公司 Civil construction method for oil refining tank area
CN115112482A (en) * 2022-07-29 2022-09-27 深圳康佳电子科技有限公司 Pressure testing device for elastic materials
CN115112482B (en) * 2022-07-29 2025-07-11 深圳康佳电子科技有限公司 Pressure testing device for elastic materials

Also Published As

Publication number Publication date
CN112881166B (en) 2022-07-05

Similar Documents

Publication Publication Date Title
CN112881166B (en) A kind of whole mining process and ground stability test device and method in goaf subsidence area
Gao et al. Model test and numerical simulation research of water leakage in operating tunnels passing through intersecting faults
CN105137048B (en) Stratum grouting simulation system
CN211505504U (en) Test device for simulating tunnel crossing water-rich fault gushing water
CN110441159B (en) Simulation test device and method for well wall bearing characteristics under hydraulic coupling effect
CN104833537B (en) A similar model test device for simulating tunnel construction
CN108061687A (en) It is a kind of to study the geotechnical engineering analogue test platform for having Latent destruction face
CN106596268B (en) A kind of multi-water immersion working condition simulation test model box and test method
CN102914632A (en) Multifunctional geotechnical model test chamber
CN103616287A (en) Laboratory model testing device for tunnel excavation
CN211602719U (en) Stope mine pressure three-dimensional physical simulation test platform of multi-functional top bottom plate gushing water
CN105926686A (en) Centrifugal model testing system and method studying common character of composite foundation and support structure
CN205263089U (en) Stratum slip casting analog system
CN206681764U (en) A kind of coal mine tunnel top board simulates anchor bar suspension device
CN107354961B (en) Variable-rigidity pre-stressed anchor-pull type retaining wall soil arch effect test model device and method
CN107290501B (en) Experimental device and method for seepage instability and water inrush of filling medium in fractured-fault-type geological structure
CN113447362B (en) Coal stratum bottom plate pressure-bearing water counter force simulation experiment device and method
CN202916109U (en) Multifunctional experimental device for simulating pipe-clay effect
CN104458425A (en) Grouting effect evaluation device for geotechnical engineering
CN116448569A (en) Collapse type mining and earthquake well joint monitoring physical simulation device and method
CN104614244A (en) High-stress roadway stability similarity simulation test device and method
CN106284085B (en) It is close to both wired deep water foundation Large-Span Continuous beam construction methods
CN111505237A (en) A kind of test device and test method for grouting modification of broken coal and rock mass in re-mining of residual coal
CN205691438U (en) A kind of anchoring type Rock And Soil in-situ direct shear test device
CN113686603B (en) Simulation test method for combined load bearing of surrounding rock and lining structure of deep tunnels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant