CN112663880A - Water leakage prevention construction device for building pool and construction method thereof - Google Patents

Water leakage prevention construction device for building pool and construction method thereof Download PDF

Info

Publication number
CN112663880A
CN112663880A CN202011441889.9A CN202011441889A CN112663880A CN 112663880 A CN112663880 A CN 112663880A CN 202011441889 A CN202011441889 A CN 202011441889A CN 112663880 A CN112663880 A CN 112663880A
Authority
CN
China
Prior art keywords
roller
mount
bonding roller
plane
organism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011441889.9A
Other languages
Chinese (zh)
Inventor
赵勇
李春梅
张神宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan China Construction Engineering Co ltd
Original Assignee
Sichuan China Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan China Construction Engineering Co ltd filed Critical Sichuan China Construction Engineering Co ltd
Priority to CN202011441889.9A priority Critical patent/CN112663880A/en
Publication of CN112663880A publication Critical patent/CN112663880A/en
Pending legal-status Critical Current

Links

Images

Abstract

The utility model relates to a pond is built in room and is built leak protection water construction equipment and construction method thereof, belong to the construction field, including the organism, be provided with the mount on the organism, be provided with the elevating gear who is used for driving the mount to go up and down along vertical direction on the organism, be provided with the unwinding roller on the mount, first bonding roller and second bonding roller, the unwinding roller is located the first plane with first bonding roller, first bonding roller is located the second plane with the second bonding roller, first plane and second plane mutually perpendicular, the advancing direction of organism is on a parallel with the first plane all the time, and perpendicular to the second plane, and the second plane is located outside the organism. This application has the effect of being convenient for carry out waterproofing membrane's laying to pond corner.

Description

Water leakage prevention construction device for building pool and construction method thereof
Technical Field
The application relates to the field of building construction, in particular to a water leakage prevention construction device for building a water pool and a construction method thereof.
Background
The pool is a water storage facility which is built by naturally formed small depressions filled with water or artificial materials and has an anti-seepage effect. The most common artificial water pool is used for swimming pools, water reservoirs, artificial fountains, swimming pools and the like, and can be widely applied to building of each residential quarter or high-grade villas.
The existing Chinese patent with application publication number CN111764721A discloses a construction method for preventing water leakage during building pool construction, which comprises the following steps: s1, digging a pool on the ground, and trimming the pool to form a cuboid structure; s2, cleaning the side wall and the bottom wall in the tank body; s3, brushing neoprene asphalt adhesive diluted by gasoline on the inner surface of the pool body, and brushing the neoprene asphalt adhesive uniformly without penetrating the bottom; s4, paving a group of waterproof rolls at the corners of the pool body; s5, placing the movable machine body on the bottom end of the inner part of the tank body in a hoisting mode, then pushing the movable machine body to enable the bonding roller on the movable machine body to horizontally roll along the corner processing position, and sequentially paving the waterproof coiled material on the inner surface of the tank body; and S6, after the coiled material is laid, paving a protective layer on the outer side of the waterproof coiled material by using mud mortar or fine aggregate concrete.
To the correlation technique among the above-mentioned, the inventor thinks when carrying out waterproofing membrane's the laying, when laying the position at pond corner, because the restriction of bonding roller and organism position, the bonding roller can not remove the corner completely, therefore waterproofing membrane at pond corner needs the manual work again to paste, leads to staff's the increase in the amount of labour, has also wasted the manpower simultaneously.
Disclosure of Invention
In order to facilitate laying of waterproof coiled materials at the corners of the water tank, the application provides a water leakage prevention construction device for building the water tank in a house and a construction method thereof.
First aspect, the application provides a pond is built in room and is built leak protection water construction equipment adopts following technical scheme:
the utility model provides a pond is built in room and leak protection water construction equipment is built, includes the organism, be provided with the mount on the organism, be provided with the elevating gear who is used for driving the mount and goes up and down along vertical direction on the organism, be provided with unwinding roller, first bonding roller and second bonding roller on the mount, unwinding roller and first bonding roller are located the first plane, first bonding roller and second bonding roller are located the second plane, first plane and second plane mutually perpendicular, the advancing direction of organism is on a parallel with first plane all the time, and the perpendicular to second plane, just the second plane is located outside the organism.
By adopting the technical scheme, when the waterproof coiled material in the pool is paved, the machine body is moved into the pool body, the waterproof coiled material is coiled on the unreeling roller, then the waterproof coiled material sequentially passes through the first bonding roller and the second bonding roller, and the second bonding roller is abutted to the inner side wall of the pool, then a worker moves the machine body along the length direction of the inner side wall of the pool, in the moving process, the second bonding roller can pave the waterproof coiled material on the inner side wall of the pool, the machine body is continuously moved until the second bonding roller moves to the corner of the pool, at the moment, as the second plane where the first bonding roller and the second bonding roller are positioned is positioned outside the machine body, the first bonding roller and the second bonding roller can be abutted to the adjacent inner side wall, meanwhile, the waterproof coiled material between the first bonding roller and the second bonding roller can be adhered to the adjacent inner side wall, so that the waterproof coiled material is paved to the corner of the pool by utilizing the construction device, the staff rotates the organism direction again afterwards, on laying every inside wall in pond with waterproofing membrane, utilizes construction equipment directly to flash laying of the waterproofing membrane in pond corner, need not the staff and goes manual laying again, has reduced staff's the amount of labour, has improved waterproofing membrane's the efficiency of laying.
Optionally, a cutting device for cutting the waterproof roll is arranged on the fixing frame.
Through adopting above-mentioned technical scheme, when needs transfer organism direction, the staff need cut off the waterproofing membrane who has laid earlier, this moment the staff only need utilize cutting device to cut can, need not again the manual work to go to cut, further made things convenient for construction equipment's use.
Optionally, the cutting device includes an electric cylinder arranged on the fixing frame, a driving end of the electric cylinder faces to a position where the machine body is located, a cutting knife is arranged on the driving end of the electric cylinder, the length of the cutting knife is the same as that of the second bonding roller, and the cutting knife is located on one side of the unwinding roller.
Through adopting above-mentioned technical scheme, when needs cutting waterproofing membrane, start electric jar, electric jar can drive the cutting knife and move towards the position at organism place, until the cutting knife butt to waterproofing membrane on for the cutting knife cuts off waterproofing membrane, so just realized waterproofing membrane's cutting, and overall structure is simple, has saved the manpower.
Optionally, be provided with the tensioning roller on the mount, the tensioning roller is located between unreeling roller and the first bonding roller, the position that is located the tensioning roller on the mount is provided with the support frame, the tensioning roller rotates and connects on the support frame, be provided with the supporting shoe on the mount, be provided with the elastomer between support frame and the supporting shoe, the elastomer is used for producing elasticity to the support frame.
Through adopting above-mentioned technical scheme, before making waterproofing membrane pass through first bonding roller, on the time of first waterproofing membrane supported the tensioning roller to make the elastomer compression between support frame and the supporting shoe, the elastomer can produce elasticity to the support frame after the compression, thereby makes the tensioning roller produce thrust to waterproofing membrane, makes waterproofing membrane can remain the tensioning state throughout, so alright lay waterproofing membrane to the inside wall in pond better on.
Optionally, the elastic body includes a tension spring, one end of the tension spring is fixedly connected with the support frame, the other end of the tension spring is fixedly connected with the support block, and the tension spring is in a compressed state.
Through adopting above-mentioned technical scheme, compression state's tensioning spring can produce elasticity to make tensioning spring produce elasticity to the support frame, make the tensioning roller with waterproofing membrane tensioning, tensioning spring has stronger elasticity, and not fragile, can use longer time.
Optionally, a limiting rod is arranged between the support frame and the support block and at the position of the tension spring, one end of the limiting rod is fixedly connected to the support frame, the other end of the limiting rod penetrates through the support block, and the tension spring is sleeved on the limiting rod.
Through adopting above-mentioned technical scheme, the setting of gag lever post can play the guide effect to the compression of tensioning spring, reduces the condition that the tensioning spring appears the slope when compressed for the tensioning spring can produce elasticity better.
Optionally, the unwinding roller is detachably connected to the fixed frame.
Through adopting above-mentioned technical scheme, after waterproofing membrane used, the staff can pull down unreeling roller from the mount, then twine new waterproofing membrane on unreeling the roller to make waterproofing membrane's winding can not receive stopping of first bonding roller, second bonding roller and mount, and is more convenient.
Optionally, the fixed slot has been seted up to the position that just is located unreeling roller both ends on the mount, the fixed slot internal rotation is connected with the butt piece, be provided with the rubber pad on the butt piece, the joint groove has been seted up to the position that is located the fixed slot on the mount, the one end and the fixed slot intercommunication in joint groove, the other end link up the mount setting, the tip of unreeling roller is provided with the fixed axle, the size and the fixed slot looks adaptation of fixed axle, fixed axle and butt piece butt.
Through adopting above-mentioned technical scheme, when fixed unwinding roller, the one end that the fixed axle that makes unwinding roller tip link up through the joint groove gets into the joint groove, and move in the unwinding roller towards the joint inslot, move to the fixed slot until the fixed axle in, and make the fixed axle butt to the butt piece on, utilize the rubber pad on the butt piece to fix the fixed axle in the fixed slot, thereby realize unwinding roller's fixed, because butt piece rotation connection is in the fixed slot, consequently unwinding roller can rotate on the mount, and when the unwinding roller is pulled down to needs, it can directly to shift out through the joint groove with unwinding roller tip's fixed axle.
In a second aspect, the application provides a construction method for building a water leakage prevention construction device of a building pool, which adopts the following technical scheme:
a construction method for building a water leakage prevention construction device for a building pool comprises the following steps:
s1: cleaning a base layer, namely removing impurities on the inner side wall and the bottom wall of the tank body;
s2: coating an adhesive, namely coating the adhesive on the inner side wall of the tank body;
s3: paving a waterproof coiled material, placing the machine body in the tank body, moving the machine body along the length direction of the inner side wall of the tank body to enable the first bonding roller to be abutted against the inner side wall of the tank body, and paving the waterproof coiled material on the inner side wall of the tank body by utilizing the first bonding roller;
s4: corner treatment, namely compacting the waterproof coiled material at the corner to ensure that the waterproof coiled material is attached to the corner;
s4: and (4) edge sealing treatment, namely paving a protective layer on the outer side of the waterproof roll by using mud mortar or fine aggregate concrete after the waterproof roll is paved.
Through adopting above-mentioned technical scheme, utilize construction equipment can directly lay waterproofing membrane to the corner in pond, need not the staff and go the manual work to lay, reduced staff's the amount of labour, improved waterproofing membrane's the efficiency of laying.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the unwinding roller, the first bonding roller and the second bonding roller are arranged on the fixing frame, so that the first bonding roller and the second bonding roller are positioned on the same plane, and the first bonding roller and the second bonding roller are positioned outside the machine body;
2. the tensioning roller is arranged on the fixing frame to tension the waterproof coiled material, so that the waterproof coiled material can be better paved on the inner side wall of the water pool;
3. can dismantle through making to unreel the roller and connect on the mount, when convoluteing waterproofing membrane, can earlier with unreeling the roller and take off from the mount to make waterproofing membrane's coiling more convenient.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic top view of an embodiment of the present application;
FIG. 3 is a schematic diagram of a rear structure of the body of FIG. 1 according to an embodiment of the present disclosure;
FIG. 4 is an enlarged partial schematic view of portion A of FIG. 3;
fig. 5 is a schematic view of a partial explosion structure after the unwinding roller and the fixing frame are exploded.
Description of reference numerals: 1. a body; 11. a roller; 2. a fixed mount; 21. a first plate body; 22. a second plate body; 23. a rod body; 24. a connecting rod; 25. a support block; 26. fixing grooves; 261. a butting block; 27. a clamping groove; 3. a lifting device; 4. unwinding rollers; 41. a fixed shaft; 5. a first bonding roller; 6. a second bonding roller; 7. an electric cylinder; 71. a cutting knife; 8. a tension roller; 81. a support frame; 82. tensioning the spring; 83. a limiting rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses pond is built in room and leak protection water construction equipment is built.
Referring to fig. 1 and 3, a building pond is built and is built leak protection water construction equipment, including organism 1, be provided with mount 2 on the organism 1, mount 2 includes first plate body 21 and second plate body 22, first plate body 21 and second plate body 22 are parallel to each other, through body of rod 23 fixed connection between first plate body 21 and the second plate body 22, be provided with elevating gear 3 on the organism 1, elevating gear 3 is including rotating the threaded lead screw (not shown in the figure) of connecting on organism 1, threaded lead screw sets up along vertical direction, be provided with connecting rod 24 on the mount 2, connecting rod 24 keeps away from one end screw thread of mount 2 and cup joints on threaded lead screw, utilize threaded lead screw to realize the lift of mount 2, organism 1 bottom is provided with gyro wheel 11.
Referring to fig. 2 and 3, an unwinding roller 4, a first bonding roller 5 and a second bonding roller 6 are rotatably connected to the fixing frame 2, the unwinding roller 4, the first bonding roller 5 and the second bonding roller 6 are all located between the first plate body 21 and the second plate body 22, and the waterproof roll is wound on the unwinding roller 4 and then sequentially passes through the first bonding roller 5 and the second bonding roller 6; unreel roller 4 and first bonding roller 5 and be located the first plane, first bonding roller 5 and second bonding roller 6 are located the second plane, first plane and second plane mutually perpendicular, when organism 1 moved along the length direction of the inside wall in pond, the direction of travel of organism 1 was parallel with the first plane all the time, and perpendicular to second plane, and the second plane is located outside organism 1 simultaneously, so when organism 1 moved, first bonding roller 5 and second bonding roller 6 just were located the place ahead of organism 1 all the time.
When carrying out laying of waterproofing membrane, the staff removes removal organism 1 along the length direction of pond inside wall, and keep the butt of second bonding roller 6 and pond inside wall, when organism 1 removes the position at pond corner, first bonding roller 5 and second bonding roller 6 all can butt on the inside wall adjacent with this inside wall, and first bonding roller 5 then just is located the position at corner, so first bonding roller 5 and second bonding roller 6 alright with lay the position at corner with waterproofing membrane, thereby need not the manual work and lay, waterproofing membrane's laying efficiency has been improved.
Referring to fig. 3 and 4, in the laying process, if the speed that the staff moved the organism 1 is inhomogeneous, produce waterproofing membrane and the first bonding roller 5 and the second bonding roller 6 condition of not laminating easily, lead to waterproofing membrane's laying to receive the influence, in order to reduce this kind of condition to appear, the position that lies in between unreeling roller 4 and the first bonding roller 5 on mount 2 has set up tensioning roller 8 and is used for connecting the support frame 81 of tensioning roller 8, support frame 81 is not fixed mutually with mount 2, tensioning roller 8 then rotates and connects on support frame 81, equal fixedly connected with supporting shoe 25 on the first plate body 21 of mount 2 and the second plate body 22, be provided with the elastomer between support frame 81 and the supporting shoe 25, the elastomer can produce the elasticity to supporting shoe 81.
When unreeling waterproofing membrane, make waterproofing membrane laminate to tensioning roller 8 on, so alright make tensioning roller 8 can butt all the time on waterproofing membrane with the elasticity that utilizes the elastomer to keep waterproofing membrane's tensioning state, make waterproofing membrane can be laid on the pond inside wall better.
Referring to fig. 3 and 4, in the present embodiment, an elastic body is selected as the tension spring 82, one end of the tension spring 82 is fixedly connected to the supporting frame 81, the other end is fixedly connected to the supporting block 25, and the tension spring 82 is in a compressed state, so that the tension spring 82 can generate elasticity to the supporting frame 81 and the tension roller 8, and the tension spring 82 has a long service life; in other embodiments, the elastic body can be a plate spring or rubber.
Referring to fig. 4, in order to ensure that the tension spring 82 normally generates elasticity to the supporting frame 81, a limiting rod 83 is disposed between the supporting frame 81 and the supporting block 25 at a position of the tension spring 82, one end of the limiting rod 83 is fixedly connected to the supporting frame 81, the other end of the limiting rod 83 penetrates through the supporting block 25, and the tension spring 82 is sleeved on the limiting rod 83.
Referring to fig. 3 and 4, a cutting device is arranged on the fixing frame 2, the cutting device can cut the waterproof roll, the cutting device comprises an electric cylinder 7 fixedly connected to the first plate body 21 and the second plate body 22, the driving end of the electric cylinder 7 faces away from the machine body 1, the cutting device further comprises a cutting knife 71, the cutting knife 71 is fixedly connected with the driving ends of the two cylinders, the length of the cutting knife 71 is the same as that of the second bonding roller 6, and the cutting knife 71 is located on one side of the unwinding roller 4.
After organism 1 moved the turning in pond, need rotate organism 1 in order to change organism 1's moving direction, need earlier to open the waterproofing membrane who lays this moment, the staff only needs start electric jar 7, electric jar 7 alright remove towards organism 1 with drive cutting knife 71, until cutting knife 71 butt to waterproofing membrane on, and the waterproofing membrane between will unreeling roller 4 and the first bonding roller 5 cuts off, so just need not staff's manual cutting, further made things convenient for construction equipment's use.
When rolling up waterproofing membrane on unreeling roller 4, receive the stopping of mount 2 and organism 1 position, the speed that the staff convoluteed is slower, in order to improve winding efficiency, make unreeling roller 4 can dismantle with mount 2 and be connected, when waterproofing membrane is reeled up to unreeling roller 4 to needs, the staff can take off unreeling roller 4 from mount 2 earlier, and the staff has reeled a plurality of unreeling roller 4 that have waterproofing membrane in advance earlier, waterproofing membrane on unreeling roller 4 finishes using one, directly change on mount 2 with new unreeling roller 4, so just further improved waterproofing membrane's the efficiency of laying.
Referring to fig. 5, the fixing frame 2 is provided with a fixing groove 26 on each of the first plate 21 and the second plate 22, the fixing groove 26 is located at a position where an end of the unwinding roller 4 is located, a butting block 261 is rotatably connected in the fixing groove 26, a rubber pad is pasted on the butting block 261, a fixing shaft 41 is integrally connected to the end of the unwinding roller 4, the fixing shaft 41 is matched with the fixing groove 26 in size, when the fixing shaft 41 is located in the fixing groove 26, the fixing shaft 41 butts against the butting block 261, the fixing shaft 41 extrudes the rubber pad, the rubber pad is correspondingly elastic, the fixing shaft 41 is fixed in the fixing groove 26, the unwinding roller 4 can rotate on the fixing frame 2, meanwhile, a clamping groove 27 is provided at a position of the fixing groove 26 on the first plate 21 and the second plate 22, one end of the clamping groove 27 is communicated with the fixing groove 26, and the other end of the clamping groove passes through, when the unwinding roller 4 needs to be detached, the unwinding roller 4 is separated from the fixing frame 2 only by separating the fixing shaft 41 from the fixing groove 26 and separating the fixing shaft 41 from the fixing frame 2 through the clamping groove 27, which is very convenient.
The implementation principle of the water leakage prevention construction device for building the water pool in the house building embodiment of the application is as follows: when laying a waterproof coiled material of a pool, moving a machine body 1 into the pool, rolling the waterproof coiled material onto an unwinding roller 4, enabling the waterproof coiled material to sequentially pass through a first bonding roller 5 and a second bonding roller 6, enabling the second bonding roller 6 to abut against the inner side wall of the pool, then moving the machine body 1 along the length direction of the inner side wall of the pool by a worker, wherein in the moving process, the second bonding roller 6 can lay the waterproof coiled material onto the inner side wall of the pool, continuously moving the machine body 1 until the second bonding roller 6 moves to the corner of the pool, at the moment, as a second plane where the first bonding roller 5 and the second bonding roller 6 are located is positioned outside the machine body 1, the first bonding roller 5 and the second bonding roller 6 can abut against the adjacent inner side wall, and meanwhile, the waterproof coiled material between the first bonding roller 5 and the second bonding roller 6 can also adhere to the adjacent inner side wall, so that the waterproof coiled material is laid to the corner by using a construction device, the staff rotates 1 direction of organism again afterwards, on laying every inside wall in pond with waterproofing membrane, utilizes construction equipment directly to flash laying of the waterproofing membrane in pond corner, need not the staff and goes manual laying again, has reduced staff's the amount of labour, has improved waterproofing membrane's the efficiency of laying.
The embodiment of the application also discloses a construction method for building the water leakage prevention construction device of the water pool for building the house, which comprises the following steps:
s1: cleaning a base layer, namely removing impurities on the inner side wall and the bottom wall of the tank body;
s2: coating an adhesive, namely coating the adhesive on the inner side wall of the tank body;
s3: laying a waterproof coiled material, placing the machine body 1 in the tank body, moving the machine body 1 along the length direction of the inner side wall of the tank body to enable a first bonding roller 5 to be abutted against the inner side wall of the tank body, and laying the waterproof coiled material on the inner side wall of the tank body by utilizing the first bonding roller 5;
s4: corner treatment, namely compacting the waterproof coiled material at the corner to ensure that the waterproof coiled material is attached to the corner;
s4: and (4) edge sealing treatment, namely paving a protective layer on the outer side of the waterproof roll by using mud mortar or fine aggregate concrete after the waterproof roll is paved.
Utilize construction equipment can directly lay the corner in pond with waterproofing membrane, need not the staff and go the manual work to lay, reduced staff's the amount of labour, improved waterproofing membrane's the efficiency of laying.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a pond is built in room constructs leak protection water construction equipment, includes organism (1), be provided with mount (2) on organism (1), be provided with elevating gear (3) that are used for driving mount (2) to go up and down along vertical direction on organism (1), its characterized in that: be provided with on mount (2) and unreel roller (4), first bonding roller (5) and second bonding roller (6), it is located the first plane with first bonding roller (5) to unreel roller (4), first bonding roller (5) and second bonding roller (6) are located the second plane, first plane and second plane mutually perpendicular, the advancing direction of organism (1) is on a parallel with the first plane all the time, and the perpendicular to second plane, just the second plane is located outside organism (1).
2. The water leakage preventing construction device for building the water pool according to claim 1, wherein: and a cutting device for cutting the waterproof coiled material is arranged on the fixing frame (2).
3. The water leakage preventing construction device for building the water pool according to claim 2, wherein: the cutting device comprises an electric cylinder (7) arranged on a fixing frame (2), the driving end of the electric cylinder (7) faces to the position of the machine body (1), a cutting knife (71) is arranged on the driving end of the electric cylinder (7), the length of the cutting knife (71) is the same as that of the second bonding roller (6), and the cutting knife (71) is positioned on one side of the unwinding roller (4).
4. The water leakage preventing construction device for building the water pool according to claim 1, wherein: be provided with tensioning roller (8) on mount (2), tensioning roller (8) are located unreeling roller (4) and first bonding roller (5) between, the position that lies in tensioning roller (8) on mount (2) is provided with support frame (81), tensioning roller (8) rotate and connect on support frame (81), be provided with supporting shoe (25) on mount (2), be provided with the elastomer between support frame (81) and supporting shoe (25), the elastomer is used for producing elasticity to support frame (81).
5. The water leakage preventing construction device for building the water pool according to claim 4, wherein: the elastic body comprises a tensioning spring (82), one end of the tensioning spring (82) is fixedly connected with the supporting frame (81), the other end of the tensioning spring is fixedly connected with the supporting block (25), and the tensioning spring (82) is in a compression state.
6. The water leakage preventing construction device for building the water pool according to claim 5, wherein: a limiting rod (83) is arranged between the supporting frame (81) and the supporting block (25) and located at the position of the tensioning spring (82), one end of the limiting rod (83) is fixedly connected to the supporting frame (81), the other end of the limiting rod penetrates through the supporting block (25), and the tensioning spring (82) is sleeved on the limiting rod (83).
7. The water leakage preventing construction device for building the water pool according to claim 1, wherein: the unwinding roller (4) is detachably connected to the fixed frame (2).
8. The water leakage preventing construction device for building the water pool according to claim 7, wherein: fixed slot (26) have been seted up to the position that just is located unreeling roller (4) both ends on mount (2), fixed slot (26) internal rotation is connected with butt piece (261), be provided with the rubber pad on butt piece (261), joint groove (27) have been seted up to the position that lies in fixed slot (26) on mount (2), the one end and fixed slot (26) intercommunication in joint groove (27), the other end link up mount (2) setting, the tip of unreeling roller (4) is provided with fixed axle (41), the size and fixed slot (26) looks adaptation of fixed axle (41), fixed axle (41) and butt piece (261) butt.
9. A construction method of a water leakage preventing construction device for building a water pool, comprising the water leakage preventing construction device for building a water pool according to any one of claims 1 to 8, characterized by comprising the steps of:
s1: cleaning a base layer, namely removing impurities on the inner side wall and the bottom wall of the tank body;
s2: coating an adhesive, namely coating the adhesive on the inner side wall of the tank body;
s3: laying a waterproof coiled material, placing the machine body (1) in the tank body, moving the machine body (1) along the length direction of the inner side wall of the tank body to enable the first bonding roller (5) to be abutted against the inner side wall of the tank body, and laying the waterproof coiled material on the inner side wall of the tank body by using the first bonding roller (5);
s4: corner treatment, namely compacting the waterproof coiled material at the corner to ensure that the waterproof coiled material is attached to the corner;
s4: and (4) edge sealing treatment, namely paving a protective layer on the outer side of the waterproof roll by using mud mortar or fine aggregate concrete after the waterproof roll is paved.
CN202011441889.9A 2020-12-08 2020-12-08 Water leakage prevention construction device for building pool and construction method thereof Pending CN112663880A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011441889.9A CN112663880A (en) 2020-12-08 2020-12-08 Water leakage prevention construction device for building pool and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011441889.9A CN112663880A (en) 2020-12-08 2020-12-08 Water leakage prevention construction device for building pool and construction method thereof

Publications (1)

Publication Number Publication Date
CN112663880A true CN112663880A (en) 2021-04-16

Family

ID=75402227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011441889.9A Pending CN112663880A (en) 2020-12-08 2020-12-08 Water leakage prevention construction device for building pool and construction method thereof

Country Status (1)

Country Link
CN (1) CN112663880A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004080696A1 (en) * 2003-03-14 2004-09-23 Daimlerchrysler Ag Method and device for automated application of lacquer film on bodywork parts and use of a stretched adhesive strip
US20070267310A1 (en) * 2006-05-17 2007-11-22 Barbara Berkowitz Roll Roofing
US20090178752A1 (en) * 2008-01-11 2009-07-16 Kyle William Behringer Protective film applicator tool, kit, and methods of shielding a surface
US20130014903A1 (en) * 2011-07-15 2013-01-17 Innovative Tools & Technologies, Inc. Applicator
CN108678304A (en) * 2018-05-18 2018-10-19 安徽朗凯奇建材有限公司 A kind of waterproof roll installation apparatus and its laying method
CN208732275U (en) * 2018-08-31 2019-04-12 湖北华宇防水材料科技股份有限公司 A kind of waterproof roll cutting on line device
CN211396336U (en) * 2019-11-20 2020-09-01 北京华泰龙城防腐工程有限公司 Dolly is laid to pitch waterproofing membrane
CN211447528U (en) * 2019-12-13 2020-09-08 天津卓宝科技有限公司 Waterproofing membrane's automatic feed device
CN111764721A (en) * 2020-07-07 2020-10-13 中交三公局第一工程有限公司 Water leakage prevention construction method for building pool of building
CN111779203A (en) * 2020-07-03 2020-10-16 高云超 Waterproofing membrane is with cutting device that paves
CN211756504U (en) * 2019-12-30 2020-10-27 北新禹王防水科技(四川)有限公司 Knife coating equipment in waterproofing membrane production

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004080696A1 (en) * 2003-03-14 2004-09-23 Daimlerchrysler Ag Method and device for automated application of lacquer film on bodywork parts and use of a stretched adhesive strip
US20070267310A1 (en) * 2006-05-17 2007-11-22 Barbara Berkowitz Roll Roofing
US20090178752A1 (en) * 2008-01-11 2009-07-16 Kyle William Behringer Protective film applicator tool, kit, and methods of shielding a surface
US20130014903A1 (en) * 2011-07-15 2013-01-17 Innovative Tools & Technologies, Inc. Applicator
CN108678304A (en) * 2018-05-18 2018-10-19 安徽朗凯奇建材有限公司 A kind of waterproof roll installation apparatus and its laying method
CN208732275U (en) * 2018-08-31 2019-04-12 湖北华宇防水材料科技股份有限公司 A kind of waterproof roll cutting on line device
CN211396336U (en) * 2019-11-20 2020-09-01 北京华泰龙城防腐工程有限公司 Dolly is laid to pitch waterproofing membrane
CN211447528U (en) * 2019-12-13 2020-09-08 天津卓宝科技有限公司 Waterproofing membrane's automatic feed device
CN211756504U (en) * 2019-12-30 2020-10-27 北新禹王防水科技(四川)有限公司 Knife coating equipment in waterproofing membrane production
CN111779203A (en) * 2020-07-03 2020-10-16 高云超 Waterproofing membrane is with cutting device that paves
CN111764721A (en) * 2020-07-07 2020-10-13 中交三公局第一工程有限公司 Water leakage prevention construction method for building pool of building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘彩峰: "《建筑施工专业综合实务》", 31 August 2018 *

Similar Documents

Publication Publication Date Title
CN112726976B (en) Equipment for building waterproof construction and construction method thereof
CN209308304U (en) A kind of waterproof roll laying apparatus
CN111519929A (en) Waterproof heat-preservation energy-saving construction device for old roof and construction method thereof
CN111764721A (en) Water leakage prevention construction method for building pool of building
CN107893513A (en) A kind of spreading device and construction method that can carry out large area waterproof roll paving
CN207419885U (en) A kind of efficient waterproof rolled material sprawls machine
CN113668343B (en) Plateau asphalt highway waterproof construction equipment and construction method
CN206859606U (en) A kind of quick laying apparatus in floor
CN112663880A (en) Water leakage prevention construction device for building pool and construction method thereof
CN110682655A (en) Synchronous composite forming equipment for multilayer geotextile
CN207469627U (en) Semi-automatic waterproof roll paving machine
CN108797906A (en) A kind of waterproof roll laying apparatus
CN113174999A (en) Basement bottom plate and outer wall waterproof construction method
CN209308303U (en) A kind of self-adhesive waterproof coiled material laying apparatus
CN112758737A (en) Coiled material conveying control method
CN115369710A (en) Construction method of anti-crack pavement
CN117684670B (en) Waterproof coiled material laying construction method and equipment
CN115218059A (en) Trenchless pipeline leakage repairing method
CN111071868B (en) Be used for waterproofing membrane to lay and use rolling placer
CN113668339B (en) Road maintenance protective cloth covering removing machine
CN109911679B (en) Waterproofing membrane's traction compaction device
CN208870311U (en) A kind of lying device of waterproof material
CN209494144U (en) Waterproof roll laying apparatus
CN112660887A (en) Asphalt waterproof coiled material laying device
CN210561629U (en) Automatic cement stabilized macadam base course edge film covering device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210416