CN112828508B - Positioning tool for water nozzle of feed hopper - Google Patents
Positioning tool for water nozzle of feed hopper Download PDFInfo
- Publication number
- CN112828508B CN112828508B CN202011598646.6A CN202011598646A CN112828508B CN 112828508 B CN112828508 B CN 112828508B CN 202011598646 A CN202011598646 A CN 202011598646A CN 112828508 B CN112828508 B CN 112828508B
- Authority
- CN
- China
- Prior art keywords
- water pipe
- water
- positioning mechanism
- bottom plate
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 166
- 238000003825 pressing Methods 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 8
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 238000009434 installation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000006057 Non-nutritive feed additive Substances 0.000 description 1
- 241000405070 Percophidae Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Domestic Plumbing Installations (AREA)
- Arc Welding In General (AREA)
Abstract
The invention discloses a feeding hopper water nozzle positioning tool, wherein a limit baffle is arranged at one end of a bottom plate, two positioners are fixed on the bottom plate and are composed of a water pipe positioning mechanism and a water nozzle positioning mechanism, the water pipe positioning mechanism is composed of two wedge-shaped structures fixed on the bottom plate, inclined planes of the two wedge-shaped structures are oppositely arranged, a gap for enabling the bottom surface of a water pipe to contact the bottom plate is arranged in the middle of the inclined planes of the two wedge-shaped structures, the center line of the water pipe positioning mechanism is on a straight line, the water nozzle positioning mechanism is of a V-shaped structure, and a slot for being obliquely inserted into the water pipe positioning mechanism from the side face is arranged in the center of the water nozzle positioning mechanism. The invention has the advantages of simple structure, reliable positioning of the two water nozzles, simple use and easy hand-up, and can ensure that the axes of the water nozzles are intersected with and vertical to the axes of the water pipes.
Description
Technical Field
The present invention relates to generating a processing aid.
Background
The agricultural water tank equipment is generally provided with a pipeline, a water nozzle is required to be welded on the pipeline, the short pipe is welded on the side face of the pipeline, then when the pipeline wall in the short pipe is perforated, the pipeline is communicated with the water nozzle, and the water nozzle is flattened to be in a duckbill shape by combination to form a water nozzle structure. At present, a company has a product that two parallel water nozzles are arranged on an L-shaped water pipe, but an included angle exists between the water nozzle and the bending part of the water pipe, and when the water nozzle is arranged, the axis of the water nozzle is required to be intersected with and perpendicular to the axis of the water pipe, so that the installation and positioning work is challenged.
Disclosure of Invention
The invention aims to solve the technical problem of realizing a water nozzle installation and positioning tool.
In order to achieve the above purpose, the technical scheme adopted by the invention is as follows: the utility model provides a feeder hopper water injection well choke location frock, bottom plate one end is equipped with limit baffle, be fixed with two locators on the bottom plate, two the locator comprises water pipe positioning mechanism and water injection well choke positioning mechanism, water pipe positioning mechanism comprises two wedge structures of fixing on the bottom plate, two wedge structure inclined planes set up in opposite directions and the centre is equipped with the clearance that the delivery pipe bottom surface contacted the bottom plate, water pipe positioning mechanism central line is on a straight line, water injection well choke positioning mechanism is V-arrangement structure, water injection well choke positioning mechanism center is equipped with the slot that is used for inserting to water pipe positioning mechanism on the side to one side.
The water pipe fixing device is characterized in that 1-3 water pipe fixing devices are fixed on the bottom plate, each water pipe fixing device comprises a base fixed on the bottom plate, a pressing block is fixed on the base through a rotating shaft, an arc-shaped groove used for clamping a water pipe is formed in the lower surface of each pressing block, and a buckle used for fixing a pressing rod is fixed on the bottom plate.
The pressing block is made of rubber.
The application method of the feed hopper water nozzle positioning tool comprises the steps of placing an L-shaped water pipe on a bottom plate, enabling the end part of the water pipe to contact with a limiting baffle plate, placing a pipe body on two positioners, positioning the water pipe by a water pipe positioning mechanism, placing two water nozzles to be welded on the positioners, enabling one end of the water nozzle to contact with the water pipe, positioning the two sides of the water nozzle by the water nozzle positioning mechanism, and locally spot-welding the water nozzle and the water pipe by a welding machine.
After the water pipe is placed on the bottom plate, the pressing rod is pressed down and fixed on the clamping buckle, and the water pipe is fixed by the water pipe fixer.
After the water nozzle and the water pipe are locally spot-welded, the water pipe is taken down, and the water nozzle and the water pipe are welded for one circle in contact.
The invention has the advantages of simple structure, reliable positioning of the two water nozzles, simple use and easy hand-up, and can ensure that the axes of the water nozzles are intersected with and vertical to the axes of the water pipes.
Drawings
The contents of each drawing in the specification of the present invention are briefly described as follows:
FIG. 1 is a top view of a feed hopper water nozzle positioning tool;
FIG. 2 is a side view of a feed hopper water nozzle positioning tool;
FIG. 3 is a schematic view of a water pipe positioning mechanism;
FIG. 4 is a schematic view of a water nozzle positioning mechanism;
FIG. 5 is a schematic view of a water tube holder;
the labels in the above figures are: 1. a bottom plate; 2. a limit baffle; 3. a positioner; 4. a water pipe positioning mechanism; 5. a water nozzle positioning mechanism; 6. a tube placing groove; 7. a slot; 8. a base; 9. a compression bar; 10. briquetting; 11. and (5) a buckle.
Detailed Description
The following detailed description of the embodiments of the invention, such as the shape and construction of the components, the mutual positions and connection relationships between the components, the roles and working principles of the components, the manufacturing process and the operating and using method, etc., is provided to assist those skilled in the art in a more complete, accurate and thorough understanding of the inventive concept and technical solution of the present invention.
As shown in fig. 1, the feed hopper water nozzle positioning tool is provided with a strip-shaped bottom plate 1, the bottom plate 1 is of a flat plate structure, a limit baffle 2 is fixed at one end of the bottom plate 1 and used for determining the position of the end part of a water pipe for positioning, and two positioners 3 are fixed on the bottom plate 1 corresponding to two positions of the water nozzle to be welded on the water pipe.
As shown in fig. 2, the positioner 3 is composed of a water pipe positioning mechanism 4 and a water nozzle positioning mechanism 5, the water pipe positioning mechanism 4 is composed of two wedge structures fixed on the bottom plate 1, the inclined angles of the wedge structures are the same as the inclined angles required to be installed, the inclined planes of the wedge structures are opposite, the middle is provided with a gap for the bottom surface of a water supply pipe to contact the bottom plate 1, namely a pipe placing groove 6, the center line of the water pipe positioning mechanism 4 is on a straight line, thus when the water pipe is placed on the bottom plate 1, the bottom surface is completely contacted with the bottom plate 1, one end of the water pipe contacts with the limiting baffle 2, and the two sides of the water pipe contacted by the wedge structures are used for positioning the water pipe.
The water nozzle positioning mechanism 5 is of a V-shaped structure, the center of the water nozzle positioning mechanism 5 is provided with a slot 7 used for being obliquely inserted into the water pipe positioning mechanism 4 from the side face, and the inclination angle of the water nozzle positioning mechanism 5 relative to the bottom plate 1 is perpendicular to the inclined plane of the wedge-shaped structure, so that when the water pipe is placed in the positioner 3, only the water nozzle (a short pipe with the same pipe diameter as the water pipe) is placed in the water nozzle positioning mechanism 5, the inclination angle of the water nozzle can be ensured to be completely consistent, and the central line of the water nozzle is necessarily perpendicular to and intersected with the central line of the water pipe.
When the welding machine is used, the L-shaped water pipe is placed on the bottom plate 1, the contact surface between the L-shaped water pipe and the bottom plate 1 is L-shaped, the end part of the water pipe is in contact with the limit baffle 2, the pipe body is placed on the two positioners 3, the water pipe is positioned by the water pipe positioning mechanism 4, two water nozzles needing to be welded are placed on the positioners 3, one ends of the water nozzles are in contact with the water pipe, the two sides are positioned by the water nozzle positioning mechanism 5, the water nozzles and the water pipe are locally spot-welded by the welding machine, the positioning of the water pipe and the water nozzles can be realized, the water pipe is taken down again, the water nozzle can be fixed on the water pipe, and one circle of the water nozzle in contact with the water pipe is welded.
In order to guarantee the reliability of water pipe location, be fixed with 1-3 water pipe fixer on the bottom plate 1, water pipe fixer is equipped with base 8 and buckle 11 that are located the water pipe both sides respectively, base 8 and buckle 11 are all fixed on bottom plate 1, be fixed with briquetting 10 through the pivot on the base 8, briquetting 10 lower surface is equipped with the arc recess that is used for blocking the water pipe, briquetting 10 is the rubber material preferentially, buckle 11 can lock depression bar 9, put the water pipe on bottom plate 1 after, push down depression bar 9 and fix on buckle 11, use water pipe fixer fixed water pipe, then can guarantee welding process, the reliability of water pipe position, guarantee the welding accuracy and reliability.
While the invention has been described above with reference to the accompanying drawings, it will be apparent that the invention is not limited to the above embodiments, but is capable of being modified or applied directly to other applications without modification, as long as various insubstantial modifications of the method concept and technical solution of the invention are adopted, all within the scope of the invention.
Claims (6)
1. Feeder hopper water injection well choke location frock, its characterized in that: a limit baffle is arranged at one end of the bottom plate, two positioners are fixed on the bottom plate and are composed of a water pipe positioning mechanism and a water nozzle positioning mechanism, the water pipe positioning mechanism is composed of two wedge-shaped structures fixed on the bottom plate, inclined planes of the two wedge-shaped structures are arranged in opposite directions, a gap for the bottom surface of a water supply pipe to contact the bottom plate is arranged in the middle of the inclined planes of the two wedge-shaped structures, the center line of the water pipe positioning mechanism is on a straight line, the water nozzle positioning mechanism is of a V-shaped structure, and a slot for being obliquely inserted into the water pipe positioning mechanism from the side face is arranged in the center of the water nozzle positioning mechanism;
when the welding machine is used, the L-shaped water pipe is placed on the bottom plate, the contact surface between the L-shaped water pipe and the bottom plate is L-shaped, the end part of the water pipe is contacted with the limiting baffle, the pipe body is placed on the two positioners, the water pipe is positioned by the water pipe positioning mechanism, two water nozzles needing to be welded are placed on the positioners, one ends of the water nozzles are contacted with the water pipe, the two sides of the water nozzles are positioned by the water nozzle positioning mechanism, and the water nozzles and the water pipe are locally spot welded by the welding machine.
2. The feed hopper tap positioning tooling of claim 1, wherein: the water pipe fixing device is characterized in that 1-3 water pipe fixing devices are fixed on the bottom plate, each water pipe fixing device comprises a base fixed on the bottom plate, a pressing block is fixed on the base through a rotating shaft, an arc-shaped groove used for clamping a water pipe is formed in the lower surface of each pressing block, and a buckle used for fixing a pressing rod is fixed on the bottom plate.
3. The feed hopper tap positioning tooling of claim 2, wherein: the pressing block is made of rubber.
4. The use method of the feed hopper water nozzle positioning tool based on claim 3 is characterized in that: the L-shaped water pipe is placed on the bottom plate, the end part of the water pipe is contacted with the limiting baffle, the pipe body is placed on the two positioners, the water pipe is positioned by the water pipe positioning mechanism, two water nozzles needing to be welded are placed on the positioners, one ends of the water nozzles are contacted with the water pipe, the two sides of the water nozzles are positioned by the water nozzle positioning mechanism, and the water nozzles and the water pipe are locally spot-welded by the welding machine.
5. The method of claim 4, wherein the step of: after the water pipe is placed on the bottom plate, the pressing rod is pressed down and fixed on the clamping buckle, and the water pipe is fixed by the water pipe fixer.
6. The method for using the feed hopper water nozzle positioning tool according to claim 4 or 5, wherein the method comprises the following steps: after the water nozzle and the water pipe are locally spot-welded, the water pipe is taken down, and the water nozzle and the water pipe are welded for one circle in contact.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011598646.6A CN112828508B (en) | 2020-12-30 | 2020-12-30 | Positioning tool for water nozzle of feed hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011598646.6A CN112828508B (en) | 2020-12-30 | 2020-12-30 | Positioning tool for water nozzle of feed hopper |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112828508A CN112828508A (en) | 2021-05-25 |
CN112828508B true CN112828508B (en) | 2023-11-14 |
Family
ID=75925277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011598646.6A Active CN112828508B (en) | 2020-12-30 | 2020-12-30 | Positioning tool for water nozzle of feed hopper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112828508B (en) |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205037538U (en) * | 2015-08-18 | 2016-02-17 | 合肥天物金佰包装制品有限公司 | EPS water collector water injection well choke location structure |
CN206373534U (en) * | 2016-12-07 | 2017-08-04 | 绍兴讯飞自动化设备有限公司 | The welding fixture of sanitary bath equipment connecting pipe |
CN207171371U (en) * | 2017-09-11 | 2018-04-03 | 江苏华阳管业股份有限公司 | A kind of pipe fitting welding positioning tool |
CN207873483U (en) * | 2017-12-28 | 2018-09-18 | 上海中船三井造船柴油机有限公司 | A kind of positioning device for flange and steel pipe branch pipe welding |
CN208117138U (en) * | 2018-03-19 | 2018-11-20 | 嘉兴压力容器厂 | Gas tank assembly welding fixture |
CN208680873U (en) * | 2018-08-24 | 2019-04-02 | 嘉兴市富莱德汽车零部件制造有限公司 | A kind of positioning tool of bonding machine |
CN208880568U (en) * | 2018-11-02 | 2019-05-21 | 无锡市五星弹性元件厂 | The assembly tooling of air inlet tube |
CN208977178U (en) * | 2018-11-02 | 2019-06-14 | 无锡市五星弹性元件厂 | The erection welding tooling of cooler for recycled exhaust gas air inlet pipe |
CN209598572U (en) * | 2019-02-28 | 2019-11-08 | 江苏曼格尼特磁电有限公司 | A kind of catch magnetism welding positioning tool |
CN110549054A (en) * | 2019-09-26 | 2019-12-10 | 贵州永红航空机械有限责任公司 | Positioning welding device and method for oil suction nozzle of lubricating oil tank |
CN209927594U (en) * | 2019-04-01 | 2020-01-10 | 同济大学 | Experiment table device for inclined loading of thin pipe structure |
CN110977277A (en) * | 2019-10-31 | 2020-04-10 | 中国航发南方工业有限公司 | Arc-shaped pipeline adapter welding positioning device and welding positioning method |
CN210937916U (en) * | 2019-07-04 | 2020-07-07 | 宁波奥克斯电气股份有限公司 | Copper pipe welding orientation device |
CN211331956U (en) * | 2019-11-26 | 2020-08-25 | 黑龙江北鸥卫浴用品有限公司 | Tubular water injection well choke welding frock clamp |
CN211488908U (en) * | 2019-08-28 | 2020-09-15 | 黄石惠晶显示科技有限公司 | Novel shower water test device |
CN211614762U (en) * | 2020-01-17 | 2020-10-02 | 北京中煤建机电设备有限公司 | Engine outlet pipe welding jig |
CN212169869U (en) * | 2020-05-20 | 2020-12-18 | 绵阳天和机械制造有限公司 | Special connector shell inner hole chamfering tool |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI421135B (en) * | 2011-04-28 | 2014-01-01 | China Steel Corp | Precise positioning method and auxiliary device of welding nozzle |
-
2020
- 2020-12-30 CN CN202011598646.6A patent/CN112828508B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205037538U (en) * | 2015-08-18 | 2016-02-17 | 合肥天物金佰包装制品有限公司 | EPS water collector water injection well choke location structure |
CN206373534U (en) * | 2016-12-07 | 2017-08-04 | 绍兴讯飞自动化设备有限公司 | The welding fixture of sanitary bath equipment connecting pipe |
CN207171371U (en) * | 2017-09-11 | 2018-04-03 | 江苏华阳管业股份有限公司 | A kind of pipe fitting welding positioning tool |
CN207873483U (en) * | 2017-12-28 | 2018-09-18 | 上海中船三井造船柴油机有限公司 | A kind of positioning device for flange and steel pipe branch pipe welding |
CN208117138U (en) * | 2018-03-19 | 2018-11-20 | 嘉兴压力容器厂 | Gas tank assembly welding fixture |
CN208680873U (en) * | 2018-08-24 | 2019-04-02 | 嘉兴市富莱德汽车零部件制造有限公司 | A kind of positioning tool of bonding machine |
CN208880568U (en) * | 2018-11-02 | 2019-05-21 | 无锡市五星弹性元件厂 | The assembly tooling of air inlet tube |
CN208977178U (en) * | 2018-11-02 | 2019-06-14 | 无锡市五星弹性元件厂 | The erection welding tooling of cooler for recycled exhaust gas air inlet pipe |
CN209598572U (en) * | 2019-02-28 | 2019-11-08 | 江苏曼格尼特磁电有限公司 | A kind of catch magnetism welding positioning tool |
CN209927594U (en) * | 2019-04-01 | 2020-01-10 | 同济大学 | Experiment table device for inclined loading of thin pipe structure |
CN210937916U (en) * | 2019-07-04 | 2020-07-07 | 宁波奥克斯电气股份有限公司 | Copper pipe welding orientation device |
CN211488908U (en) * | 2019-08-28 | 2020-09-15 | 黄石惠晶显示科技有限公司 | Novel shower water test device |
CN110549054A (en) * | 2019-09-26 | 2019-12-10 | 贵州永红航空机械有限责任公司 | Positioning welding device and method for oil suction nozzle of lubricating oil tank |
CN110977277A (en) * | 2019-10-31 | 2020-04-10 | 中国航发南方工业有限公司 | Arc-shaped pipeline adapter welding positioning device and welding positioning method |
CN211331956U (en) * | 2019-11-26 | 2020-08-25 | 黑龙江北鸥卫浴用品有限公司 | Tubular water injection well choke welding frock clamp |
CN211614762U (en) * | 2020-01-17 | 2020-10-02 | 北京中煤建机电设备有限公司 | Engine outlet pipe welding jig |
CN212169869U (en) * | 2020-05-20 | 2020-12-18 | 绵阳天和机械制造有限公司 | Special connector shell inner hole chamfering tool |
Also Published As
Publication number | Publication date |
---|---|
CN112828508A (en) | 2021-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8288676B2 (en) | Nut supply apparatus to bonding machine | |
CN205651097U (en) | Fixture | |
CN112828508B (en) | Positioning tool for water nozzle of feed hopper | |
CN209491439U (en) | A kind of resistance mounted welder being bent special pipe and bracket | |
US20030189033A1 (en) | Parts welding device | |
CN214602498U (en) | Triple-set mounting seat fixing device of ultrasonic welding machine | |
CN217019083U (en) | Be used for panel laser to wash welding switching mechanism | |
CN205834589U (en) | A kind of fixing device of pipe fitting welding | |
CN213195113U (en) | Steel pipe straightening equipment convenient to position | |
CN211707923U (en) | Automatic stamping die of oiling | |
CN210334925U (en) | Valve body welding tool | |
CN210025261U (en) | Universal inclined hole marking tool for pressure vessel seal head | |
CN218946773U (en) | Welding machine with secondary positioning device | |
CN219684251U (en) | Welding equipment for bent pipe and tank body | |
CN217832550U (en) | Elbow welding positioning fixture | |
CN110919283A (en) | Free direction welding jig | |
CN207548265U (en) | A kind of flank hole fixture | |
CN211759500U (en) | Positioning tool convenient for right-angle welding | |
CN219005011U (en) | Arc-shaped soldering lug | |
CN215588107U (en) | Welding positioning device | |
CN219986634U (en) | General parallel seam welding bonding fixture | |
CN216882374U (en) | Electric brush welding fixture | |
CN217413118U (en) | Integrated tool for pins of semiconductor elements | |
CN216177854U (en) | Multi-angle welding auxiliary device | |
CN215967125U (en) | Contact positioning device for automatic welding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |