CN112709558B - Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method - Google Patents

Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method Download PDF

Info

Publication number
CN112709558B
CN112709558B CN201911021741.7A CN201911021741A CN112709558B CN 112709558 B CN112709558 B CN 112709558B CN 201911021741 A CN201911021741 A CN 201911021741A CN 112709558 B CN112709558 B CN 112709558B
Authority
CN
China
Prior art keywords
water
channeling
well
water channeling
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911021741.7A
Other languages
Chinese (zh)
Other versions
CN112709558A (en
Inventor
吴迪楠
韩煦
韩月
兰卫星
徐丹
丁靓靓
孙念
尚策
杨冬霞
秦艳玲
冯玉
蓝阔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201911021741.7A priority Critical patent/CN112709558B/en
Publication of CN112709558A publication Critical patent/CN112709558A/en
Application granted granted Critical
Publication of CN112709558B publication Critical patent/CN112709558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The specification provides a method for identifying a water channeling channel and a method for designing a water drive-to-steam drive reservoir project, wherein the method for identifying the water channeling channel comprises the following steps: determining a water channeling well and a water injection well in the water channeling direction in the well group according to the injection-production dynamic response characteristics of the well group; determining the range of a water channeling channel and the water storage pore volume of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the stratum characteristic data; and determining the deployment position of the steam injection well according to the range of the water channeling channel and the volume of a water storage hole of the water channeling channel. The steam injection well selected by the method is used for oil deposit development from water drive to steam drive, so that the steam drive exploitation of the heavy oil deposit in the stratum can be realized, the water storage absorption amount of the steam heat by the water channeling channel can be reduced, and the utilization efficiency of the steam heat can be improved.

Description

Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method
Technical Field
The specification relates to the technical field of oil exploitation, in particular to a water channeling channel identification method and a water-drive-to-steam-drive reservoir engineering design method.
Background
In the oil exploitation technology, water-drive exploitation is still a widely adopted secondary oil exploitation method, and is mainly used for developing a thin oil reservoir with the viscosity of less than 150mPa & s; when the method is used for exploiting a heavy oil reservoir with the viscosity of over 150 mPas, the economy of water-drive exploitation is obviously reduced. Influenced by factors such as the heterogeneity, the prosody and the viscosity difference of oil and water of an oil reservoir, after water flooding development, the heavy oil in the oil reservoir generally reaches the upper layer position containing a well section, namely the upper part in the layer from the negative electrode.
In order to overcome the problem of poor economy of water-drive heavy oil reservoir exploitation, steam-drive exploitation is available as a scheme for replacing water-drive exploitation after water-drive exploitation. Steam flooding recovery is achieved by heating the heavy oil so that the viscosity of the heavy oil reservoir is reduced to a certain level.
Disclosure of Invention
The specification provides a method for identifying a water channeling channel and a water-drive-to-steam-drive reservoir engineering design method, which are used for arranging a steam injection well and determining process parameters of steam drive when water-drive is converted into steam drive, so that the effective utilization of steam drive heat energy is realized.
In one aspect, the present specification provides a method for identifying a water channeling pathway, including:
determining a water channeling well and a water injection well in the well group in the water channeling direction according to the injection-production dynamic response characteristics of the well group;
determining the range of a water channeling channel and the water storage pore volume of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the stratum characteristic data;
and determining the deployment position of the steam injection well according to the range of the water channeling channel and the volume of a water storage hole of the water channeling channel.
Optionally, determining the water channeling well and the water injection well in the water channeling direction in the well group according to the injection-production dynamic response characteristics of the well group, including:
determining whether a production well of the well group is a water channeling well or not according to the injection-production dynamic response characteristic of the well group;
judging whether a plurality of water injection wells cause the water channeling phenomenon of the water channeling well under the condition that the production well is the water channeling well;
determining the water channeling direction according to the sedimentary microfacies of the development block and the injection-production dynamic response characteristics under the condition that a plurality of water injection wells cause the water channeling phenomenon of the water channeling well;
and determining the water injection well in the water channeling direction according to the water channeling direction.
Optionally, determining a range of the water channeling channel and a water storage pore volume of the water channeling channel according to the fluid production characteristic of the water channeling well, the water absorption characteristic of the water injection well and the formation characteristic data, including:
determining a water channeling layer in a stratum according to the liquid production characteristics of the water channeling well and the water absorption characteristics of the water injection well;
and determining the range of the water channeling channel and the water storage pore volume of the water channeling channel according to the formation characteristic data of the water channeling layer, the liquid production characteristic of the water channeling well in the water channeling layer and the water absorption characteristic of the water injection well in the water channeling layer.
Optionally, determining a water channeling layer in the formation according to the fluid production characteristics of the water channeling well and the water absorption characteristics of the water injection well, including:
and determining a water channeling layer in the stratum according to the liquid production characteristic of the water channeling well and the water absorption characteristic of the water injection well by combining the primary logging interpretation data and the secondary logging interpretation data of the water channeling well.
Optionally, determining a water channeling channel of the water channeling layer and a water storage pore volume of the water channeling channel according to the formation characteristic data of the water channeling layer, the fluid production characteristic of the water channeling well in the water channeling layer and the water absorption characteristic of the water injection well in the water channeling layer, and includes:
forming a water phase vector diagram of the water channeling layer according to the stratum characteristic data of the water channeling layer, the liquid production characteristic of the water channeling well in the water channeling layer and the water absorption characteristic of the water injection well in the water channeling layer;
and determining the range of a water channeling channel of the water channeling layer and the water storage pore volume of the water channeling layer according to the water phase vector diagram.
Optionally, determining a deployment position of the steam injection well according to the water channeling channel and the volume of the water storage hole of the water channeling channel includes:
selecting a water channeling layer to be developed according to the range of all water channeling channels and the volume of water storage pores of the water channeling channels;
and determining the deployment position of the steam injection well according to the range of the water channeling channel of the water channeling layer to be developed.
Optionally, determining a deployment position of the steam injection well according to a range of the water channeling channel of the water channeling layer to be developed includes:
determining a translation direction according to the direction of a water channeling channel of a water channeling layer to be developed;
determining a translation distance according to the range of a water channeling channel of a water channeling layer to be developed;
and taking the water injection well as an origin point, and taking a selected position after the translation distance is moved in the translation direction as a deployment position of the steam injection well.
In another aspect, the present specification provides a method for engineering design of a water drive-steam drive reservoir, including:
determining a water channeling well and a water injection well in the well group in the water channeling direction according to the injection-production dynamic response characteristics of the well group;
determining the range of a water channeling channel and the water storage pore volume of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the formation characteristic data;
determining the deployment positions of a stratum to be developed and a steam injection well according to the range of the water channeling channel and the volume of a water storage pore of the water channeling channel;
setting steam drive operation parameters according to the oil layer utilization condition of the stratum to be developed and the water storage pore volume of a water channeling channel;
and carrying out steam flooding development on the water channeling layer to be developed by the steam injection well according to the steam flooding operation parameters.
Optionally, set for steam flooding operating parameter according to the oil reservoir condition of using of the water channeling layer of awaiting development and water pore volume, include:
determining whether water needs to be drained or not according to the volume of a water storage hole of a water channeling channel in a water channeling layer to be developed, and determining the time for converting water drive into steam drive according to the oil layer utilization condition of the water channeling layer to be developed and the volume of the water storage hole.
Optionally, the steam flooding development of the water channeling layer to be developed by the steam injection well according to the steam flooding operation parameters includes:
and in the case that the need for water drainage is determined, water injection wells are adopted to assist in draining the water channeling channels in the water channeling layer to be developed.
According to the method for identifying the water channeling channel, the characteristics of the water channeling channel in the stratum are determined according to injection and production dynamic response characteristic data of the water channeling well and the water injection well in combination with stratum characteristic data, the steam flooding development cost of the oil reservoir in the corresponding stratum is determined according to the characteristics of each water channeling channel, the deployment position of the steam injection well is set in combination with the steam flooding development cost of the oil reservoir in each stratum, steam flooding exploitation of the heavy oil reservoir in the stratum with exploitation value is achieved, meanwhile, the absorption of steam heat by stored water of the water channeling channel is reduced, and the utilization efficiency of the steam heat energy is improved.
Drawings
Fig. 1 is a schematic view of an identification method of a water channeling passage provided in one embodiment;
FIG. 2 is an overall schematic diagram of an embodiment providing well groups and depositional microfacies in a formation;
FIG. 3 is a flow chart of determining water channeling extent and water holding pore volume provided by one embodiment;
FIG. 4 is a schematic diagram of a water injection well water absorption profile and a water channeling well fluid production profile provided by an embodiment;
FIG. 5 is a schematic diagram showing the comparison between the first well logging interpretation data and the second well logging interpretation data;
FIG. 6 is a schematic illustration of an embodiment providing for determining a location of deployment of a steam injection well based on a range of water channeling;
FIG. 7 is a flow chart of a method of water drive to steam drive reservoir engineering design provided by an embodiment;
FIG. 8 is a flow chart of a specific waterflooding development block to steam flood development according to an embodiment;
FIG. 9 is a water phase vector field diagram between a water injection well and a water channeling well provided by an embodiment.
Detailed Description
The present application will be described in further detail with reference to the drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and not restrictive of the invention. It should be noted that, for convenience of description, only the portions related to the related invention are shown in the drawings.
As will be understood from the description of the background art, for a reservoir developed using water flooding, if a large amount of heavy oil is included in the reservoir, it may be necessary to recover the heavy oil using steam flooding after water flooding. During steam flooding exploitation, if steam is injected into the stratum and then directly enters the water channeling channel of the stratum, a large amount of heat contained in the steam can be absorbed by water stored in the water channeling channel, and therefore the heat for effectively heating the oil reservoir is reduced. Therefore, in order to improve the steam heat energy utilization efficiency of steam flooding exploitation, the deployment position of the steam injection well and the reasonable process parameters of the steam injection well need to be optimally designed according to the stratum characteristics in the operation block after water flooding exploitation.
The embodiment of the application provides a method for identifying a water channeling channel, which is used for selecting the deployment position of a steam injection well according to the water storage characteristic condition of a stratum in a water drive operation block.
FIG. 1 is a schematic diagram of a method for determining a deployment location of a steam injection well according to an embodiment. As shown in fig. 1, the method provided by the present embodiment includes steps S101-S103.
S101: and determining a water channeling well and a water injection well in the water channeling direction according to the injection-production dynamic response characteristics of the well group.
In the water injection operation block, a water injection well and a production well form a well group according to a preset arrangement mode; the stratum pressure is increased by injecting water to the stratum through the water injection wells in the well group, so that the oil reservoir in the stratum flows to the side of the production well.
And if the stratum has geological regions with similar characteristics such as a sediment riverway, the water injection well and the production well are both in the scope of the sediment riverway, and the water injection operation enables the sediment riverway to be communicated to form a channel (namely a water channeling channel) for high-pressure water to flow fast, and high-pressure water injected by the water injection well directly flows to the water injection well through the water channeling channel without playing a role of water drive.
And judging whether the production well is a water channeling well or not according to the injection and production dynamic response characteristics of the operation wells in the well group. For example, without throughput or other stimulation, a production well may be identified as a water channeling well when the fluid production capacity of the production well reaches 1.5 times that before the waterflood operation and the fluid production water content of the production well rises to a particular value, such as 95%.
After the water channeling well is determined, the water injection well in the water channeling direction can be determined according to the injection and production dynamic response characteristics of the water injection well and the water channeling well in the well group. For example, if a water injection well increases the amount of water injected, and the amount of fluid production and the water content of the fluid production of the water breakthrough well increase, then it can be determined that the water injection well is likely to be a water injection well in the direction of water breakthrough.
In practical application, the problem of multidirectional water channeling may occur in a well group, that is, the water injection amount of a plurality of water injection wells and the liquid production amount characteristic of the water channeling well can be in a correlation relationship, and the water channeling phenomenon can occur in the water channeling well due to water injection of each water injection well. In order to determine the water injection well in the general water channeling direction, the water channeling direction of a water channeling channel in the stratum needs to be determined according to the sedimentary microfacies of the stratum, and then the water injection well in the water channeling direction needs to be determined.
FIG. 2 is a schematic diagram illustrating an embodiment of an overall pattern of well groups and sedimentary microfacies in a formation. As can be seen in conjunction with fig. 2, the general flow direction of sedimentary river in the formation may be determined from the sedimentary microcontinuosity; determining the water channeling direction according to the flow direction of the sedimentary river channel and the positions of the water injection well and the water channeling well in the sedimentary river channel; then, the water injection well in the water channeling direction (or the water channeling channel) can be determined according to the water channeling direction and the water channeling well. Regarding the direction of the sedimentary river, the water injection well in the flow direction of the sedimentary river is the water injection well in the water channeling direction.
In addition, in some applications, only one water injection well in the well group has a correlation with the liquid production and the water production water content of the water channeling well, so that the water injection well can be directly determined as the water injection well in the water channeling direction.
S102: and determining the range of the water channeling channel and the volume of a water storage pore of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the stratum characteristic data.
After the water channeling well and the water injection well in the water channeling direction are determined, the historical liquid production characteristics of the water channeling well, the historical water absorption characteristics of the water injection well and the stratum characteristic data of an operation block are obtained, and the range of a water channeling channel in the stratum and the water storage pore volume of the water channeling channel are determined through simulation deduction of a data model.
The water producing characteristic of the water channeling well is the water producing characteristic of the water channeling well in the depth direction, the water absorbing characteristic of the water injection well is the water absorbing characteristic of the water injection well in the depth direction, and the water producing characteristic and the water absorbing characteristic can reflect the water absorbing and water storing characteristics of each stratum; by combining with formation characteristic data and utilizing the historical statistical data of the liquid production characteristic and the water absorption characteristic, the range of the water channeling channel and the water storage pore volume of the water channeling channel can be determined by utilizing a numerical simulation method.
S103: and determining the deployment position of the steam injection well according to the range of the water channeling channel and the volume of a water storage hole of the water channeling channel.
After the range of each water channeling channel and the volume of the water storing pore of each water channeling channel are determined, the characteristics of the water channeling channels in each stratum in the whole operation block can be determined; the reservoir development costs in the water channeling channels in certain formations may be determined in conjunction with the water channeling channel characteristics of all the formations in the work block. The deployment position of the steam injection well in the operation zone can be determined by integrating the oil reservoir development cost and the oil liquid yield of all the strata.
The method comprises the following steps of determining whether a stratum where a water channeling channel is located is a strong water flooded layer, a weak water flooded layer or a non-water flooded layer according to the volume of water storage pores of the water channeling channel; the weak water flooded layer and the non-water flooded layer have development value because of less water storage.
According to the method for identifying the water channeling channel, the characteristics of the water channeling channel in the stratum are determined according to the injection and production dynamic response characteristic data of the water channeling well and the water injection well and by combining with the stratum characteristic data, the steam flooding development cost of the oil reservoir in the corresponding stratum is determined according to the characteristics of each water channeling channel, and the deployment position of the steam injection well is set by combining with the steam flooding development cost of the oil reservoir in each stratum. By adopting the steam injection well at the deployment position and combining reasonable steam flooding process parameters, the steam heat can be reduced as much as possible to be absorbed by the stored water of the water channeling channel while realizing steam flooding exploitation of the heavy oil reservoir in the stratum, and the utilization efficiency of the steam heat is improved.
Fig. 3 is a flow chart of determining water channeling extent and water holding pore volume provided by one embodiment. As shown in fig. 3, in an alternative embodiment, the method for implementing the foregoing step S102 may include steps S201 and S202.
S201: and determining a water channeling layer in the stratum according to the liquid production characteristic of the water channeling well and the water absorption characteristic of the water injection well.
In the working block operated in the embodiment of the application, the stratum has obvious layering characteristics. Some of these formations do not have good pore characteristics and are unlikely to develop into water channeling layers. In practical application, in order to reduce data processing amount, which of the stratum is the water channeling layer can be determined according to the liquid production characteristics of the water channeling layer and the water absorption characteristics of the water injection well, and then the characteristics of the water channeling channel can be obtained by carrying out numerical simulation on the water channeling layer.
The water channeling layer is determined according to the liquid production characteristics of the water channeling well and the water absorption characteristics of the water injection well, which layers in the stratum are layers with large water absorption rate or water absorption capacity, which layers are corresponding layers with large liquid production capacity and liquid production water content, and the stratum is used as the water channeling layer.
Fig. 4 is a schematic diagram of a water absorption section and a water channeling well fluid production section of the water injection well provided by the embodiment. Through the correlation between the two, it can be seen that the water absorption of some stratum in the water injection layer is large, and the liquid production of the corresponding layer in the water channeling well is large, so that the layer can be determined as the water channeling layer.
In practical application, the water channeling layer in the stratum can be determined by using the liquid production characteristic of the water channeling well and the water absorption characteristic of the water injection well and combining the primary logging interpretation data and the secondary logging interpretation data of the water channeling well as assistance. FIG. 5 is a schematic diagram of a comparison between primary and secondary well log interpretation data.
The primary logging interpretation data is logging interpretation data when a production well (serving as a water channeling well) is deployed; the secondary well logging interpretation data are well logging interpretation data formed by re-exploring the water channeling well. The two logging interpretations have resistivity characteristic data of each stratum. If the water yield of a certain stratum of the water channeling well is greatly increased, the resistivity of the corresponding stratum is reversely reduced, so that the resistivity of the stratum is greatly reduced in the two times of logging interpretation data, the stratum can be generally determined as a water channeling layer; namely, the primary logging interpretation data and the secondary logging interpretation data can be used for assisting in determining the water channeling layer.
S202: and determining the range of the water channeling channel and the volume of a water storing pore of the water channeling channel according to the stratum characteristic data of the water channeling layer, the liquid producing characteristic of the water channeling well in the water channeling layer and the water absorbing characteristic of the water injection well in the water channeling layer.
After a certain stratum is determined to be a water channeling layer, numerical simulation can be carried out on the stratum, and the range of a water channeling channel of the stratum and the volume of a water storage pore of the water channeling channel are determined by utilizing stratum characteristic data, the liquid production characteristic of a water channeling well in the stratum and the water absorption characteristic of a water injection well in the stratum; the range of all water channeling channels and the volume of the water storage pores are integrated to determine the characteristics of all water channeling channels in the operation block. Of course, the water channeling passage referred to herein may be a water channeling passage whose water channeling amount reaches a certain level.
In step S202, for a certain water channeling layer, a water phase vector diagram of the water channeling layer may be formed according to the formation characteristic data, the liquid production characteristic of the water channeling well in the water channeling layer, and the water absorption characteristic of the water injection well in the water channeling layer, and the range of the water channeling channel of the water channeling layer and the water storage pore volume of the water channeling layer are determined by the water phase vector diagram.
Of course, in the case of sufficient data processing capability, all strata can be directly processed without identifying water channeling layers in the strata, and the range of all water channeling channels and the corresponding water storage pore volume can be obtained.
As mentioned above, the stratum of development value is selected, that is, the water channeling layer of development value is selected according to the range of the water channeling channel and the water storage pore volume of the water channeling channel, and the water channeling layer is called the water channeling layer to be developed. Subsequently, the deployment position of the steam injection well is determined according to the range of the water channeling channel of the water channeling layer to be developed.
FIG. 6 is a schematic illustration of an embodiment providing for determining a location of deployment of a steam injection well based on a range of water channeling. As shown in FIG. 6, in one embodiment, determining the deployment location of the steam injection well may employ steps S301-S303.
S301: and determining the translation direction according to the direction of the water channeling channel of the water channeling layer to be developed.
S302: the translation distance is determined according to the range of the water channeling passage of the water channeling layer to be developed.
S303: and taking the water injection well as the origin, and taking the position selected after moving the translation distance in the translation direction as the deployment position of the steam injection well.
In order to minimize the absorption of the heat of the steam-driven steam by the water stored in the water channeling channel, the steam injection well should be located as far away as possible from the central region of the water channeling channel, but at the edge region of the water channeling channel or away from the water channeling channel; therefore, the embodiment of the application takes the water injection well as the origin to move towards the water channeling direction vertical to the water channeling channel, and the deployment position of the steam injection well is determined; and, the translation area is determined according to the range of the water channeling passage to keep the steam injection well as far away from the water channeling passage as possible.
It should be noted that the foregoing determination of the translation direction and the translation distance is only a preferred solution, and in other embodiments, the deployment position of the steam injection well may be determined by a technician based on the range of the water channeling paths of the respective strata. Alternatively, the deployment location of the steam injection well may be determined by modeling to find an optimal solution.
FIG. 7 is a flow chart of a reservoir engineering design method for converting water flooding into steam flooding according to an embodiment. The method for converting water drive to steam drive of an oil reservoir provided by the embodiment is a steam injection well determined based on the method for determining the deployment position of the steam injection well. As shown in FIG. 7, the method for converting oil reservoir from water drive to steam drive comprises steps S501-S505.
S501: and determining a water channeling well and a water injection well in the water channeling direction according to the injection-production dynamic response characteristics of the well group.
S502: and determining the range of the water channeling channel and the volume of a water storage pore of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the stratum characteristic data.
S503: and determining the deployment positions of the stratum to be developed and the steam injection well according to the range of the water channeling channel and the volume of the water storage hole of the water channeling channel.
The foregoing steps S501 to S503 can be implemented in a specific manner, and are not described herein.
S504: and setting steam drive operation parameters according to the oil layer utilization condition of the stratum to be developed and the water storage pore volume of the water channeling channel.
The steam drive operation parameters are set according to the oil layer usage condition of the layer to be developed and the water storage air of the water channeling channel, and at least comprise the following parameters (1) to (4).
(1) And determining whether to carry out steam flooding development on the corresponding stratum or not according to the water storage pore volume of the water channeling channel.
(2) And (4) determining whether water drainage is needed or not according to the pore volume of the water starting and storing for the stratum to be developed, and performing steam flooding development after water drainage.
(3) And aiming at different strata, sectional steam flooding development or simultaneous steam flooding development is adopted.
(4) And determining the optimal time for driving and transferring according to the oil layer utilization condition and the water storage pore volume of the stratum to be developed.
In addition, there are other steam flooding operating parameters, such as steam injection rate per unit volume, bottom hole quality, injection-production ratio, etc., which may be based on empirical parameters or by small area optimization experiments.
S505: and carrying out steam flooding development on the water channeling layer to be developed by the steam injection well according to the steam flooding operation parameters.
And step S505, according to the operation parameters determined in the step S504, injecting steam into the steam injection well, and obtaining oil deposit production liquid from the production well.
In actual operation, aiming at a region with a low oil reservoir exploitation degree, in order to enable a stratum oil reservoir to flow to a production well under the action of pressure difference, the production well can be stimulated and stimulated for 2-3 periods, so that the temperature among wells reaches the temperature enabling the heavy oil reservoir to flow, and then steam drive development is carried out.
FIG. 8 is a flow chart of a specific waterflood development block to steam flooding development according to one embodiment. Referring to FIG. 8, the exemplary implementation includes steps S601-S608.
S601: and determining the water channeling wells in the well group according to the injection-production dynamic response characteristics of the well group.
In this embodiment, the operation block is a five-point water-flooding well pattern of an 83m injection-production well zone. And determining the water channeling well by combining the change of the water injection rate of the water injection well, the change of the liquid production rate of the production well and the change of the water content of the liquid production of the production well according to the production dynamic curve of the well group. Wherein, the standard for judging the water channeling well comprises that under the condition of no swallowing and spitting and no other production increasing measures, the liquid production amount of the production well is increased to 1.5 times of that before water flooding, and the water content of the liquid production of the production well reaches 95 percent.
S602: judging whether a plurality of water injection wells which enable the production wells to become water channeling wells exist or not; if yes, go to S603; if not, go to S605.
Step S602 is to inject water into a plurality of production wells, and check whether the fluid production status of the water channeling well changes accordingly. If so, it is determined that the plurality of water injection wells affect the water channeling well, and thus S603 is performed. If not, it is determined that only one water injection well influences the water channeling well, and S604 is performed.
S603: drawing a well group well pattern on a sandstone group sedimentary facies diagram; determining whether the water injection well and the production well are in the same phase zone according to the sandstone sedimentary facies diagram; if yes, go to step S604.
S604: the water channeling directions of the water injection well and the water channeling well are determined according to the sandstone sedimentary facies map, and then S605 is performed.
S605: and determining the range of the water channeling channel and the volume of a water storage pore of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the stratum characteristic data.
Specifically, step S605 determines a water channeling layer in the formation according to the fluid production characteristic of the water channeling well and the water absorption characteristic of the water injection well by combining the primary logging information and the secondary logging information of the water channeling well; simulating according to the liquid production characteristic of the water channeling layer at the water channeling well, the water absorption characteristic at the water injection well and the stratum characteristic data to form a water phase vector diagram of the stratum and the water pore volume of the water channeling channel; the water phase vector diagram represents the range of water channeling channels and the water channeling direction in the water channeling layer.
Fig. 9 is a water-phase vector field diagram between a water injection well and a water channeling well, provided by an embodiment, which embodies the developmental characteristics of water channeling pathways in different formations.
S606: and determining the deployment position of the steam injection well according to the range of the water channeling channel and the volume of a water storage hole of the water channeling channel.
Step S606 is to determine which strata have the steam-driven development value by using the water-phase vector diagram representing the range of the water channeling passage and the water storage pore volume of the water channeling passage generated in step S605, and determine the deployment position of the steam injection well by combining the range of the water channeling passage and the water storage pore volume of the strata having the development value.
In the embodiment of the application, according to the range of the water channeling channel and the volume of the water storage pore space, the injection-production ratio of steam flooding is ensured, and the deployment position of the steam injection well is determined by adopting 118m large well spacing reverse nine-point well pattern deployment. And the deployment position of the steam-drive steam injection well on the plane avoids the original water injection well and translates towards the direction vertical to the water channeling channel.
S607: and setting steam flooding operation parameters according to the oil layer utilization condition of the stratum to be developed and the water storage pore volume of the water channeling channel.
In the embodiment of the application, water is linearly discharged in the area with the water storage pore volume exceeding 0.2 according to the characteristic of a water channeling channel of a stratum, and steam drive development is carried out by selecting a better rotary drive time according to the oil layer utilization condition and the water storage pore volume. In the embodiment of the application, in the longitudinal direction, the combined segmented steam flooding is carried out according to the size of the water channeling layer water storage pore volume: the combined thickness is 15-20m, the net total ratio is more than 40%, the permeability grade difference is less than 4, and the strong water flooded layer and the weak water flooded layer are combined separately. And for the area with lower utilization degree, the well is driven after the temperature between the wells reaches 55-70 ℃ after the water channeling well is stimulated for 2-3 periods.
The steam flooding operation parameters set by the embodiment of the application further comprise: the steam injection rate per unit volume is 1.6 t/d.ha.m, the dryness of the well bottom can be kept in the range of 40-50%, and the production-injection ratio is controlled to be 1.0-1.2. It should be noted that the aforementioned parameters should ensure the expansion of the steam cavity and the internal pressure of the oil reservoir, and inhibit the invasion of the formation water.
S608: and carrying out steam flooding development on the water channeling layer to be developed by the steam injection well according to the steam flooding operation parameters.
The following table shows a production condition simulation comparison table of the embodiment and a current steam injection well production condition simulation comparison table, which reflects that compared with a method adopting a water injection well as a steam injection well, the method provided by the embodiment can greatly improve the effective production time, the stage output production and the stage oil-gas ratio, namely can improve the energy consumption of steam flooding exploitation.
Figure GDA0003221797240000101
Figure GDA0003221797240000111
The above description is only a preferred embodiment of the application and is illustrative of the principles of the technology employed. It will be appreciated by those skilled in the art that the scope of the invention herein disclosed is not limited to the particular combination of features described above, but also encompasses other arrangements formed by any combination of the above features or their equivalents without departing from the spirit of the invention. For example, the above features and the technical features disclosed in this application but not limited to having similar functions are mutually replaced to form the technical solution.

Claims (9)

1. A method for identifying a water channeling passage, comprising:
determining a water channeling well and a water injection well in the well group in the water channeling direction according to the injection-production dynamic response characteristics of the well group;
determining the range of a water channeling channel and the water storage pore volume of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the formation characteristic data;
determining the deployment position of the steam injection well according to the range of the water channeling channel and the volume of a water storage hole of the water channeling channel;
wherein, according to the liquid production characteristic of the water channeling well, the water absorption characteristic of the water injection well and the stratum characteristic data, the range of the water channeling channel and the volume of the water storage pore space of the water channeling channel are determined, and the method comprises the following steps:
determining a water channeling layer in a stratum according to the liquid production characteristics of the water channeling well and the water absorption characteristics of the water injection well;
and determining the range of the water channeling channel and the water storage pore volume of the water channeling channel according to the stratum characteristic data of the water channeling layer, the liquid production characteristic of the water channeling well in the water channeling layer and the water absorption characteristic of the water injection well in the water channeling layer.
2. The method of claim 1, wherein determining the water breakthrough wells and the water injection wells in the water breakthrough direction in the well group based on the injection-production dynamic response characteristics of the well group comprises:
determining whether a production well of the well group is a water channeling well or not according to the injection-production dynamic response characteristic of the well group;
judging whether a plurality of water injection wells cause the water channeling phenomenon of the water channeling well under the condition that the production well is the water channeling well;
determining the water channeling direction according to the sedimentary microfacies of the development block and the injection-production dynamic response characteristics under the condition that a plurality of water injection wells cause the water channeling phenomenon of the water channeling well;
and determining the water injection well in the water channeling direction.
3. The method of claim 1, wherein determining water channeling in the formation based on fluid production characteristics of the water channeling well and water absorption characteristics of the water injection well comprises:
and determining a water channeling layer in the stratum according to the liquid production characteristic of the water channeling well and the water absorption characteristic of the water injection well by combining the primary logging interpretation data and the secondary logging interpretation data of the water channeling well.
4. The method of claim 1, wherein determining a water channeling pathway for said water channeling layer and a water void volume for said water channeling pathway from formation characteristic data for said water channeling layer, fluid production characteristics for said water channeling well in said water channeling layer, water absorption characteristics for said water injection well in said water channeling layer comprises:
forming a water phase vector diagram of the water channeling layer according to the stratum characteristic data of the water channeling layer, the liquid production characteristic of the water channeling well in the water channeling layer and the water absorption characteristic of the water injection well in the water channeling layer;
and determining the range of a water channeling channel of the water channeling layer and the water storage pore volume of the water channeling layer according to the water phase vector diagram.
5. The method of claim 1, wherein determining a deployment location of a steam injection well based on the water channeling channel and the water trap pore volume of the water channeling channel comprises:
selecting a water channeling layer to be developed according to the range of all water channeling channels and the volume of water storage pores of the water channeling channels;
and determining the deployment position of the steam injection well according to the range of the water channeling channel of the water channeling layer to be developed.
6. The method of claim 5, wherein determining a deployment location of the steam injection well based on a range of a water channeling pathway of the water channeling layer to be developed comprises:
determining a translation direction according to the direction of a water channeling channel of a water channeling layer to be developed;
determining a translation distance according to the range of a water channeling channel of a water channeling layer to be developed;
and taking the water injection well as an origin point, and taking a selected position after the translation direction moves the translation distance as a deployment position of the steam injection well.
7. A method for designing a water drive-to-steam drive reservoir engineering is characterized by comprising the following steps:
determining a water channeling well and a water injection well in the well group in the water channeling direction according to the injection-production dynamic response characteristics of the well group;
determining the range of a water channeling channel and the water storage pore volume of the water channeling channel according to the liquid production characteristics of the water channeling well, the water absorption characteristics of the water injection well and the stratum characteristic data;
determining the deployment positions of a stratum to be developed and a steam injection well according to the range of the water channeling channel and the volume of a water storage pore of the water channeling channel;
setting steam drive operation parameters according to the oil layer utilization condition of the stratum to be developed and the water storage pore volume of a water channeling channel;
carrying out steam flooding development on a water channeling layer to be developed by the steam injection well according to the steam flooding operation parameters;
wherein, according to the liquid production characteristic of the water channeling well, the water absorption characteristic of the water injection well and the stratum characteristic data, the range of the water channeling channel and the water storage pore volume of the water channeling channel are determined, and the method comprises the following steps:
determining a water channeling layer in the stratum according to the liquid production characteristics of the water channeling well and the water absorption characteristics of the water injection well;
and determining the range of the water channeling channel and the water storage pore volume of the water channeling channel according to the formation characteristic data of the water channeling layer, the liquid production characteristic of the water channeling well in the water channeling layer and the water absorption characteristic of the water injection well in the water channeling layer.
8. The method of claim 7, wherein setting steam drive operating parameters based on oil development and water trap pore volume of the water channeling layer to be developed comprises:
and determining whether water needs to be drained or not according to the volume of the water storage pore of the water channeling channel in the water channeling layer to be developed, and determining the time for water driving to be converted into steam driving according to the oil layer utilization condition of the water channeling layer to be developed and the volume of the water storage pore.
9. The method of claim 8, wherein steam flooding development of a water channeling layer to be developed by the steam injection well according to the steam flooding operating parameters comprises:
and in the case that the need for water drainage is determined, water injection wells are adopted to assist in draining the water channeling channels in the water channeling layer to be developed.
CN201911021741.7A 2019-10-25 2019-10-25 Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method Active CN112709558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911021741.7A CN112709558B (en) 2019-10-25 2019-10-25 Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911021741.7A CN112709558B (en) 2019-10-25 2019-10-25 Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method

Publications (2)

Publication Number Publication Date
CN112709558A CN112709558A (en) 2021-04-27
CN112709558B true CN112709558B (en) 2023-01-10

Family

ID=75541382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911021741.7A Active CN112709558B (en) 2019-10-25 2019-10-25 Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method

Country Status (1)

Country Link
CN (1) CN112709558B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114165201B (en) * 2021-11-10 2023-06-20 杰瑞能源服务有限公司 Method for pressure flooding water injection
CN114352242B (en) * 2021-12-02 2023-12-01 中国石油天然气股份有限公司 Heavy oil reservoir exploitation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5246071A (en) * 1992-01-31 1993-09-21 Texaco Inc. Steamflooding with alternating injection and production cycles
CN101307679B (en) * 2008-04-15 2012-06-27 中国石化集团胜利石油管理局石油开发中心 Thin interlayer steam injection thermal production well mixing-proof well completion process
CN104847322A (en) * 2014-02-18 2015-08-19 中国石油化工股份有限公司 Method for improving recovery efficiency for deep common thickened oil water drive-converting into-steam flooding
CN106593377A (en) * 2016-12-19 2017-04-26 中国石油天然气股份有限公司 Steam flooding starting method for ultra-thick oil horizontal well

Also Published As

Publication number Publication date
CN112709558A (en) 2021-04-27

Similar Documents

Publication Publication Date Title
CN102278103B (en) Method for improving deep super heavy oil reservoir recovery ratio by gravity drainage assisted steam flooding
CN106640027B (en) The construction method of fracture-pore reservoir underground river type karst Reservoir Body space structure well pattern
CN107664031B (en) Method for improving recovery efficiency by determining steam flooding well pattern form of horizontal well
EP3800324B1 (en) Method and apparatus for determining integrated development approach for shale and adjacent oil layers
CN102322249B (en) Method for improving recovery ratio of interlayer-developed deep heavy oil reservoir
CN112709558B (en) Water channeling channel identification method and water drive-to-steam drive reservoir engineering design method
RU2439299C1 (en) Method of oil deposit development
CN103174403A (en) Gravity and steam flooding combined mining method for thick-layer interlayer-containing common heavy oil reservoir
CN110822748A (en) Method for heat distribution control and energy recovery in geothermal wells
CN111749658A (en) Carbon dioxide huff and puff oil production method and device
CN104033137A (en) Method for improving fault block oil reservoir recovery efficiency by utilizing oilfield wastewater
Butler et al. Steam and gas push (SAGP)-4; recent theoretical developments and laboratory results using layered models
CN109281642A (en) A method of improving postpolymer flood stratified reservoir development effectiveness
RU2473796C1 (en) Development method of superviscous oil deposit in layer-by-layer non-homogeneous manifold with partial vertical connectivity
CN112943230B (en) Residual oil distribution prediction method for common heavy oil reservoir
Latief et al. Unlocking tight carbonate reservoir potential: Geological characterization to execution
RU2290501C1 (en) Method for extracting an oil pool
CN111322054B (en) Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage
CN114320271A (en) Method for adjusting injection and production well network of continental facies heavy oil reservoir based on displacement pressure gradient
US2828819A (en) Oil production method
EA025372B1 (en) Method of developing oil deposit in fractured carbonate reservoirs
CN115075784A (en) Low-permeability reservoir composite development method
RU2580671C1 (en) Procedure for development of multi-pay oil deposits
RU2513469C1 (en) Oil deposit development method
RU2170344C1 (en) Process of exploitation of multipool oil deposit

Legal Events

Date Code Title Description