CN102146789A - Deep profile controlling method - Google Patents

Deep profile controlling method Download PDF

Info

Publication number
CN102146789A
CN102146789A CN2011100780527A CN201110078052A CN102146789A CN 102146789 A CN102146789 A CN 102146789A CN 2011100780527 A CN2011100780527 A CN 2011100780527A CN 201110078052 A CN201110078052 A CN 201110078052A CN 102146789 A CN102146789 A CN 102146789A
Authority
CN
China
Prior art keywords
well
profile control
blocking agent
series
strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100780527A
Other languages
Chinese (zh)
Other versions
CN102146789B (en
Inventor
汪庐山
张光焰
刘承杰
靳彦欣
吕西辉
关悦
陈玉丽
付琛
王海英
尹相文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co filed Critical China Petroleum and Chemical Corp
Priority to CN201110078052.7A priority Critical patent/CN102146789B/en
Publication of CN102146789A publication Critical patent/CN102146789A/en
Application granted granted Critical
Publication of CN102146789B publication Critical patent/CN102146789B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a deep profile controlling method. The method is characterized by comprising the steps of dividing multiple oil layers of the same oil field block of a continental oil layer into a plurality of layer series, wherein each layer series has a respective flooding well network, and all the flooding well networks do not interfere with each other; passing water wells of the other layer series are found out as plugging agent injection wells between oil-water wells in a well group to be controlled rather than injecting plugging agents into water wells to be controlled, wherein the layer series of the passing water wells are positioned above or below the layer series of the well group to be controlled; and the passing water wells of the other layer series for injecting the plugging agents are returned to place the plugging agents between oil-water wells of a target oil layer, therefore, a purpose of deep profile control is achieved. The deep profile controlling method disclosed by the invention has the advantages of broad popularization and application prospects and simpleness of field implementation; moreover, just by using the current conventional technology, the deep profile control purpose can be achieved with comparatively low cost.

Description

Depth profile control method
Technical field
The present invention relates to the method that oil reservoir improves recovery ratio, relate in particular to a kind of depth profile control method.
Background technology
Profile control technique is to inject blocking agent in water injection well, realization is to the shutoff of water stream channel, with contradiction in the plane of improving oil reservoir and interlayer, the layer, makes the intake profile of water injection well become balanced more, enlarge the water drive swept volume, thereby improve a technology of water drive development effectiveness.Desk research and mining site practice all show, implement the purpose that profile control can reach decreasing water cut and increasing oil in water injection well, are one of dominant technology of present water drive sandstone oil reservoir high water-cut development period water and oil control.The sandstone oil reservoir of long-term injecting water exploitation, particularly turn the sandstone oil reservoir of follow-up water drive exploitation through polymer, macropore and high infiltration band are generally grown, contradiction is more outstanding in interlayer, the layer, cause injecting water and do invalid circulation at oil reservoir, and adopt the profile control technique of conventional blocking agent, the effect of going up at the scene is variation year by year, influenced development effectiveness, especially outstanding in the oil reservoir of this phenomenon after having passed through many rounds profile control.Present domestic deep profile controlling Study on Technology field mainly concentrates on blocking agent research aspect, and main way is to develop the blocking agent with good migration ability, implements heavy dose of the injection by well, makes blocking agent enter the purpose that the oil reservoir deep reaches deep profile controlling.For example, the agent of cross-linked polymer solution deep profile controlling, deep adjusting water blocking agent of self-crosslinked shell acrylamide multipolymer, shift drive agent of self cross-linked polymer, residual polyalcohol utilizes agent, polymer microballoon etc. again behind the polymer flooding.At present, these deep profile controlling technical costs based on novel profile control agent are higher relatively, and the engineering time is longer.Usually, its shut-off capacity of blocking agent with good migration ability a little less than, and relatively poor its shut-off capacity of blocking agent of migration ability is stronger.Thereby novel profile control agent all is not suitable for macropore plugging and high infiltration band.The objective of the invention is to adopt profile control agent commonly used to go up the purpose that realizes deep profile controlling at the scene, be specially adapted to the macropore of water plugging and profile controlling sizable application and the saturating old liberated area of the middle and high infiltration oil reservoir that high infiltration band is grown.
Summary of the invention
The objective of the invention is at the problems referred to above, a kind of depth profile control method is proposed, adopt profile control agent commonly used to go up the purpose that realizes deep profile controlling at the scene, be specially adapted to the macropore of water plugging and profile controlling sizable application and the saturating old liberated area of the middle and high infiltration oil reservoir that high infiltration band is grown.
Technical scheme of the present invention is:
A kind of depth profile control method is characterized in that: described depth profile control method is that a plurality of oil reservoirs with the same oil field block of terrestrial facies oil reservoir are divided into several series of strata, and each series of strata has flooding pattern separately, and flooding pattern is not disturbed each other; Between the oil-water well in intending the profile control well group, find the well of passing by on one's way of other series of strata to inject well, rather than in intending the profile control well, inject blocking agent as blocking agent; The series of strata of this well of passing by on one's way be positioned on the series of strata of intending the profile control well group or under.
Usually, every cover straticulate exploration all has well location map, and the figure acceptance of the bid understands that the position and the well of well do not form flooding pattern.All wells of passing by on one's way in intending the profile control well group all are candidate wells that profile control is implemented well.
The described well of passing by on one's way is positioned on the line of intending the profile control oil-water well or near the line, the well of passing by on one's way is apart from water injection well 20m-150m.
When the series of strata of the described well of passing by on one's way are positioned on the series of strata of intending the profile control well group, pass by on one's way well between the oil-water well of intending the profile control well group; This water injection well of passing by on one's way is injected well as the profile control blocking agent, adopt to seal up to pour down tubing string, the following series of strata at the place of intending the profile control well group are injected blocking agent, after construction was finished, the water injection well of passing by on one's way playback returned in the former aboveground series of strata net.During the profile control construction, former well casing post must be proposed, be lowered to the profile control operating tool string, recovering after profile control is finished is exactly to propose operating tool string, and the former well casing post that proposes is originally gone back down again, returns to the preceding state of profile control.
When the series of strata of the described well of passing by on one's way are positioned under the series of strata of intending the profile control well group, pass by on one's way well between the oil-water well of intending the profile control well group; This water injection well of passing by on one's way is injected well as blocking agent, adopts envelope to make a bet and go up tubing string or adopt back-up sand protection series of strata down, the last series of strata at the place of intending the profile control well group are injected blocking agent, after construction is finished, the well of passing by on one's way playback, return to former under in the series of strata well pattern.When the profile control of series of strata is constructed under the employing back-up sand protection, former well casing post must be proposed, be lowered to the profile control operating tool string, by the sand washing operation sand of inserting be rushed out after profile control is finished, more former well casing post is lowered to, return to the preceding state of profile control.
Blocking agent adopts blocking agent commonly used and combination thereof to carry out slug, and the blocking agent type is polymer gel blocking agent and particle blocking agent, and wherein the particle blocking agent comprises three kinds of particle dispersion, particle induration and hydroexpanding bodies again.
The slug of described blocking agent combination comprises: low concentration polymer frozen glue blocking agent and hydroexpanding body compound system, high concentration polymer frozen glue blocking agent; Polymer gel blocking agent and hydroexpanding body compound system, particle induration; Polymer gel blocking agent and hydroexpanding body compound system, particle dispersion, particle induration; Particle dispersion, particle induration and particle dispersion, polymer gel blocking agent.
Blocking agent adopts relatively poor and the particle blocking agent that shut-off capacity is stronger of migration ability.
Blocking agent adopts the stronger novel deep profile controlling agent of migration ability to make blocking agent.
Beneficial effect of the present invention:
Between the oil-water well of the present invention in intending the profile control well group, find the well of passing by on one's way of other series of strata to inject well, rather than in intending the profile control well, inject blocking agent as blocking agent.
(1) adopt blocking agent commonly used to go up at the scene and realize deep profile controlling, the ability of particularly migrating is relatively poor and the strong particle blocking agent of shut-off capacity also can realize deep profile controlling;
(2) blocking agent is placed between the profit, promptly realizes the oil reservoir deep;
(3) field conduct is simple, adopt present routine techniques can reach the deep profile controlling purpose, and cost is cheap relatively.
Figure of description
Deep profile controlling is sealed up and is transferred signal down between Fig. 1 oil-water well
As shown in fig. 1, the 1-well series of strata of passing by on one's way; 2-intends profile control well group series of strata; 3-intends the well in the profile control well group; The 4-well of passing by on one's way; 5-intends the oil well in the profile control well group
Signal is gone up in the downward modulation of deep profile controlling envelope between Fig. 2 oil-water well
As shown in Figure 2,6-intends profile control well group series of strata; The 7-well series of strata of passing by on one's way; 8-intends the well in the profile control well group; The 9-well of passing by on one's way; 10-intends the oil well in the profile control well group
The specific embodiment
The terrestrial facies oil reservoir is the main oil reservoir of China, and it is one of its characteristics that a block has a plurality of series of strata.Waterflooding extraction is the main development scheme in China oil field.At the Oilfield developing initial stage, generally all adopt full well to close to annotate and close the mode of adopting and exploit an i.e. cover flooding pattern exploitation.Under this development scheme, the interlayer contradiction that produces from the intrinsic non-homogeneity of oil reservoir itself, interlayer interference just, promptly because the infiltration difference of oil reservoir, when full well commingled water injection, the stratum water absorption that permeability is high is bigger.Bigger to the exploitation influential effect.Along with development of technology, the separate zone production of segmentation series of strata is applied at the scene.Consider reservoir development, every interlayer, different series of strata geology characteristic, fluid properties, crude oil property, close at present adopt whether exist layer with layer between problem such as influence each other, a plurality of oil reservoirs of same block are divided into several series of strata, and the flooding pattern that each series of strata has is not separately disturbed each other, reduces the influence of interlayer contradiction to exploitation with this.In segmentation series of strata development process, in order to improve new well pattern, except utilizing original old well, it is more newly to bore oil-water well.Particularly in latter period of oilfield development, well pattern is adjusted as one of effective way that improves development effectiveness, is used widely at the scene.This provides the foundation for realization of the present invention.
Depth profile control method of the present invention is characterized in that: described depth profile control method is that a plurality of oil reservoirs with the same oil field block of terrestrial facies oil reservoir are divided into several series of strata, and each series of strata has flooding pattern separately, and flooding pattern is not disturbed each other; Between the oil-water well in intending the profile control well group, find the well of passing by on one's way of other series of strata to inject well, rather than in intending the profile control well, inject blocking agent as blocking agent; The series of strata of this well of passing by on one's way be positioned on the series of strata of intending the profile control well group or under.
Usually, every cover straticulate exploration all has well location map, and the figure acceptance of the bid understands that the position and the well of well do not form flooding pattern.All wells of passing by on one's way in intending the profile control well group all are candidate wells that profile control is implemented well.
The described well of passing by on one's way is positioned on the line of intending the profile control oil-water well or near the line, the well of passing by on one's way is apart from water injection well 20m-150m.
When the series of strata of the described well of passing by on one's way are positioned on the series of strata of intending the profile control well group, pass by on one's way well between the oil-water well of intending the profile control well group; This water injection well of passing by on one's way is injected well as the profile control blocking agent, adopt to seal up to pour down tubing string, the following series of strata at the place of intending the profile control well group are injected blocking agent, after construction was finished, the water injection well of passing by on one's way playback returned in the former aboveground series of strata net.During the profile control construction, former well casing post must be proposed, be lowered to the profile control operating tool string, recovering after profile control is finished is exactly to propose operating tool string, and the former well casing post that proposes is originally gone back down again, returns to the preceding state of profile control.
When the series of strata of the described well of passing by on one's way are positioned under the series of strata of intending the profile control well group, pass by on one's way well between the oil-water well of intending the profile control well group; This water injection well of passing by on one's way is injected well as blocking agent, adopts envelope to make a bet and go up tubing string or adopt back-up sand protection series of strata down, the last series of strata at the place of intending the profile control well group are injected blocking agent, after construction is finished, the well of passing by on one's way playback, return to former under in the series of strata well pattern.When the profile control of series of strata is constructed under the employing back-up sand protection, former well casing post must be proposed, be lowered to the profile control operating tool string, by the sand washing operation sand of inserting be rushed out after profile control is finished, more former well casing post is lowered to, return to the preceding state of profile control.
Blocking agent adopts blocking agent commonly used and combination thereof to carry out slug, and the blocking agent type is polymer gel blocking agent and particle blocking agent, and wherein the particle blocking agent comprises three kinds of particle dispersion, particle induration and hydroexpanding bodies again.
The slug of described blocking agent combination comprises: low concentration polymer frozen glue blocking agent and hydroexpanding body compound system, high concentration polymer frozen glue blocking agent; Polymer gel blocking agent and hydroexpanding body compound system, particle induration; Polymer gel blocking agent and hydroexpanding body compound system, particle dispersion, particle induration; Particle dispersion, particle induration and particle dispersion, polymer gel blocking agent.
Blocking agent adopts relatively poor and the particle blocking agent that shut-off capacity is stronger of migration ability.
Blocking agent adopts the stronger novel deep profile controlling agent of migration ability to make blocking agent.

Claims (8)

1. depth profile control method is characterized in that: described depth profile control method is that a plurality of oil reservoirs with the same oil field block of terrestrial facies oil reservoir are divided into several series of strata, and each series of strata has flooding pattern separately, and flooding pattern is not disturbed each other; Between the oil-water well in intending the profile control well group, find the well of passing by on one's way of other series of strata to inject well, rather than in intending the profile control well, inject blocking agent as blocking agent; The series of strata of this well of passing by on one's way be positioned on the series of strata of intending the profile control well group or under.
2. depth profile control method as claimed in claim 1 is characterized in that: the described well of passing by on one's way is positioned on the line of intending the profile control oil-water well, and distance is intended profile control water injection well 20m-150m.
3. depth profile control method as claimed in claim 1 is characterized in that: the described well of passing by on one's way is positioned to be intended near the profile control oil-water well line, and distance is intended profile control water injection well 20m-150m.
4. depth profile control method as claimed in claim 1 is characterized in that: when the series of strata of the described well of passing by on one's way are positioned on the series of strata of intending the profile control well group, pass by on one's way well between the oil-water well of intending the profile control well group; This water injection well of passing by on one's way is injected well as the profile control blocking agent, adopt to seal up to pour down tubing string, the following series of strata at the place of intending the profile control well group are injected blocking agent, after construction was finished, the water injection well of passing by on one's way playback returned in the former aboveground series of strata net.
5. depth profile control method as claimed in claim 1 is characterized in that: when the series of strata of the described well of passing by on one's way are positioned under the series of strata of intending the profile control well group, pass by on one's way well between the oil-water well of intending the profile control well group; This water injection well of passing by on one's way is injected well as blocking agent, adopts envelope to make a bet and go up tubing string or adopt back-up sand protection series of strata down, the last series of strata at the place of intending the profile control well group are injected blocking agent, after construction is finished, the well of passing by on one's way playback, return to former under in the series of strata well pattern.
6. as the described depth profile control method of one of claim 1 to 5, it is characterized in that: blocking agent adopts blocking agent commonly used and combination thereof to carry out slug, blocking agent type commonly used is polymer gel blocking agent and particle blocking agent, and wherein the particle blocking agent comprises three kinds of particle dispersion, particle induration and hydroexpanding bodies again;
The slug type of described blocking agent combination comprises: low concentration polymer frozen glue blocking agent and hydroexpanding body compound system, high concentration polymer frozen glue blocking agent; Polymer gel blocking agent and hydroexpanding body compound system, particle induration; Polymer gel blocking agent and hydroexpanding body compound system, particle dispersion, particle induration; Particle dispersion, particle induration and particle dispersion, polymer gel blocking agent.
7. as the described depth profile control method of one of claim 1 to 5, it is characterized in that: blocking agent adopts relatively poor and the particle blocking agent that shut-off capacity is stronger of migration ability.
8. as the described depth profile control method of one of claim 1 to 5, it is characterized in that: blocking agent adopts the stronger polymer microballoon moldeed depth portion profile control agent of migration ability to make blocking agent.
CN201110078052.7A 2011-03-30 2011-03-30 Deep profile controlling method Expired - Fee Related CN102146789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110078052.7A CN102146789B (en) 2011-03-30 2011-03-30 Deep profile controlling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110078052.7A CN102146789B (en) 2011-03-30 2011-03-30 Deep profile controlling method

Publications (2)

Publication Number Publication Date
CN102146789A true CN102146789A (en) 2011-08-10
CN102146789B CN102146789B (en) 2015-01-14

Family

ID=44421238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110078052.7A Expired - Fee Related CN102146789B (en) 2011-03-30 2011-03-30 Deep profile controlling method

Country Status (1)

Country Link
CN (1) CN102146789B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628848A (en) * 2013-12-02 2014-03-12 中国地质大学(武汉) Multidirectional interlayer water flooding displacement oil extraction method and system
CN105971550A (en) * 2016-06-27 2016-09-28 烟台智本知识产权运营管理有限公司 Profile control method for medium-and-high-permeability reservoir
CN106089168A (en) * 2016-06-27 2016-11-09 烟台智本知识产权运营管理有限公司 A kind of method of medium to high permeable oil reservoir integral profile control
CN106988715A (en) * 2017-04-14 2017-07-28 陕西和尊能源科技有限公司 A kind of many slug profile control methods of water injection well
CN108019192A (en) * 2016-11-01 2018-05-11 中国石油化工股份有限公司 A kind of hydroexpanding body blocking agent profile control blocks removal of bridge formation method
CN109763800A (en) * 2019-03-18 2019-05-17 哈尔滨理工大学 A kind of separated-zone water infection oil field amount prediction technique
CN113969768A (en) * 2020-07-23 2022-01-25 中国石油化工股份有限公司 Directional enabling-differential releasing type volume water drive method for one-injection multi-production well group
CN113980664A (en) * 2021-11-23 2022-01-28 中国石油化工股份有限公司 Profile control agent and method suitable for layered polymer injection well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4147211A (en) * 1976-07-15 1979-04-03 Union Oil Company Of California Enhanced oil recovery process utilizing a plurality of wells
US4750562A (en) * 1985-08-30 1988-06-14 Mobil Oil Corporation Method to divert fractures induced by high impulse fracturing
US4815537A (en) * 1987-07-02 1989-03-28 Mobil Oil Corporation Method for viscous hydrocarbon recovery
US4848464A (en) * 1988-05-23 1989-07-18 Mobil Oil Corp. Method to improve use of polymers for injectivity profile control in enhanced oil recovery
CN2381781Y (en) * 1999-07-09 2000-06-07 中原石油勘探局采油三厂 Pipe column for regulating separated layer water injection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4147211A (en) * 1976-07-15 1979-04-03 Union Oil Company Of California Enhanced oil recovery process utilizing a plurality of wells
US4750562A (en) * 1985-08-30 1988-06-14 Mobil Oil Corporation Method to divert fractures induced by high impulse fracturing
US4815537A (en) * 1987-07-02 1989-03-28 Mobil Oil Corporation Method for viscous hydrocarbon recovery
US4848464A (en) * 1988-05-23 1989-07-18 Mobil Oil Corp. Method to improve use of polymers for injectivity profile control in enhanced oil recovery
CN2381781Y (en) * 1999-07-09 2000-06-07 中原石油勘探局采油三厂 Pipe column for regulating separated layer water injection

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王泽九等: "《2001 第七次李四光地质科学奖获得者 主要科学技术成就与贡献》", 30 September 2003 *
辛爱渊: "胜利油田中高渗油藏高含水期调剖剂的研究及应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628848A (en) * 2013-12-02 2014-03-12 中国地质大学(武汉) Multidirectional interlayer water flooding displacement oil extraction method and system
CN103628848B (en) * 2013-12-02 2016-09-07 中国地质大学(武汉) Multidirectional interlayer displacement in flooding oil production method and system
CN105971550A (en) * 2016-06-27 2016-09-28 烟台智本知识产权运营管理有限公司 Profile control method for medium-and-high-permeability reservoir
CN106089168A (en) * 2016-06-27 2016-11-09 烟台智本知识产权运营管理有限公司 A kind of method of medium to high permeable oil reservoir integral profile control
CN108019192A (en) * 2016-11-01 2018-05-11 中国石油化工股份有限公司 A kind of hydroexpanding body blocking agent profile control blocks removal of bridge formation method
CN108019192B (en) * 2016-11-01 2019-11-08 中国石油化工股份有限公司 A kind of hydroexpanding body blocking agent profile control blocking removal of bridge formation method
CN106988715A (en) * 2017-04-14 2017-07-28 陕西和尊能源科技有限公司 A kind of many slug profile control methods of water injection well
CN109763800A (en) * 2019-03-18 2019-05-17 哈尔滨理工大学 A kind of separated-zone water infection oil field amount prediction technique
CN113969768A (en) * 2020-07-23 2022-01-25 中国石油化工股份有限公司 Directional enabling-differential releasing type volume water drive method for one-injection multi-production well group
CN113980664A (en) * 2021-11-23 2022-01-28 中国石油化工股份有限公司 Profile control agent and method suitable for layered polymer injection well

Also Published As

Publication number Publication date
CN102146789B (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN102146789B (en) Deep profile controlling method
CN105298438B (en) More fine profile control methods in round polymer gel deep
Delamaide et al. Pelican Lake field: first successful application of polymer flooding in a heavy-oil reservoir
Ghahfarokhi et al. Overview of CO2 Injection and WAG Sensitivity in SACROC
Liu et al. Application and development of chemical-based conformance control treatments in china oil fields
CN102777157B (en) CO2 drive oil-gas-water separate well injecting oil reservoir mixing drive development method
CN101876241B (en) Method for improving water drive recovery rate of thick positive rhythm reservoir
CN102146788A (en) Method for enhancing recovery ratio through three-dimensional streamline regulation of water drive reservoir
CN107218024B (en) The method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern
CN104653148A (en) Well group reforming comprehensive utilization method for waste oil wells
CN103087699B (en) Sand-carrying profile control agent composition of fracture-cave type oil deposit and profile control method of profile control agent
CN103967458B (en) A kind of sand control section water drive method
CN109577942A (en) A kind of Tapping Potential Method of dominant flowing path development oil reservoir remaining oil
Chen et al. Current status and key factors for coalbed methane development with multibranched horizontal wells in the southern Qinshui basin of China
Jaripatke et al. Water-control management technologies: a review of successful chemical technologies in the last two decades
CN103628848B (en) Multidirectional interlayer displacement in flooding oil production method and system
CN110318719A (en) A kind of two-way displacement method of positive rhythm thick formation
CN105003223A (en) Method for effectively improving portability of packing particles after contact with oil
Romero et al. Non-selective placement of a polymer gel treatment to improve water injection profile and sweep efficiency in the Lagomar Field, Venezuela
CN106223912B (en) The augmented injection method of LOW PERMEABILITY RESERVOIR water injection well
O'Brien et al. Mechanistic reservoir modeling improves fissure treatment gel design in horizontal injectors, Idd El Shargi North Dome Field, Qatar
CN111322054B (en) Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage
Yang et al. An Innovated Water Shutoff Technology in Offshore Carbonate Reservoir
Ge et al. Reservoir Management Makes a Marginal Field Fruitful in Bohai
Helaly et al. Overcoming the Typical Operational Problems & Cost of Water Injection Using Dumpflooding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Lushan

Inventor after: Cui Wenfu

Inventor after: Zhang Guangyan

Inventor after: Lv Xihui

Inventor after: Nie Binglin

Inventor after: Hao Jinke

Inventor after: Wang Haiying

Inventor after: Liu Chengjie

Inventor after: Jin Yanxin

Inventor after: Xiong Zhaohong

Inventor after: Li Jiyong

Inventor after: Guan Yue

Inventor after: Chen Yuli

Inventor after: Fu Chen

Inventor after: Yin Xiangwen

Inventor before: Wang Lushan

Inventor before: Yin Xiangwen

Inventor before: Zhang Guangyan

Inventor before: Liu Chengjie

Inventor before: Jin Yanxin

Inventor before: Lv Xihui

Inventor before: Guan Yue

Inventor before: Chen Yuli

Inventor before: Fu Chen

Inventor before: Wang Haiying

COR Change of bibliographic data
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20160330

CF01 Termination of patent right due to non-payment of annual fee