CN112811052A - 一种两跨双步进梁全自动上卷的方法 - Google Patents
一种两跨双步进梁全自动上卷的方法 Download PDFInfo
- Publication number
- CN112811052A CN112811052A CN202011597491.4A CN202011597491A CN112811052A CN 112811052 A CN112811052 A CN 112811052A CN 202011597491 A CN202011597491 A CN 202011597491A CN 112811052 A CN112811052 A CN 112811052A
- Authority
- CN
- China
- Prior art keywords
- walking beam
- span
- roll
- east
- west
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G1/00—Storing articles, individually or in orderly arrangement, in warehouses or magazines
- B65G1/02—Storage devices
- B65G1/04—Storage devices mechanical
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G1/00—Storing articles, individually or in orderly arrangement, in warehouses or magazines
- B65G1/02—Storage devices
- B65G1/04—Storage devices mechanical
- B65G1/137—Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed
- B65G1/1373—Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Controlling Rewinding, Feeding, Winding, Or Abnormalities Of Webs (AREA)
- Winding, Rewinding, Material Storage Devices (AREA)
Abstract
本发明公开了一种两跨双步进梁全自动上卷的方法,包括以下步骤:步骤一、按照MES计划及钢卷所在库区位置进行重新排序,分为NoA1,NoA2…NoAi…;NoB1,NoB2…NoBj…;步骤二、判断第一卷是否在东跨1号步进梁上卷;步骤三、如第一卷在东跨1号步进梁上卷,直接执行东跨1号步进梁上卷程序;步骤四、如第一卷在西跨2号步进梁上卷,将上一计划最后一卷移动到13号鞍座后,再执行西跨2号步进梁上卷中断程序;将西跨开始的连续计划从西跨2号步进梁上完后,继续执行东跨1号步进梁上卷程序;步骤五、直到计划内最后一卷上到步进梁。本发明实现两跨双步进梁全自动上卷功能,提高上卷效率。
Description
技术领域
本发明涉及自动化控制技术领域,具体涉及一种两跨双步进梁全自动上卷的方法。
背景技术
无人行车及库管系统在现代钢铁企业得到广泛应用,根据生产计划实现自动上卷功能就是其中重要一环,大部分机组钢卷库区为单跨单步进梁上卷。冷联轧酸轧原料库一般为两跨,但因钢卷温度高,对检测元件要求高,目前还很少使用无人行车系统,主要是采用有人行车及库管系统相结合的方式,没法实现钢卷全自动上卷功能。酸轧原料库实现无人行车运行后,两跨双步进梁全自动上卷功能将成为面临的首要问题。
发明内容
本发明的目的在于提供一种两跨双步进梁全自动上卷的方法,通实现两跨双步进梁全自动上卷功能,提高上卷效率,减少行车操作人员及地面指吊人员,降低生产运行成本及安全风险。
本发明解决其技术问题所采用的技术方案是:一种两跨双步进梁全自动上卷的方法,包括以下步骤:
步骤一、按照MES计划及钢卷所在库区位置进行重新排序,分为NoA1,NoA2…NoAi…;NoB1,NoB2…NoBj…;
步骤二、判断第一卷是否在东跨1号步进梁上卷;
步骤三、如第一卷在东跨1号步进梁上卷,直接执行东跨1号步进梁上卷程序;
步骤四、如第一卷在西跨2号步进梁上卷,需先移动步进梁,将上一计划最后一卷移动到13号鞍座后,再执行西跨2号步进梁上卷中断程序;将西跨开始的连续计划从西跨2号步进梁上完后,继续执行东跨1号步进梁上卷程序;
步骤五、直到计划内最后一卷上到步进梁。
进一步,所述步骤三或步骤四中东跨1号步进梁上卷程序具体流程如下:
东跨1号步进梁调用上卷子程序,并判断当前卷是否为东跨最后一卷,如果不是,继续判断下一卷顺序号是否和当前卷连续,如果连续,则下一卷继续在东跨1号步进梁上卷;如果不连续,继续判断当前卷号是否到西跨2号步进梁13号鞍座,如果没到,则东跨1号步进梁继续下一卷上卷;如果到13号鞍座,则调用西跨2号步进梁上卷中断程序;
如果当前卷为东跨最后一卷,则结束东跨上卷程序;继续判断当前卷是否是总计划最后一卷,如果是,则结束总上卷程序;如果不是,则两段步进梁同时前进,直到当前卷到达13号鞍座后,调用西跨2号步进梁上卷中断程序,直到中断结束,结束总计划上卷程序。
进一步,所述步骤四中西跨2号步进梁上卷中断程序的具体流程如下:
东垮1号步进梁停止前进,西跨2号步进梁单独前进;
西跨2号步进梁调用上卷程序,并判断当前卷是否为西跨最后一卷,如果是,则东垮1号步进梁、西跨2号步进梁同时前进,结束中断;如果不是,继续判断下一卷顺序号是否和当前卷连续,如果连续,下一卷继续在西跨2号步进梁上卷;如果不连续,东垮1号步进梁、西跨2号步进梁同时前进,结束中断。
本发明具有以下有益效果:本发明的一种两跨双步进梁全自动上卷的方法,通过库管系统、无人行车系统及机组步进梁系统协调配合,实现两跨双步进梁全自动上卷功能,提高上卷效率,减少行车操作人员及地面指吊人员,降低生产运行成本及安全风险。
附图说明
图1是本发明的自动上卷程序总流程图;
图2是1号步进梁上卷程序流程图;
图3是2号步进梁上卷中断程序流程图;
图4是步进梁上卷子程序流程图;
图5是两跨双步进梁的结构示意图。
其中:图中白色鞍座为上料鞍座,其中5号、6号、7号鞍座受厂房墙影响,不能吊卷,13号鞍座为1号、2号步进梁交接鞍座。
具体实施方式
现在结合附图对本发明作进一步详细的说明。
如图1-5所示,一种两跨双步进梁全自动上卷的方法,包括以下步骤:
步骤一、按照MES计划及钢卷所在库区位置进行重新排序,分为NoA1,NoA2…NoAi…;NoB1,NoB2…NoBj…;
步骤二、判断第一卷是否在东跨1号步进梁上卷;
步骤三、如第一卷在东跨1号步进梁上卷,直接执行东跨1号步进梁上卷程序;
步骤四、如第一卷在西跨2号步进梁上卷,需先移动步进梁,将上一计划最后一卷移动到13号鞍座后,再执行西跨2号步进梁上卷中断程序;将西跨开始的连续计划从西跨2号步进梁上完后,继续执行东跨1号步进梁上卷程序;
步骤五、直到计划内最后一卷上到步进梁。
所述步骤三或步骤四中东跨1号步进梁上卷程序具体流程如下:
东跨1号步进梁调用上卷子程序,并判断当前卷是否为东跨最后一卷,如果不是,继续判断下一卷顺序号是否和当前卷连续,如果连续,则下一卷继续在东跨1号步进梁上卷;如果不连续,继续判断当前卷号是否到西跨2号步进梁13号鞍座,如果没到,则东跨1号步进梁继续下一卷上卷;如果到13号鞍座,则调用西跨2号步进梁上卷中断程序;
如果当前卷为东跨最后一卷,则结束东跨上卷程序;继续判断当前卷是否是总计划最后一卷,如果是,则结束总上卷程序;如果不是,则两段步进梁同时前进,直到当前卷到达13号鞍座后,调用西跨2号步进梁上卷中断程序,直到中断结束,结束总计划上卷程序。
所述步骤四中西跨2号步进梁上卷中断程序的具体流程如下:
东垮1号步进梁停止前进,西跨2号步进梁单独前进;
西跨2号步进梁调用上卷程序,并判断当前卷是否为西跨最后一卷,如果是,则东垮1号步进梁、西跨2号步进梁同时前进,结束中断;如果不是,继续判断下一卷顺序号是否和当前卷连续,如果连续,下一卷继续在西跨2号步进梁上卷;如果不连续,东垮1号步进梁、西跨2号步进梁同时前进,结束中断。
Claims (3)
1.一种两跨双步进梁全自动上卷的方法,其特征在于,包括以下步骤:
步骤一、按照MES计划及钢卷所在库区位置进行重新排序,分为NoA1,NoA2…NoAi…;NoB1,NoB2…NoBj…;
步骤二、判断第一卷是否在东跨1号步进梁上卷;
步骤三、如第一卷在东跨1号步进梁上卷,直接执行东跨1号步进梁上卷程序;
步骤四、如第一卷在西跨2号步进梁上卷,需先移动步进梁,将上一计划最后一卷移动到13号鞍座后,再执行西跨2号步进梁上卷中断程序;将西跨开始的连续计划从西跨2号步进梁上完后,继续执行东跨1号步进梁上卷程序;
步骤五、直到计划内最后一卷上到步进梁。
2.根据权利要求1所述的一种两跨双步进梁全自动上卷的方法,其特征在于:所述步骤三或步骤四中东跨1号步进梁上卷程序具体流程如下:
东跨1号步进梁调用上卷子程序,并判断当前卷是否为东跨最后一卷,如果不是,继续判断下一卷顺序号是否和当前卷连续,如果连续,则下一卷继续在东跨1号步进梁上卷;如果不连续,继续判断当前卷号是否到西跨2号步进梁13号鞍座,如果没到,则东跨1号步进梁继续下一卷上卷;如果到13号鞍座,则调用西跨2号步进梁上卷中断程序;
如果当前卷为东跨最后一卷,则结束东跨上卷程序;继续判断当前卷是否是总计划最后一卷,如果是,则结束总上卷程序;如果不是,则两段步进梁同时前进,直到当前卷到达13号鞍座后,调用西跨2号步进梁上卷中断程序,直到中断结束,结束总计划上卷程序。
3.根据权利要求1所述的一种两跨双步进梁全自动上卷的方法,其特征在于:所述步骤四中西跨2号步进梁上卷中断程序的具体流程如下:
东垮1号步进梁停止前进,西跨2号步进梁单独前进;
西跨2号步进梁调用上卷程序,并判断当前卷是否为西跨最后一卷,如果是,则东垮1号步进梁、西跨2号步进梁同时前进,结束中断;如果不是,继续判断下一卷顺序号是否和当前卷连续,如果连续,下一卷继续在西跨2号步进梁上卷;如果不连续,东垮1号步进梁、西跨2号步进梁同时前进,结束中断。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011597491.4A CN112811052B (zh) | 2020-12-29 | 2020-12-29 | 一种两跨双步进梁全自动上卷的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011597491.4A CN112811052B (zh) | 2020-12-29 | 2020-12-29 | 一种两跨双步进梁全自动上卷的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112811052A true CN112811052A (zh) | 2021-05-18 |
CN112811052B CN112811052B (zh) | 2022-11-29 |
Family
ID=75855993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011597491.4A Active CN112811052B (zh) | 2020-12-29 | 2020-12-29 | 一种两跨双步进梁全自动上卷的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112811052B (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2663304Y (zh) * | 2003-12-19 | 2004-12-15 | 深圳市金达科技实业有限公司 | 用于钢卷包装线上的组合式输卷机 |
CN2880676Y (zh) * | 2005-12-09 | 2007-03-21 | 深圳市派克威科技发展有限公司 | 用于钢卷包装线上的输卷设备 |
CN203370834U (zh) * | 2013-06-27 | 2014-01-01 | 中冶陕压重工设备有限公司 | 步进梁头、尾二次上卷装置 |
CN106269895A (zh) * | 2015-06-04 | 2017-01-04 | 上海梅山钢铁股份有限公司 | 一种热轧轧线钢卷多路径入库的控制方法 |
CN107363102A (zh) * | 2016-05-12 | 2017-11-21 | 鞍钢股份有限公司 | 一种用于酸洗冷连轧机钢卷跟踪的过程控制方法 |
CN110342169A (zh) * | 2019-08-19 | 2019-10-18 | 上海梅山工业民用工程设计研究院有限公司 | 一种高效的钢卷运输系统 |
CN111459114A (zh) * | 2020-04-17 | 2020-07-28 | 首钢京唐钢铁联合有限责任公司 | 一种热轧平整机组钢卷上料的方法及装置 |
CN111913428A (zh) * | 2020-06-18 | 2020-11-10 | 宝信软件(武汉)有限公司 | 一种用于消除横移小车翻卷的安全控制系统及方法 |
CN112044955A (zh) * | 2020-08-03 | 2020-12-08 | 广西柳州钢铁集团有限公司 | 酸轧出口钢卷数据跟踪标识方法 |
-
2020
- 2020-12-29 CN CN202011597491.4A patent/CN112811052B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2663304Y (zh) * | 2003-12-19 | 2004-12-15 | 深圳市金达科技实业有限公司 | 用于钢卷包装线上的组合式输卷机 |
CN2880676Y (zh) * | 2005-12-09 | 2007-03-21 | 深圳市派克威科技发展有限公司 | 用于钢卷包装线上的输卷设备 |
CN203370834U (zh) * | 2013-06-27 | 2014-01-01 | 中冶陕压重工设备有限公司 | 步进梁头、尾二次上卷装置 |
CN106269895A (zh) * | 2015-06-04 | 2017-01-04 | 上海梅山钢铁股份有限公司 | 一种热轧轧线钢卷多路径入库的控制方法 |
CN107363102A (zh) * | 2016-05-12 | 2017-11-21 | 鞍钢股份有限公司 | 一种用于酸洗冷连轧机钢卷跟踪的过程控制方法 |
CN110342169A (zh) * | 2019-08-19 | 2019-10-18 | 上海梅山工业民用工程设计研究院有限公司 | 一种高效的钢卷运输系统 |
CN111459114A (zh) * | 2020-04-17 | 2020-07-28 | 首钢京唐钢铁联合有限责任公司 | 一种热轧平整机组钢卷上料的方法及装置 |
CN111913428A (zh) * | 2020-06-18 | 2020-11-10 | 宝信软件(武汉)有限公司 | 一种用于消除横移小车翻卷的安全控制系统及方法 |
CN112044955A (zh) * | 2020-08-03 | 2020-12-08 | 广西柳州钢铁集团有限公司 | 酸轧出口钢卷数据跟踪标识方法 |
Also Published As
Publication number | Publication date |
---|---|
CN112811052B (zh) | 2022-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102553948B (zh) | 冷轧连续处理线活套同步套量的自动动态调节方法 | |
CN112811052B (zh) | 一种两跨双步进梁全自动上卷的方法 | |
CN110580028A (zh) | 一种agv小车控制方法 | |
CN112016810B (zh) | 一种同轨双过跨车智能调度方法 | |
CN116205452A (zh) | 用于多个天车避让的调度方法、系统、存储介质及处理器 | |
EP0183187B1 (en) | Method of increasing the productivity of reversing plate mills | |
CN116755401A (zh) | 包含路径规划和车辆通行策略的多无人叉车调度控制方法 | |
CN115035706B (zh) | 车辆控制方法、车辆控制系统以及信息处理装置 | |
EP3208005B1 (en) | Combined welding and rolling plant for metallic strips | |
US3875774A (en) | Method of controlling rolling speed | |
CN110918677B (zh) | 一种基于状态机的炉卷轧线卷取机自动控制方法 | |
JPH11327644A (ja) | 無人搬送車の配車制御方法 | |
CN112093345A (zh) | 热轧钢卷分配下线入库的控制系统及控制方法 | |
CN101598941B (zh) | 一种提高酸轧计划实施中物流设备运行效率的方法和装置 | |
CN111506064A (zh) | 多操作端智能派工控制方法 | |
CN114481281B (zh) | 一种电镀生产线生产控制方法、装置及系统 | |
CN104232880A (zh) | 一种减少连续退火涂层机组钢带跑偏的方法 | |
CN107608326B (zh) | 轧辊管理加工系统及控制方法 | |
CN118056625A (zh) | 一种防止中厚板轧制道次出错的控制方法及轧线 | |
CN116125932A (zh) | 一种冷轧钢卷包装资源平衡的控制方法 | |
CN114879614A (zh) | 一种柔性制造的agv调度方法 | |
KR100805048B1 (ko) | 코일의 표면흠 개선을 위한 조질압연의 릴 장력 및 속도제어방법 | |
SU1738399A1 (ru) | Способ настройки системы поддержани линии прокатки полос и устройство дл его осуществлени | |
CN118154104A (zh) | 一种立体仓库系统的物流管理方法 | |
JPH04172126A (ja) | 巻取コイラーの決定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |