CN112637001B - Function pre-test method and system for data communication network shutdown - Google Patents

Function pre-test method and system for data communication network shutdown Download PDF

Info

Publication number
CN112637001B
CN112637001B CN202011410067.4A CN202011410067A CN112637001B CN 112637001 B CN112637001 B CN 112637001B CN 202011410067 A CN202011410067 A CN 202011410067A CN 112637001 B CN112637001 B CN 112637001B
Authority
CN
China
Prior art keywords
remote control
measurement
test
maintenance
command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011410067.4A
Other languages
Chinese (zh)
Other versions
CN112637001A (en
Inventor
杜奇伟
郑翔
阮黎翔
孙珂
刘永新
刘栋
方超
侯雅林
张文准
车帅
铁勇魁
张庭
卫星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Xuchang XJ Software Technology Co Ltd
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
Xuchang XJ Software Technology Co Ltd
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, Xuchang XJ Software Technology Co Ltd, Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN202011410067.4A priority Critical patent/CN112637001B/en
Publication of CN112637001A publication Critical patent/CN112637001A/en
Application granted granted Critical
Publication of CN112637001B publication Critical patent/CN112637001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Power Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention relates to a function pre-test method and a system for a data communication gateway machine, wherein the method comprises the following steps: initiating a remote control pre-test command; the operation and maintenance substation receives the remote control pre-test command, and if the remote control pre-test command can be executed, the remote control pre-test command is forwarded to the network shutdown machine; otherwise, sending a function pre-test failure alarm to the operation and maintenance master station and recording a preset serialization report; the network shutdown machine receives the remote control pre-test command, and if the network shutdown machine is not abnormal, the remote control pre-test command is forwarded to the measurement and control device; otherwise, the network switch machine sends a state message of failure of the remote control command to the operation and maintenance substation; the measurement and control device receives the remote control pre-test command, and if the measurement and control device is not abnormal, a remote control command anti-correction message is returned; otherwise, the measurement and control device sends a state message of failure of the remote control command to the network shutdown machine. The system comprises a gateway machine, an EMS main station, a measurement and control device, an operation and maintenance main station and an operation and maintenance substation. The invention has the advantages that: the testing of the remote control function is realized on the premise of not changing the working state of the measurement and control device; and verifying whether the remote control in the station has a problem or not, and assisting in detecting the reason of remote control failure.

Description

Function pre-test method and system for data communication network shutdown
Technical Field
The invention relates to the field of intelligent power grids, in particular to a function pre-testing method and system for a data communication network shutdown machine.
Background
At present, a data communication network is accessed to an EMS master station through a scheduling data network by an IEC104 communication protocol, data is transmitted to the EMS master station, and remote control information sent by the EMS master station is received. Because a complex link is experienced between the EMS master station and the network shutdown machine, when the EMS master station fails in remote control, it cannot be clearly known whether a problem occurs between the internal network of the station shutdown machine and the measurement and control device, which causes the remote control failure, or the failure caused by the problem of the communication link. In addition, if the failure is caused by the reason in the station, the main station cannot know the specific reason of the failure because 104 cannot transmit the specific reason of the failure, and people must be dispatched to the site to search and analyze the phenomena one by one.
Disclosure of Invention
The invention mainly solves the problems that a fault point cannot be remotely positioned when the EMS master station fails in remote control and workers need to go to the site to perform troubleshooting, and provides a function pre-test method for the data communication network shutdown, which is used for testing whether a remote control command from the network shutdown machine to a measurement and control device is available or not and assisting in detecting whether the remote control failure is caused by the abnormality from the network shutdown machine to the measurement and control device or not after the EMS system fails in executing remote control operation.
The technical scheme adopted by the invention for solving the technical problem is that the function pre-test method for the data communication network shutdown machine comprises the following steps:
s1: initiating a remote control pre-test command;
s2: the operation and maintenance substation receives the remote control pre-test command, and if the operation and maintenance substation can execute the remote control pre-test command, the remote control pre-test command is forwarded to the gateway machine; otherwise, sending a function pre-test failure alarm to the operation and maintenance master station and recording a preset serialization report;
s3: the network shutdown machine receives the remote control pre-test command, and if the network shutdown machine is not abnormal, the remote control pre-test command is forwarded to the measurement and control device; otherwise, the network switch machine sends a state message of failure of the remote control command to the operation and maintenance substation;
s4: the measurement and control device receives the remote control pre-test command, and if the measurement and control device is not abnormal, a remote control command anti-correction message is returned; otherwise, the measurement and control device sends a state message of failure of the remote control command to the gateway machine, and the gateway machine forwards the state message to the operation and maintenance substation.
The method can ensure that whether remote control in the station has problems or not through a 104 channel between the operation and maintenance substation and the network shutdown machine under the condition that the network in the station is shut down to a measurement and control link is not changed, and assists in detecting whether remote control failure is caused by the fact that the network shutdown machine is abnormal to the measurement and control device after the EMS system fails to execute remote control operation.
As a preferred scheme of the above scheme, the operation and maintenance master station issues a remote control cancellation command after receiving the remote control command reverse correction message, and the measurement and control device returns a remote control cancellation confirmation message after receiving the remote control cancellation command. By executing the remote control cancelling command, the remote control function pre-test is realized on the premise of maintaining the measurement and control device.
As a preferred scheme of the above scheme, the remote control cancellation command reaches the measurement and control device sequentially through the operation and maintenance substation and the gateway machine, and the remote control cancellation confirmation message reaches the operation and maintenance master station sequentially through the gateway machine and the operation and maintenance substation.
As a preferred scheme of the above scheme, after receiving the status message sent by the gateway machine, the operation and maintenance substation acquires a remote control message record file and a log file record stored in the gateway machine, analyzes the remote control message record file, adds a mark and a failure reason to a serialized report of a pre-test, and sends a function pre-test failure alarm to the master station. And operation and maintenance personnel can conveniently find and maintain specific reasons of failure.
As a preferred scheme of the above scheme, the operation and maintenance substation acquires a remote control message record file and a log file record of the gateway machine through an MMS channel.
As a preferable scheme of the above scheme, the remote control pre-test command is initiated by one of the operation and maintenance master station and the operation and maintenance substation.
Correspondingly, the invention also provides a system for pre-testing the function of the data communication network machine, which is used for the method for pre-testing the function of the data communication network machine.
In the whole process of remote control pre-test, the sub-station records the execution process of all commands to form a serialized report, and when the pre-test fails, the remote control message record file is analyzed to obtain the failure reason from the remote control message record file and fill the failure reason into the serialized record report. The sub-stations which succeed in pre-test or fail in pre-test send alarm information to the main station, and the main station can inquire the serialized record report of the sub-station remote control pre-test according to the alarm.
As a preferable scheme of the above scheme, an MMS channel and an IE104 channel are established between the operation and maintenance substation and the gateway machine. The IE104 channel is used for function pre-test and issuing remote control commands, and the MMS channel is used for acquiring corresponding files in the gateway.
As a preferred scheme of the above scheme, MMS channels are established between the operation and maintenance substation and the measurement and control device, and between the gateway machine and the measurement and control device.
The invention has the advantages that: the remote control function test is realized on the premise of not changing the working state of the measurement and control device by remote control selection, remote control reverse correction, remote control cancellation and confirmation cancellation; and under the condition that the intra-station network is ensured to be switched off to the measurement and control link, whether remote control in the station has a problem is verified through a 104 channel between the substation and the intra-station network, and after the EMS system fails to execute remote control operation, whether remote control failure is caused by the abnormality from the intra-station network to the measurement and control device is detected in an auxiliary mode.
Drawings
Fig. 1 is a schematic structural diagram of a data communication network shutdown function pre-test system in an embodiment.
Fig. 2 is a flowchart illustrating a method for pre-testing a shutdown function of a data communication network in an embodiment.
The system comprises a network unit 2, an EMS main station 3, a measurement and control device 4, an operation and maintenance main station 5 and an operation and maintenance substation.
Detailed Description
The technical solution of the present invention is further described below by way of examples with reference to the accompanying drawings.
Example (b):
the data communication gateway machine function pre-test system comprises a gateway machine 1, an EMS main station 2, a measurement and control device 3, an operation and maintenance main station 4 and an operation and maintenance substation 5, wherein the gateway machine is communicated with the EMS main station through IEC104 and communicated with the measurement and control device through IEC61850 MMS, receives a remote control command issued by the EMS main station and issues the remote control command to the measurement and control device, and then the slave device returns a result to the main station, as shown in FIG. 1. The operation and maintenance master station is arranged at the main station end of the operation and maintenance management and control system, the operation and maintenance substation is arranged at the substation end, and the operation and maintenance master station and the operation and maintenance substation are communicated through the GSP; an IEC104 channel and an IEC61850 MMS channel are established between the operation substation device and the gateway machine, the IEC104 channel is used for issuing remote control commands in function pre-test, and the IEC61850 MMS channel is used for acquiring corresponding files in the gateway machine; and the operation and maintenance substation device also establishes an IEC61850 MMS link with the same measurement and control device and is used for acquiring remote control related remote signaling information.
Correspondingly, this embodiment further provides a method for pre-testing a shutdown function of a data communication network, which is implemented based on the data communication network shutdown function pre-testing system, and as shown in fig. 2, includes the following steps:
s1: initiating a remote control pre-test command; the remote control preset command can be initiated by the operation and maintenance master station or the operation and maintenance substation, when the operation and maintenance master station initiates, the remote control pre-test command is transmitted to the operation and maintenance substation through the GSP, and the remote control pre-test command is a remote control selection command;
s2: the operation and maintenance substation receives the remote control pre-test command, and if the operation and maintenance substation can execute the remote control pre-test command, the remote control pre-test command is forwarded to the gateway machine; otherwise, sending a function pre-test failure alarm to the operation and maintenance master station and recording a preset serialization report;
s3: the network shutdown machine receives the remote control pre-test command forwarded by the operation and maintenance substation, and forwards the remote control pre-test command to the measurement and control device if the network shutdown machine is not in an interlocking lock state or other abnormal states; otherwise, the network switch machine sends a state message of failure of the remote control command to the operation and maintenance substation; after receiving the state message sent by the gateway machine, the operation and maintenance substation acquires the remote control message record file and the log file record stored in the gateway machine through the MMS channel, analyzes the remote control message record file, adds a mark and a failure reason in a pre-test serialization report, and sends a function pre-test failure alarm to the main station.
S4: the measurement and control device receives a remote control pre-test command forwarded by the network shutdown machine, and if the measurement and control device is not in an interlocking or other abnormal state, a remote control command anti-correction message is returned; otherwise, the measurement and control device sends a state message of failure of the remote control command to the gateway machine, and the gateway machine forwards the state message to the operation and maintenance substation. After receiving the state message sent by the gateway machine, the operation and maintenance substation acquires the remote control message record file and the log file record stored in the gateway machine through the MMS channel, analyzes the remote control message record file, adds a mark and a failure reason in a pre-test serialization report, and sends a function pre-test failure alarm to the main station.
The remote control command anti-correction message is received by the operation and maintenance main station through the network shutdown machine and the operation and maintenance substation in sequence, the operation and maintenance main station receives the remote control command anti-correction message and then issues a remote control cancellation command, the remote control cancellation command forwarding process is the same as that of the remote control selection command and sequentially reaches the measurement and control device through the operation and maintenance substation and the network shutdown machine, the measurement and control device receives the remote control cancellation command and then returns a remote control cancellation confirmation message, and the remote control cancellation confirmation message sequentially reaches the operation and maintenance main station through the network shutdown machine and the operation and maintenance substation. And when the operation and maintenance master station receives the remote control cancellation confirmation message, the remote control pre-test is finished, and the output pre-test is successful.
In the whole process of remote control pre-test, the sub-station records the execution process of all commands to form a serialized report, and when the pre-test fails, the remote control message record file is analyzed to obtain the failure reason from the remote control message record file and fill the failure reason into the serialized record report. The sub-stations which succeed in pre-test or fail in pre-test send alarm information to the main station, and the main station can inquire the serialized record report of the sub-station remote control pre-test according to the alarm.
The data communication network shutdown function pre-test system is also used for assisting in detecting whether the remote control failure is caused by the abnormality from the network shutdown device to the measurement and control device after the EMS system fails to execute the remote control operation. After the EMS master station fails in remote control, the operation and maintenance master station performs remote control presetting to judge whether remote control failure is caused by network shutdown or the measurement and control device.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications or additions may be made to the described embodiments or alternatives may be employed by those skilled in the art without departing from the spirit or ambit of the invention as defined in the appended claims.

Claims (8)

1. A pre-test method for the network shutdown function of data communication is characterized in that: the method comprises the following steps:
s1: initiating a remote control pre-test command;
s2: the operation and maintenance substation receives the remote control pre-test command, and if the operation and maintenance substation can execute the remote control pre-test command, the remote control pre-test command is forwarded to the gateway machine; otherwise, sending a function pre-test failure alarm to the operation and maintenance master station and recording a preset serialization report;
s3: the network shutdown machine receives the remote control pre-test command, and if the network shutdown machine is not abnormal, the remote control pre-test command is forwarded to the measurement and control device; otherwise, the network switch machine sends a state message of failure of the remote control command to the operation and maintenance substation;
s4: the measurement and control device receives the remote control pre-test command, and if the measurement and control device is not abnormal, a remote control command anti-correction message is returned; otherwise, the measurement and control device sends a state message of failure of the remote control command to the gateway machine, and the gateway machine forwards the state message to the operation and maintenance substation.
2. The method according to claim 1, wherein the method comprises: and the operation and maintenance master station sends a remote control cancellation command after receiving the remote control command anti-calibration message, and the measurement and control device returns a remote control cancellation confirmation message after receiving the remote control cancellation command.
3. The method according to claim 2, wherein the method comprises: the remote control cancellation command sequentially passes through the operation and maintenance substation and the gateway machine to reach the measurement and control device, and the remote control cancellation confirmation message sequentially passes through the gateway machine and the operation and maintenance substation to reach the operation and maintenance main station.
4. The method according to claim 1, wherein the method comprises: and after receiving the state message sent by the gateway machine, the operation and maintenance substation acquires a remote control message record file and a log file record stored in the gateway machine, analyzes the remote control message record file, adds a mark and a failure reason in a pre-test serialized report, and sends a function pre-test failure alarm to the master station.
5. The method according to claim 1, wherein the method comprises: and the operation and maintenance substation acquires the remote control message record file and the log file record of the gateway machine through the MMS channel.
6. A data communication network shutdown function pre-test system is used for the data communication network shutdown function pre-test method of any claim 1 to 5, and comprises a network shutdown machine, an EMS master station and a measurement and control device, wherein the network shutdown machine is respectively communicated with the EMS master station and the measurement and control device, and the system is characterized in that: and the operation and maintenance substation is arranged in the transformer substation and is communicated with the operation and maintenance main station, the network switch machine and the measurement and control device respectively.
7. The pre-test system for the shutdown function of the data communication network as claimed in claim 6, wherein: an MMS channel and an IE104 channel are established between the operation and maintenance substation and the gateway machine.
8. The pre-test system for the shutdown function of the data communication network as claimed in claim 6, wherein: MMS channels are established between the operation and maintenance substation and the measurement and control device and between the gateway machine and the measurement and control device.
CN202011410067.4A 2020-12-03 2020-12-03 Function pre-test method and system for data communication network shutdown Active CN112637001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011410067.4A CN112637001B (en) 2020-12-03 2020-12-03 Function pre-test method and system for data communication network shutdown

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011410067.4A CN112637001B (en) 2020-12-03 2020-12-03 Function pre-test method and system for data communication network shutdown

Publications (2)

Publication Number Publication Date
CN112637001A CN112637001A (en) 2021-04-09
CN112637001B true CN112637001B (en) 2022-04-19

Family

ID=75308268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011410067.4A Active CN112637001B (en) 2020-12-03 2020-12-03 Function pre-test method and system for data communication network shutdown

Country Status (1)

Country Link
CN (1) CN112637001B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109713791A (en) * 2018-12-21 2019-05-03 国网四川省电力公司电力科学研究院 The diagnostic method of smart grid remote control command exception

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104750092B (en) * 2013-12-31 2019-02-05 上海可鲁系统软件有限公司 A kind of automatic diagnosis method of industrial control system remote control/remote regulating order transmission fault
CN104750095B (en) * 2013-12-31 2018-01-26 华东电网有限公司 Regulation and control center inspection pilot system and method
CN104155970B (en) * 2014-08-04 2015-09-30 国家电网公司 A kind of intelligent substation monitoring host computer closed loop test system and method for testing thereof
CN109639529B (en) * 2018-12-21 2022-05-24 国网四川省电力公司电力科学研究院 Diagnostic method for abnormal remote control command of intelligent substation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109713791A (en) * 2018-12-21 2019-05-03 国网四川省电力公司电力科学研究院 The diagnostic method of smart grid remote control command exception

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于测控的远方同期并网高级应用研究;杨云翠等;《科技创新与应用》;20181113(第32期);全文 *

Also Published As

Publication number Publication date
CN112637001A (en) 2021-04-09

Similar Documents

Publication Publication Date Title
CN102570602B (en) Fault comprehensive processing platform and method of distribution network
CN109217465A (en) Supervisory control of substation information Acceptance Test System and method
CN105406589A (en) Intellectual press plate system for relay protection of transformer substation
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN107069968A (en) A kind of method, main website, stability control device and the system of remotely modifying definite value
CN116094175A (en) Safety early warning system and method for power distribution cabinet
CN104750092A (en) Automatic diagnosis method for remote control/ remote transferring instruction transmission fault of industrial control system
CN113114732B (en) Automatic data point aligning system and method suitable for multiple links of transformer substation
CN205178647U (en) Relay protection of transformer substation intelligence clamp plate system
CN112637001B (en) Function pre-test method and system for data communication network shutdown
CN111708700B (en) Intelligent remote machine closed loop comprehensive test method
CN111525689B (en) Accurate two location distribution terminal monitoring management system
CN112134351B (en) Remote telemetry acceptance system and method based on transformer substation distribution network
CN107707408A (en) A kind of digital broadcast transmitter long-distance monitoring method and system
CN104753734B (en) A kind of method of automatic diagnosis power grid EMS system remote signalling data transmission fault
CN106877498A (en) The method for diagnosing faults of regulation automatization equipment in a kind of power network
CN109471059A (en) A kind of ammeter automatic tour inspection system and method
CN115425747A (en) One-key type automatic closed-loop detection method for relay protection signals of main substation and sub substation of transformer substation
CN111987794A (en) Intelligent substation on-line monitoring and fault analysis system
CN114371355A (en) Self-adaptive joint debugging system for realizing multi-interval point-to-point test of distribution automation terminal
CN103595492B (en) CDT channel fault alarm system
CN107357199B (en) Electric power operation and maintenance system
CN111884329A (en) Unified operation and maintenance method and system for secondary equipment of power distribution network
CN110176808A (en) Regulation remote operation method for diagnosing faults based on event-driven and oriented graph search
CN112804082B (en) Fault location system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant