CN112734363A - Subsidy declaration and auditing method and system based on data full-link supervision - Google Patents
Subsidy declaration and auditing method and system based on data full-link supervision Download PDFInfo
- Publication number
- CN112734363A CN112734363A CN202011624563.XA CN202011624563A CN112734363A CN 112734363 A CN112734363 A CN 112734363A CN 202011624563 A CN202011624563 A CN 202011624563A CN 112734363 A CN112734363 A CN 112734363A
- Authority
- CN
- China
- Prior art keywords
- project
- information
- subsidy
- data
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 115
- 238000012550 audit Methods 0.000 claims abstract description 19
- 238000007726 management method Methods 0.000 claims abstract description 14
- 239000013589 supplement Substances 0.000 claims abstract description 13
- 238000012790 confirmation Methods 0.000 claims description 28
- 238000012795 verification Methods 0.000 claims description 7
- 102100036790 Tubulin beta-3 chain Human genes 0.000 claims description 6
- 102100036788 Tubulin beta-4A chain Human genes 0.000 claims description 6
- 238000012544 monitoring process Methods 0.000 claims description 6
- 238000012552 review Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 5
- 238000013524 data verification Methods 0.000 claims description 3
- 230000000977 initiatory effect Effects 0.000 claims description 3
- 238000004321 preservation Methods 0.000 claims 1
- 238000004590 computer program Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 5
- 238000010248 power generation Methods 0.000 description 5
- 238000012545 processing Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 3
- 239000002028 Biomass Substances 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2455—Query execution
- G06F16/24564—Applying rules; Deductive queries
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Data Mining & Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Finance (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Computational Linguistics (AREA)
- Databases & Information Systems (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Development Economics (AREA)
- Technology Law (AREA)
- Public Health (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a subsidy declaration and auditing method and system based on data full-link supervision, wherein the method is executed by a server and comprises the following steps: starting a daemon process to start supervision; informing a user to confirm information and supplement project information; acquiring and storing user input information, and updating a project state label; checking project information to ensure correctness and completeness; recording the operation trace of the user, so as to facilitate the follow-up audit; starting a timing program and updating the item state label; identifying a project state label and pushing a project to a proper process node; after the guard is finished, the process is dormant, and the hot standby can be awakened at any time. The method can effectively improve the auditing efficiency of subsidy declaration, solves the problem that the conventional subsidy management only stays at the data filing level by innovating a data driving business mode, realizes the overall subsidy process and transparent management and control, ensures that the subsidy data cannot be falsified, and realizes the tracking, retrieval and updating of the project historical files.
Description
Technical Field
The invention relates to a subsidy declaration and auditing method and system based on data full-link supervision, and belongs to the technical field of internet application.
Background
With the rapid development of the renewable energy power generation industry, the scale of the renewable energy power generation such as wind power, solar power generation, biomass and the like is increased day by day, the requirement on new energy consumption is higher and higher, and the contradiction and the deficiency in the aspects of planning and construction, grid-connected service, technical support, market transaction and the like are more and more prominent.
According to the traditional new energy subsidy reporting auditing and routing process, the subsidy reporting work has the problems of low efficiency, reporting proving material not meeting the requirements of relevant policies and the like. In order to cooperate with the development of new energy subsidy catalog management, implement the work deployment of renewable energy subsidy project management required for power grid enterprises, make new energy subsidy management work, realize online reporting and auditing of new energy subsidy, realize deep fusion of new generation information technology and traditional subsidy management business, better serve new energy power generation enterprises, promote healthy and orderly development of new energy utilities, and assist in realization of major cycle economic strategic targets, the online reporting, auditing and publishing functions of subsidy projects are developed, and online one-stop subsidy project list reporting and auditing service is provided for power users, energy management departments and information management centers.
Disclosure of Invention
The invention aims to overcome the technical defects in the prior art, solve the technical problems and provide a subsidy declaration project data self-driven management mechanism, namely a subsidy declaration and auditing method and system based on data full-link supervision. According to the online operation result of the state network new energy cloud subsidy declaration module, the method can effectively improve subsidy declaration and verification efficiency and solve the pain point problem in the past subsidy declaration work.
The invention specifically adopts the following technical scheme: a subsidy declaration and auditing method based on data full-link supervision is executed by a server and comprises the following steps:
step SS 1: starting a daemon process to start supervision;
step SS 2: informing a user to confirm information and supplement project information; the step SS2 specifically includes: the daemon process sends information to related users in the steps of main reporting, power grid enterprise preliminary examination, energy-saving source office review and final information center confirmation, and reminds the users to carry out information supplement or information confirmation; the daemon process automatically judges according to a preset business rule by identifying the current business stage and various state labels of the project, and triggers a mechanism to notify a user in various forms such as short messages or website in-site messages if the project meets the condition;
step SS 3: acquiring and storing user input information, and updating a project state label;
step SS 4: checking project information to ensure correctness and completeness;
step SS 5: recording the operation trace of the user, so as to facilitate the follow-up audit;
step SS 6: starting a timing program and updating the item state label;
step SS 7: identifying a project state label and pushing a project to a proper process node;
step SS 8: after the guard is finished, the process is dormant, and the hot standby can be awakened at any time.
As a preferred embodiment, step SS1 specifically includes: the server configures a daemon process for each project for starting the business process, and the daemon process plays the role of an auditor and is responsible for monitoring the project state in the full life cycle of the project and pushing the project to finish the whole application business process.
As a preferred embodiment, step SS3 specifically includes: the method comprises the steps that a daemon process obtains and stores project information, uploaded accessory materials and audit information filled by auditors in the links of owner filing, preliminary audit of power grid enterprises, recheck audit of energy-saving source bureaus and final confirmation of an information center, the information and project associations are stored in a database, corresponding project state values are updated according to preset business rules, and the project state values comprise declaration state values and audit state values; the subsequent daemon process makes judgment according to the project state labels and triggers a corresponding mechanism to arrange the project progress.
As a preferred embodiment, step SS4 specifically includes: when a main filing, power grid enterprise preliminary examination, energy-saving source bureau recheck examination, information center final confirmation, project bulletin, project inclusion subsidy list and publishing links are carried out, a daemon process can compare whether the current data of a verification project and the historical data of the previous link have deviation or not when each link starts, and data tampering or data loss of the project in the circulation process is prevented; at the end of each link, a 'snapshot' of the current project data is stored as if the section specimen was stored, and is used for data verification.
As a preferred embodiment, step SS5 specifically includes: in the links of main reporting, power grid enterprise preliminary examination, energy-saving source bureau recheck examination and final confirmation of the information center, the daemon process records the trace of a series of operations of creating, submitting, modifying and examining a project when a user uses the system.
As a preferred embodiment, step SS6 specifically includes: in the project disclosure link, the daemon starts a timer with a period of multiple days for the project, and after the timing is finished, the project is removed from the relevant page of the project disclosure, and the tag value of the project disclosure state is updated.
As a preferred embodiment, step SS7 specifically includes: and the daemon monitors various state labels of the project in real time, judges whether the project advances to the next link, is kept in the current link or returns to the previous link according to a rule preset by combining business logic, and realizes data self-driving of project management.
As a preferred embodiment, step SS8 specifically includes: when a project is brought into a subsidy list and a link is published, a daemon process temporarily completes the project supervision task, stops monitoring the project in real time and enters a dormant state; when the project restarts the business process, the trigger mechanism wakes up the daemon again to continue the supervision of the data state of the project.
The invention also provides a subsidy declaration and auditing system based on data full-link supervision, which comprises the following steps:
a process initiation module to perform: starting a daemon process to start supervision;
an information confirmation module to perform: informing a user to confirm information and supplement project information; the information confirmation module specifically includes: the daemon process sends information to related users in the steps of main reporting, power grid enterprise preliminary examination, energy-saving source office review and final information center confirmation, and reminds the users to carry out information supplement or information confirmation; the daemon process automatically judges according to a preset service rule by identifying the current service stage and various state labels of the project, and triggers a mechanism to notify a user in various forms such as short messages or website internal messages and the like when the project meets the condition;
a status tag update module to perform: acquiring and storing user input information, and updating a project state label;
a verification module to perform: checking project information to ensure correctness and completeness;
a trace recording module to perform: recording the operation trace of the user, so as to facilitate the follow-up audit;
a timing module to perform: starting a timing program and updating the item state label;
a status tag identification module to perform: identifying a project state label and pushing a project to a proper flow node;
a wake-up module to perform: after the guard is finished, the process is dormant, and the hot standby can be awakened at any time.
The invention also proposes a device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the steps of the method being implemented when the processor executes the program.
The invention also proposes a medium on which a computer program is stored, characterized in that the computer program implements the steps of the method when executed by a processor.
The invention achieves the following beneficial effects: the subsidy declaration and auditing method based on data full-link supervision can realize self-driving of the full process of the subsidy declaration project, realize self-checking and backup of project data by associating with the project data of the previous process nodes, statistically analyze the overall condition of the subsidy declaration project and comprehensively master the working progress of the subsidy declaration. By applying the subsidy declaration and auditing method of the data full-link supervision provided by the text, the circulation efficiency of a new energy subsidy declaration and auditing process can be effectively improved, the subsidy declaration work is public and transparent, adverse conditions that proved materials do not meet national policy requirements and the like are avoided, efficient, reliable and public and transparent subsidy declaration service is provided for vast new energy power generation owners, and the social service level of national network companies is improved. The method can effectively improve the auditing efficiency of subsidy declaration, solves the problem that the conventional subsidy management only stays at the data filing level through innovating a data driving business mode, realizes the whole subsidy process and transparent management and control, ensures that the subsidy data cannot be falsified, and realizes the tracking, transferring and reading of project history files.
Drawings
Fig. 1 is a topological flow diagram of a subsidy declaration and auditing method based on data full-link supervision according to the present invention.
Detailed Description
The invention is further described below with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.
Example 1: the invention provides a subsidy declaration and auditing method based on data full-link supervision, which is executed by a server and comprises the following steps:
step SS 1: starting a daemon process to start supervision;
step SS 2: informing a user to confirm information and supplement project information; the step SS2 specifically includes: the daemon process sends information to related users in the steps of main reporting, power grid enterprise preliminary examination, energy-saving source office review and final information center confirmation, and reminds the users to carry out information supplement or information confirmation; the daemon process automatically judges according to a preset business rule by identifying the current business stage and various state labels of the project, and triggers a mechanism to notify a user in various forms such as short messages or website in-site messages if the project meets the condition;
step SS 3: acquiring and storing user input information, and updating a project state label;
step SS 4: checking project information to ensure correctness and completeness;
step SS 5: recording the operation trace of the user, so as to facilitate the follow-up audit;
step SS 6: starting a timing program and updating the item state label;
step SS 7: identifying a project state label and pushing a project to a proper process node;
step SS 8: after the guard is finished, the process is dormant, and the hot standby can be awakened at any time.
As a preferred embodiment, step SS1 specifically includes: the server configures a daemon process for each project for starting the business process, and the daemon process plays the role of an auditor and is responsible for monitoring the project state in the full life cycle of the project and pushing the project to finish the whole application business process.
As a preferred embodiment, step SS3 specifically includes: the method comprises the steps that a daemon process obtains and stores project information, uploaded accessory materials and audit information filled by auditors in the links of owner filing, preliminary audit of power grid enterprises, recheck audit of energy-saving source bureaus and final confirmation of an information center, the information and project associations are stored in a database, corresponding project state values are updated according to preset business rules, and the project state values comprise declaration state values and audit state values; the subsequent daemon process makes judgment according to the project state labels and triggers a corresponding mechanism to arrange the project progress.
As a preferred embodiment, step SS4 specifically includes: when a main filing, power grid enterprise preliminary examination, energy-saving source bureau recheck examination, information center final confirmation, project bulletin, project inclusion subsidy list and publishing links are carried out, a daemon process can compare whether the current data of a verification project and the historical data of the previous link have deviation or not when each link starts, and data tampering or data loss of the project in the circulation process is prevented; at the end of each link, a 'snapshot' of the current project data is stored as if the section specimen was stored, and is used for data verification.
As a preferred embodiment, step SS5 specifically includes: in the links of main reporting, power grid enterprise preliminary examination, energy-saving source bureau recheck examination and final confirmation of the information center, the daemon process records the trace of a series of operations of creating, submitting, modifying and examining a project when a user uses the system.
As a preferred embodiment, step SS6 specifically includes: in the project disclosure link, the daemon starts a timer with a period of multiple days for the project, and after the timing is finished, the project is removed from the relevant page of the project disclosure, and the tag value of the project disclosure state is updated.
As a preferred embodiment, step SS7 specifically includes: and the daemon monitors various state labels of the project in real time, judges whether the project advances to the next link, is kept in the current link or returns to the previous link according to a rule preset by combining business logic, and realizes data self-driving of project management.
As a preferred embodiment, step SS8 specifically includes: when a project is brought into a subsidy list and a link is published, a daemon process temporarily completes the project supervision task, stops monitoring the project in real time and enters a dormant state; when the project restarts the business process, the trigger mechanism wakes up the daemon again to continue the supervision of the data state of the project.
Example 2: the invention also provides a subsidy declaration and auditing system based on data full-link supervision, which comprises the following steps:
a process initiation module to perform: starting a daemon process to start supervision;
an information confirmation module to perform: informing a user to confirm information and supplement project information; the information confirmation module specifically includes: the daemon process sends information to related users in the steps of main reporting, power grid enterprise preliminary examination, energy-saving source office review and final information center confirmation, and reminds the users to carry out information supplement or information confirmation; the daemon process automatically judges according to a preset service rule by identifying the current service stage and various state labels of the project, and triggers a mechanism to notify a user in various forms such as short messages or website internal messages and the like when the project meets the condition;
a status tag update module to perform: acquiring and storing user input information, and updating a project state label;
a verification module to perform: checking project information to ensure correctness and completeness;
a trace recording module to perform: recording the operation trace of the user, so as to facilitate the follow-up audit;
a timing module to perform: starting a timing program and updating the item state label;
a status tag identification module to perform: identifying a project state label and pushing a project to a proper flow node;
a wake-up module to perform: after the guard is finished, the process is dormant, and the hot standby can be awakened at any time.
Example 3: the invention also proposes a device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the steps of the method are implemented when the processor executes the program.
Example 4: the invention also proposes a medium on which a computer program is stored, characterized in that the computer program implements the steps of the method when executed by a processor.
The invention establishes a data-driven mechanism, so that the system can automatically sense the state of the subsidy declaration project in real time, thereby judging which treatment is carried out on the project. After a project is submitted by an owner declaration, the system marks a 'birth' label for the project and configures a daemon process for the project, the role of the daemon process is similar to that of an auditor, and the daemon process is responsible for tracking the state of the project and pushing the project to automatically circulate in an auditing process in the whole life cycle of the project. When the project flows to a certain process node and needs to be intervened by related personnel, the daemon process is responsible for sending a message to inform a user to process the project; the process link daemon without manual intervention can automatically push the project to enter the following link until the project is formally brought into the subsidy list and the subsidy is issued, and the life cycle of the project is finished. Besides driving the project to finish the whole life cycle, the daemon process is also responsible for recording the operation trace of the project, and if the data of the project is changed or lost unexpectedly, the daemon process can restore and reproduce the data of the project according to the log information, so that the safety of the data of the project is guaranteed. According to the historical trace data of the project, the daemon process can easily show the statistical data of all indexes of the project, and valuable information is analyzed, so that data support is provided for new energy decisions of government departments and power grid enterprises.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks. These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks. These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting the same, and although the present invention is described in detail with reference to the above embodiments, it should be understood by those of ordinary skill in the art that: modifications and equivalents may be made to the embodiments of the invention without departing from the spirit and scope of the invention, which is to be covered by the claims.
Claims (9)
1. A subsidy declaration and auditing method based on data full-link supervision is executed by a server and is characterized by comprising the following steps:
step SS 1: starting a daemon process to start supervision;
step SS 2: informing a user to confirm information and supplement project information; the step SS2 specifically includes: the daemon process sends information to related users in the steps of main reporting, power grid enterprise preliminary examination, energy-saving source office review and final information center confirmation, and reminds the users to carry out information supplement or information confirmation; the daemon process automatically judges according to a preset business rule by identifying the current business stage and various state labels of the project, and triggers a mechanism to notify a user in various forms such as short messages or website in-site messages if the project meets the condition;
step SS 3: acquiring and storing user input information, and updating a project state label;
step SS 4: checking project information to ensure correctness and completeness;
step SS 5: recording the operation trace of the user, so as to facilitate the follow-up audit;
step SS 6: starting a timing program and updating the item state label;
step SS 7: identifying a project state label and pushing a project to a proper process node;
step SS 8: after the guard is finished, the process is dormant, and the hot standby can be awakened at any time.
2. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS1 specifically includes: the server configures a daemon process for each project for starting the business process, and the daemon process plays the role of an auditor and is responsible for monitoring the project state in the full life cycle of the project and pushing the project to finish the whole application business process.
3. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS3 specifically includes: the daemon process acquires and stores project information, uploaded accessory materials and audit information filled by auditors, which are filled by project owners, in the links of main filing, power grid enterprise preliminary audit, energy-saving source bureau recheck audit and information center final confirmation, stores the information and project association in a database, and updates corresponding project state values according to preset business rules, wherein the project state values comprise declaration state values and audit state values; the subsequent daemon process makes judgment according to the project state labels and triggers a corresponding mechanism to arrange the project progress.
4. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS4 specifically includes: when a main filing, power grid enterprise preliminary examination, energy-saving source bureau recheck examination, information center final confirmation, project bulletin, project inclusion subsidy list and publishing links are carried out, a daemon process can compare whether the current data of a verification project and the historical data of the previous link have deviation or not when each link starts, and data tampering or data loss of the project in the circulation process is prevented; at the end of each link, a "snapshot" of the current project data is saved, as is the preservation of the slide specimen, for data verification.
5. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS5 specifically includes: in the links of main reporting, power grid enterprise preliminary examination, energy-saving source bureau recheck examination and final confirmation of the information center, the daemon process records the trace of a series of operations of creating, submitting, modifying and examining a project when a user uses the system.
6. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS6 specifically includes: in the project disclosure link, the daemon starts a timer with a period of multiple days for the project, and after the timing is finished, the project is removed from the relevant page of the project disclosure, and the tag value of the project disclosure state is updated.
7. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS7 specifically includes: and when a main report, a power grid enterprise preliminary examination, an energy-saving source bureau recheck examination, an information center final confirmation, a project public notice and a project inclusion subsidy list are carried out and links are published, a daemon monitors various state labels of the project in real time, and judges whether the project advances to the next link, is kept in the current link or is returned to the previous link according to a rule preset by combining business logic, so that the data self-driving of project management is realized.
8. The subsidy declaration and auditing method based on data full-link supervision according to claim 1, wherein the step SS8 specifically includes: when a project is brought into a subsidy list and a link is published, a daemon process temporarily completes the project supervision task, stops monitoring the project in real time and enters a dormant state; when the project restarts the business process, the trigger mechanism wakes up the daemon again to continue the supervision of the project data state.
9. A subsidy reporting and auditing system based on data full-link supervision is characterized by comprising:
a process initiation module to perform: starting a daemon process to start supervision;
an information confirmation module to perform: informing a user to confirm information and supplement project information; the information confirmation module specifically includes: the daemon process sends information to related users in the steps of main reporting, power grid enterprise preliminary examination, energy-saving source office review and final information center confirmation, and reminds the users to carry out information supplement or information confirmation; the daemon process automatically judges according to a preset business rule by identifying the current business stage and various state labels of the project, and triggers a mechanism to notify a user in various forms such as short messages or website in-site messages if the project meets the condition;
a status tag update module to perform: acquiring and storing user input information, and updating a project state label;
a verification module to perform: checking project information to ensure correctness and completeness;
a trace recording module to perform: recording the operation trace of the user, so as to facilitate the follow-up audit;
a timing module to perform: starting a timing program and updating the item state label;
a status tag identification module to perform: identifying a project state label and pushing a project to a proper process node;
a wake-up module to perform: after the guard is finished, the process is dormant, and the hot standby can be awakened at any time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011624563.XA CN112734363A (en) | 2020-12-30 | 2020-12-30 | Subsidy declaration and auditing method and system based on data full-link supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011624563.XA CN112734363A (en) | 2020-12-30 | 2020-12-30 | Subsidy declaration and auditing method and system based on data full-link supervision |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112734363A true CN112734363A (en) | 2021-04-30 |
Family
ID=75609622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011624563.XA Pending CN112734363A (en) | 2020-12-30 | 2020-12-30 | Subsidy declaration and auditing method and system based on data full-link supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112734363A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113888142A (en) * | 2021-11-15 | 2022-01-04 | 常州市科技资源统筹服务中心(常州市科技情报研究所) | Project intelligent management method and system for reporting enterprise information |
CN114092035A (en) * | 2021-10-29 | 2022-02-25 | 珠海大横琴科技发展有限公司 | Data processing method and device based on enterprise service system |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009009515A (en) * | 2007-06-29 | 2009-01-15 | Sumitomo Mitsui Banking Corp | Housing loan preliminary review application system and method |
CN107918916A (en) * | 2017-09-13 | 2018-04-17 | 平安科技(深圳)有限公司 | Self-service Claims Resolution application processing method, device, computer equipment and storage medium |
CN108198308A (en) * | 2018-01-11 | 2018-06-22 | 广州得令信息科技有限公司 | Door-access control method and device |
CN108288244A (en) * | 2018-02-05 | 2018-07-17 | 合肥和钧正策信息技术有限公司 | One kind being based on big data platform application service system |
CN109064137A (en) * | 2018-08-02 | 2018-12-21 | 龙马智芯(珠海横琴)科技有限公司 | A kind of project application device, system |
CN109272297A (en) * | 2018-09-28 | 2019-01-25 | 赛拓信息技术有限公司 | Project Report on Network management system |
CN111126962A (en) * | 2019-12-24 | 2020-05-08 | 南方电网科学研究院有限责任公司 | New energy grid-connected standard reporting system and method based on block chain |
CN111222853A (en) * | 2020-01-09 | 2020-06-02 | 广州运通链达金服科技有限公司 | Project resource management method and device based on block chain and computer equipment |
CN111724135A (en) * | 2020-06-21 | 2020-09-29 | 华中科技大学同济医学院附属协和医院 | Management system and method for full process of title declaration and review |
CN111782809A (en) * | 2020-06-30 | 2020-10-16 | 中国工商银行股份有限公司 | International reimbursement network data processing method, device, electronic equipment and storage medium |
CN111899084A (en) * | 2020-09-30 | 2020-11-06 | 杭州城市大数据运营有限公司 | Online policy instant cashing method, device, equipment and storage medium |
-
2020
- 2020-12-30 CN CN202011624563.XA patent/CN112734363A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009009515A (en) * | 2007-06-29 | 2009-01-15 | Sumitomo Mitsui Banking Corp | Housing loan preliminary review application system and method |
CN107918916A (en) * | 2017-09-13 | 2018-04-17 | 平安科技(深圳)有限公司 | Self-service Claims Resolution application processing method, device, computer equipment and storage medium |
CN108198308A (en) * | 2018-01-11 | 2018-06-22 | 广州得令信息科技有限公司 | Door-access control method and device |
CN108288244A (en) * | 2018-02-05 | 2018-07-17 | 合肥和钧正策信息技术有限公司 | One kind being based on big data platform application service system |
CN109064137A (en) * | 2018-08-02 | 2018-12-21 | 龙马智芯(珠海横琴)科技有限公司 | A kind of project application device, system |
CN109272297A (en) * | 2018-09-28 | 2019-01-25 | 赛拓信息技术有限公司 | Project Report on Network management system |
CN111126962A (en) * | 2019-12-24 | 2020-05-08 | 南方电网科学研究院有限责任公司 | New energy grid-connected standard reporting system and method based on block chain |
CN111222853A (en) * | 2020-01-09 | 2020-06-02 | 广州运通链达金服科技有限公司 | Project resource management method and device based on block chain and computer equipment |
CN111724135A (en) * | 2020-06-21 | 2020-09-29 | 华中科技大学同济医学院附属协和医院 | Management system and method for full process of title declaration and review |
CN111782809A (en) * | 2020-06-30 | 2020-10-16 | 中国工商银行股份有限公司 | International reimbursement network data processing method, device, electronic equipment and storage medium |
CN111899084A (en) * | 2020-09-30 | 2020-11-06 | 杭州城市大数据运营有限公司 | Online policy instant cashing method, device, equipment and storage medium |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114092035A (en) * | 2021-10-29 | 2022-02-25 | 珠海大横琴科技发展有限公司 | Data processing method and device based on enterprise service system |
CN113888142A (en) * | 2021-11-15 | 2022-01-04 | 常州市科技资源统筹服务中心(常州市科技情报研究所) | Project intelligent management method and system for reporting enterprise information |
CN113888142B (en) * | 2021-11-15 | 2022-04-19 | 常州市科技资源统筹服务中心(常州市科技情报研究所) | Project intelligent management method and system for reporting enterprise information |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Emergency resources demand prediction using case-based reasoning | |
CN114925045B (en) | PaaS platform for big data integration and management | |
CN112734363A (en) | Subsidy declaration and auditing method and system based on data full-link supervision | |
CN108520464A (en) | A kind of real-time automation supervision reporting system based on traditional block chain | |
CN110597791B (en) | Knowledge database construction and management method for operation and maintenance of electric power metering equipment | |
TW200502802A (en) | Method, device and system for intelligent right data search management as well as the storage medium storing and executing computer program of this method | |
CN110647567B (en) | Power failure plan auxiliary decision system based on end data fusion | |
CN102938129A (en) | Routing management method of electricity information machine accounts | |
CN113706101B (en) | Intelligent system architecture and method for power grid project management | |
CN101364284A (en) | Production management system for electrical power system | |
CN107832962A (en) | A kind of enterprise asset management and its management method | |
CN115221380A (en) | Method, system and platform for managing urban construction files in batches | |
CN112884369B (en) | Method, device, equipment and storage medium for monitoring power-off bill | |
DE102007013340A1 (en) | System and method for managing environmental impacts of companies | |
CN110007905A (en) | A kind of generation method and system of the software development scheme based on big data | |
Cui et al. | Application of identity resolution and blockchain technology in the whole industrial chain management of electrical equipment | |
CN107423035B (en) | Product data management system in software development process | |
CN117350677A (en) | Service plan platform integrating service plan assistants and application method of service plan platform | |
CN102346666B (en) | Capturing and processing data generatid in ERP interim phase | |
CN109754225B (en) | Design method and device of monitoring system for daily power generation planning process | |
CN114877943B (en) | Ecological environment monitoring device based on block chain | |
CN112734226A (en) | Data asset management method for power customer service business | |
Radyanto et al. | Design of sustainable production performance systems for MSMEs creative industry sub sector | |
CN109274176A (en) | Meter power failure period alarm method and system | |
CN108846627A (en) | A kind of enterprise management system and its implementation based on sales management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |