CN112609708A - Optimized connection method for underground continuous wall and secant pile - Google Patents

Optimized connection method for underground continuous wall and secant pile Download PDF

Info

Publication number
CN112609708A
CN112609708A CN202011465137.6A CN202011465137A CN112609708A CN 112609708 A CN112609708 A CN 112609708A CN 202011465137 A CN202011465137 A CN 202011465137A CN 112609708 A CN112609708 A CN 112609708A
Authority
CN
China
Prior art keywords
pile
underground continuous
continuous wall
secant
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011465137.6A
Other languages
Chinese (zh)
Inventor
严融
陈益贵
罗云峰
向春
张标
顾欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN202011465137.6A priority Critical patent/CN112609708A/en
Publication of CN112609708A publication Critical patent/CN112609708A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Abstract

The invention relates to an optimized connection method of an underground continuous wall and an occlusive pile, which comprises the following steps of firstly, adding or utilizing a pre-digging section at a corner as a grooving part of the underground continuous wall; then, constructing the underground continuous wall at the joint and pouring concrete together with the pre-digging section; and finally, directly cutting the vegetable concrete of the pre-dug section of the ground wall during the meat-bearing pile construction of the secant pile, and forming a secant joint with the underground continuous wall after the meat-bearing pile is formed. The optimization method provided by the invention not only ensures the problem that the connecting section is difficult to process, but also optimizes the joint to form a U-shaped occlusion form, and more effectively ensures the water stopping effect of the weak part of the joint. The underground diaphragm wall, the pre-dug sections and the secant plain piles are constructed firstly in the process, so that the concrete pouring time of the pre-dug sections on one sides of the two sides of the plain piles and the concrete pouring time of the plain piles on one side are basically consistent, the strength of the plain concrete cut on the left side and the right side is basically consistent when the rotary excavating equipment is adopted for forming holes in the secant plain piles, the hole forming drilling can be effectively carried out, the construction efficiency is improved, and the economic cost can be further reduced.

Description

Optimized connection method for underground continuous wall and secant pile
Technical Field
The invention relates to an underground engineering construction process, in particular to a construction process when double-layer steel reinforcement cage sections cannot be quickly connected in construction.
Background
The foundation pit adopts different support forms according to the consideration of peripheral environment, the condition of structures, the safety level of the foundation pit, the economic consideration of construction units and the like, particularly, an underground continuous wall is adopted at a common subway protection section in a Shenzhen region, and other support surfaces adopt a secant pile support form. Two common methods are as follows: considering that the underground continuous wall has a large reinforcement ratio, plain piles of the secant piles have no reinforcement configuration (but bored piles have reinforcements), but conventional underground continuous wall grooving equipment only needs a grooving machine, for example, firstly constructed plain piles of the secant piles or bored piles (namely a supporting form of row piles and inter-pile rotary spraying) and then constructed underground continuous wall, at the moment, the formed plain piles need to be seceded by the underground continuous wall, so that the requirement of the equipment needs to adopt the grooving machine, the economic cost is greatly increased, meanwhile, the stress on two sides of the underground continuous wall is uneven, and the verticality deviation in the grooving process is easily generated, so that the treatment method is not easy to realize basically; if the underground continuous wall is constructed firstly and then the secant pile element pile or the high-pressure jet grouting pile is constructed, the formed underground continuous wall and the reinforcement cage thereof need to be damaged, the structural stress can be greatly influenced, and the water leakage condition is easily aggravated; two high-pressure jet grouting piles are additionally arranged at the joint to ensure the water stopping effect, so that the connection mode of the high-pressure jet grouting piles is optimized to solve the problem.
Disclosure of Invention
The invention aims to provide an optimized connection method for an underground continuous wall and an occlusive pile, and provides a specific and effective optimized connection method aiming at solving the problems that the supporting stress at the weak joint of the underground continuous wall and the occlusive pile is reduced and the water leakage condition is aggravated in the absence of a proper connection mode at present.
In order to realize the construction purpose, the invention adopts the following scheme:
a method for optimally connecting an underground continuous wall and an occlusive pile comprises the following steps of firstly, adding or utilizing a pre-digging section at a corner as a grooving part of the underground continuous wall; then, constructing the underground continuous wall at the joint and pouring concrete together with the pre-digging section; and finally, directly cutting the vegetable concrete of the pre-dug section of the ground wall during the meat-bearing pile construction of the secant pile, and forming a secant joint with the underground continuous wall after the meat-bearing pile is formed.
Further, in the ground wall grooving stage, the distance of the pre-digging section is controlled according to the distance between the underground continuous wall and the meat-bearing pile of the secant pile or the cast-in-situ bored pile, so that the subsequent cutting of the pre-digging section of the vegetable concrete of the secant pile construction machine is facilitated.
Further, in the construction stage of the secant pile, the meat-bearing pile and the underground continuous wall form a U-shaped secant form after being formed into a pile, and the water stopping effect of the weak part of the joint is effectively ensured.
Furthermore, when the underground continuous wall at the construction joint is cast with concrete together with the pre-digging section, the pre-digging section only casts concrete without reinforcing bars.
Compared with the prior art, the invention has the beneficial effects that:
1. the invention can effectively reduce the construction difficulty of the connection part of the ground wall and the secant pile, accelerate the construction efficiency and obviously improve the water stopping effect of the wall and pile joints.
2. The optimized connection mode formed by the invention is a construction measure which can be relatively fast and convenient, the pre-digging section is added to offset the plain pile of the secant pile, machinery such as a slot milling machine is not needed, and the construction cost is reduced.
Drawings
FIG. 1 is a schematic flow chart of the construction method of the present invention;
FIGS. 2 to 5 are schematic diagrams of the optimized construction process of the ground wall and secant pile connecting joint.
Detailed Description
The invention is further illustrated with reference to the following figures and specific examples. These examples are given solely for the purpose of illustration and are not intended to limit the scope of the invention, which is to be given the full breadth of the present disclosure, and any variations or modifications within the skill of the art after reading the teachings herein, may be made, and such equivalents are intended to fall within the scope of the invention as defined in the claims appended hereto.
As shown in fig. 1 to 5, the present embodiment provides an optimized connection method for an underground continuous wall and a bite pile, which specifically includes the following steps:
firstly, adding or utilizing a pre-dug section 1 at a corner as a grooving part 2 of an underground continuous wall (the distance of the pre-dug section 1 is controlled according to the distance of a meat pile or a bored pile of the underground continuous wall and an occluding pile), and the figure 2 is shown; then, the underground continuous wall of the construction joint is cast with concrete 3 together with the pre-digging section (the pre-digging section only casts concrete without reinforcing bars), as shown in figure 3; and finally, directly cutting the vegetable concrete 4 of the pre-dug section of the ground wall during the meat-pile construction of the secant pile, as shown in figure 4, and forming a secant joint 5 with the underground continuous wall after the meat-pile is formed, as shown in figure 5.
Further, in the groove forming stage of the ground wall, the distance of the pre-digging section is controlled according to the distance between the underground continuous wall and the meat-bearing pile of the secant pile or the drilling cast-in-place pile, so that the subsequent cutting of the pre-digging section of the vegetable concrete of the secant pile construction machine is facilitated.
Further, in the construction stage of the secant pile, the vegetable concrete of the pre-dug section of the ground wall is directly cut when the secant pile is constructed by using the secant pile, and the meat pile and the underground continuous wall form a U-shaped secant form after being formed into the pile, so that the water stop effect of the weak part of the joint is effectively ensured, and the water stop effect is shown in figure 5.
The invention can solve the problems that the supporting stress at the weak joint is reduced and the water leakage condition is aggravated when the ground wall is connected with the secant pile, effectively reduces the construction difficulty at the connection part of the ground wall and the secant pile and accelerates the construction efficiency. The pre-digging section added in the construction counteracts the plain pile of the secant pile, and machines such as a slot milling machine and the like are not needed, so that the construction cost is reduced, the construction method is quick and convenient, and the popularization is easy.

Claims (4)

1. An optimized connection method of an underground continuous wall and an occlusive pile is characterized in that: firstly, adding or utilizing a pre-digging section at a corner as a grooving part of an underground continuous wall; then, constructing the underground continuous wall at the joint and pouring concrete together with the pre-digging section; and finally, directly cutting the vegetable concrete of the pre-dug section of the ground wall during the meat-bearing pile construction of the secant pile, and forming a secant joint with the underground continuous wall after the meat-bearing pile is formed.
2. The method for optimally connecting the underground continuous wall and the occlusive piles according to claim 1, wherein the method comprises the following steps: and in the ground wall grooving stage, the distance of the pre-dug section is controlled according to the distance between the underground continuous wall and the meat-bearing pile of the secant pile or the drilled cast-in-place pile, so that the subsequent cutting of the pre-dug section of the plain concrete of the secant pile construction machine is facilitated.
3. The method for optimally connecting the underground continuous wall and the occlusive piles according to claim 1, wherein the method comprises the following steps: in the construction stage of the secant pile, the meat-bearing pile and the underground continuous wall form a U-shaped secant form after being formed into the pile, and the water stopping effect of the weak part of the joint is effectively ensured.
4. The method for optimally connecting the underground continuous wall and the occlusive piles according to claim 1, wherein the method comprises the following steps: and when the underground continuous wall at the construction joint and the pre-digging section are used for pouring concrete together, the pre-digging section is only used for pouring concrete without reinforcing bars.
CN202011465137.6A 2020-12-14 2020-12-14 Optimized connection method for underground continuous wall and secant pile Pending CN112609708A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011465137.6A CN112609708A (en) 2020-12-14 2020-12-14 Optimized connection method for underground continuous wall and secant pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011465137.6A CN112609708A (en) 2020-12-14 2020-12-14 Optimized connection method for underground continuous wall and secant pile

Publications (1)

Publication Number Publication Date
CN112609708A true CN112609708A (en) 2021-04-06

Family

ID=75233581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011465137.6A Pending CN112609708A (en) 2020-12-14 2020-12-14 Optimized connection method for underground continuous wall and secant pile

Country Status (1)

Country Link
CN (1) CN112609708A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103103990A (en) * 2013-02-04 2013-05-15 天津市建工集团(控股)有限公司 Underground diaphragm wall construction method utilizing large-diameter reinforced concrete filling pile as connector
CN105862875A (en) * 2016-04-15 2016-08-17 肖锐 Support structure and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103103990A (en) * 2013-02-04 2013-05-15 天津市建工集团(控股)有限公司 Underground diaphragm wall construction method utilizing large-diameter reinforced concrete filling pile as connector
CN105862875A (en) * 2016-04-15 2016-08-17 肖锐 Support structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李春磊: "地连墙与咬合桩之间的结构形式研究", 《期刊网》 *

Similar Documents

Publication Publication Date Title
CN109750660B (en) Underground diaphragm wall with seepage-proof joint and construction method thereof
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN104120712A (en) Construction method for underground diaphragm wall
KR101018282B1 (en) Method for constructing fabric for undergound tunnel
CN104975606B (en) Method for handling high-low strides at adjacent parts of reverse building foundation pit and adjacent foundation pit
CN207159990U (en) One kind combination steel construction support pile
CN105239607A (en) Integrated anti-floating structure of underground diaphragm wall and concrete structure bottom plate and construction method of integrated anti-floating structure
CN112609708A (en) Optimized connection method for underground continuous wall and secant pile
CN108755702A (en) A kind of higher soft soil foundation foundation ditch strengthening processing method of level of ground water
CN104480945B (en) A kind of foundation ditch reversed construction method
CN105840209B (en) Construction method for controlling deformation of anchor pile in tunnel body section
CN111733853A (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN102434718A (en) Method for reinforcing originating end of push bench
CN205605215U (en) Big section loess tunnel is grooving method construction structures in advance
CN111364477A (en) Waterproof construction method for penetrating basement exterior wall through support changing structure
CN106812148A (en) A kind of open caisson construction technique
CN207904990U (en) A kind of groutable underground continuous wall connector
CN207362853U (en) A kind of steel-concrete structure assembled underground engineering support device
CN113882360A (en) Pile connecting structure and method for pouring tubular pile transverse partition plates
CN106759383A (en) A kind of reverse construction short section borehole wall pouring structure and construction method
CN101824823B (en) Construction method of enclosure structure with ultra-short underground walls
CN111535317A (en) Piling protection method for peripheral static pressure piles of shallow foundation building
CN104963332A (en) Construction method for pipe-following drilling micro pile of slewing drilling machine
CN116971364A (en) Construction method for connecting underground diaphragm wall and occluding pile joint in deep foundation pit engineering
CN212427155U (en) Tongue-and-groove type prefabricated underground continuous wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210406