CN112853015A - High-efficiency cooling system and method for blast furnace gas - Google Patents

High-efficiency cooling system and method for blast furnace gas Download PDF

Info

Publication number
CN112853015A
CN112853015A CN202110014535.4A CN202110014535A CN112853015A CN 112853015 A CN112853015 A CN 112853015A CN 202110014535 A CN202110014535 A CN 202110014535A CN 112853015 A CN112853015 A CN 112853015A
Authority
CN
China
Prior art keywords
blast furnace
gas
furnace gas
water
cooling tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110014535.4A
Other languages
Chinese (zh)
Other versions
CN112853015B (en
Inventor
徐伟
张天赋
矫继东
赵伟
何嵩
张函
陈鹏
高军
张炎
马光宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN202110014535.4A priority Critical patent/CN112853015B/en
Publication of CN112853015A publication Critical patent/CN112853015A/en
Application granted granted Critical
Publication of CN112853015B publication Critical patent/CN112853015B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/06Making pig-iron in the blast furnace using top gas in the blast furnace process
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/10Cooling; Devices therefor
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/22Dust arresters
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/62Energy conversion other than by heat exchange, e.g. by use of exhaust gas in energy production
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/66Heat exchange
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Blast Furnaces (AREA)

Abstract

The invention relates to the technical field of high-efficiency application of metallurgical coal gas in the steel industry, in particular to a high-efficiency cooling system and a high-efficiency cooling method for blast furnace coal gas. The system comprises a blast furnace, a furnace top spraying device, a dry-method dust removal device, a TRT power generation device, a bypass spraying device, a dehumidification device, a bypass pressure-reducing valve bank, a coal gas cooling tower, a circulating water pool, a CCPP power generation device and a water pump which are connected through pipelines. A blast furnace gas efficient cooling method specifically comprises two operation states, namely a TRT power generation device operation state and a TRT power generation device stop operation state. Aiming at the condition that part of blast furnace raw gas produced by the blast furnace is in a higher temperature range of 250-300 ℃ for a long time, the blast furnace gas is efficiently cooled, the requirement of a CCPP generator set on the blast furnace gas temperature under the matching of an early wet dust removal process is met on the premise of not obviously increasing the circulating water amount, and the restriction bottleneck of changing the wet dust removal method into the dry dust removal method for the blast furnace gas in the steel industry is solved.

Description

High-efficiency cooling system and method for blast furnace gas
Technical Field
The invention relates to the technical field of high-efficiency application of metallurgical coal gas in the steel industry, in particular to a high-efficiency cooling system and a high-efficiency cooling method for blast furnace coal gas.
Background
The blast furnace gas dust removal process of the iron and steel enterprises is divided into dry dust removal and wet dust removal, the large blast furnace gas dust removal process put into production in early stage in China basically adopts a wet dust removal mode, the wet dust removal process can lose part of gas excess pressure and heat energy, sewage ring water for gas washing is difficult to treat, small particles can be circulated and enriched in a sewage ring water treatment system, and finally discharged to cause secondary environmental pollution. With the improvement of the cloth bag technology in recent years, the problem that the cloth bag is easy to damage at the furnace top temperature of 180-300 ℃ is solved, and the dry dust removal becomes the first choice of the blast furnace gas dust removal mode of various large steel plants.
Compared with the wet method, the dry method dust removal method has the advantages that not only can the pressure energy of blast furnace gas be fully utilized, but also the sensible heat of the gas is fully utilized, so that the energy which can be recovered by the TRT device is greatly increased. However, the CCPP generator set matched with the original wet dust removal is designed according to the temperature of blast furnace gas after the wet dust removal at the beginning of design, and the temperature of the inlet gas is required to be about 35-40 ℃, particularly, in the early large CCPP generator set, for example, a saddle steel 300MW large CCPP generator set, the temperature of the inlet blast furnace gas is required to be not higher than 35 ℃, and the CCPP cannot run at full load to reduce the power generation.
Although the wet method for blast furnace gas dust removal is changed into the dry method, the TRT power generation can be improved, if the problem that the temperature of blast furnace gas is too high cannot be solved, the CCPP power generation is influenced, which is irrecoverable, and is also a main reason for restricting a plurality of iron and steel enterprises from being incapable of carrying out dry method modification on blast furnace gas. Therefore, it is necessary to study the temperature reduction of blast furnace gas under dry dedusting to meet the requirements of the subsequent CCPP operation.
CN107604116A discloses a blast furnace gas processing system and a processing method thereof, in the method, the temperature of the gas is controlled by a TRT power generation device, although the temperature of the gas can be controlled in a certain range, the temperature of the gas is controlled at the expense of power generation efficiency, which is irrecoverable, and there is a certain controversy. CN105950226A discloses a vertical gas spraying, cooling and dewatering integrated system, which utilizes water atomized water to spray and cool high-temperature gas, wash acid substances and salt, and rotate the gas containing mechanical water in a vertical gas dewatering device to remove mechanical water drops, but the pipeline spraying and cooling method is difficult to reduce the temperature of blast furnace gas to about 35-40 ℃. CN201525851U discloses a "gas cooling device for a blast furnace gas dry dedusting process", which sprays atomized cooling water into a pipeline through a double-medium atomizing nozzle installed on a blast furnace gas pipeline to cool the blast furnace gas, so that the blast furnace gas enters a dry deduster without burning filter materials in the deduster; but the device does not consider the requirements of subsequent gas users on the gas temperature.
In summary, the blast furnace gas cooling system and the method have some problems. The blast furnace gas cooling system and the blast furnace gas cooling method mainly reflect that when part of blast furnace gas produced by a blast furnace is at a high temperature for a long time, the blast furnace gas can not be effectively cooled to about 35 ℃ by the existing blast furnace gas cooling system and method after the original wet dust removal process is changed into the dry dust removal process, so that the temperature requirement of a CCPP (CCPP) generator set matched with the early wet dust removal process can be met. Therefore, it is necessary to find a more practical and effective high-efficiency blast furnace gas cooling system and method.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides a high-efficiency cooling system and a high-efficiency cooling method for blast furnace gas, aiming at the problem that part of blast furnace gas produced by a blast furnace is in a higher temperature range of 250-300 ℃ for a long time. The high-efficiency cooling of the blast furnace gas is realized, the requirement of a CCPP power generator set on the blast furnace gas temperature under the matching of an early wet dust removal process is met on the premise of not obviously increasing the circulating water amount, and the restriction bottleneck of changing the wet dust removal method into the dry dust removal method for the blast furnace gas in the steel industry is solved.
In order to achieve the purpose, the invention adopts the following technical scheme:
a high-efficiency cooling system for blast furnace gas comprises a furnace top spraying device, a dry dust removal device, a bypass spraying device, a dehumidifying device, a bypass pressure reducing valve bank, a gas cooling tower, a circulating water cooling tower and a circulating water pool;
the devices are connected through pipelines, a gas outlet of the blast furnace is connected with a furnace top spraying device, and the gas outlet of the furnace top spraying device is connected with an inlet of a dry dust removal device;
the coal gas outlet of the dry dust removal device is connected with the TRT power generation device and the inlet of the bypass spraying device, the outlet of the bypass spraying device is connected with the inlet of the dehumidification device, and the outlet of the dehumidification device is connected with the inlet of the bypass pressure reducing valve bank;
the dehumidifying device adopts an efficient membrane separation technology to dehumidify;
the gas outlet of the TRT power generation device and the bypass pressure reducing valve set is connected with the gas inlet of the gas cooling tower, and the gas outlet of the gas cooling tower is connected with the inlet of the CCPP power generation device;
the cooling water outlet of the gas cooling tower is connected with the inlet of the circulating water cooling tower, the outlet of the circulating water cooling tower is connected with the inlet of the circulating water pool, and the outlet of the circulating water pool is connected with the cooling water inlet of the gas cooling tower.
Also comprises a valve and a water pump.
The water pump is arranged on a connecting pipeline between the outlet of the circulating water tank and the cooling water inlet of the coal gas cooling tower.
A blast furnace gas efficient cooling method specifically comprises two operation states, namely a TRT power generation device operation state and a TRT power generation device stop operation state.
Under the operation state of the TRT power generation device:
1) the temperature of blast furnace gas generated in blast furnace smelting is generally above 220 ℃, and can change along with the fluctuation of the blast furnace condition, even the temperature of blast furnace top raw gas can be in the range of about 250-300 ℃ for a long time; the generated blast furnace gas enters a furnace top spraying device, if the temperature is higher than 180-200 ℃, spraying cooling is carried out, and sprayed fog drops absorb the sensible heat of the blast furnace gas and vaporize into water vapor so as to achieve the purpose of cooling the blast furnace gas; if the temperature is not higher than 180-200 ℃, the spraying cooling is not carried out; the water content of the blast furnace gas at the outlet of the furnace top spraying device after the temperature is reduced is 10g/Nm3~40g/Nm3
2) The furnace top spraying device ensures that the temperature of blast furnace gas is lower than 180-200 ℃ and enters the dry dust removal device to prevent the cloth bag filter material in the dry dust removal device from being burnt out due to overhigh temperature of the gas; the blast furnace gas enters a TRT power generation device after being dedusted by a dry dedusting device, the residual pressure and the waste heat are utilized for power generation, the temperature of the blast furnace gas after coming out of the TRT power generation device is generally in the range of 60-80 ℃, and the water content is 10g/Nm3~40g/Nm3The dew point temperature is lower than 35 ℃.
3) The blast furnace gas flows upwards from the bottom of the gas cooling tower and carries out countercurrent heat exchange with spray water on the upper part of the gas cooling tower, the blast furnace gas is cooled by utilizing sensible heat of the spray water, and the temperature of the gas is reduced to below 35 ℃ by controlling the water amount of the spray water.
4) The temperature of the spray water is raised to 30 ℃ after heat exchange, the spray water enters a circulating water cooling tower from a waterway outlet at the bottom of the gas cooling tower, is cooled to 25 ℃ through the cooling tower and flows into a circulating water pool, and then cooling water in the circulating water pool is circularly pumped into the gas cooling tower by a water pump to cool the blast furnace gas.
In the stop operation state of the TRT power generation device:
1) the temperature of blast furnace gas generated in blast furnace smelting is generally above 220 ℃; the generated blast furnace gas enters a furnace top spraying device, and if the temperature is higher than 180-200 ℃, spraying and cooling are carried out; if the temperature is not higher than 180-200 ℃, the spraying cooling is not carried out; content of outlet blast furnace gas after temperature reduction of furnace top spraying deviceThe water amount is 10g/Nm3~40g/Nm3
2) The furnace top spraying device ensures that the temperature of blast furnace gas is lower than 180-200 ℃ and enters a dry dust removal device; the blast furnace gas is dedusted by the dry dedusting device and enters the bypass spraying device for cooling, the sprayed and atomized water drops absorb the heat of the blast furnace gas and are vaporized into water vapor, and the blast furnace gas is cooled to be within the range of 100-120 ℃.
3) The water content of the blast furnace gas after temperature reduction is 50g/Nm3~90g/Nm3The pressure is about 230 Kp-240 Kp generally, and the corresponding dew point temperature is 59-72 ℃; if the blast furnace gas in the state directly enters the gas cooling tower to be cooled to 35 ℃ and can be cooled to below the dew point temperature of the blast furnace gas, most of the cold energy provided by the circulating water of the gas cooling tower is used for latent heat cold absorption of water by water vapor cooling, and the amount of the circulating water is expected to be increased by 25-90%; in order to ensure that the difference between the circulating water amount of the gas cooling tower in the operation state and the fault state of the TRT power generation device is not large, the blast furnace gas after being cooled by the bypass spray enters a dehumidifying device which adopts a membrane separation technology, when the blast furnace gas flows through one side of a high-molecular separation membrane, under the action of the pressure difference of the two sides of the membrane, water vapor enters the other side through the membrane to be discharged, and dry blast furnace gas is remained;
4) the process belongs to a gas membrane separation process, and the process utilizes the self pressure of blast furnace gas to operate without external energy. After passing through the dehumidification device, the water vapor removal efficiency of the blast furnace gas reaches over 90 percent, and the water content of the blast furnace gas is reduced to 5g/Nm3~9g/Nm3The pressure of the dehumidified blast furnace gas is reduced to 13 Kp-16 Kp by a bypass pressure reducing valve group, and the dew point temperature of the blast furnace gas is far lower than 35 ℃;
5) the blast furnace gas after dehumidification and pressure reduction flows upwards from the bottom of the gas cooling tower to perform countercurrent heat exchange with spray water on the upper part of the gas cooling tower, the blast furnace gas is cooled by utilizing sensible heat of the spray water, and the temperature of the gas is reduced to below 35 ℃ by controlling the water amount of the spray water.
6) The temperature of the spray water is raised to 30 ℃ after heat exchange, the spray water enters a circulating water cooling tower from a waterway outlet at the bottom of the gas cooling tower, is cooled to 25 ℃ through the cooling tower and flows into a circulating water pool, and then cooling water in the circulating water pool is circularly pumped into the gas cooling tower by a water pump to cool the blast furnace gas.
7) Along with the operation of the dehumidifying device, water vapor can be accumulated on the surface of a downstream side membrane after penetrating through the polymer separation membrane, so that the concentration polarization phenomenon is caused, the membrane separation efficiency is reduced, and the dehumidifying effect is reduced; therefore, accumulated water on the downstream side of the polymer separation membrane needs to be swept and separated in the operation process, the membrane separation water vapor removal efficiency is ensured to be over 90%, and a sweeping gas source can utilize blast furnace gas dehumidified by a dehumidification device; the water separated by purging is discharged through a drainer or can be returned to the circulating water pool as the water supplement.
Compared with the prior art, the invention has the beneficial effects that:
by using the TRT bypass spraying device and the dehumidifying device, the invention ensures that the blast furnace gas produced by the blast furnace is in a higher temperature range of 250-300 ℃ for a long time, and can also control the temperature and the moisture content of the gas entering the gas cooling tower when the TRT power generation device stops operating, and the temperature and the moisture content of the gas entering the gas cooling tower are not greatly different from those of the gas entering the gas cooling tower when the TRT power generation device operates; on the premise of not obviously increasing the circulating water quantity, the circulating water quantity of the gas cooling tower is ensured not to generate large fluctuation, the cooling effect of the gas cooling tower on the temperature of blast furnace gas to be reduced to 35 ℃ is also ensured, and the operation stability and reliability of the whole gas cooling system are improved.
Drawings
FIG. 1 is a schematic diagram of the structure and process of the present invention.
In the figure:
1. the system comprises a blast furnace, 2, a furnace top spraying device, 3, a dry dust removal device, 4, a TRT power generation device, 5, a bypass spraying device, 6, a dehumidification device, 7, a bypass pressure reducing valve bank, 8, a coal gas cooling tower, 9, a circulating water cooling tower, 10, a circulating water pool, 11, a CCPP power generation device, 12, a water pump, 13, 14, 15, 16 switch valves and 17 switch adjusting valves.
Detailed Description
The invention discloses a high-efficiency cooling system and a high-efficiency cooling method for blast furnace gas. Those skilled in the art can modify the process parameters appropriately to achieve the desired results with reference to the disclosure herein. It is expressly intended that all such similar substitutes and modifications which would be obvious to one skilled in the art are deemed to be included in the invention. While the methods and applications of this invention have been described in terms of preferred embodiments, it will be apparent to those of ordinary skill in the art that variations and modifications in the methods and applications described herein, as well as other suitable variations and combinations, may be made to implement and use the techniques of this invention without departing from the spirit and scope of the invention.
A blast furnace gas high-efficiency cooling system comprises a furnace top spraying device 2, a dry dust removal device 3, a bypass spraying device 5, a dehumidification device 6, a bypass pressure reducing valve bank 7, a gas cooling tower 8, a circulating water cooling tower 9, a circulating water pool 10, a water pump 12, switch valves 13, 14, 15 and 16 and a switch regulating valve 17.
Wherein the gas outlet of the blast furnace 1 is connected with the furnace top spraying device 2, the gas outlet of the furnace top spraying device 2 is connected with the inlet of the dry dust removal device 3, the gas outlet of the dry dust removal device 3 is connected with the inlets of the TRT power generation device 4 and the bypass spraying device 5, the outlet of the bypass spraying device 5 is connected with the inlet of the dehumidifying device 6, and the outlet of the dehumidifying device 6 is connected with the inlet of the bypass pressure reducing valve bank 7.
Meanwhile, the TRT power generation device 4 and the coal gas outlet of the bypass pressure reducing valve group 7 are connected with the coal gas inlet of the coal gas cooling tower 8, and the coal gas outlet of the coal gas cooling tower 8 is connected with the inlet of the CCPP power generation device 11; the cooling water outlet of the coal gas cooling tower 8 is connected with the inlet of a circulating water cooling tower 9, the outlet of the circulating water cooling tower 9 is connected with the inlet of a circulating water pool 10, and the outlet of the circulating water pool 10 is connected with the cooling water inlet of the coal gas cooling tower 8. A water pump 12 is arranged on a pipeline connecting the outlet of the circulating water pool 10 and the cooling water inlet of the coal gas cooling tower 8.
A switching valve 13 is arranged on a pipeline connecting the dry dust removal device 3 and the bypass spraying device 5, a switching valve 14 is arranged on a pipeline at the outlet of the bypass pressure reducing valve bank 7, a switching valve 15 is arranged on a pipeline connecting the dry dust removal device 3 and the TRT power generation device 4, a switching valve 16 is arranged on a pipeline at the outlet of the TRT power generation device 4, and a switching regulating valve 17 is arranged on a pipeline connecting the outlet of the dehumidification device 6 and the inlet of the bypass pressure reducing valve bank 7.
Example 1:
a blast furnace gas high-efficiency cooling method is characterized in that in the running state of a TRT power generation device:
in the TRT power plant operating state, the on-off valves 15, 16 are in the open state, and the on-off valves 13, 14 and the on-off regulating valve 17 are in the closed state.
The temperature of blast furnace gas generated in a blast furnace 1 is 280 ℃, the blast furnace gas enters a furnace top spraying device 2, the furnace top spraying device 2 sprays and atomizes water with the temperature of 25 ℃, sprayed fog drops absorb the sensible heat of the blast furnace gas and are vaporized into water vapor to achieve the purpose of cooling the blast furnace gas, the temperature of the blast furnace gas is reduced to 200 ℃, and the water content of the blast furnace gas at the outlet of the furnace top spraying device 2 is 38.7g/Nm3Left and right.
The blast furnace gas after temperature reduction is dedusted by a dry dedusting device 3 and then enters a TRT power generation device 4, the residual pressure and the waste heat are utilized for power generation, the temperature of the blast furnace gas after coming out of the TRT power generation device 4 is 75 ℃, and the water content is 38.7g/Nm3The pressure was 16Kp and the dew point temperature was 34 ℃.
Blast furnace gas at 75 ℃ flows upwards from the bottom of the gas cooling tower 8 and carries out countercurrent heat exchange with spray water on the upper part of the gas cooling tower 8, the blast furnace gas is cooled by utilizing sensible heat of the spray water, the outlet temperature of the blast furnace gas is reduced to about 35 ℃ by controlling the water amount of the spray water, and the cooled blast furnace gas is supplied to the CCPP power generation device 11 for power generation.
The temperature of spray water in the gas cooling tower 8 is 25 ℃, the temperature of the spray water is raised to 30 ℃ after heat exchange, the spray water enters a circulating water cooling tower 9 from a water channel at the bottom of the gas cooling tower 8, the spray water is cooled to 25 ℃ through the cooling tower and flows into a circulating water pool 10, and cooling water in the circulating water pool 10 circularly enters the gas cooling tower 8 through a water pump 12 to cool blast furnace gas.
Example 2:
a blast furnace gas high-efficiency cooling method is characterized in that when a TRT power generation device stops operating:
in the TRT power plant shutdown state, the on-off valves 13 and 14 and the on-off regulating valve 17 are in the open state, and the on-off valves 15 and 16 are in the closed state.
The temperature of blast furnace gas generated in a blast furnace 1 is 280 ℃, the blast furnace gas enters a furnace top spraying device 2, the furnace top spraying device 2 sprays and atomizes water with the temperature of 25 ℃, sprayed fog drops absorb the sensible heat of the blast furnace gas and are vaporized into water vapor to achieve the purpose of cooling the blast furnace gas, the temperature of the blast furnace gas is reduced to 200 ℃, and the water content of the blast furnace gas at the outlet of the furnace top spraying device 2 is 38.7g/Nm3Left and right.
Then, the blast furnace gas is dedusted by a dry dedusting device 3 and enters a bypass spraying device 5 for secondary cooling, the sprayed and atomized water drops absorb the heat of the blast furnace gas and are vaporized into steam, and the temperature of the blast furnace gas is reduced to 110 ℃; the water content of the blast furnace gas after temperature reduction is 88g/Nm3The pressure was about 235Kp, corresponding to a dew point temperature of about 71 ℃.
The cooled gas enters a dehumidifying device 6, the blast furnace gas flows through one side of a high-molecular separation membrane by virtue of self pressure, water vapor enters the other side of the membrane to be discharged under the action of pressure difference between the two sides of the membrane, the removing efficiency reaches over 90 percent, and the water content of the blast furnace gas is reduced to 8.8g/Nm3Left and right.
In the dehumidifying device 6, a small amount of dehumidified blast furnace gas is led back to be used as a gas source for sweeping and separating accumulated water on the downstream side of the polymer separation membrane through a switch regulating valve 17, and the separated water is discharged; the pressure of the dehumidified blast furnace gas is reduced to 15Kp by a bypass pressure reducing valve bank 7, and the dew point temperature of the blast furnace gas is far lower than 35 ℃.
Then, the blast furnace gas flows upwards from the bottom of the gas cooling tower 8 and carries out countercurrent heat exchange with spray water on the upper part of the gas cooling tower 8, the blast furnace gas is cooled by utilizing sensible heat of the spray water, the temperature of the blast furnace gas is reduced to be below 35 ℃, and the cooled blast furnace gas is supplied to a CCPP power generation device 11 for power generation.
The temperature of the spray water is 25 ℃, the temperature of the spray water is raised to 30 ℃ after heat exchange, the spray water enters a circulating water cooling tower 9 from a water channel at the bottom of the gas cooling tower 8, the spray water is cooled to 25 ℃ through the cooling tower and flows into a circulating water pool 10, and cooling water in the circulating water pool 10 circularly enters the gas cooling tower 8 through a water pump 12 to circularly cool the blast furnace gas.
According to the invention, through the use of the TRT bypass spraying device and the dehumidifying device, the temperature and the moisture content of the coal gas entering the coal gas cooling tower in the state that the TRT power generation device stops operating are controlled, and the difference between the temperature and the moisture content of the coal gas entering the coal gas cooling tower in the state that the TRT power generation device operates is not large; the circulating water quantity of the gas cooling tower is ensured not to fluctuate greatly, the cooling effect of the gas cooling tower on the temperature of blast furnace gas to be reduced to 35 ℃ is also ensured, and the operation stability and reliability of the whole gas cooling system are improved.
The invention solves the problem that the blast furnace gas temperature is not matched with the requirement of the CCPP power generation device after the blast furnace gas wet dust removal is changed into the dry dust removal, realizes the cooling of the blast furnace gas to 35 ℃, and ensures the requirement of the CCPP power generation device on the blast furnace gas temperature.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (7)

1. A high-efficiency cooling system for blast furnace gas is characterized by comprising a furnace top spraying device, a dry dust removal device, a bypass spraying device, a dehumidification device, a bypass pressure reducing valve bank, a gas cooling tower, a circulating water cooling tower and a circulating water pool;
the devices are connected through pipelines, a gas outlet of the blast furnace is connected with a furnace top spraying device, and the gas outlet of the furnace top spraying device is connected with an inlet of a dry dust removal device;
the coal gas outlet of the dry dust removal device is connected with the TRT power generation device and the inlet of the bypass spraying device, the outlet of the bypass spraying device is connected with the inlet of the dehumidification device, and the outlet of the dehumidification device is connected with the inlet of the bypass pressure reducing valve bank;
the gas outlet of the TRT power generation device and the bypass pressure reducing valve set is connected with the gas inlet of the gas cooling tower, and the gas outlet of the gas cooling tower is connected with the inlet of the CCPP power generation device;
the cooling water outlet of the gas cooling tower is connected with the inlet of the circulating water cooling tower, the outlet of the circulating water cooling tower is connected with the inlet of the circulating water pool, and the outlet of the circulating water pool is connected with the cooling water inlet of the gas cooling tower.
2. The blast furnace gas high-efficiency cooling system according to claim 1, further comprising a valve and a water pump.
3. The blast furnace gas high-efficiency cooling system according to claim 2, wherein the water pump is installed on a connecting pipeline between an outlet of the circulating water pond and a cooling water inlet of the gas cooling tower.
4. The blast furnace gas high-efficiency cooling method based on the blast furnace gas high-efficiency cooling system of claim 1 is characterized by comprising the operation state of a TRT power generation device;
in the operation state of the TRT power generation device:
1) blast furnace gas generated in blast furnace smelting and with the temperature higher than 180-200 ℃ is sent into a furnace top spraying device for spraying and cooling, and the water content of the blast furnace gas after cooling is controlled at 10g/Nm3~40g/Nm3
2) The blast furnace gas temperature lower than 180-200 ℃ after being cooled by spraying enters a dry dust removal device, the blast furnace gas after being dedusted by the dry dust removal device enters a TRT power generation device, the residual pressure and the waste heat are utilized for power generation, the blast furnace gas temperature after coming out of the TRT power generation device is in the range of 60-80 ℃, the water content is 10g/Nm3~40g/Nm3The dew point temperature is lower than 35 ℃;
3) the blast furnace gas flows upwards from the bottom of the gas cooling tower and carries out countercurrent heat exchange with spray water on the upper part of the gas cooling tower, the blast furnace gas is cooled by utilizing sensible heat of the spray water, and the temperature of the gas is reduced to below 35 ℃ by controlling the water amount of the spray water.
5. The method for efficiently cooling blast furnace gas according to claim 4, wherein in the operating state of the TRT power generation plant:
after heat exchange, the temperature of spray water is raised to 30 ℃, the spray water enters a circulating water cooling tower from a waterway outlet at the bottom of the gas cooling tower, is cooled to 25 ℃ by the cooling tower and flows into a circulating water pool, and then cooling water in the circulating water pool is circularly pumped into the gas cooling tower by a water pump to cool blast furnace gas.
6. The blast furnace gas high-efficiency cooling method according to claim 4, further comprising a TRT power generation device stop state;
in the stop operation state of the TRT power generation device:
1) blast furnace gas generated in blast furnace smelting and with the temperature higher than 180-200 ℃ is sent into a furnace top spraying device for spraying and cooling, and the water content of the blast furnace gas after cooling is controlled at 10g/Nm3~40g/Nm3
2) The blast furnace gas with the temperature lower than 180-200 ℃ after being cooled by spraying enters a dry dust removal device, the blast furnace gas after being removed dust by the dry dust removal device enters a bypass pressure reducing valve group for pressure reduction, then enters a bypass spraying device for temperature reduction, and sprayed and atomized water drops absorb the heat of the blast furnace gas and are vaporized into water vapor to cool the blast furnace gas to the range of 100-120 ℃;
3) the water content of the blast furnace gas after temperature reduction is 50g/Nm3~90g/Nm3The pressure is 230 Kp-240 Kp, and the corresponding dew point temperature is 59-72 ℃; the blast furnace gas after the bypass spray cooling enters a dehumidifying device, the dehumidifying device adopts a membrane separation technology, when the blast furnace gas flows through one side of a high-molecular separation membrane, water vapor enters the other side through the membrane to be discharged under the action of pressure difference between the two sides of the membrane, and dry blast furnace gas is left;
4) after passing through the dehumidification device, the water vapor removal efficiency of the blast furnace gas reaches over 90 percent, and the water content of the blast furnace gas is reduced to 5g/Nm3~9g/Nm3Reducing the pressure of the dehumidified blast furnace gas to 13 Kp-16 Kp by a bypass pressure reducing valve group, wherein the dew point temperature of the blast furnace gas is lower than 35 ℃;
5) the blast furnace gas after dehumidification and pressure reduction flows upwards from the bottom of the gas cooling tower to perform countercurrent heat exchange with spray water on the upper part of the gas cooling tower, the blast furnace gas is cooled by utilizing sensible heat of the spray water, and the temperature of the gas is reduced to below 35 ℃ by controlling the water amount of the spray water;
6) in the operation process, the blast furnace gas dehumidified by the dehumidifying device is used as a purging gas source to purge and separate accumulated water on the downstream side of the polymer separation membrane, and the purged and separated water is discharged through a drainer or flows back to a circulating water pool to serve as water supplement.
7. The method for efficiently cooling blast furnace gas according to claim 6, wherein in a state where the TRT power generation plant is not in operation: the temperature of spray water is raised to 30 ℃ after heat exchange, the spray water enters a circulating water cooling tower from a waterway outlet at the bottom of the gas cooling tower, is cooled to 25 ℃ through the cooling tower and flows into a circulating water pool, and then cooling water in the circulating water pool is circularly pumped into the gas cooling tower by a water pump to cool blast furnace gas.
CN202110014535.4A 2021-01-06 2021-01-06 High-efficiency cooling system and method for blast furnace gas Active CN112853015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110014535.4A CN112853015B (en) 2021-01-06 2021-01-06 High-efficiency cooling system and method for blast furnace gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110014535.4A CN112853015B (en) 2021-01-06 2021-01-06 High-efficiency cooling system and method for blast furnace gas

Publications (2)

Publication Number Publication Date
CN112853015A true CN112853015A (en) 2021-05-28
CN112853015B CN112853015B (en) 2022-11-18

Family

ID=76004404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110014535.4A Active CN112853015B (en) 2021-01-06 2021-01-06 High-efficiency cooling system and method for blast furnace gas

Country Status (1)

Country Link
CN (1) CN112853015B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004149831A (en) * 2002-10-29 2004-05-27 Jfe Steel Kk Method for collecting dust in blast furnace gas
CN101074453A (en) * 2006-09-13 2007-11-21 童裳慧 Efficient economical dust collecting method and dust collector for iron-smelting blast furnace
CN101603107A (en) * 2009-07-14 2009-12-16 河北省首钢迁安钢铁有限责任公司 Remove the system and the technology thereof of corrosive deposit in the iron-smelting blast furnace dry method dust coal gas
CN202465752U (en) * 2012-02-29 2012-10-03 中冶赛迪工程技术股份有限公司 Dry process dust removing device of blast furnace gas
CN103205516A (en) * 2013-04-03 2013-07-17 河北省首钢迁安钢铁有限责任公司 Method and device for desalting blast furnace gas
CN203295518U (en) * 2013-06-08 2013-11-20 佰利天控制设备(北京)有限公司 Blast-furnace gas centralized processing system and iron making blast furnace with same
CN203668429U (en) * 2013-09-14 2014-06-25 上海梅山钢铁股份有限公司 Pressure, vibration and noise reduction device for high coal pipe network of large blast furnace
CN107385130A (en) * 2017-07-17 2017-11-24 常州大学 A kind of blast furnace gas purification technique
CN208406508U (en) * 2018-05-14 2019-01-22 苏州百润环保设备有限公司 A kind of efficiency of waste gas condensing unit

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004149831A (en) * 2002-10-29 2004-05-27 Jfe Steel Kk Method for collecting dust in blast furnace gas
CN101074453A (en) * 2006-09-13 2007-11-21 童裳慧 Efficient economical dust collecting method and dust collector for iron-smelting blast furnace
CN101603107A (en) * 2009-07-14 2009-12-16 河北省首钢迁安钢铁有限责任公司 Remove the system and the technology thereof of corrosive deposit in the iron-smelting blast furnace dry method dust coal gas
CN202465752U (en) * 2012-02-29 2012-10-03 中冶赛迪工程技术股份有限公司 Dry process dust removing device of blast furnace gas
CN103205516A (en) * 2013-04-03 2013-07-17 河北省首钢迁安钢铁有限责任公司 Method and device for desalting blast furnace gas
CN203295518U (en) * 2013-06-08 2013-11-20 佰利天控制设备(北京)有限公司 Blast-furnace gas centralized processing system and iron making blast furnace with same
CN203668429U (en) * 2013-09-14 2014-06-25 上海梅山钢铁股份有限公司 Pressure, vibration and noise reduction device for high coal pipe network of large blast furnace
CN107385130A (en) * 2017-07-17 2017-11-24 常州大学 A kind of blast furnace gas purification technique
CN208406508U (en) * 2018-05-14 2019-01-22 苏州百润环保设备有限公司 A kind of efficiency of waste gas condensing unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李鹏 等: "高炉干式除尘喷水(碱液)降温系统", 《钢铁研究》 *

Also Published As

Publication number Publication date
CN112853015B (en) 2022-11-18

Similar Documents

Publication Publication Date Title
CN101579602B (en) Energy-saving and high-quality ammonia desulphurization process for ammonia sulfate recovery
CN107032428B (en) System and method for zero emission treatment of undersaturated flue gas concentration crystallization desulfurization wastewater
CN112831622B (en) Blast furnace gas cooling and dechlorinating system and method
CN101700463A (en) Method for desulfurating and denitrating and recovering sulfur resource in closed cycle way
CN105668669B (en) A kind of power plant desulfurization wastewater treatment system and technique
CN109020031B (en) Evaporation concentration system based on thermal compression
CN107098414B (en) Low-temperature evaporation device for treating desulfurization wastewater discharge of power plant and discharge process thereof
CN206823510U (en) One kind CO suitable for cement kiln flue gas2The change system continuously trapped
CN107115776A (en) One kind CO suitable for cement kiln flue gas2The change system continuously trapped
CN111072091A (en) System and method for treating desulfurization wastewater by using flue gas waste heat
CN110585883A (en) Sodium method flue gas desulfurization and dust removal treatment device and process with zero wastewater discharge
CN112853015B (en) High-efficiency cooling system and method for blast furnace gas
CN205156423U (en) Exhaust purification and waste heat recovery use multipurposely system
CN205796959U (en) A kind of synthesis gas acid gas separates and sulfur recovery integrated apparatus
CN110526318B (en) Comprehensive utilization method and system for energy of smoke whitening coupling sea water desalination
CN106039941A (en) Method used for desulphurization and denitration closed cycle and sulfur resource recovery
CN112831621B (en) Blast furnace gas cooling system and cooling control method
CN208742284U (en) A kind of single column washing Wet fume sweetening dust remover of no stock tank secondary cycle
CN115419907A (en) Waste heat recovery takes off white clean system
CN115893559A (en) Desulfurization wastewater zero-discharge system and desulfurization wastewater zero-discharge process
CN112853016B (en) Blast furnace gas treatment system and method suitable for CCPP operation
CN208151318U (en) A kind of gas wet desulfurizer
CN206901809U (en) A kind of desulfurization wastewater fume afterheat concentrates abatement system
CN111499064A (en) System and method for zero discharge of desulfurization wastewater by carrier gas extraction and bypass flue evaporation
CN103436301A (en) Combined dust removal and desulfurization system for coal gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant