CN112670891A - Method for overhauling underground cable based on virtual reality - Google Patents

Method for overhauling underground cable based on virtual reality Download PDF

Info

Publication number
CN112670891A
CN112670891A CN202110062562.9A CN202110062562A CN112670891A CN 112670891 A CN112670891 A CN 112670891A CN 202110062562 A CN202110062562 A CN 202110062562A CN 112670891 A CN112670891 A CN 112670891A
Authority
CN
China
Prior art keywords
underground cable
virtual
scene
cable
virtual reality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110062562.9A
Other languages
Chinese (zh)
Inventor
孙大伟
宋立辉
云帮助
张盛昱
王子韬
李哲
胡婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohhot Power Supply Bureau Of Inner Mongolia Power Group Co ltd
Original Assignee
Hohhot Power Supply Bureau Of Inner Mongolia Power Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohhot Power Supply Bureau Of Inner Mongolia Power Group Co ltd filed Critical Hohhot Power Supply Bureau Of Inner Mongolia Power Group Co ltd
Priority to CN202110062562.9A priority Critical patent/CN112670891A/en
Publication of CN112670891A publication Critical patent/CN112670891A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a method for overhauling an underground cable based on virtual reality, which comprises scene construction, data access, reality twinning and comprehensive overhauling; establishing a high-simulation underground cable scene according to a ratio of 1:1, and realizing on-site virtual simulation construction; acquiring field information, embedding the field information with an underground cable virtual scene, and completing live-action access of all underground cable data; the virtual reality fusion of the underground cable is completed through a digital twin technology platform, and the fusion of virtual and real display scenes is realized; and (4) displaying the underground cable through a digital twin platform, and carrying out accurate early warning and maintenance. According to the invention, a technical mode of virtual reality is used for replacing conventional artificial experience simulation interpretation, so that the accuracy of data processing is improved, and the defect that artificial problem risks are omitted is overcome; two factors of the space position of the underground cable and the real-time operation information of the cable are comprehensively considered, the potential risk problem of underground cable operation is practically and accurately detected through overhauling, and the management quality is improved.

Description

Method for overhauling underground cable based on virtual reality
Technical Field
The invention belongs to the technical field of power transmission line inspection, and particularly relates to a method for overhauling an underground cable based on virtual reality.
Background
The cable is mainly used as a carrier for transmitting electric power, consists of single-strand or multi-strand wires and an insulating layer, and is arranged to convey the electric power from a power plant to a user unit so as to facilitate the production and living use of the user unit. After entering modern society, due to the reasons of shortage of urban land, high traffic pressure, urban construction and the like, underground cable power transmission is commonly adopted in large cities. Compared with an overhead line, the cable has the advantages of small occupied area, reliable power transmission, strong anti-interference capability and the like.
The underground cable is an important component of national economic infrastructure, is a life line of a city, is responsible for transmitting light and energy for thousands of households, is an important support for guaranteeing economic development and normal production and life of common people, and the maintenance operation of the underground cable becomes an important content of daily operation and maintenance work of a power grid.
The traditional maintenance treatment mode mainly comprises two modes of manual line inspection maintenance and early fault judgment cognitive maintenance. Manual inspection requires a large amount of manpower and time to perform manual investigation, and identification and judgment are performed after abnormality is determined, and then disposal is performed. And (3) early fault judgment cognitive maintenance, namely performing operation maintenance on the underground cable according to different angles of monitoring of power grid parameters by adopting an early judgment mode based on an early fault model, a wavelet transformation method and a Bayesian method.
The manual line patrol inspection only depends on manual identification, so that the efficiency is low inevitably, a large amount of manual errors exist when large data volume is processed, the manual line patrol inspection is basically not suitable for operation, inspection and processing of a large amount of underground cables, in addition, the workload is huge, the efficiency is low, the weight checking accuracy is extremely low, and a large amount of human resources are consumed.
The early failure judgment cognitive maintenance mode is used for carrying out abstract evaluation on the cable operation data, the calculation times are huge when the cable data with large data volume is processed, the evaluation model period is too long, and the efficiency is low. When the underground line operation maintenance processing is carried out, due to the existence of time resolution, frequency resolution and statistical errors of data, invalid information identification can occur, so that abnormal information is omitted; the early fault judgment cognitive maintenance mode can only find abnormal data under the condition of a specific model and cannot analyze and screen all operation data information. When the amount of data to be processed is large, the processing efficiency is still low, and the accuracy is low and can only reach about 60%.
Therefore, it is urgently needed to develop a method for overhauling an underground cable based on virtual reality to solve the problems.
Disclosure of Invention
In order to solve the problems in the background art, the invention provides a method for overhauling an underground cable based on virtual reality.
In order to achieve the purpose, the invention provides the following technical scheme:
the method for overhauling the underground cable based on the virtual reality comprises the following steps:
s1, constructing a scene; establishing a high-simulation underground cable scene according to a ratio of 1:1, and marking a working area and an operation and inspection point in a three-dimensional virtual scene through a distributed mode based on multi-person cooperation to realize three-dimensional control simulation before maintenance; combining a three-dimensional scene with the arrangement of a real physical line by a coordinate matching combined measurement method to realize on-site virtual simulation construction;
s2, data access; through cable partial discharge, environment and gas sensors, infrared temperature measurement and video acquisition of field information are carried out, and the field information is embedded with an underground cable virtual scene, so that all underground cable data are accessed in a real scene;
s3, twinning; the virtual reality fusion of the underground cable is completed through a digital twin technology platform, and the fusion of virtual and real display scenes is realized;
s4, comprehensive maintenance; the underground cable is displayed through a digital twin platform, network information transmission is adopted, and the physical information, the operation information and the operation and inspection information of the hidden risks of the underground cable are subjected to on-site early warning in a multimedia mode to be maintained.
Specifically, in step S3, the twin reality further includes using the high-end computer, the tracking and positioning device, and the human-computer interaction device to perform scene recognition and reality augmentation.
Compared with the prior art, the invention has the beneficial effects that:
1. the automatic maintenance efficiency of underground cable when overhauing is promoted, the scene accident incidence of overhauing is reduced, and maintenance work efficiency is greatly improved.
2. The technical mode of virtual reality replaces the conventional artificial experience simulation interpretation, the accuracy of data processing is improved, and the defect that the artificial ground problem risk is omitted is overcome.
3. Two factors of the space position of the underground cable and the real-time operation information of the cable are comprehensively considered, the potential risk problem of underground cable operation is practically and accurately detected through overhauling, and the management quality is improved.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides the following technical scheme:
the method for overhauling the underground cable based on the virtual reality comprises the following steps:
1. scene construction
Establishing a high-simulation underground cable scene according to a ratio of 1:1, and marking a working area and an operation and inspection point in a three-dimensional virtual scene through a distributed mode based on multi-person cooperation to realize three-dimensional control simulation before maintenance; the three-dimensional scene is combined with the arrangement of the real physical lines through a coordinate matching combined measurement technology, and the construction of the on-site virtual simulation is realized.
2. Data access
After the scene construction process is completed, the construction of the underground cable virtual scene is actually completed, the virtual scene construction is completed, and the data access is the real-scene access to all underground cable data. Meanwhile, field information is collected through cable partial discharge, environment and gas sensors, infrared temperature measurement, video and the like, and is embedded with an underground cable virtual scene.
3. Twinning of reality
After data access is completed, all underground cable scenes and physical information are digitally constructed, virtual reality fusion of the underground cables is completed through a digital twinning technology platform, fusion of virtual and real display scenes is achieved, and scene recognition and reality enhancement effects are achieved by using a high-end computer, tracking and positioning equipment and human-computer interaction equipment.
4. Comprehensive overhaul
After the twins are finished, the underground cable is formed in a virtual and realistic mode, the underground cable is displayed through a digital twins platform, the operation and detection information such as the physical information, the operation information and the risk hidden danger of the underground cable is subjected to on-site early warning in a multimedia mode through network information transmission, and the purposes of accurate positioning, convenient control, vivid display and comprehensive early warning prompt are achieved.
The key points of the application are as follows:
1. underground cable digital twinning:
compared with the traditional three-dimensional scene construction, the underground cable digital twin systematization and systematization underground cable digital standardization standard can not only dynamically provide various spatial information required by users according to the position change of the users, but also dynamically superpose the spatial information on the scene information in a virtual three-dimensional mode, thereby increasing the interactivity between the users and the system, leading the user interface to be more intelligent, and being a new mode for combining the future spatial information service and the position service.
2. Virtual reality overhaul:
the problem risk condition is examined to the fortune not comprehensive judgement to traditional maintenance means, and this patent technique introduces and examines underground cable to virtual reality, examines information through abundant swift form with fortune such as underground cable physical information, operational information, risk hidden danger and carries out on-the-spot early warning through digital twin, reaches the problem accurate positioning and deals with.
The method for constructing the underground cable twin reality is designed by combining a three-dimensional modeling technology, a digital twin technology, an internet of things acquisition technology and a space positioning technology by adopting a virtual reality technology aiming at huge and complex objective scenes of the underground cable.
The problem risk is examined to more accurate judgement underground cable of this application, makes things convenient for the maintainer to carry out the collaborative deduction of many specialty, many shifts group in virtual underground cable scene, realizes the comprehensive maintenance of operation process, reaches the accurate, the convenient, lively, the comprehensive purpose of early warning suggestion of show of location.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (2)

1. The method for overhauling the underground cable based on virtual reality is characterized by comprising the following steps of:
s1, constructing a scene; establishing a high-simulation underground cable scene according to a ratio of 1:1, and marking a working area and an operation and inspection point in a three-dimensional virtual scene through a distributed mode based on multi-person cooperation to realize three-dimensional control simulation before maintenance; combining a three-dimensional scene with the arrangement of a real physical line by a coordinate matching combined measurement method to realize on-site virtual simulation construction;
s2, data access; through cable partial discharge, environment and gas sensors, infrared temperature measurement and video acquisition of field information are carried out, and the field information is embedded with an underground cable virtual scene, so that all underground cable data are accessed in a real scene;
s3, twinning; the virtual reality fusion of the underground cable is completed through a digital twin technology platform, and the fusion of virtual and real display scenes is realized;
s4, comprehensive maintenance; the underground cable is displayed through a digital twin platform, network information transmission is adopted, and the physical information, the operation information and the operation and inspection information of the hidden risks of the underground cable are subjected to on-site early warning in a multimedia mode to be maintained.
2. The method for performing underground cable maintenance based on virtual reality according to claim 1, wherein in step S3, the reality twin further comprises using a high-end computer, a tracking and positioning device and a human-computer interaction device to perform scene recognition and reality augmentation.
CN202110062562.9A 2021-01-18 2021-01-18 Method for overhauling underground cable based on virtual reality Pending CN112670891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110062562.9A CN112670891A (en) 2021-01-18 2021-01-18 Method for overhauling underground cable based on virtual reality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110062562.9A CN112670891A (en) 2021-01-18 2021-01-18 Method for overhauling underground cable based on virtual reality

Publications (1)

Publication Number Publication Date
CN112670891A true CN112670891A (en) 2021-04-16

Family

ID=75415551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110062562.9A Pending CN112670891A (en) 2021-01-18 2021-01-18 Method for overhauling underground cable based on virtual reality

Country Status (1)

Country Link
CN (1) CN112670891A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113189447A (en) * 2021-04-29 2021-07-30 南方电网电力科技股份有限公司 Feeder fault detection method, system and equipment based on Bayesian network
CN116308302A (en) * 2023-05-19 2023-06-23 深圳抛物线科技有限公司 Digital twinning-based advanced warning method and system for potential insulation hazards
CN117540518A (en) * 2023-12-06 2024-02-09 北京城建勘测设计研究院有限责任公司 Underground pipeline inspection equipment and method based on three-dimensional live-action virtual-real fusion

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014121178A (en) * 2012-12-17 2014-06-30 Nippon Telegr & Teleph Corp <Ntt> Overhead optical cable construction method
CN104618694A (en) * 2015-03-02 2015-05-13 国家电网公司 Three-dimensional dynamic monitoring method and system of machine room
CN109246195A (en) * 2018-08-13 2019-01-18 孙琤 A kind of pipe network intelligence management-control method and system merging augmented reality, virtual reality
CN110991670A (en) * 2019-12-02 2020-04-10 浙江华云电力工程设计咨询有限公司 Power cable management method
CN111585239A (en) * 2020-05-26 2020-08-25 中国建筑第八工程局有限公司 Construction method for airport pipeline relocation and transformation without stopping navigation
CN111698468A (en) * 2020-05-14 2020-09-22 中国电力工程顾问集团西南电力设计院有限公司 Method for automatically monitoring three-dimensional scene based on power transmission line

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014121178A (en) * 2012-12-17 2014-06-30 Nippon Telegr & Teleph Corp <Ntt> Overhead optical cable construction method
CN104618694A (en) * 2015-03-02 2015-05-13 国家电网公司 Three-dimensional dynamic monitoring method and system of machine room
CN109246195A (en) * 2018-08-13 2019-01-18 孙琤 A kind of pipe network intelligence management-control method and system merging augmented reality, virtual reality
CN110991670A (en) * 2019-12-02 2020-04-10 浙江华云电力工程设计咨询有限公司 Power cable management method
CN111698468A (en) * 2020-05-14 2020-09-22 中国电力工程顾问集团西南电力设计院有限公司 Method for automatically monitoring three-dimensional scene based on power transmission line
CN111585239A (en) * 2020-05-26 2020-08-25 中国建筑第八工程局有限公司 Construction method for airport pipeline relocation and transformation without stopping navigation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏湛然等: "基于BIM+物联网的智慧保电指挥系统助力武汉军运会顺利召开", 《住宅与房地产》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113189447A (en) * 2021-04-29 2021-07-30 南方电网电力科技股份有限公司 Feeder fault detection method, system and equipment based on Bayesian network
CN113189447B (en) * 2021-04-29 2022-06-14 南方电网电力科技股份有限公司 Feeder fault detection method, system and equipment based on Bayesian network
CN116308302A (en) * 2023-05-19 2023-06-23 深圳抛物线科技有限公司 Digital twinning-based advanced warning method and system for potential insulation hazards
CN116308302B (en) * 2023-05-19 2023-08-08 深圳抛物线科技有限公司 Digital twinning-based advanced warning method and system for potential insulation hazards
CN117540518A (en) * 2023-12-06 2024-02-09 北京城建勘测设计研究院有限责任公司 Underground pipeline inspection equipment and method based on three-dimensional live-action virtual-real fusion

Similar Documents

Publication Publication Date Title
CN112670891A (en) Method for overhauling underground cable based on virtual reality
CN111611855B (en) Intelligent inspection system for three-dimensional visual robot of transformer substation
CN110728670A (en) Low-voltage equipment operation and maintenance method based on AR technology
CN110363878A (en) A kind of computer room method for inspecting based on image processing techniques
CN108614191A (en) A kind of power distribution network and buried cable fault detection method based on BIM models
CN207409918U (en) A kind of intelligent patrol detection device of transmission line of electricity
CN112446080A (en) GIS (geographic information System) and BIM (building information modeling + building information modeling) technology-based comprehensive pipe rack operation and maintenance work visualization system and method
CN214704735U (en) Comprehensive pipe rack wisdom system of patrolling and examining
CN110048509A (en) A kind of substation inspection system and method based on MR intelligent safety helmet
CN112036086A (en) Dynamic risk early warning system for gas pipeline
CN109446290A (en) A kind of intelligent three-dimensional virtual visualization meteorological equipment comprehensive coverage method
CN110926439A (en) Operation tunnel structure health monitoring system based on BIM technology
CN112541704A (en) Intelligent building operation and maintenance management system based on BIM platform
CN109474333A (en) A kind of electric power optical cable real-time monitoring protection system based on deep learning
CN110689450A (en) Wisdom water utilities operation system based on three-dimensional visual mode
CN113554360A (en) Power transmission line running state visual management method and system and storage medium
CN116720242A (en) Digital twin panoramic monitoring system for high-voltage cable tunnel
CN112070379A (en) Little electric wire netting risk monitoring early warning system
CN115912625A (en) Online monitoring system and method for power transmission line
CN116363397A (en) Equipment fault checking method, device and inspection system
CN115364992A (en) Coal mill health monitoring system and health monitoring method
CN112130036A (en) High tension cable partial discharge on-line monitoring system
CN112116108A (en) Expert system and method for failure analysis of power equipment
CN113159643A (en) 3D modeling digital management platform for rotary hearth furnace
CN211787185U (en) AR technology-based power grid equipment state evaluation inspection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210416