CN111322054B - Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage - Google Patents

Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage Download PDF

Info

Publication number
CN111322054B
CN111322054B CN201811541449.3A CN201811541449A CN111322054B CN 111322054 B CN111322054 B CN 111322054B CN 201811541449 A CN201811541449 A CN 201811541449A CN 111322054 B CN111322054 B CN 111322054B
Authority
CN
China
Prior art keywords
well
chemical flooding
combined
excavation
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811541449.3A
Other languages
Chinese (zh)
Other versions
CN111322054A (en
Inventor
张舒琴
唐海龙
温静
肖传敏
孙安培
邱晓娇
李凌伟
司大志
李敏
潘延东
王玲
周雨峰
王振兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201811541449.3A priority Critical patent/CN111322054B/en
Publication of CN111322054A publication Critical patent/CN111322054A/en
Application granted granted Critical
Publication of CN111322054B publication Critical patent/CN111322054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a three-three combined excavation and potential optimization mining method of a sandstone reservoir in a chemical flooding stage. The method comprises the following steps: 1) Determining three-three combined diving positions: determining three-three combined excavation and submerging wells at the positions of the anti-nine-point side wells in the five-point method area well pattern; 2) Determining the three-three combined diving entry time: injecting the chemical flooding solution into a submergible well with PV number of 0.2-0.6PV to enter a chemical flooding layer for submerging; 3) Determining the ending time of the three-three combined excavation: and the three-combined excavation and submergence well enters a high water-cut period, the excavation and submergence are finished, and other strata are upwards returned. The optimized exploitation method can improve the oil layer exploitation effect and improve the chemical flooding technology and economic indexes.

Description

Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage
Technical Field
The invention belongs to the technical field of oil reservoir development, and particularly relates to a three-three combined excavation and potential optimization mining method for a sandstone oil reservoir in a chemical flooding stage.
Background
In China, most of thin oil, high-condensation oil and high-water-permeability flooding sandstone reservoirs enter the middle and later stages of the water flooding development stage of oil fields with high water content and high production degree, taking Liaohe oil fields as an example, by 2017, the average recoverable reserve production degree is 93.7 percent, the average comprehensive water content is 87.3 percent, the continuous water flooding potential is very limited, and the conversion of the development mode to carry out tertiary oil recovery is very urgent. The tertiary oil recovery is oil recovery by means of chemistry, physics, biology and the like, the recovery ratio can be improved by about 6-20%, four technical series of the tertiary oil recovery are formed in the world at present, including chemical flooding, gas flooding, thermal flooding and microbial flooding, and the most applicable technology of the tertiary oil recovery of the high-permeability sandstone oil reservoir in the thin oil and the high-setting oil is the chemical flooding technology.
In recent years, chemical flooding is applied to the practice of mines in various oil fields such as Daqing, shengli, liaohe, jilin, xinjiang, hongkong and the like, the recovery rate of crude oil is improved to a certain extent, for example, the recovery rate of 16 Xinglong platform oil layer polymer surface composite flooding industrial tests of Liaohe oil field is 65.5% in 8 months and the recovery rate of chemical flooding is estimated to be improved by 19%.
The chemical flooding blocks of the oil field in China mostly adopt five-point method area well patterns, and numerical simulation also proves that under the same well pattern density, the five-point method area well pattern technology and economic indexes are superior to those of other well pattern types, however, even if chemical flooding is utilized, under the condition of improving the flow rate of the displacement fluid, the five-point method area well pattern still forms a part which cannot be reached by the displacement fluid on a plane, so that the three-three combined excavation and submergence optimizing mining method for the chemical flooding stage of the sandstone reservoir is provided, the area sweep coefficient can be further expanded, more oil is extracted at the early stage of the chemical flooding stage, and the economic indexes such as the chemical flooding recovery rate and the internal yield rate are improved.
Disclosure of Invention
The invention particularly relates to a three-three combined excavation potential optimization mining method of a sandstone reservoir in a chemical flooding stage. The invention improves the development effect of the three-three combined excavation and submergence by optimizing the position of the three-three combined excavation and submergence, the time of ending the three-three combined excavation and submergence, realizes the maximization of economic indexes such as the improvement of recovery ratio and internal yield of chemical flooding, and the like, and is a method for exploiting the sandstone reservoir by using old wells or chemical flooding new wells in the chemical flooding development stage.
In order to achieve the purpose, the invention adopts the following technical scheme:
a three-three combined excavation and potential optimization mining method for a sandstone reservoir in a chemical flooding stage comprises the following steps:
1) Determining three-three combined diving positions: determining three-three combined excavation and submergence wells at the positions of the reverse nine-point side wells in the five-point method area well pattern;
2) Determining the three-three combined diving entry time: injecting the chemical flooding solution into a submergible well with PV number of 0.2-0.6PV to enter a chemical flooding layer for submerging;
3) Determining the ending time of the three-three combined excavation: and the three-combined excavation and submergence well enters a high water-cut period, the excavation and submergence are finished, and other strata are upwards returned.
The submerged wells are all oil production wells, the submerged wells are additionally arranged on the basis of a five-point method area well pattern, and crude oil gathered by chemical flooding displacement is produced; the chemical flooding solution is injected through an injection well.
The following is a description of specific steps:
step 1): determining three-three combined excavation and submergence positions: and determining three-three combined excavation and submerging wells at the positions of the anti-nine-point side wells in the five-point method area well pattern.
According to the digital-analog research and the actual production condition of a mine field, the potential digging effect is better when the three-three combination is determined to be at the position of the side well with the reverse nine points in the five-point method area well pattern. The appropriate submergence location is determined and then it is determined whether there is an appropriate well for submerging at that location. The position of the anti-nine-point side well in the five-point method area well pattern is not necessarily the point, namely the middle position of the side length of the square in the five-point method, when the proper position is actually determined, the submersible well is actually determined by combining the distribution condition of each well in the well group, and the proper well near the anti-nine-point side well position can be used as the submersible well.
In the invention, the five-point method area well pattern is an injection-production well pattern type adopted by a chemical flooding target layer.
The anti-nine-point side well position is the middle position of the injection in the south and north or the mining in the south and north in the five-point method area well pattern of the chemical flooding target layer, as shown in figure 1. FIG. 1 is a five-point method area well pattern with a water well as the center, wherein four corners are oil production wells, the middle is an injection well, and the side length middle of a square is at an inverted nine-point position.
Specifically, old wells, low-yield oil wells or other chemical drive wells of the stratum system which are not used can be used as three-three combined excavation and submergence wells.
In the invention, the unused old well refers to a well which is not used any more in other water-flooding intervals or chemical flooding target layers in the same block, such as a geological abandoned well, an observation well, an inspection well, a monitoring well and the like.
In the invention, when the other layer chemical flooding well is a multi-layer chemical flooding layer containing two or more water in a block, if the two-layer chemical flooding is performed first, the chemical flooding well of the one layer is drilled only at the stage of chemical flooding of the two layer, and the chemical flooding well of the one layer does not have chemical flooding formal injection conditions, the chemical flooding well of the two layer can enter the chemical flooding layer of the two layer at a proper position and at a proper time to perform three-three combined excavation (fig. 2). FIG. 2 is a schematic diagram of two sets of layer system injection and production well patterns of the chemical flooding, wherein a well A is a layer system production well and is also an inverse nine-point position in a two-layer system area well pattern; the well B is a two-layer oil production well and is also at the position of an opposite nine point in a one-layer area well pattern. Step 2): determining the three-three combined diving entry time: injecting chemical flooding solution into a three-three combined potential digging well with PV number of 0.2-0.6PV to enter a chemical flooding horizon for potential digging.
According to the digital-analog research and the actual production condition of a mine field, the three-three combination is determined to be at a suitable position for dredging, namely the determined three-three combination dredging well, the number of chemical flooding solutions injected into the chemical flooding well is between 0.2 and 0.6PV, the chemical flooding well enters a chemical flooding layer for dredging, and the dredging effect is good.
In the invention, the injection PV number refers to the ratio of the total injection amount of the chemical flooding solution of a chemical flooding target layer to the total pore volume of the chemical flooding target layer, and also refers to the ratio of the total injection amount of the chemical flooding solution of a certain well group to the total pore volume in a well group control range, according to the digital analog research, the optimal entering time of the three-three combination is the injection PV number between 0.2 and 0.6PV, as shown in figure 3, in the reverse nine-point position of a five-point method well pattern, along with the process of oil wall migration, the process of increasing saturation firstly and then decreasing exists; the saturation on the injection-production connecting line is always reduced. Production and digital-analog researches show that well point production effect is better when the position of the reverse nine points is increased before the peak of effectiveness (before PV number is injected to be 0.6 PV).
Step 3): determining the ending time of the three-three combined excavation: and the three combined dredging well enters a high water cut period, the dredging is finished, and other strata are returned upwards.
In the invention, the high water cut period means that the water content of the three-three combined excavation and submergence well reaches more than 95%, the daily oil production is less than 1t, and the three-three combined excavation and submergence can be considered to be finished.
The sandstone reservoir chemical flooding stage three-three combined excavation and potential optimization method provided by the invention is suitable for exploiting the layered sandstone reservoir developed by high-permeability water flooding in thin oil and high-pour-point oil, and the recovery ratio of the sandstone reservoir chemical flooding stage can be improved by the method provided by the invention.
The exploitation method provided by the invention fully depends on the chemical flooding displacement migration rule, solves the problem that the dead oil area in the chemical flooding five-point method area well pattern causes the restriction of the chemical flooding technology and the economic index through the optimization design, further expands the area sweep coefficient, and produces more oil in the early stage of the chemical flooding stage, thereby improving the economic indexes such as the chemical flooding recovery rate and the internal yield.
Drawings
FIG. 1 is a schematic diagram of the position of the anti-nine point in a five-point area well pattern.
FIG. 2 is a schematic diagram of two sets of layer injection and production patterns for chemical flooding.
FIG. 3 is a schematic diagram of the optimal time for the three-in-three combination diving of the present invention.
FIG. 4 is a schematic diagram of three-in-three mining potential combination of a north mining well and a south mining well in the embodiment of the invention.
FIG. 5 is a J2-7-116C well production curve for an example of the present invention.
Detailed Description
In order to more clearly illustrate the invention, the invention is further described below in connection with preferred embodiments. It is to be understood by persons skilled in the art that the following detailed description is illustrative and not restrictive, and is not to be taken as limiting the scope of the invention.
A certain layer of J16 Xinglong platform oil layers are selected in the Liaohe oil field to carry out a polymer flooding compound flooding industrial test, 24-injection 35-production is designed in a test area, the reserve is 298 ten thousand tons, the oil layer formally enters a chemical flooding front slug to be injected in 4 months in 2011, a main slug is transferred in 12 months in 2011, and the chemical flooding effect is further improved by increasing oil production well points in the main slug stage plan. Selecting a typical well group 7-A227 to carry out three-three combined excavation and potential optimization, wherein the three-three combined excavation and potential optimization comprises the following steps:
(1) Selecting available 7-116C wells in the well group, locating near the middle position of the north-south mining interval, and injecting a horizon II for the 7-A227 wells 8 And III 1 Three-three combined dives were performed (fig. 4).
(2) Injection well 7-A227 well level II in a well group 8 7-116C into horizon II at an injected PV number of 0.28PV 8 And (5) performing excavation, and accumulating oil 1605.9t in the stage.
(3) 7-116C at horizon II 8 When the effect of medium potential excavation is poor, the daily oil production is less than 1t and the water content is more than 95 percent, the layer II is finished 8 Digging and submerging.
(4) Injection well 7-A227 well horizon III in a well group 1 7-116C into horizon III at an injection PV number of 0.19PV 1-2 And (5) carrying out excavation, and accumulating oil 2924t.
(5) 7-116C at horizon III 1-2 When the effect of the medium excavation potential is poor, the daily oil production is less than 1t, and the water content is more than 95 percent, the horizon III is finished 1-2 Digging and submerging.
(6) After more than 3 years of three-three combined potential excavation, the accumulated oil yield reaches 4529.9t, and the production curve is shown in figure 5. Injecting a well 7-A227 in the well group in the step (2) 8 7-116C into horizon II at an injected PV number of 0.28PV 8 And (4) carrying out excavation, wherein the daily oil yield is 7.7t/d at the initial stage, the water content is 77.1 percent, and the oil yield is 1605.9t cumulatively at the stage. Injecting well 7-A227 well horizon III in the well group by step (4) 1 Injection intoAt a PV number of 0.19PV, 7-116C enters horizon III 1-2 And (4) carrying out excavation, wherein daily oil yield is 8.7t/d at the initial stage, water content is 66.2%, and oil yield is 2924t cumulatively at the stage.
The above example is only one example of one of the three-in-three combined wells in the industrial test area, and the three-in-three combined wells are subjected to three-in-three combined excavation in the test area, and by the end of 2017.11 months, the three-in-three combined wells can accumulate 3.3 ten thousand tons of oil, and the net present value of the finance is increased by 2780 ten thousand yuan compared with the case of not performing three-in-three combined excavation. The embodiment shows that the chemical flooding stage three-three combined excavation and potential optimization method for the sandstone reservoir can improve the oil layer development effect and improve the chemical flooding technology and economic indexes.
It should be understood that the above-mentioned embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention, and it will be obvious to those skilled in the art that other variations or modifications may be made on the basis of the above description, and all embodiments may not be exhaustive, and all obvious variations or modifications may be included within the scope of the present invention.

Claims (4)

1. A three-three combined excavation and potential optimization mining method for a sandstone reservoir in a chemical flooding stage is characterized by comprising the following steps:
1) Determining three-three combined diving positions: determining three-three combined excavation and submerging wells by combining the distribution condition of each well in a well group near the position of a side well with the reverse nine points in a five-point method area well pattern; the anti-nine-point side well is positioned at the middle position of the injection in the south and north or the mining in the south and north in a five-point method area well pattern of a chemical flooding target layer; the submersible digging well is an old well which is not used, a low-yield oil well or a chemical flooding new well of other strata;
2) Determining the three-three combined diving entry time: injecting the chemical flooding solution into a submergible well with PV number of 0.2-0.6PV to enter a chemical flooding layer for submerging;
3) Determining the ending time of the three-three combined excavation: thirdly, the three combined excavation wells enter a high water-cut period, excavation and submergence are finished, and other strata are returned upwards; the high water content period means that the water content of the three-in-three combined submersible digging well reaches more than 95 percent.
2. The triple-combination excavation and potential optimization mining method according to claim 1, wherein the five-point method area well pattern is an injection-production well pattern type adopted by a chemical flooding target stratum.
3. The three-in-three combined mining and diving optimization production method as claimed in claim 1, wherein the unused old well is a well which is not used any more in other water-drive intervals or chemical-drive target zones in the same block, and comprises a geological abandonment well, an observation well, an inspection well and a monitoring well.
4. The triple-combination excavation and potential optimization mining method according to claim 1, wherein the injection PV number is a ratio of a total injection amount of chemical flooding solution of a chemical flooding target layer to a total pore volume of the chemical flooding target layer.
CN201811541449.3A 2018-12-17 2018-12-17 Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage Active CN111322054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811541449.3A CN111322054B (en) 2018-12-17 2018-12-17 Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811541449.3A CN111322054B (en) 2018-12-17 2018-12-17 Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage

Publications (2)

Publication Number Publication Date
CN111322054A CN111322054A (en) 2020-06-23
CN111322054B true CN111322054B (en) 2022-11-04

Family

ID=71172600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811541449.3A Active CN111322054B (en) 2018-12-17 2018-12-17 Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage

Country Status (1)

Country Link
CN (1) CN111322054B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727413A (en) * 2021-01-09 2021-04-30 西南石油大学 Oil extraction method combining fine water injection and chemical combination flooding of complex fault block oil reservoir

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4234689A (en) * 1979-02-22 1980-11-18 Biotechnologie Aktiengesellschaft Fur Emulsan Production of α-emulsans
CN101493003B (en) * 2009-04-14 2012-01-11 大庆油田有限责任公司 Microbe oil production method after polymer drive
CN102116143B (en) * 2010-12-30 2014-04-02 长江大学 Method for extracting oil by utilizing indigenous microbe of oil pool subjected to polymer flooding
CA2852199A1 (en) * 2014-04-04 2015-10-04 Oil Chem Technologies, Inc. Method for in-situ solid particles formation and applications thereof
CN105863587B (en) * 2016-06-01 2018-10-16 中国海洋石油集团有限公司 A kind of determination method of polymer flooding alternating injection timing
CN106050196B (en) * 2016-06-08 2019-03-08 西南石油大学 A kind of Offshore Heavy Oil Field oil reservoir early stage note gathers the determination method on preferable metaideophone opportunity

Also Published As

Publication number Publication date
CN111322054A (en) 2020-06-23

Similar Documents

Publication Publication Date Title
Havlena et al. The material balance as an equation of a straight line—Part II, field cases
CN102777157B (en) CO2 drive oil-gas-water separate well injecting oil reservoir mixing drive development method
CN103628850B (en) A kind of waterflooding oil field integral profile control water blockoff decision-making technique
EP3800324B1 (en) Method and apparatus for determining integrated development approach for shale and adjacent oil layers
CN107630686B (en) compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections
CN105317407B (en) A kind of development approach of ultra-high water cut stage Untabulated reservoirs
CN1743641A (en) Method for extracting residue oil by injecting profile control agent to norizontal well for blocking water injection path of oil reservoir
CN105089584A (en) Method for improving recovery ratio of sealed small fault-block oil reservoir through alternate coupling injection and production of oil-water well
CN109339752A (en) Oil reservoir development method based on the phlogisticated air displacement of reservoir oil
CN111749658A (en) Carbon dioxide huff and puff oil production method and device
CN102146789A (en) Deep profile controlling method
CN112253071A (en) Design method for pretreatment, blockage removal and capacity increase fracturing of compact sandstone reservoir
Skauge et al. Review of WAG field experience
CN111322054B (en) Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage
King et al. A reservoir study of the Hawkins Woodbine field
CN100538004C (en) Improve the method for designing of anisotropic reservoir waterflooding effect
Barbe et al. Quantitative analysis of infill performance: Robertson Clearfork Unit
CN112324413B (en) Chemical construction method for improving injection amount of injection well
Van Everdingen et al. A proposal to improve recovery efficiency
RU2290501C1 (en) Method for extracting an oil pool
Talash et al. Summary of performance and evaluations in the west burkburnett chemical waterflood project
RU2132939C1 (en) Method of developing multiple-zone oil deposit
Braithwaite A Review of IOR/EOR Opportunities for the Brent Field: Depressurisation, the Way Forward
CN114592831B (en) Long-arm synergistic exploitation method for deep sea natural gas hydrate
Raiders et al. Selective plugging and oil displacement in crossflow core systems by microrganisms

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant