CN112597677B - 一种判断煤矿掘进工作面最大控顶距的方法 - Google Patents

一种判断煤矿掘进工作面最大控顶距的方法 Download PDF

Info

Publication number
CN112597677B
CN112597677B CN202011462141.7A CN202011462141A CN112597677B CN 112597677 B CN112597677 B CN 112597677B CN 202011462141 A CN202011462141 A CN 202011462141A CN 112597677 B CN112597677 B CN 112597677B
Authority
CN
China
Prior art keywords
coal mine
maximum control
correlation function
working face
parameters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011462141.7A
Other languages
English (en)
Other versions
CN112597677A (zh
Inventor
范金洋
任奕玮
姜德义
陈结
李宗泽
刘文浩
杜俊生
贾栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN202011462141.7A priority Critical patent/CN112597677B/zh
Publication of CN112597677A publication Critical patent/CN112597677A/zh
Application granted granted Critical
Publication of CN112597677B publication Critical patent/CN112597677B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种判断煤矿掘进工作面最大控顶距的方法,其包括步骤:1)测试煤矿巷道围岩动荷载力学参数,2)测试煤矿巷道围岩静荷载力学参数,3)数值模拟掘进机截割工作状态,建立掘进机截割工作状态参数与围岩顶板状态的关联函数;4)根据现场掘进机工作状态参数对关联函数进行修正;5)根据修正后的关联函数计算掘进工作面最大控顶距。本发明判断煤矿掘进工作面最大控顶距的方法,能在掘进机掘进过程中根据掘进机截割工作状态参数实时计算出工作面的最大控顶距,能保证掘进过程中工作面围岩的稳定。

Description

一种判断煤矿掘进工作面最大控顶距的方法
技术领域
本发明涉及煤矿掘进技术领域,具体涉及一种判断煤矿掘进工作面最大控顶距的方法。
背景技术
控顶距是指工作面支架支护的空间宽度,显然控顶距愈大,顶板的挠曲变形量大,底板的鼓起量也大。最大控顶距指的是当工作面推进一次或两次之后,工作空间达到的允许的最大宽度,准确的最大控顶距是保证工作面围岩稳定的重要参数。因此如何在开采过程中实时准确的掌握最大控顶距,以保证厚煤层开采时工作面围岩的稳定,是煤矿掘进开采需要解决的重要问题。
发明内容
有鉴于此,本发明的目的是提供一种判断煤矿掘进工作面最大控顶距的方法,以解决在掘进机掘进开采过程自动计算确定最大控顶距,以保证工作面围岩稳定的技术问题。
本发明判断煤矿掘进工作面最大控顶距的方法,其包括以下步骤:
1)测试煤矿巷道围岩动荷载力学参数:
采用霍普金森压杆测定围岩的动态破坏强度,及不同冲击荷载、冲击频率、冲击角度下不同岩性岩石的破坏规律;
2)测试煤矿巷道围岩静荷载力学参数:
通过单轴抗压、抗剪、抗拉实验,获得不同岩性岩石的基本物理力学参数,所述的基本物理力学参数包括岩石的单轴抗压强度、抗拉强度、内摩擦角和粘聚力;
3)数值模拟掘进机截割工作状态:
基于步骤1)和步骤2)所测得的不同岩性岩石的动态和静态力学参数,采用ANSYS数值模拟软件分析掘进机的截齿与岩石间的动静态相互作用,通过分析不同截割角度、速度、荷载作用下岩石和截齿的受力状态,建立掘进机截割工作状态参数与围岩顶板状态的关联函数;
4)关联函数的修正:
根据现场掘进机工作状态参数对关联函数进行修正;
5)计算最大控顶距:
根据修正后的关联函数计算掘进工作面最大控顶距。
本发明的有益效果:
本发明判断煤矿掘进工作面最大控顶距的方法,能在掘进机掘进过程中根据掘进机截割工作状态参数实时计算出工作面的最大控顶距,能保证掘进过程中工作面围岩的稳定。
具体实施方式
下面结合实施例对本发明作进一步描述。
本实施例判断煤矿掘进工作面最大控顶距的方法,其包括以下步骤:
1)测试煤矿巷道围岩动荷载力学参数:
采用霍普金森压杆测定围岩的动态破坏强度,及不同冲击荷载、冲击频率、冲击角度下不同岩性岩石的破坏规律。
2)测试煤矿巷道围岩静荷载力学参数:
通过单轴抗压、抗剪、抗拉实验,获得不同岩性岩石的基本物理力学参数,所述的基本物理力学参数包括岩石的单轴抗压强度、抗拉强度、内摩擦角和粘聚力。
3)数值模拟掘进机截割工作状态:
基于步骤1)和步骤2)所测得的不同岩性岩石的动态和静态力学参数,采用ANSYS数值模拟软件分析掘进机的截齿与岩石间的动静态相互作用,通过分析不同截割角度(Φ)、速度(v)、荷载(p)作用下岩石和截齿的受力状态,建立掘进机截割工作状态参数与围岩顶板受力状态(σ)的关联函数F(σ,p,v,Φ)。
4)关联函数的修正:
根据现场掘进机工作状态参数对关联函数进行修正。
5)计算最大控顶距:
根据修正后的关联函数计算掘进工作面最大控顶距。
采用本实施例中判断煤矿掘进工作面最大控顶距的方法,能在掘进机掘进过程中根据掘进机截割工作状态参数实时计算出工作面的最大控顶距,能保证掘进过程中工作面围岩的稳定。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (1)

1.一种判断煤矿掘进工作面最大控顶距的方法,其特征在于:包括以下步骤:
1)测试煤矿巷道围岩动荷载力学参数:
采用霍普金森压杆测定围岩的动态破坏强度,及不同冲击荷载、冲击频率、冲击角度下不同岩性岩石的破坏规律;
2)测试煤矿巷道围岩静荷载力学参数:
通过单轴抗压、抗剪、抗拉实验,获得不同岩性岩石的基本物理力学参数,所述的基本物理力学参数包括岩石的单轴抗压强度、抗拉强度、内摩擦角和粘聚力;
3)数值模拟掘进机截割工作状态:
基于步骤1)和步骤2)所测得的不同岩性岩石的动态和静态力学参数,采用ANSYS数值模拟软件分析掘进机的截齿与岩石间的动静态相互作用,通过分析不同截割角度Φ、速度v、荷载p作用下岩石和截齿的受力状态,建立掘进机截割工作状态参数与围岩顶板受力状态σ的关联函数F(σ,p,v,Φ);
4)关联函数的修正:
根据现场掘进机工作状态参数对关联函数进行修正;
5)计算最大控顶距:
根据修正后的关联函数计算掘进工作面最大控顶距。
CN202011462141.7A 2020-12-11 2020-12-11 一种判断煤矿掘进工作面最大控顶距的方法 Active CN112597677B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011462141.7A CN112597677B (zh) 2020-12-11 2020-12-11 一种判断煤矿掘进工作面最大控顶距的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011462141.7A CN112597677B (zh) 2020-12-11 2020-12-11 一种判断煤矿掘进工作面最大控顶距的方法

Publications (2)

Publication Number Publication Date
CN112597677A CN112597677A (zh) 2021-04-02
CN112597677B true CN112597677B (zh) 2022-12-27

Family

ID=75192604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011462141.7A Active CN112597677B (zh) 2020-12-11 2020-12-11 一种判断煤矿掘进工作面最大控顶距的方法

Country Status (1)

Country Link
CN (1) CN112597677B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1248967A (en) * 1968-02-29 1971-10-06 Hemscheidt Maschf Hermann Improvements in or relating to hydraulically-advanceable roof-supports, particularly for use in mines
CN103590846A (zh) * 2013-10-28 2014-02-19 山东科技大学 一种工作面液压支架合理工作阻力的核定方法
CN203463122U (zh) * 2013-09-17 2014-03-05 河南理工大学 煤矿井下掘进工作面临时支护设备
CN207366551U (zh) * 2017-10-13 2018-05-15 石家庄铁道大学 降雨与交通振动联合作用下边坡失稳物理模型试验装置
CN111255495A (zh) * 2020-01-16 2020-06-09 中国矿业大学 一种用于急倾斜特厚煤层水平分段开采的支架选型方法
CN111353194A (zh) * 2020-03-16 2020-06-30 青岛理工大学 一种浅埋煤层大采高顶板初次来压时支架工作阻力的确定方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1248967A (en) * 1968-02-29 1971-10-06 Hemscheidt Maschf Hermann Improvements in or relating to hydraulically-advanceable roof-supports, particularly for use in mines
CN203463122U (zh) * 2013-09-17 2014-03-05 河南理工大学 煤矿井下掘进工作面临时支护设备
CN103590846A (zh) * 2013-10-28 2014-02-19 山东科技大学 一种工作面液压支架合理工作阻力的核定方法
CN207366551U (zh) * 2017-10-13 2018-05-15 石家庄铁道大学 降雨与交通振动联合作用下边坡失稳物理模型试验装置
CN111255495A (zh) * 2020-01-16 2020-06-09 中国矿业大学 一种用于急倾斜特厚煤层水平分段开采的支架选型方法
CN111353194A (zh) * 2020-03-16 2020-06-30 青岛理工大学 一种浅埋煤层大采高顶板初次来压时支架工作阻力的确定方法

Non-Patent Citations (9)

* Cited by examiner, † Cited by third party
Title
Key technologies and equipment for a fully mechanized top-coal caving operation with a large mining height at ultra-thick coal seams;Jinhua Wang等;《Int J Coal Sci Technol》;20150721;第2卷(第2期);第97-161页 *
Study on the Mechanical Relationship among the Backfilling Mining Support, Roof Rock Beam, and Gangue Filling Body in Comprehensive Mechanized Filling Mining Process;Zhimin Huang等;《Advances in Civil Engineering》;20201027;第1-15页 *
基于计算机仿真技术的采煤机截割部可靠性分析;刘恕华;《煤炭技术》;20141231;第33卷(第12期);第291-292页 *
断层附近工作面顶板围岩运动规律及其稳定性控制研究;孙健;《中国优秀博硕士学位论文全文数据库(硕士) 工程科技Ⅰ辑》;20160315(第03期);第B021-40页 *
水平应力条件下矩形煤巷支护优化研究;田金玉;《中国优秀博硕士学位论文全文数据库(硕士) 工程科技Ⅰ辑》;20180115(第01期);第B021-96页 *
深井软岩岩巷综合机械化快速施工及支护技术;肖东兴等;《中国矿山工程》;20111031;第40卷(第5期);第47-49、52页 *
煤矿快速掘进技术应用研究;程化水等;《内蒙古煤炭经济》;20181231(第11期);第62、87页 *
连续采煤机双巷掘进工艺及参数优化;温江龙;《陕西煤炭》;20191231;第168-170页 *
连续采煤机双巷掘进工艺及参数优化研究;曹军等;《煤炭科学技术》;20120531;第40卷(第5期);第9-13页 *

Also Published As

Publication number Publication date
CN112597677A (zh) 2021-04-02

Similar Documents

Publication Publication Date Title
CN110390152B (zh) 一种模拟巷道围岩裂隙演化的离散元方法
CN109490086B (zh) 一种巷道围岩支护强度试验装置及强度确定方法
CN105631102B (zh) 一种深部高应力巷道钻孔卸压参数的数值模拟确定方法
Sjoberg Failure modes and pillar behaviour in the Zinkgruvan mine
Wang et al. Application of a combined supporting technology with U-shaped steel support and anchor-grouting to surrounding soft rock reinforcement in roadway
Kang et al. A new linear cutting machine for assessing the rock-cutting performance of a pick cutter
He et al. Rock burst induced by roof breakage and its prevention
CN106767515A (zh) 一种隧道病害快速诊断防治方法
Wu et al. Failure characteristics and cooperative control strategies for gob-side entry driving near an advancing working face: a case study
Pinazzi et al. Mechanical performance of rock bolts under combined load conditions
CN112597677B (zh) 一种判断煤矿掘进工作面最大控顶距的方法
CN112196531B (zh) 一种煤矿岩巷小断面智能掘进方法
CN112131732A (zh) 基于可变荷载作用的刀柱法残采区稳定性分析方法
CN104931355B (zh) 一种沿空留巷底鼓的相似材料模拟装置及其模拟方法
CN108593236A (zh) 一种爆破冲击和瞬态卸荷的荷载实验分离方法
CN112228083B (zh) 一种煤矿小断面掘进机破岩路径选择方法
Burkov et al. Analysis of stress concentrators arising during MKY. 2SH-26/53 support unit testing
CN114961713A (zh) 一种确定动压巷道水力压裂切顶卸压时机的方法及系统
CN115467662A (zh) 岩体碎胀特性原位测试与评价方法
Bouzeran et al. Accounting for rock mass heterogeneity and buckling mechanisms in the study of excavation performance in foliated ground at Westwood mine
Medhurst et al. Investigation into roof support behaviour at Grasstree Mine
Plana et al. Numerical analysis of a tunnel in an anisotropy rock mass. Envalira tunnel (Principality of Andorra)
RU2834170C1 (ru) Способ определения напряжений массива пород в подземной горной выработке кольцевой щелью
Tuncay et al. A new abutment angle equation for deep cover coal mines
Medhurst Investigation into a new approach for roadway roof support design that includes convergence data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant