CN112735102A - Control method, device, system, equipment and medium for electric shock protection - Google Patents

Control method, device, system, equipment and medium for electric shock protection Download PDF

Info

Publication number
CN112735102A
CN112735102A CN202011388054.1A CN202011388054A CN112735102A CN 112735102 A CN112735102 A CN 112735102A CN 202011388054 A CN202011388054 A CN 202011388054A CN 112735102 A CN112735102 A CN 112735102A
Authority
CN
China
Prior art keywords
level
emergency
control
data
power equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011388054.1A
Other languages
Chinese (zh)
Inventor
姚志洪
庄清涛
杨妙文
洪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN202011388054.1A priority Critical patent/CN112735102A/en
Publication of CN112735102A publication Critical patent/CN112735102A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/182Level alarms, e.g. alarms responsive to variables exceeding a threshold
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B7/00Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00
    • G08B7/06Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00 using electric transmission, e.g. involving audible and visible signalling through the use of sound and light sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H5/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal non-electric working conditions with or without subsequent reconnection
    • H02H5/12Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal non-electric working conditions with or without subsequent reconnection responsive to undesired approach to, or touching of, live parts by living beings

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiment of the invention discloses a control method, a device, a system, equipment and a medium for electric shock protection. The method comprises the following steps: acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment; analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result; and if the safety level belongs to the preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction. According to the embodiment of the invention, the safety level of the power equipment is judged by analyzing the acquired monitoring data, and the emergency protection device in the power equipment is remotely controlled to send out an alarm signal and/or execute power-off operation when the power equipment has a leakage risk, so that the risk of hurting people due to large-area leakage in a severe environment is reduced, and the safety of the power equipment is improved.

Description

Control method, device, system, equipment and medium for electric shock protection
Technical Field
The embodiment of the invention relates to the power equipment monitoring technology, in particular to a control method, a device, a system, equipment and a medium for electric shock protection.
Background
Rainwater is more every summer season, and the urban flood disaster often happens because of heavy rain, so that the safe operation of a power grid and equipment is influenced. Especially, go deep into the outdoor cubical switchboard and the room of joining in marriage of load center, because outdoor cubical switchboard and room of joining in marriage are located the lower place of relief, are more vulnerable to the invasion that the rainwater was irritated, in case take place the condition of outdoor cubical switchboard and the room of joining in marriage electric power facility water logging of joining in marriage, just have serious electric shock risk.
At present, also set up special detection device that soaks in outdoor cubical switchboard, but this monitoring device that soaks function is comparatively single, only can monitor water level data and feed back to the backstage, by backstage assignment special operation and maintenance personnel arrive the scene and carry out flood discharge and maintenance work. However, before the operation and maintenance personnel arrive at the site, the electric shock risk of the on-site switch cabinet is easy to cause the situation that the electric leakage injures people. Therefore, how to reduce the leakage risk and improve the safety of the power equipment becomes an urgent problem to be solved.
Disclosure of Invention
The embodiment of the invention provides a control method, a control device, a control system, control equipment and a control medium for electric shock protection, which can reduce the electric leakage risk and improve the safety of electric power equipment.
In a first aspect, an embodiment of the present invention provides a method for controlling electric shock protection, including:
acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result;
and if the safety level belongs to a preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
In a second aspect, an embodiment of the present invention further provides a control device for electric shock protection, including:
the data acquisition module is used for acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
the data analysis module is used for analyzing a set safety interval to which the monitoring data belongs and determining the safety level of the power equipment according to an analysis result;
and the early warning control module is used for sending an early warning control instruction to the emergency protection device if the safety level belongs to a preset early warning level so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
In a third aspect, an embodiment of the present invention further provides a control system for electric shock protection, including:
a control device of electric shock protection for executing a control method of electric shock protection as provided in any of the embodiments of the present invention;
the emergency protection device is arranged in the power equipment and used for monitoring the working environment and the electric leakage condition of the power equipment and sending monitoring data to the control device for electric shock protection.
In a fourth aspect, an embodiment of the present invention further provides a control system for electric shock protection, including:
a control device of electric shock protection for executing a control method of electric shock protection as provided in any of the embodiments of the present invention;
the emergency protection device is arranged in the power equipment and used for monitoring the working environment and the electric leakage condition of the power equipment and sending monitoring data to the control device for electric shock protection.
In a fifth aspect, embodiments of the present invention further provide a storage medium containing computer-executable instructions, which when executed by a computer processor, are configured to perform a control method for protection against electric shock as provided in any of the embodiments of the present invention.
According to the embodiment of the invention, monitoring data of an emergency protection device in power equipment are acquired, a set safety interval to which the monitoring data belong is analyzed, the safety level of the power equipment is determined according to the analysis result, and if the safety level belongs to a preset early warning level, an early warning control instruction is sent to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction. According to the embodiment of the invention, the safety level of the power equipment is judged by analyzing the acquired monitoring data, and the emergency protection device in the power equipment is remotely controlled to send out an alarm signal and/or execute power-off operation when the power equipment has a leakage risk, so that the risk of hurting people due to large-area leakage in a severe environment is reduced, and the safety of the power equipment is improved.
Drawings
Fig. 1 is a flowchart of a control method for electric shock protection according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a control system for electric shock protection according to an embodiment of the present invention;
fig. 3 is a flowchart of another control method for protection against electric shock according to the second embodiment of the present invention;
fig. 4 is a schematic structural diagram of another electric shock protection control system according to a second embodiment of the present invention;
fig. 5 is a schematic structural diagram of another electric shock protection control system according to a second embodiment of the present invention;
fig. 6 is a schematic structural diagram of a control device for electric shock protection according to a third embodiment of the present invention;
fig. 7 is a schematic structural diagram of a control device for electric shock protection according to a fifth embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures.
Example one
Fig. 1 is a flowchart of a method for controlling electric shock protection according to an embodiment of the present invention, where the method is applicable to a case where electric shock protection control is performed on an electric power device, and the method may be executed by an electric shock protection control apparatus, and the apparatus may be implemented in a software and/or hardware manner. The device can be configured in the control equipment for electric shock protection. As shown in fig. 1, the method includes:
step S110, acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment.
The power device may be a device having a power generation function and/or a power supply function. For example, the electrical device may be a switchgear, a power distribution facility in a power distribution room, a generator, a contactor, or the like. Because outdoor cubical switchboard and distribution facility are located the lower places of relief such as roadside in the city, receive the rainwater invasion easily, in case take place the condition that outdoor cubical switchboard and distribution facility water invaded, will have serious electric shock risk, influence resident's life power consumption. And because the faults of the power grid are frequent when the flood disaster happens, which area can not be expected to have dangerous situations, the emergency personnel can not take the rain day and night to rush to repair, and therefore, the electric power operation and maintenance rush-repair personnel also have serious risks of wading and electric shock.
The emergency protection device can be a device arranged in the power equipment and used for monitoring the working environment and the electric leakage condition of the power equipment and sending monitoring data to the control device for electric shock protection provided by the embodiment of the invention. For example, the emergency protection device may include a monitoring module, a communication module, an early warning module, and the like. The monitoring module can be used for monitoring the working environment and the electric leakage condition of the power equipment. The communication module can be used for sending monitoring data to the electric shock protection control device provided by the embodiment of the invention, receiving a control instruction sent by the electric shock protection control device and sending the control instruction to the early warning module. The communication module can also send the monitoring data to the user terminal and receive the control instruction sent by the user terminal. The early warning module can be used for receiving the control command sent by the communication module and sending out an alarm signal and/or executing power-off operation according to the control command.
Illustratively, the working environment and the leakage condition of the electrical equipment are monitored through a monitoring module in the emergency protection device, and the monitoring data sent by the monitoring module is received through a communication module in the emergency protection device, so that the monitoring data of the communication module in the emergency protection device is obtained.
Fig. 2 is a schematic structural diagram of a shock protection control system according to an embodiment of the present invention. As shown in fig. 2, an emergency protection device may be provided in each power equipment. The control device for electric shock protection provided by the embodiment of the invention can be in communication connection with a plurality of emergency protection devices and is used for carrying out the control method for electric shock protection provided by the embodiment of the invention on the emergency protection devices in each power equipment.
And step S120, analyzing the set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to the analysis result.
The set safety interval may be a plurality of preset data ranges, and is used to determine the safety level corresponding to the monitoring data. For example, the set safety interval may be set by a user according to the actual situation of the location of the power equipment.
The safety level of the electrical equipment may be a safety risk level set by a user according to a set safety interval, and the safety level is used for grading the safety risk of the electrical equipment. For example, the safety level of the power equipment may include a low level, an early warning level, a sub-emergency level, an emergency level, and the like. Wherein a low level indicates that the power device is in a safe state. The early warning level indicates that the power equipment is in a light leakage state and an alarm needs to be given out to remind nearby people. The sub-emergency level represents a moderate leakage condition, a need to sound an alarm to alert nearby personnel, and a need for user control of whether an emergency power outage is required to avoid electrocution of nearby personnel. The power equipment being in an emergency level indicates that the power equipment is in a heavily leaky state, an alarm needs to be issued to alert nearby personnel, and an emergency power off is needed to prevent nearby personnel from getting an electric shock. The safety level of the power equipment may be further divided by a first level, a second level, and a third level. Wherein the first level is a highest level indicating that the power equipment needs to be immediately emergently powered off. The level of the second level is lower than the first level, which indicates that the power equipment does not need to be powered off but needs to send out an alarm signal. The third level is lower than the second level, and indicates that the power equipment is in a safe state without power failure and without sending an alarm signal. The division of the safety level of the power equipment may also be implemented in other feasible manners, which is not specifically limited by the present invention.
The safety levels of the power equipment correspond to the set safety intervals one by one. For example, the set safety interval may include a first interval, a second interval, a third interval, and a fourth interval. The lowest value of the second interval is greater than the maximum value of the first interval, the lowest value of the third interval is greater than the maximum value of the second interval, and the lowest value of the fourth interval is greater than the maximum value of the third interval. The first section corresponds to a low level, the second section corresponds to an early warning level, the third section corresponds to a secondary emergency level, and the fourth section corresponds to an emergency level.
If the monitoring data comprises one type of data, analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to the set safety interval. And when the monitored data is analyzed to belong to the first interval, determining that the safety level of the power equipment is a low level. And when the monitored data is analyzed to belong to the second interval, determining that the safety level of the power equipment is the early warning level. And when the monitored data belong to the third interval, determining that the safety level of the power equipment is a secondary emergency level. And when the monitored data belong to the fourth interval, determining that the safety level of the power equipment is an emergency level.
If the monitoring data comprises at least two types of data, respectively analyzing set safety intervals to which the at least two types of data belong, respectively determining corresponding safety levels according to the analyzed set safety intervals, and taking the highest level of all the safety levels as the safety level of the power equipment. For example, the monitoring data may include water level data and step voltage data, wherein the water level data belongs to a set second water level interval, and the corresponding safety level is determined to be an early warning level according to the second water level interval. And the step voltage data belongs to a set third voltage interval, and the corresponding safety level is determined to be a secondary emergency level according to the third voltage interval. The safety level of the power equipment is determined to be the sub-emergency level since the sub-emergency level is higher than the pre-warning level.
And S130, if the safety level belongs to a preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
The preset early warning level can be a level interval determined according to the electric shock risk of each safety level. For example, if the safety levels of the power equipment include a low level, an early warning level, a sub-emergency level and an emergency level, wherein the early warning level, the sub-emergency level and the emergency level may cause electric shock hazard to people near the power equipment, the early warning level, the sub-emergency level and the emergency level may be set as preset early warning levels by a user. If the safety level of the power equipment determined in step S120 belongs to one of the preset early warning levels, it indicates that the power equipment has an electric shock risk, and an electric shock protection control needs to be performed on an emergency protection device in the power equipment.
The early warning control command can be used for controlling the emergency protection device to send out an alarm signal and/or execute power-off operation. For example, if the safety level is one of the early warning level, the sub-emergency level and the emergency level, an early warning control command is sent to the emergency protection device to control the emergency protection device to send out an alarm signal according to the early warning control command. And if the safety level is the emergency level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to execute power-off operation according to the early warning control instruction.
According to the embodiment of the invention, the monitoring data of the emergency protection device in the power equipment is acquired, the set safety interval to which the monitoring data belong is analyzed, the safety level of the power equipment is determined according to the analysis result, and if the safety level belongs to the preset early warning level, the early warning control instruction is sent to the emergency protection device so as to control the emergency protection device to send out the warning signal and/or execute the power-off operation according to the early warning control instruction. According to the embodiment of the invention, the safety level of the power equipment is judged by analyzing the acquired monitoring data, and the emergency protection device in the power equipment is remotely controlled to send out an alarm signal and/or execute power-off operation when the power equipment has a leakage risk, so that the risk of hurting people due to large-area leakage in a severe environment is reduced, and the safety of the power equipment is improved.
Example two
Fig. 3 is a flowchart of another method for controlling protection against electric shock according to a second embodiment of the present invention, which is optimized based on the second embodiment, and as shown in fig. 3, the method includes:
step S210, acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment.
Fig. 4 is a schematic structural diagram of another electric shock protection control system according to a second embodiment of the present invention. As shown in fig. 4, the emergency protection device may include a water intrusion early warning monitoring unit, a ground fault detection unit, a data transmission unit, an audible and visual alarm unit, and an emergency execution unit. The water invasion early warning monitoring unit and the grounding detection unit are respectively in communication connection with the data transmission unit, and the sound-light alarm unit and the emergency execution unit are respectively in communication connection with the data transmission unit.
Wherein, early warning monitoring unit is invaded to water can be used for monitoring the water invasion data around the power equipment. For example, the water invasion early warning monitoring unit may be a water invasion monitoring sensor or the like. The water intrusion early warning monitoring unit can send the water level data to the control device for electric shock protection provided by the embodiment of the invention through the data transmission unit.
The grounding detection unit can be contacted with a part of the power equipment where an electric shock accident easily occurs, and is used for detecting the electric leakage condition of the power equipment. For example, the ground detection unit may be a step voltage sensor using a contact type electroscopy monitoring or step voltage monitoring principle. The step voltage sensors can be distributed at locations around the power device to detect step voltage data at the locations around the power device. The grounding detection unit can send the step voltage data to the control device for electric shock protection provided by the embodiment of the invention through the data transmission unit.
The data transmission unit can be a unit with data acquisition and data transmission functions, and is used for acquiring monitoring data of the water invasion early warning monitoring unit, the grounding detection unit and the like, communicating with the electric shock protection control device provided by the embodiment of the invention, and receiving a control instruction sent by the electric shock protection control device. For example, the Data transmission Unit may be a Data Transfer Unit (DTU) including a Central Processing Unit (CPU) control sub-Unit, a wireless communication sub-Unit, and a power supply sub-Unit. The data transmission unit can send the water level data and/or the step voltage data to the control device for electric shock protection.
The sound and light alarm unit can be an alarm capable of simultaneously emitting sound and light alarm signals and is used for reminding people nearby the power equipment that the power equipment has a leakage risk.
The emergency execution unit may be a unit supporting an emergency power-off function for emergency power-off when the safety level of the power equipment reaches a certain level.
Optionally, the monitoring data comprises water level data and/or step voltage data. As shown in fig. 4, the emergency protection device may monitor water level data near the power equipment through the water intrusion early warning monitoring unit, and send the water level data to the control device for electric shock protection provided in the embodiment of the present invention through the data transmission unit, and the control device for electric shock protection may obtain the water level data sent by the emergency protection device through the data acquisition module 3. The emergency protection device can also detect the step voltage data near the power equipment through the grounding detection unit and send the step voltage data to the control device for electric shock protection provided by the embodiment of the invention through the data transmission unit, and the control device for electric shock protection can obtain the step voltage data sent by the emergency protection device through the data acquisition module 3.
For example, as shown in fig. 4, the control device for electric shock protection according to the embodiment of the present invention may include a data acquisition module, a data analysis module, and an early warning control module. The early warning control module can comprise an alarm control unit and an emergency control unit. The control device for electric shock protection can acquire monitoring data of the emergency protection device in the power equipment through the data acquisition module.
S220, analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result; if the security level is the early warning level, performing step S230, and if the security level is the emergency level, performing step S240; if the security level is the sub-emergency level, step S250 is executed.
For example, as shown in fig. 4, the control device for electric shock protection may analyze a set safety interval to which the monitoring data belongs by the data analysis module 3, and determine the safety level of the power equipment according to the analysis result.
Optionally, analyzing the set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to the analysis result may include:
comparing the water level data with a first water level threshold and a second water level threshold;
if the water level data is less than or equal to the first water level threshold, determining that the safety level corresponding to the water level data is a low level;
if the water level data is larger than the first water level threshold and smaller than or equal to the second water level threshold, determining that the safety level corresponding to the water level data is an early warning level;
if the water level data is larger than the second water level threshold, determining that the safety level corresponding to the water level data is an emergency level; and/or
Comparing the step voltage data with a first voltage threshold and a second voltage threshold;
if the step voltage data is less than or equal to the first voltage threshold, determining that the safety level corresponding to the step voltage data is a low level;
if the step voltage data is larger than the first voltage threshold and smaller than or equal to the second voltage threshold, determining that the safety level corresponding to the step voltage data is an early warning level;
if the step voltage data is larger than the second voltage threshold, determining that the safety level corresponding to the step voltage data is an emergency level;
determining the safety level of the power equipment according to the safety level corresponding to the water level data and/or the safety level corresponding to the step voltage data;
the early warning level and the emergency level belong to preset early warning levels.
Specifically, if the monitoring data includes one of water level data or step voltage data, whether the water level data exceeds a set normal value or not is judged by comparing the water level data with a water level threshold, or whether the step voltage data exceeds a set normal value or not is judged by comparing the step voltage data with a voltage threshold, so that whether electric leakage of the power equipment can occur to cause electric shock hazard or not is judged. And meanwhile, the power equipment is judged to be in the dangerous state grade according to the difference between the water level data or the step voltage data and the set normal value. If the monitoring data comprise water level data and step voltage data, the safety level corresponding to the water level data and the safety level corresponding to the step voltage data are respectively determined, the safety level of the power equipment is determined by comprehensively analyzing the two safety levels, and the electric shock risk of the power equipment can be accurately evaluated.
Optionally, determining the safety level of the power device according to the safety level corresponding to the water level data and the safety level corresponding to the step voltage data may include:
and determining the highest level in the safety levels corresponding to the water level data and the step voltage data as the safety level of the power equipment.
Illustratively, if the safety level corresponding to the water level data is a low level, the safety level corresponding to the step voltage data is an early warning level, and the safety level of the power equipment is determined to be the early warning level because the early warning level is higher than the low level.
And step S230, sending an alarm control instruction to an acousto-optic alarm unit in the emergency protection device so as to control the acousto-optic alarm unit to send an acousto-optic alarm signal according to the alarm control instruction.
For example, as shown in fig. 4, the early warning control module in the electric shock protection control device may include an alarm control unit and an emergency control unit. The control device for electric shock protection can send an alarm control instruction to the sound and light alarm unit in the emergency protection device through the alarm control unit so as to control the sound and light alarm unit to send out sound and light alarm signals according to the alarm control instruction. According to the embodiment of the invention, when the electric power equipment has an electric leakage risk according to the safety level of the electric power equipment, the audible and visual alarm unit in the emergency protection device sends out the alarm signal to warn the personnel around the electric power equipment to be far away from the electric power equipment, so that the risk of electric shock is reduced, and the audible and visual alarm device is beneficial for a management department to reduce the risk of electric shock of the operation and maintenance personnel in the process of arranging the operation and maintenance personnel to arrive at the site of the electric power equipment for rush repair.
Step S240, sending an emergency control command to an emergency execution unit in the emergency protection device to control the emergency execution unit to execute a power-off operation according to the emergency control command, or sending an alarm control command to an audible and visual alarm unit and sending the emergency control command to the emergency execution unit to control the audible and visual alarm unit to send an audible and visual alarm signal according to the alarm control command and control the emergency execution unit to execute the power-off operation according to the emergency control command.
For example, as shown in fig. 4, the control device for electric shock protection may send an emergency control command to an emergency execution unit in the emergency protection device through the emergency control unit to control the emergency execution unit to perform a power-off operation according to the emergency control command. Alternatively, the control device for electric shock protection may send an emergency control command to an emergency execution unit in the emergency protection device through the emergency control unit to control the emergency execution unit to execute the power-off operation according to the emergency control command. And an alarm control instruction is sent to an acousto-optic alarm unit in the emergency protection device through the alarm control unit so as to control the acousto-optic alarm unit to send an acousto-optic alarm signal according to the alarm control instruction. According to the embodiment of the invention, when the power equipment has serious electric leakage risk according to the safety level of the power equipment, the power-off control can be directly carried out on the power equipment, or not only the power-off control is carried out on the power equipment, but also the alarm signal is sent out through the sound-light alarm unit in the emergency protection device, so that the safety of peripheral personnel is ensured, the risk of electric shock is further reduced, and the safety and the reliability of switch cabinet wading emergency management are improved.
And step S250, sending the monitoring data to the user terminal.
Wherein the level of the secondary emergency level is higher than the early warning level and lower than the emergency level.
The user terminal may be a Mobile phone, a tablet computer, a smart watch, a computer, or a Mobile Internet Device (MID) terminal.
Specifically, when the safety level is a secondary emergency level, the monitoring data is sent to the user terminal, and the monitoring data and the corresponding safety level are displayed on the user terminal, so that a user can know the working environment and the electric leakage condition of the power equipment in time.
And step S260, when a terminal control instruction sent by the user terminal is obtained, sending an emergency control instruction to the emergency protection device according to the terminal control instruction so as to control the emergency protection device to determine whether to execute a power-off operation according to the emergency control instruction.
Illustratively, as shown in fig. 4, when the security level is the sub-emergency level, the control device for electric shock protection obtains a terminal control command of the user terminal through the data obtaining module, sends the emergency control command to the emergency execution unit through the data transmission unit in the emergency protection device according to the terminal control command, and controls the emergency execution unit to perform the power-off operation on the electrical equipment. The embodiment of the invention provides a manual control method, which is used for completely analyzing and judging whether power failure is performed or not by accurately reflecting the current state data of power equipment to a user, so that the user can manually send a power failure control instruction to control the power failure of the power equipment. Meanwhile, the user can also judge whether to continuously observe the state change of the power equipment or to select power-off at a proper time according to the professional knowledge of the user.
Optionally, if the security level is a sub-emergency level, sending the monitoring data to the user terminal may include:
if the safety level is a secondary emergency level, the real-time environment image sent by an image acquisition unit in the emergency protection device is acquired while the monitoring data is sent to the user terminal, and the real-time environment image is sent to the user terminal; the image acquisition unit is used for acquiring a real-time environment image of the position where the power equipment is located in real time.
The emergency protection device may further comprise an image acquisition unit. The image acquisition unit can be used for acquiring a real-time environment image of the position where the power equipment is located in real time. For example, the image capturing unit may be an image sensor having an image capturing function.
Fig. 5 is a schematic structural diagram of another electric shock protection control system according to a second embodiment of the present invention. As shown in fig. 5, after the real-time environment image sent by the image acquisition unit in the emergency protection device is acquired, the real-time environment image can be sent to the user terminal through the display subunit in the control device for electric shock protection, so that a user can accurately judge whether the power is off according to the field condition of the power equipment, and more reference data are provided for the user.
Optionally, after acquiring the real-time environment image sent by the image acquisition unit in the emergency protection device, the method may further include:
converting the image type of the real-time environment image from an RGB color space type to a Lab color space type, and acquiring a brightness component image of an L channel, a color component of an a channel and a color component of a b channel from the real-time environment image of the Lab color space type;
dividing the brightness component image of the L channel to obtain sub-regions which are not overlapped with each other, and calculating the enhanced brightness of each sub-region based on a preset brightness enhancement model; the preset brightness enhancement model is used for adjusting the exposure position and the dark position of the real-time environment image in a targeted manner according to the overall brightness level and the local brightness condition of the real-time environment image;
respectively carrying out brightness enhancement processing on the corresponding sub-regions according to each enhanced brightness to obtain enhanced brightness components after the brightness enhancement processing;
and outputting the enhanced real-time environment image according to the enhanced brightness component, the color component of the a channel and the color component of the b channel.
Wherein an RGB color space type may be understood as a color model determined on the basis of the three primary colors red, green and blue. The Lab color control type may be understood as a color model determined based on the luminance of the L channel, the color of the a channel, and the color of the b channel.
Illustratively, as shown in fig. 5, the control device for electric shock protection can also perform brightness enhancement processing on the real-time environment image through the picture adjusting subunit. And converting the real-time environment image from an RGB color space to a Lab color space, and respectively obtaining a brightness component image of an L channel, a color component of an a channel and a color component of a b channel of the real-time environment image. And performing brightness enhancement processing on the real-time environment image aiming at the acquired brightness component image of the L channel. Dividing the brightness component image of the L channel into a plurality of non-overlapping sub-regions, and respectively performing brightness enhancement processing on each sub-region according to a preset brightness enhancement model. The brightness enhancement model may use the following brightness enhancement function:
Figure BDA0002810344890000151
wherein LZ (i, n) represents a luminance component value of an nth pixel point in an ith sub-area after the luminance enhancement processing, L (i, n) represents a luminance component value of an nth pixel point in the ith sub-area,
Figure BDA0002810344890000152
represents the mean value of the luminance components of the ith sub-region,
Figure BDA0002810344890000153
luminance representing an ambient imageThe component mean value, T represents a set threshold, and T e [20,30 ] can be selected]Beta represents an enhancement regulation factor, and beta epsilon [0.27,0.38 ] can be selected]。
And respectively carrying out brightness enhancement processing on each subarea to obtain an enhanced brightness component LZ after the brightness enhancement processing, reconstructing a real-time environment image according to the enhanced brightness component LZ, the color component of the a channel and the color component of the b channel, and outputting the enhanced real-time environment image.
The embodiment of the invention aims at the situation that the real-time environment image collected in the severe environment is possibly low in quality, so that the understanding and judgment of a user on the actual situation of the power equipment site are influenced, the display effect of the real-time environment image is improved by performing enhancement processing on the collected real-time environment image of the power equipment, the user can accurately obtain the site situation of the power equipment in real time, and particularly under the condition of emergency level, accurate power failure judgment is made.
Meanwhile, the embodiment of the invention also provides an improved processing technical scheme for enhancing the brightness of the real-time environment image, the overall brightness level and the local brightness condition of the real-time environment image can be comprehensively considered based on the Lab color space, and the targeted adjustment processing is particularly carried out on the exposure and dark explosion positions which locally appear, so that the condition that the image quality is influenced by the exposure and dark explosion conditions caused under the severe environment in the acquisition process of the image is avoided, and the observability of the image is effectively enhanced.
Optionally, after determining the safety level of the electrical device according to the analysis result, the method may further include:
and generating a monitoring data log according to the monitoring data and the safety level corresponding to the monitoring data, and storing the monitoring data log into a log group corresponding to the safety level.
As shown in fig. 4, in the embodiment of the present invention, the data management module generates the monitoring data logs according to the monitoring data and the corresponding security levels, and the monitoring data logs are stored in a classified manner, so that the risk of the electrical device is conveniently evaluated according to the historical monitoring data logs in the subsequent process, a security interval can be adjusted and set according to the historical monitoring data logs, the accuracy of the security level judgment is improved, and the monitoring data logs are recorded, so that the electrical device is conveniently maintained in the subsequent process.
The embodiment of the invention monitors the power equipment in real time, monitors the monitoring data (such as water level data and/or leakage data and the like) of the power equipment in real time through the emergency protection device arranged in the power equipment, intelligently analyzes the received monitoring data, monitors the current safety risk level of the power equipment, and automatically and remotely controls the acousto-optic alarm unit of the power equipment to send an acousto-optic alarm signal when the power equipment has leakage risk (such as leakage but not injuring people), so as to remind people nearby the power equipment to avoid electric shock. When the power equipment has serious electric leakage (for example, high step voltage causes danger of electric shock and injury of people), the emergency power-off operation is automatically carried out on the power equipment or manually carried out by a user, so that the threat that the large-area electric leakage and injury of people exist in the power equipment under the severe environment is reduced.
EXAMPLE III
Fig. 6 is a schematic structural diagram of a control device for electric shock protection according to a third embodiment of the present invention. The device can be realized by software and/or hardware, can be generally integrated in the control equipment for electric shock protection, and can realize the reduction of electric leakage risk and the improvement of the safety of electric power equipment by executing the control method for electric shock protection. As shown in fig. 6, the apparatus includes:
the data acquisition module 310 is configured to acquire monitoring data of an emergency protection device in the electrical equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
the data analysis module 320 is configured to analyze a set safety interval to which the monitoring data belongs, and determine a safety level of the power equipment according to an analysis result;
and the early warning control module 330 is configured to send an early warning control instruction to the emergency protection device if the security level belongs to a preset early warning level, so as to control the emergency protection device to send an alarm signal and/or execute a power-off operation according to the early warning control instruction.
According to the embodiment of the invention, monitoring data of an emergency protection device in power equipment are acquired, a set safety interval to which the monitoring data belong is analyzed, the safety level of the power equipment is determined according to the analysis result, and if the safety level belongs to a preset early warning level, an early warning control instruction is sent to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction. According to the embodiment of the invention, the safety level of the power equipment is judged by analyzing the acquired monitoring data, and the emergency protection device in the power equipment is remotely controlled to send out an alarm signal and/or execute power-off operation when the power equipment has a leakage risk, so that the risk of hurting people due to large-area leakage in a severe environment is reduced, and the safety of the power equipment is improved.
Optionally, the monitoring data includes water level data and/or step voltage data, and the data analysis module 320 is specifically configured to:
comparing the water level data with a first water level threshold and a second water level threshold;
if the water level data is smaller than or equal to a first water level threshold, determining that the safety level corresponding to the water level data is a low level;
if the water level data is larger than a first water level threshold and smaller than or equal to a second water level threshold, determining that the safety level corresponding to the water level data is an early warning level;
if the water level data is larger than a second water level threshold, determining that the safety level corresponding to the water level data is an emergency level; and/or
Comparing the step voltage data to a first voltage threshold and a second voltage threshold;
if the step voltage data is smaller than or equal to a first voltage threshold, determining that the safety level corresponding to the step voltage data is a low level;
if the step voltage data is larger than a first voltage threshold and smaller than or equal to a second voltage threshold, determining that the safety level corresponding to the step voltage data is an early warning level;
if the step voltage data is larger than a second voltage threshold, determining that the safety level corresponding to the step voltage data is an emergency level;
determining the safety level of the power equipment according to the safety level corresponding to the water level data and/or the safety level corresponding to the step voltage data;
and the early warning grade and the emergency grade belong to preset early warning grades.
Optionally, the early warning control module 330 is specifically configured to:
if the safety level is an early warning level, sending an alarm control instruction to an acousto-optic alarm unit in the emergency protection device so as to control the acousto-optic alarm unit to send an acousto-optic alarm signal according to the alarm control instruction;
if the safety level is an emergency level, an emergency control instruction is sent to an emergency execution unit in the emergency protection device to control the emergency execution unit to execute power-off operation according to the emergency control instruction, or an alarm control instruction is sent to the sound-light alarm unit and an emergency control instruction is sent to the emergency execution unit to control the sound-light alarm unit to send out sound-light alarm signals according to the alarm control instruction and control the emergency execution unit to execute power-off operation according to the emergency control instruction.
Optionally, the early warning control module 330 is further specifically configured to:
after the safety level of the power equipment is determined according to the analysis result, if the safety level is a secondary emergency level, the monitoring data is sent to a user terminal; wherein the level of the secondary emergency level is higher than the early warning level and lower than the emergency level;
and when a terminal control instruction sent by the user terminal is acquired, sending an emergency control instruction to the emergency protection device according to the terminal control instruction so as to control the emergency protection device to determine whether to execute power-off operation according to the emergency control instruction.
Optionally, the early warning control module 330 is specifically configured to:
if the safety level is a secondary emergency level, the monitoring data is sent to a user terminal, meanwhile, a real-time environment image sent by an image acquisition unit in the emergency protection device is obtained, and the real-time environment image is sent to the user terminal; the image acquisition unit is used for acquiring a real-time environment image of the position where the power equipment is located in real time.
Optionally, the early warning control module 330 is specifically configured to:
after a real-time environment image sent by an image acquisition unit in the emergency protection device is acquired, converting the image type of the real-time environment image from an RGB color space type to a Lab color space type, and acquiring a brightness component image of an L channel, a color component of an a channel and a color component of a b channel from the real-time environment image of the Lab color space type;
dividing the brightness component image of the L channel to obtain non-overlapping sub-regions, and calculating the enhanced brightness of each sub-region based on a preset brightness enhancement model; the preset brightness enhancement model is used for adjusting the exposure position and the dark position of the real-time environment image in a targeted manner according to the overall brightness level and the local brightness condition of the real-time environment image;
respectively carrying out brightness enhancement processing on the corresponding sub-regions according to the enhanced brightness to obtain enhanced brightness components after the brightness enhancement processing;
and outputting the enhanced real-time environment image according to the enhanced brightness component, the color component of the channel a and the color component of the channel b.
The control device for electric shock protection provided by the embodiment of the invention can execute the control method for electric shock protection provided by any embodiment of the invention, and has the corresponding functional modules and beneficial effects of the execution method.
Example four
The fourth embodiment of the invention provides a control system for electric shock protection. The control system for electric shock protection comprises the control device for electric shock protection and the emergency protection device, which are provided by the embodiment of the invention, so that the electric leakage risk can be reduced, and the safety of electric power equipment can be improved.
The control device for electric shock protection is used for executing a control method for electric shock protection provided by any embodiment of the invention, and the method comprises the following steps:
acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result;
and if the safety level belongs to a preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
The emergency protection device can be arranged in the power equipment and is used for monitoring the working environment and the electric leakage condition of the power equipment and sending monitoring data to the control device for electric shock protection.
According to the embodiment of the invention, the monitoring data sent by the emergency protection device is analyzed by the electric shock protection control device, the safety level of the power equipment is judged, and the emergency protection device in the power equipment is remotely controlled to send out the alarm signal and/or execute the power-off operation when the power equipment has the electric leakage risk, so that the risk of hurting people due to large-area electric leakage in a severe environment is reduced, and the safety of the power equipment is improved.
It should be noted that the control device for electric shock protection provided in this embodiment can execute the control method for electric shock protection provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method. The emergency protection device provided by the embodiment can be the emergency protection device provided by any embodiment of the invention, and has the corresponding functional modules and beneficial effects of the execution method.
EXAMPLE five
Fig. 7 is a schematic structural diagram of a shock protection control apparatus according to a fifth embodiment of the present invention, as shown in fig. 7, the shock protection control apparatus includes a processor 400, a memory 410, an input device 420, and an output device 430; the number of the processors 400 in the electric shock protection control device can be one or more, and one processor 400 is taken as an example in fig. 7; the processor 400, the memory 410, the input device 420 and the output device 430 in the electric shock protection control apparatus may be connected by a bus or other means, and fig. 7 illustrates an example of connection by a bus.
The memory 410 is a computer-readable storage medium, and can be used to store software programs, computer-executable programs, and modules, such as program instructions and/or modules corresponding to the control method for electric shock protection in the embodiment of the present invention (for example, the data acquisition module 310, the data analysis module 320, and the warning control module 330 in the control device for electric shock protection). The processor 400 executes various functional applications and data processing of the electric shock protection control device by operating software programs, instructions and modules stored in the memory 410, that is, implements the electric shock protection control method described above. The method comprises the following steps:
acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result;
and if the safety level belongs to a preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
The memory 410 may mainly include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to the use of the terminal, and the like. Further, the memory 410 may include high speed random access memory, and may also include non-volatile memory, such as at least one magnetic disk storage device, flash memory device, or other non-volatile solid state storage device. In some examples, memory 410 may further include memory located remotely from processor 400, which may be connected to the shock protected control device over a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The input device 420 may be used to receive input numeric or character information and generate key signal inputs related to user settings and function control of the electric shock protection control apparatus. The output device 430 may include a display device such as a display screen.
EXAMPLE six
An embodiment of the present invention further provides a storage medium containing computer-executable instructions, which when executed by a computer processor, perform a control method for protection against electric shock, the method including:
acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result;
and if the safety level belongs to a preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
Of course, the storage medium containing the computer-executable instructions provided by the embodiments of the present invention is not limited to the method operations described above, and may also perform related operations in the control method for electric shock protection provided by any embodiment of the present invention.
From the above description of the embodiments, it is obvious for those skilled in the art that the present invention can be implemented by software and necessary general hardware, and certainly, can also be implemented by hardware, but the former is a better embodiment in many cases. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which can be stored in a computer-readable storage medium, such as a floppy disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a FLASH Memory (FLASH), a hard disk or an optical disk of a computer, and includes several instructions for enabling a computer device (which may be a personal computer, a server, or a network device) to execute the methods according to the embodiments of the present invention.
It should be noted that, in the embodiment of the control device for electric shock protection, the included units and modules are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be realized; in addition, specific names of the functional units are only for convenience of distinguishing from each other, and are not used for limiting the protection scope of the present invention.
It is to be noted that the foregoing is only illustrative of the preferred embodiments of the present invention and the technical principles employed. It will be understood by those skilled in the art that the present invention is not limited to the particular embodiments described herein, but is capable of various obvious changes, rearrangements and substitutions as will now become apparent to those skilled in the art without departing from the scope of the invention. Therefore, although the present invention has been described in greater detail by the above embodiments, the present invention is not limited to the above embodiments, and may include other equivalent embodiments without departing from the spirit of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims (10)

1. A control method for electric shock protection is characterized by comprising the following steps:
acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to an analysis result;
and if the safety level belongs to a preset early warning level, sending an early warning control instruction to the emergency protection device so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
2. The method according to claim 1, wherein the monitoring data comprises water level data and/or step voltage data, the analyzing a set safety interval to which the monitoring data belongs, and determining the safety level of the power equipment according to the analysis result comprises:
comparing the water level data with a first water level threshold and a second water level threshold;
if the water level data is smaller than or equal to a first water level threshold, determining that the safety level corresponding to the water level data is a low level;
if the water level data is larger than a first water level threshold and smaller than or equal to a second water level threshold, determining that the safety level corresponding to the water level data is an early warning level;
if the water level data is larger than a second water level threshold, determining that the safety level corresponding to the water level data is an emergency level; and/or
Comparing the step voltage data to a first voltage threshold and a second voltage threshold;
if the step voltage data is smaller than or equal to a first voltage threshold, determining that the safety level corresponding to the step voltage data is a low level;
if the step voltage data is larger than a first voltage threshold and smaller than or equal to a second voltage threshold, determining that the safety level corresponding to the step voltage data is an early warning level;
if the step voltage data is larger than a second voltage threshold, determining that the safety level corresponding to the step voltage data is an emergency level;
determining the safety level of the power equipment according to the safety level corresponding to the water level data and/or the safety level corresponding to the step voltage data;
and the early warning grade and the emergency grade belong to preset early warning grades.
3. The method according to claim 2, wherein if the safety level belongs to a preset early warning level, sending an early warning control command to the emergency protection device to control the emergency protection device to send out an alarm signal and/or execute a power-off operation according to the early warning control command, comprising:
if the safety level is an early warning level, sending an alarm control instruction to an acousto-optic alarm unit in the emergency protection device so as to control the acousto-optic alarm unit to send an acousto-optic alarm signal according to the alarm control instruction;
if the safety level is an emergency level, an emergency control instruction is sent to an emergency execution unit in the emergency protection device to control the emergency execution unit to execute power-off operation according to the emergency control instruction, or an alarm control instruction is sent to the sound-light alarm unit and an emergency control instruction is sent to the emergency execution unit to control the sound-light alarm unit to send out sound-light alarm signals according to the alarm control instruction and control the emergency execution unit to execute power-off operation according to the emergency control instruction.
4. The method of claim 1, after determining the safety level of the power device according to the analysis result, further comprising:
if the safety level is a secondary emergency level, sending the monitoring data to a user terminal; wherein the level of the secondary emergency level is higher than the early warning level and lower than the emergency level;
and when a terminal control instruction sent by the user terminal is acquired, sending an emergency control instruction to the emergency protection device according to the terminal control instruction so as to control the emergency protection device to determine whether to execute power-off operation according to the emergency control instruction.
5. The method of claim 4, wherein sending the monitoring data to the user terminal if the security level is a sub-emergency level comprises:
if the safety level is a secondary emergency level, the monitoring data is sent to a user terminal, meanwhile, a real-time environment image sent by an image acquisition unit in the emergency protection device is obtained, and the real-time environment image is sent to the user terminal; the image acquisition unit is used for acquiring a real-time environment image of the position where the power equipment is located in real time.
6. The method of claim 5, after acquiring the real-time environment image transmitted by the image acquisition unit in the emergency protection device, further comprising:
converting the image type of the real-time environment image from an RGB color space type to a Lab color space type, and acquiring a brightness component image of an L channel, a color component of an a channel and a color component of a b channel from the real-time environment image of the Lab color space type;
dividing the brightness component image of the L channel to obtain non-overlapping sub-regions, and calculating the enhanced brightness of each sub-region based on a preset brightness enhancement model; the preset brightness enhancement model is used for adjusting the exposure position and the dark position of the real-time environment image in a targeted manner according to the overall brightness level and the local brightness condition of the real-time environment image;
respectively carrying out brightness enhancement processing on the corresponding sub-regions according to the enhanced brightness to obtain enhanced brightness components after the brightness enhancement processing;
and outputting the enhanced real-time environment image according to the enhanced brightness component, the color component of the channel a and the color component of the channel b.
7. A control device for protection against electric shock, comprising:
the data acquisition module is used for acquiring monitoring data of an emergency protection device in the power equipment; the emergency protection device is used for monitoring the working environment and the electric leakage condition of the power equipment;
the data analysis module is used for analyzing a set safety interval to which the monitoring data belongs and determining the safety level of the power equipment according to an analysis result;
and the early warning control module is used for sending an early warning control instruction to the emergency protection device if the safety level belongs to a preset early warning level so as to control the emergency protection device to send out an alarm signal and/or execute power-off operation according to the early warning control instruction.
8. A control system for protection against electric shock, comprising:
a control device for electric shock protection for performing the control method for electric shock protection according to claims 1 to 6;
the emergency protection device is arranged in the power equipment and used for monitoring the working environment and the electric leakage condition of the power equipment and sending monitoring data to the control device for electric shock protection.
9. An electric shock protection control apparatus, characterized in that the electric shock protection control apparatus comprises:
one or more processors;
a memory for storing one or more programs,
when executed by the one or more processors, cause the one or more processors to implement the method of electric shock protection control of any one of claims 1-6.
10. A storage medium containing computer-executable instructions for performing the method of shock protection control of any one of claims 1-6 when executed by a computer processor.
CN202011388054.1A 2020-12-01 2020-12-01 Control method, device, system, equipment and medium for electric shock protection Pending CN112735102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011388054.1A CN112735102A (en) 2020-12-01 2020-12-01 Control method, device, system, equipment and medium for electric shock protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011388054.1A CN112735102A (en) 2020-12-01 2020-12-01 Control method, device, system, equipment and medium for electric shock protection

Publications (1)

Publication Number Publication Date
CN112735102A true CN112735102A (en) 2021-04-30

Family

ID=75598146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011388054.1A Pending CN112735102A (en) 2020-12-01 2020-12-01 Control method, device, system, equipment and medium for electric shock protection

Country Status (1)

Country Link
CN (1) CN112735102A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114446018A (en) * 2021-12-31 2022-05-06 深圳供电局有限公司 Step voltage protection device and step voltage protection wearing device
CN115099713A (en) * 2022-08-01 2022-09-23 武汉胜天地消防工程有限公司 Smart power grid operation log collection and analysis management system based on big data
CN115457741A (en) * 2022-08-15 2022-12-09 广东新电电力科技有限公司 Low-power consumption water immersion alarm sensor device with multi-stage alarm
CN118038653A (en) * 2024-04-11 2024-05-14 国网山东省电力公司宁津县供电公司 Electric shock prevention method and system for power grid construction operation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1716723A (en) * 2004-03-16 2006-01-04 魏晋祥 Leakage potential type action protector
CN208902212U (en) * 2018-08-28 2019-05-24 李亮棠 Intelligent water level monitors locating alarm device and supply network monitoring water level network system
CN209298575U (en) * 2019-03-04 2019-08-23 金陵科技学院 A kind of anticreep distribution box in construction site
CN111476725A (en) * 2020-03-24 2020-07-31 广西科技大学 Image defogging enhancement algorithm based on gradient domain oriented filtering and multi-scale Retinex theory
CN211183386U (en) * 2019-11-19 2020-08-04 广东电网有限责任公司 Low-voltage water immersion automatic power-off device
KR20200129617A (en) * 2019-05-09 2020-11-18 일진에이테크 주식회사 Monitoring Device for state of winder

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1716723A (en) * 2004-03-16 2006-01-04 魏晋祥 Leakage potential type action protector
CN208902212U (en) * 2018-08-28 2019-05-24 李亮棠 Intelligent water level monitors locating alarm device and supply network monitoring water level network system
CN209298575U (en) * 2019-03-04 2019-08-23 金陵科技学院 A kind of anticreep distribution box in construction site
KR20200129617A (en) * 2019-05-09 2020-11-18 일진에이테크 주식회사 Monitoring Device for state of winder
CN211183386U (en) * 2019-11-19 2020-08-04 广东电网有限责任公司 Low-voltage water immersion automatic power-off device
CN111476725A (en) * 2020-03-24 2020-07-31 广西科技大学 Image defogging enhancement algorithm based on gradient domain oriented filtering and multi-scale Retinex theory

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114446018A (en) * 2021-12-31 2022-05-06 深圳供电局有限公司 Step voltage protection device and step voltage protection wearing device
CN115099713A (en) * 2022-08-01 2022-09-23 武汉胜天地消防工程有限公司 Smart power grid operation log collection and analysis management system based on big data
CN115457741A (en) * 2022-08-15 2022-12-09 广东新电电力科技有限公司 Low-power consumption water immersion alarm sensor device with multi-stage alarm
CN118038653A (en) * 2024-04-11 2024-05-14 国网山东省电力公司宁津县供电公司 Electric shock prevention method and system for power grid construction operation

Similar Documents

Publication Publication Date Title
CN112735102A (en) Control method, device, system, equipment and medium for electric shock protection
CN109638966B (en) Visual cloud platform system for intelligent online monitoring and data remote transmission of lightning arrester
CN109068099B (en) Virtual electronic fence monitoring method and system based on video monitoring
CN104469305B (en) The fault detection method and device of power network video monitoring device
CN108429348A (en) A kind of wisdom Electrical Safety system
KR101106724B1 (en) Smart pannel board with blackbox and emergency-battery
CN110769068A (en) Method, device, server and storage medium for generating alarm message
CN209895474U (en) Intelligent substation protection and control online safe operation analysis system
CN203733243U (en) Power transmission line on-line monitoring device capable of preventing construction mechanical force damages
CN113011833A (en) Safety management method and device for construction site, computer equipment and storage medium
CN112469172B (en) Power distribution room lighting system, method, device and storage medium
CN113559442B (en) Electric automobile charging pile fire partition intelligent prevention and control method and system
CN113566883A (en) Power cable monitoring method and system based on Internet of things and storage medium
CN111341063A (en) Intelligent control system, method and device for safety early warning and monitoring of electric equipment and terminal equipment
CN110988588A (en) Distributed power grid distribution line working condition monitoring system and monitoring method
CN207926282U (en) A kind of wisdom Electrical Safety system
CN113936403A (en) Intelligent monitoring security electronic fence alarm system based on Internet of things
CN114035491B (en) Green intelligent pumping unit system
KR101251865B1 (en) Outdoor intelligent unmanned fire-alarm system and the application method
CN103871185B (en) The anti-external force processing method of transmission line of electricity, Apparatus and system
CN108933482B (en) Power distribution terminal equipment off-line reason analysis method based on wireless signal intensity
CN105467936A (en) Power equipment monitoring system
CN211236628U (en) Three-phase safety power utilization intelligent monitoring equipment system
CN115512295A (en) Power transmission line forest fire detection method, early warning method and early warning system
CN213024039U (en) Intelligent detection and management system for power distribution room environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210430