CN112746556B - 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 - Google Patents
一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 Download PDFInfo
- Publication number
- CN112746556B CN112746556B CN202110035631.7A CN202110035631A CN112746556B CN 112746556 B CN112746556 B CN 112746556B CN 202110035631 A CN202110035631 A CN 202110035631A CN 112746556 B CN112746556 B CN 112746556B
- Authority
- CN
- China
- Prior art keywords
- curved surface
- pier
- normal curved
- scouring
- granular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002245 particle Substances 0.000 title claims abstract description 49
- 238000009991 scouring Methods 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 46
- 230000003628 erosive effect Effects 0.000 claims abstract description 5
- 230000005484 gravity Effects 0.000 claims description 10
- 238000011010 flushing procedure Methods 0.000 claims description 5
- 239000013049 sediment Substances 0.000 claims description 3
- 238000011144 upstream manufacturing Methods 0.000 claims description 3
- 230000003313 weakening effect Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 12
- 230000001681 protective effect Effects 0.000 description 10
- 230000002829 reductive effect Effects 0.000 description 5
- 239000008187 granular material Substances 0.000 description 4
- 230000007547 defect Effects 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/0017—Means for protecting offshore constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/20—Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
- E02B3/26—Fenders
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Revetment (AREA)
Abstract
本发明公开一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法,该方法用于跨海或跨河桥梁桥墩基础冲刷的防护,当桥墩或桥桩底部周围局部冲刷坑达到设定深度后,铺设下凹的旋转正态曲面防护结构,并在旋转正态曲面防护结构内部铺设特定厚度的散粒体。本发明的防护方法将冲刷坑内的正态曲面结构抵御下冲水流与散粒体层削弱马蹄形漩涡有机结合起来,正态曲面结构主要用于抵御墩前下冲水流,散粒体层可以消减桥墩周围的马蹄涡。该防护体系能在大桥使用期间,消减桥墩周围下冲水流和马蹄涡能量,减小局部冲刷,对桥墩基础起到有效保护作用。本发明对涉水建筑物的基础防护均有效。
Description
技术领域
本发明属于桥梁基础局部冲刷防护领域,具体涉及一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法。
背景技术
跨海(河)桥梁桥墩周围局部冲刷对于桥梁基础安全影响极大,是导致桥梁破坏的主要原因。桥墩周围局部冲刷导致的桥梁倒塌占总数的一半以上。所以,对桥墩局部冲刷进行有效和充分的防护十分重要。
水流对桥墩的局部冲刷有三方面原因:(1)桥墩阻水导致周围流速增大,指水流遇到障碍物时过水断面面积减小,引起局部流速增大,床面泥沙冲刷而形成冲刷坑;(2)下冲水流掏蚀床面,主要指前进水流撞击桥墩后形成下冲水流,对床面产生强烈的掏蚀作用;(3)马蹄形漩涡冲刷,主要指水流绕过障碍物时形成的马蹄形漩涡,卷走了墩周的部分泥沙。
桥墩的局部冲刷防护措施主要分为两类:(1)主动防护。减小水流对桥墩的冲刷能量,即减弱水流冲刷过程中的下冲流和马蹄形漩涡流,通常采用扩大桥墩的基础平面或设护脚等措施以减小水流的冲刷能量。(2)被动防护。提高桥墩附近底床的防冲刷能力,通常是在桥墩基础周围抛石或扭王字块,试图提高桥墩的抗冲能力。
现有防护措施存在成本高、防护效果差和不能有效抵御台风暴潮等灾害性海洋环境等不足。利用扩大桥墩基础顶面的主动防护措施在通常水流下能抵御下冲水流,然而在极端水动力环境下床面冲刷严重而下降,致使桥墩基础完全暴露于床面之上,从而在桥墩基础迎流面上形成更强的下冲水流,导致局部冲刷更为严重。桥墩墩体开缝能起到削弱马蹄形漩涡强度的作用,开缝多则降低桥墩强度,开缝少则效果差,开缝还可能被漂浮物等堵塞。因旋转流或主流摆动等造成桥墩行近水流方向与开缝方向不一致时,开缝就失去防护作用。
抛石防护一直是大、中型桥梁桥墩最广泛采用的被动防护形式,具有涡流增强、防护效果差、运维费用和工作量较大等缺点。特别是当极端水动力作用下,抛石周围形成强烈的涡漩,加剧了涡漩对床面的掏蚀作用。不仅起不到防护作用,甚至可能起到相反的作用。
发明内容
针对现有技术的不足,本发明提出一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法,具体技术方案如下:
一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法,该方法用于跨海或跨河桥梁桥墩基础冲刷的防护,当桥墩或桥桩底部周围局部冲刷坑达到设定深度后,铺设下凹的旋转正态曲面防护结构,并在旋转正态曲面防护结构内部铺设特定厚度的散粒体。
进一步地,所述正态曲面防护结构为厚度为a的一段旋转正态曲面壳体,以桥墩的中心与未冲刷的河床平面的交点为原点,水流方向为x轴正方向、水平面内垂直于水流方向的为y轴、桥墩轴线向下为z轴正方向,则所述正态曲面壳体的内表面为满足如下方程的曲面:
其中,x,y,z为正态曲面壳体内表面点的坐标,l为所述正态曲面外壳套设在桥墩后正态曲面外壳的内表面距离桥墩表面的间隙距离;σ为与冲刷坑范围相关的方差值,h0为正态曲面壳体上部到床面的距离。正态曲面底部位于床面以下mhb处,hb为最大冲刷坑深度,m=0.7~0.9。
进一步地,所述散粒体层厚度Δh与冲刷坑最大深度hb的比值λ满足如下条件:
其中,G‘为散粒体颗粒等效重力;Fw为水流力;μ为冲刷坑床面的摩擦系数;L为冲刷坑长度;α,β为冲刷坑前后两部分坡面与水平面的夹角,ρw为水密度。
进一步地,所述正态曲面防护结构还包括插入河床中用于固定所述正态曲面壳体的圆柱套筒形底座,其厚度与正态曲面壳体厚度相同,该底座的内表面满足如下关系:
进一步地,a=0.1~0.3m,hc=1~2m。
进一步地,散粒体粒径d为当地自然条件下极端流速作用时泥沙起动粒径的3~5倍。
本发明的有益效果如下:
桥墩周围局部冲刷的主因为下冲水流和马蹄形漩涡。本发明的防护体系将冲刷坑内的正态曲面结构抵御下冲水流与散粒体层削弱马蹄形漩涡有机结合起来,正态曲面结构主要用于抵御墩前下冲水流,散粒体层可以消减桥墩周围的马蹄涡。该防护体系能在大桥使用期间,消减桥墩周围下冲水流和马蹄涡能量,减小局部冲刷,对桥墩基础起到有效保护作用。
附图说明
图1为斜坡上散粒体受力情况图;
图2为下凹型正态曲面和散粒体结合的桥墩周围局部冲刷防护侧面图。
图3为下凹型旋转正态曲面和散粒体结合的桥墩周围局部冲刷防护俯视图。
具体实施方式
下面根据附图和优选实施例详细描述本发明,本发明的目的和效果将变得更加明白,应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
首先介绍桥墩冲刷坑中的散粒体的受力情况。如图1所示,散粒体颗粒在冲刷坑表面受力可简化为:重力、床面阻力、浮力、水流力。
有效重力:G'=G-FT
河床阻力:f1-颗粒在冲刷坑底部受到的摩擦力
f2-颗粒在冲刷坑斜面受到的摩擦力
d为散粒体直径;u为水流速度;ρ为散粒体密度;ρw为水密度;g为重力加速度,取9.8N/kg。
根据跨海大桥现场观测资料,在以潮汐主导的海峡河口环境中,桥墩前后冲刷坑长度基本相等,前后端冲刷坑斜面与水平方向夹角也大致相等,如图2所示,为本发明的下凹型旋转正态曲面防护结构与散粒体结合的桥墩冲刷防护装置,当桥墩或桥桩底部周围局部冲刷坑达到设定深度后,铺设下凹的旋转正态曲面防护结构,并在旋转正态曲面防护结构内部铺设特定厚度的散粒体。旋转正态曲面防护结构为厚度为a的一段旋转正态曲面壳体。下面具体对桥墩冲刷防护装置的形状进行介绍。
进一步地,所述正态曲面防护结构为厚度为a的一段旋转正态曲面壳体,正态曲面底部位于床面以下mhb处,hb为最大冲刷坑深度,m=0.7~0.9。以桥墩的中心与未冲刷的河床平面的交点为原点,水流方向为x轴正方向、水平面内垂直于水流方向的为y轴、桥墩轴线向下为z轴正方向,则所述正态曲面壳体的内表面为满足如下方程的曲面:
其中,x,y,z为正态曲面壳体内表面点的坐标,l为所述正态曲面外壳套设在桥墩后正态曲面外壳的内表面距离桥墩表面的间隙距离;σ为与冲刷坑范围相关的方差值,h0为正态曲面壳体上部到床面的距离。正态曲面底部位于床面以下mhb处,hb为最大冲刷坑深度,m=0.7~0.9。
在冲刷坑形成后,将此正态曲面结构沉至冲刷坑内,由于自重的作用,该结构会压实坑内泥沙从而固定在冲刷坑表面。
进一步地,为了使该旋转正态曲面防护结构能够被牢固地固定,因此在旋转正态曲面防护结构下端继续设置一段圆柱套筒形底座,垂直向下插入沉积层中,从而将旋转正态曲面防护结构固定在冲刷坑底部的河床上。正态曲面防护结构还包括插入河床中用于固定所述正态曲面壳体的圆柱套筒形底座,其厚度与正态曲面壳体厚度相同,圆柱套筒形底座的内表面满足如下关系:
当设置底座时,hc即为旋转正态曲面防护结构插入河床底部的深度。进一步地,a=0.1~0.3m,hc=1~2m。
图3为该防护结构与散粒体俯视图。铺设散粒体的粒径d和厚度Δh由散粒体斜坡起动流速的计算方法,通过散粒体在正态曲面上的受力分析确定,以起到最有效的防护作用。散粒体粒径d和铺设厚度Δh一方面保证散粒体不会被外移出冲刷坑,另一方面避免散粒体对结构的磨蚀。该正态曲面结构与桥墩之间留有一定间隙,以避免对桥墩产生撞击力。因此,该散粒体层的厚度用以下方式确定:
若保证该颗粒不会被冲刷离开防护结构,则应满足:散粒体被冲至正态曲面防护结构边缘前,速度就应降至零并回落回冲刷坑底部,即水流力和浮力做正功之和小于重力和表面阻力做负功之和。另外设原有最大冲刷深度为hb,水流流速u,桥墩直径为D,μ为冲刷坑散粒体层表面的阻力系数。铺设散粒体层厚度为Δh=λhb,粒径d,极端水动力条件下水流流速为u2。即
整理,得:
其中,G‘为散粒体颗粒等效重力;Fw为水流力;μ为冲刷坑床面的摩擦系数;L为冲刷坑长度;α,β为冲刷坑前后两部分坡面与水平面的夹角,ρw为水密度。
优选地,采用的散粒体粒径为当地自然条件下(未建桥)极端流速作用时泥沙起动粒径的3~5倍。
本发明的下凹型正态曲面与散粒体结合的桥墩冲刷防护装置铺设在桥墩周围局部冲刷坑内,利用散粒体空隙消涡及散粒体在斜坡上运动消耗涡体能量,以削减桥墩周围水流紊动和马蹄涡的强度,降低马蹄涡对桥墩及其防护结构的冲蚀作用。散粒体之间的空隙可消减桥墩周围的尾流漩涡,有效地吸收马蹄涡能量;同时散粒体在下冲水流作用下会沿正态曲面离桥墩斜向运动,再在重力作用下回落,将水流的动能转化为散粒体的动能与势能,可进一步消耗下冲水流和马蹄涡的能量。散粒体层的重量增加正态曲面结构对其下泥沙的压实作用,有助于保持防护结构的稳定性。
对其他涉水建筑物,可参照本发明提供的防护方法设计相应的曲面结构和散粒体,本发明对涉水建筑物基础冲刷防护有指导作用。
本领域普通技术人员可以理解,以上所述仅为发明的优选实例而已,并不用于限制发明,尽管参照前述实例对发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实例记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在发明的精神和原则之内,所做的修改、等同替换等均应包含在发明的保护范围之内。
Claims (6)
1.一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法,其特征在于,该方法用于跨海或跨河桥梁桥墩基础冲刷的防护,当桥墩或桥桩底部周围局部冲刷坑达到设定深度后,铺设下凹的旋转正态曲面防护结构,并在旋转正态曲面防护结构内部铺设厚度为冲刷坑最大深度的λ倍的散粒体;正态曲面底部位于床面以下mhb处,hb为最大冲刷坑深度,m=0.7~0.9。
5.根据权利要求4所述的下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法,其特征在于,a=0.1~0.3m,hc=1~2m。
6.根据权利要求4所述的下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法,其特征在于,散粒体粒径d为当地自然条件下极端流速作用时泥沙起动粒径的3~5倍。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110035631.7A CN112746556B (zh) | 2021-01-12 | 2021-01-12 | 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 |
JP2022514627A JP7261525B2 (ja) | 2021-01-12 | 2021-01-20 | 下凹型回転正規曲面と散粒体とを組み合わせた橋脚ウォッシュ防護方法 |
US17/723,461 US11987941B2 (en) | 2021-01-12 | 2022-04-19 | Pier scour protection method by combinating a downward bivariate normal distribution surface and granular mixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110035631.7A CN112746556B (zh) | 2021-01-12 | 2021-01-12 | 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112746556A CN112746556A (zh) | 2021-05-04 |
CN112746556B true CN112746556B (zh) | 2022-04-19 |
Family
ID=75650861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110035631.7A Active CN112746556B (zh) | 2021-01-12 | 2021-01-12 | 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US11987941B2 (zh) |
JP (1) | JP7261525B2 (zh) |
CN (1) | CN112746556B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN215562387U (zh) * | 2021-01-12 | 2022-01-18 | 浙江大学 | 下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护装置 |
CN112746556B (zh) | 2021-01-12 | 2022-04-19 | 浙江大学 | 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 |
CN115293072B (zh) * | 2022-09-29 | 2023-02-10 | 珠江水利委员会珠江水利科学研究院 | 基于河口开阔水域桥梁的阻水分析方法、装置、设备及介质 |
CN115329451B (zh) * | 2022-10-17 | 2022-12-27 | 西南交通大学 | 基于能量守恒及数值流场的桥梁局部冲深计算方法和装置 |
CN115538478B (zh) * | 2022-10-21 | 2024-04-19 | 中铁大桥勘测设计院集团有限公司 | 一种抗冲刷基础 |
CN117536164B (zh) * | 2023-12-14 | 2024-07-02 | 浙江大学 | 一种正态曲面冲刷防护装置的施工方法 |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1558975A (zh) * | 2001-10-26 | 2004-12-29 | 用砌块垫层构建桥梁冲刷保护结构和河床稳定结构的方法 | |
JP2007332620A (ja) * | 2006-06-14 | 2007-12-27 | Nippon Oil Corp | 海洋構造物の防食補強方法及び海洋構造物 |
KR100982023B1 (ko) * | 2008-03-14 | 2010-09-13 | 조덕래 | 교각 기초 구조물의 세굴 방지 장치 |
CN101985838A (zh) * | 2009-10-20 | 2011-03-16 | 中国石油大学(华东) | 一种海洋石油平台桩基冲刷防治方法 |
US8348553B2 (en) * | 2010-06-01 | 2013-01-08 | Applied University Research, Inc. | Bridge pier and abutment scour preventing apparatus with vortex generators |
CN204000580U (zh) * | 2014-06-30 | 2014-12-10 | 成都新途科技有限公司 | 用于桥梁墩柱防水沙磨蚀的钢框石笼 |
CN204551240U (zh) * | 2015-03-27 | 2015-08-12 | 蔡海良 | 一种抗漩涡冲刷的桥墩结构 |
CN104895007A (zh) * | 2015-05-19 | 2015-09-09 | 浙江大学 | 一种呈双变量正态曲面形态的丁坝 |
CN205917727U (zh) * | 2016-06-16 | 2017-02-01 | 江苏海上龙源风力发电有限公司 | 一种植入式海上风机嵌岩单桩基础 |
CN106812159A (zh) * | 2017-03-14 | 2017-06-09 | 天津大学 | 一种海上风电单桩基础防冲刷套筒 |
CN108867343A (zh) * | 2018-07-09 | 2018-11-23 | 浙江大学 | 一种桥墩或丁坝头部局部冲刷的散粒体防护结构及其施工方法 |
CN111236290A (zh) * | 2020-01-20 | 2020-06-05 | 重庆大学 | 一种适用于桥墩桩基防冲刷的简易环保装置及施工方法 |
CN212001298U (zh) * | 2020-04-03 | 2020-11-24 | 长安大学 | 一种海上风力机固定基础防冲刷装置 |
CN112160288A (zh) * | 2020-07-31 | 2021-01-01 | 浙江大学 | 一种旋转正态曲面的桥墩局部冲刷防护装置 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4717286A (en) * | 1982-11-10 | 1988-01-05 | Gulf Applied Technologies, Inc. | Anti-scour apparatus and method |
JPS61277708A (ja) * | 1985-06-03 | 1986-12-08 | Bridgestone Corp | 洗堀防止装置 |
US5762448A (en) * | 1996-05-29 | 1998-06-09 | Continuum Dynamics, Inc. | System for alleviating scouring around submerged structures |
US8596919B2 (en) * | 2010-11-23 | 2013-12-03 | Technip France | Anti-scour disk and method |
CN102864756A (zh) * | 2012-09-10 | 2013-01-09 | 重庆交通大学 | 一种桥梁墩台最大冲刷深度的测控方法 |
US9453319B2 (en) * | 2013-10-08 | 2016-09-27 | Applied University Research, Inc. | Scour preventing apparatus for hydraulics structures |
CN104480961B (zh) * | 2014-11-19 | 2018-02-02 | 华电重工股份有限公司 | 一种海上风电单桩基础的防冲刷施工方法 |
CN204645105U (zh) * | 2015-04-21 | 2015-09-16 | 浙江大学 | 一种用于桩柱结构物局部冲刷试验的实时监测装置 |
CN108411802A (zh) * | 2018-05-30 | 2018-08-17 | 扬州大学 | 一种水下修复桩基础及冲刷坑的方法 |
CN110485313A (zh) * | 2019-08-08 | 2019-11-22 | 中国海洋大学 | 桥墩流空区加固方法 |
CN110804957A (zh) * | 2019-09-29 | 2020-02-18 | 安徽省交通控股集团有限公司 | 一种桥墩局部冲刷的防护方法 |
CN111926806A (zh) * | 2020-09-03 | 2020-11-13 | 华电重工股份有限公司 | 一种桩基防护结构及防护方法 |
CN111926805A (zh) * | 2020-09-03 | 2020-11-13 | 华电重工股份有限公司 | 一种桩基防护结构及防护方法 |
CN215562387U (zh) | 2021-01-12 | 2022-01-18 | 浙江大学 | 下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护装置 |
CN112746556B (zh) | 2021-01-12 | 2022-04-19 | 浙江大学 | 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 |
CN114960776A (zh) * | 2022-05-09 | 2022-08-30 | 南通市海洋水建工程有限公司 | 一种大直径单桩基础防冲刷保护施工工法 |
CN115142427B (zh) * | 2022-09-06 | 2022-11-29 | 中天科技集团海洋工程有限公司 | 一种海上风电基础用的抛石防冲刷施工工艺 |
-
2021
- 2021-01-12 CN CN202110035631.7A patent/CN112746556B/zh active Active
- 2021-01-20 JP JP2022514627A patent/JP7261525B2/ja active Active
-
2022
- 2022-04-19 US US17/723,461 patent/US11987941B2/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1558975A (zh) * | 2001-10-26 | 2004-12-29 | 用砌块垫层构建桥梁冲刷保护结构和河床稳定结构的方法 | |
JP2007332620A (ja) * | 2006-06-14 | 2007-12-27 | Nippon Oil Corp | 海洋構造物の防食補強方法及び海洋構造物 |
KR100982023B1 (ko) * | 2008-03-14 | 2010-09-13 | 조덕래 | 교각 기초 구조물의 세굴 방지 장치 |
CN101985838A (zh) * | 2009-10-20 | 2011-03-16 | 中国石油大学(华东) | 一种海洋石油平台桩基冲刷防治方法 |
US8348553B2 (en) * | 2010-06-01 | 2013-01-08 | Applied University Research, Inc. | Bridge pier and abutment scour preventing apparatus with vortex generators |
CN204000580U (zh) * | 2014-06-30 | 2014-12-10 | 成都新途科技有限公司 | 用于桥梁墩柱防水沙磨蚀的钢框石笼 |
CN204551240U (zh) * | 2015-03-27 | 2015-08-12 | 蔡海良 | 一种抗漩涡冲刷的桥墩结构 |
CN104895007A (zh) * | 2015-05-19 | 2015-09-09 | 浙江大学 | 一种呈双变量正态曲面形态的丁坝 |
CN205917727U (zh) * | 2016-06-16 | 2017-02-01 | 江苏海上龙源风力发电有限公司 | 一种植入式海上风机嵌岩单桩基础 |
CN106812159A (zh) * | 2017-03-14 | 2017-06-09 | 天津大学 | 一种海上风电单桩基础防冲刷套筒 |
CN108867343A (zh) * | 2018-07-09 | 2018-11-23 | 浙江大学 | 一种桥墩或丁坝头部局部冲刷的散粒体防护结构及其施工方法 |
CN111236290A (zh) * | 2020-01-20 | 2020-06-05 | 重庆大学 | 一种适用于桥墩桩基防冲刷的简易环保装置及施工方法 |
CN212001298U (zh) * | 2020-04-03 | 2020-11-24 | 长安大学 | 一种海上风力机固定基础防冲刷装置 |
CN112160288A (zh) * | 2020-07-31 | 2021-01-01 | 浙江大学 | 一种旋转正态曲面的桥墩局部冲刷防护装置 |
Non-Patent Citations (3)
Title |
---|
桥墩局部冲刷动态模拟及不同截面的冲刷特性;王飞等;《水利水电科技进展》;20180630;81-87 * |
正态曲面丁坝三维水流数值模拟;孙志林;《浙江大学学报》;20160630;1247-1251 * |
苏通大桥桥墩冲刷防护工程研究;何超;《现代交通技术》;20200630;46-49+59 * |
Also Published As
Publication number | Publication date |
---|---|
US11987941B2 (en) | 2024-05-21 |
JP2022549406A (ja) | 2022-11-25 |
US20220235524A1 (en) | 2022-07-28 |
JP7261525B2 (ja) | 2023-04-20 |
CN112746556A (zh) | 2021-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112746556B (zh) | 一种下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护方法 | |
CN215562387U (zh) | 下凹型旋转正态曲面与散粒体结合的桥墩冲刷防护装置 | |
CN206157667U (zh) | 一种山区斜交桥桥墩防冲刷防撞装置 | |
Takahashi et al. | Typical failures of composite breakwaters in Japan | |
US7628569B2 (en) | Covering element for protecting structures against scouring and drag force | |
Thompson | The velocity-reversal hypothesis revisited | |
CN111664060A (zh) | 一种海上风机基础防冲刷结构 | |
CN108867343B (zh) | 一种桥墩或丁坝头部局部冲刷的散粒体防护结构及其施工方法 | |
CN112160288A (zh) | 一种旋转正态曲面的桥墩局部冲刷防护装置 | |
Tang et al. | Experimental investigation of local scour around artificial reefs in steady currents | |
Chen et al. | Protection mechanisms, countermeasures, assessments and prospects of local scour for cross-sea bridge foundation: A review | |
Palmer et al. | Design and construction of rubble mound breakwaters | |
Zhang | Study on local scour protection countermeasures of bridge pier | |
CN115217074A (zh) | 一种柔性箱式格栅生态桥墩护底结构 | |
Chen | Experimental study of scour around monopile and jacket-type offshore wind turbine foundations | |
Williams | Mechanisms of wave transport of megaclasts on elevated cliff-top platforms: examples from western Ireland relevant to the storm-wave versus tsunami controversy | |
Kumala et al. | Study to Minimize the Local Scour Downstream of Stilling Basin | |
Gris | Sheath for reducing local scour in bridge piers | |
CN217174575U (zh) | 生态友好型堤坝 | |
CN221608937U (zh) | 一种用于海洋桩基础的冲刷防护装置 | |
Wüthrich et al. | Behaviour of a scour protection overlay with randomly distributed concrete prisms in plunge pools downstream of mobile barrages for exceptional operation conditions | |
Prem et al. | Effects of underscour depth and horizontal spacing between two bed protection blocks on stability of frontal block | |
CN117113554A (zh) | 具有螺旋扰流结构的单桩及具有该单桩基础局部冲刷的水动力弱化及防护分析方法 | |
Monfette | Comprehensive review of plunge pool performance at four of BC Hydro dam sites and assessment of scour extent | |
Pinto et al. | Physical Modelling of Scour near Detached Coastal Protection Breakwaters |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |