CN112523489A - Equipment and construction process for factory building high-altitude steel cable delivery piping construction - Google Patents

Equipment and construction process for factory building high-altitude steel cable delivery piping construction Download PDF

Info

Publication number
CN112523489A
CN112523489A CN202011452056.2A CN202011452056A CN112523489A CN 112523489 A CN112523489 A CN 112523489A CN 202011452056 A CN202011452056 A CN 202011452056A CN 112523489 A CN112523489 A CN 112523489A
Authority
CN
China
Prior art keywords
construction
steel cable
workstation
factory building
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011452056.2A
Other languages
Chinese (zh)
Inventor
曹荣
王志保
陈玉
李永支
谭文学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Hengsheng Construction Engineering Co ltd
Original Assignee
Kunshan Hengsheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Hengsheng Construction Engineering Co ltd filed Critical Kunshan Hengsheng Construction Engineering Co ltd
Priority to CN202011452056.2A priority Critical patent/CN112523489A/en
Publication of CN112523489A publication Critical patent/CN112523489A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/004Storage and transport racks for scaffolding components
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/042Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F17/00Safety devices, e.g. for limiting or indicating lifting force
    • B66F17/006Safety devices, e.g. for limiting or indicating lifting force for working platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of jacking equipment for the engineering and specifically relates to a factory building high altitude cable wire delivery piping construction is with equipment and construction process is related to, and it includes the base, sets up the workstation in the base top, is equipped with lifting unit between workstation and the base, and the both sides that the workstation is relative all are equipped with the thing subassembly of putting that is used for placing construction material, and the base bottom is equipped with the removal wheel that is used for driving the base removal, and it has a plurality ofly to remove the wheel interval arrangement. This application has the reduction and stacks the construction material around the staff, makes things convenient for the staff to carry out the effect of the installation operation of piping.

Description

Equipment and construction process for factory building high-altitude steel cable delivery piping construction
Technical Field
The application relates to the field of lifting equipment for engineering, in particular to equipment and a construction process for delivering and assembling a steel cable at high altitude of a factory building.
Background
Along with the popularization and use of steel structure factory building, the steel structure factory building all has relevant use in a lot of fields. In the construction process of the steel structure factory building, lighting equipment needs to be arranged at the top end of the steel structure factory building to illuminate the inside of the factory building.
At present, before lighting equipment is installed, a steel cable needs to be fixed on a support column of a steel structure factory building, and the arrangement of the steel cable is the same as the arrangement of pipeline lines of the lighting equipment in the design requirement. The pipe is connected with the steel cable through the hoop, the pipe is pushed to slide along the steel cable, and after the arrangement of the pipe is completed, the pipelines are arranged in the pipe and are connected with each other. Then the lighting device is fixed on the steel cable, and the steel cable is connected with the pipeline.
In view of the above-mentioned related technologies, the inventor thinks that when the arrangement of the piping is performed, the worker needs to carry a large amount of tools and construction materials to a high place, the arrangement of the piping is completed at the high place, the working area on the lifting platform is limited, and the work efficiency of the worker is seriously affected by the large amount of construction materials stacked on the working platform.
Disclosure of Invention
In order to reduce construction materials stacked around workers and facilitate the installation operation of the piping for the workers, the application provides equipment and a construction process for delivering the piping by the high-altitude steel cable of the factory building.
On the one hand, the equipment for construction of the factory building high-altitude steel cable delivery piping adopts the following technical scheme:
the utility model provides a factory building high altitude cable wire delivers equipment for piping construction, includes the base, sets up the workstation in the base top, be equipped with lifting unit between workstation and the base, the both sides that the workstation is relative all are equipped with the thing subassembly of putting that is used for placing construction material, the base bottom is equipped with the removal wheel that is used for driving the base removal, it has a plurality ofly to remove the wheel interval arrangement.
By adopting the technical scheme, the base is used for arranging the lifting assembly and the moving wheel; the moving wheel is used for driving the base to move; the lifting assembly is used for lifting a workbench, and the workbench is used for workers to construct; the vegetation assembly is used for placing construction materials. The movable wheels are driven to move the base to the lower part of the steel cable, and before the arrangement of the distribution pipes, construction materials such as the distribution pipes, the hoops and the like are placed on the object placing assembly. The staff carries the instrument of construction usefulness and stands on the workstation, and lifting unit is with the workstation jacking, with near staff's lifting to cable wire, the staff takes the construction material on the thing subassembly of putting and installs construction materials such as piping on the cable wire on the workstation. Through install thing subassembly additional on the workstation lateral wall, reduce the workspace that construction material occupy, staff's home range is bigger, makes things convenient for the staff to operate, promotes staff's work efficiency.
Optionally, guide rails are vertically arranged on the opposite side walls of the workbench at intervals, and each guide rail is provided with a sliding block in a sliding manner;
put the thing subassembly including setting up put the thing board on the slider, set up the connecting rod on the workstation lateral wall, connecting rod one end sets up on the workstation lateral wall, and the other end sets up put on the bottom surface of thing board, be fixed with lift cylinder on the workstation, lift cylinder's piston rod is close to slider one end with putting the thing board and articulates.
Through adopting above-mentioned technical scheme, lift cylinder's piston rod stretches out, and the piston rod will put the ascending lifting of thing board one end, and the slider is along putting thing board along the guide rail slip, and the slider drives to put thing board one end and rises, puts the thing board and expandes into the level, and the convenience is placed construction material on putting the thing board. The piston rod of the lifting oil cylinder retracts, the sliding block slides downwards along the guide rail, and the object placing plate gradually inclines and is folded, so that the occupied space is reduced. Through control lift cylinder and then control the expansion and draw in of putting the thing board, construction material stacks on putting the thing board, and the construction material that significantly reduces is to workspace's occupation, promotes staff's efficiency of construction.
Optionally, each storage plate top end all is equipped with the limiting plate that is used for blockking construction material and drops.
Through adopting above-mentioned technical scheme, pile columniform construction materials such as piping on putting the thing board, put the thing board when vibrations take place under the exogenic action, construction materials rolls from putting the thing board easily. The limiting plate blocks the tendency of rolling down of the construction materials, the stacking stability of the construction materials is improved, and the condition that the construction materials fall down is reduced.
Optionally, the storage plate is provided with a partition plate, the storage plate is provided with a sliding groove for the partition plate to slide, and the sliding groove is provided with a plurality of partitions at intervals.
Through adopting above-mentioned technical scheme, the region partition that the baffle will put on the thing board is divided into the lot, and the construction material of difference is conveniently categorised, takes different construction materials fast when the piping of easy to assemble, saves the staff and turns over the process of looking for required construction material in a large amount of construction materials, further promotes staff's efficiency of construction.
Optionally, the lifting assembly comprises a scissor type lifting frame and a plurality of driving oil cylinders, the driving oil cylinders are arranged in the lifting support, and two ends of the scissor type lifting frame are respectively arranged on the bottom surface of the workbench and the top surface of the base.
Through adopting above-mentioned technical scheme, the piston rod of drive cylinder stretches out, and drive cylinder promotes to cut fork crane and expand, and then drives the workstation and rise, realizes staff and construction material's promotion. The piston rod of the driving oil cylinder retracts, the scissor-type lifting frame is gradually folded, the workbench is driven to slowly descend, and workers and construction materials are descended.
Optionally, a guardrail is fixed on the workbench and arranged along the edge of the workbench.
Through adopting above-mentioned technical scheme, the guardrail limits staff's home range, and the restriction staff does the action that surpasss workstation working area, promotes the security of staff during operation.
Optionally, a fixing plate is arranged on the guardrail, a plurality of insertion holes are formed in the fixing plate, the diameters of the insertion holes are gradually reduced downwards, a fixing block is fixed on the bottom surface of the fixing plate, and a fixing sleeve for the fixing block to be inserted is fixed on the inner side wall of the guardrail.
Through adopting above-mentioned technical scheme, insert the fixed block and establish in fixed cover, and then set up the fixed plate on the guardrail, the staff temporarily puts the instrument in hand on the fixed plate, perhaps inserts and establishes in the jack, makes things convenient for staff's quick replacement instrument, further promotes staff's efficiency of construction. Through temporarily putting the instrument on the fixed plate and inserting and establishing in the jack, promote the stability that the instrument was put, reduce the process that the staff picked up the instrument repeatedly, further promote staff's efficiency of construction.
Optionally, a storage tank is arranged in the jack, and the storage tank is provided with a plurality of storage tanks.
Through adopting above-mentioned technical scheme, drop the easier of nut, bolt etc. and the construction material that is inconvenient to snatch is placed in the storage tank to place the storage tank in idle jack, take fast when making things convenient for the staff to install the piping, promote the installation effectiveness of piping greatly.
On the other hand, the application also provides a construction process of the high-altitude steel cable delivery piping of the factory building, which adopts the following technical scheme:
a construction process of a factory building high-altitude steel cable delivery piping, which comprises any one of the above-mentioned devices for factory building high-altitude steel cable delivery piping construction,
step1, fixing two ends of a steel cable on the side wall of a plant support column through a turn buckle, and rotating the turn buckle to adjust the tension force at the two ends of the steel cable;
step2, a worker places construction materials to be used on the placement component, and the stacking position of the construction materials is adjusted to balance the two ends of the workbench;
step3, standing a worker on the workbench, and lifting the worker and the construction materials upwards by the lifting assembly;
step4, after the worker is in place, the worker takes the construction materials on the storage board, connects the pipe to the steel cable by using the hoop, pushes the pipe to slide along the steel cable, and then continues to arrange the hoop on the outer wall of the pipe to connect the pipe and the steel cable.
Through adopting above-mentioned technical scheme, the staff carries out the transport of piping through the lift platform that can remove, plays the plan draft piping and carries the back, can directly carry out the connection between the piping or further processing on the workstation, saves and repeatedly changes the process that the construction site carries out piping connection or processing, promotes staff's efficiency of construction.
Optionally, after Step1 is completed, a plurality of support blocks are fixed on the side wall of the support column, and the support blocks are fixed below the steel cable and attached to the steel cable.
Through adopting above-mentioned technical scheme, the supporting shoe supports the cable wire, reduces the cable wire because the deformation that self gravity, piping and lighting apparatus's gravity caused, promotes the support stability and the intensity of cable wire.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the side wall of the workbench is additionally provided with the object assembly, so that the working space occupied by construction materials is reduced, the moving range of workers is wider, the workers can conveniently operate and construct, and the working efficiency of the workers is improved;
2. the limiting plate is arranged on the object placing plate, so that the condition that construction materials fall from the object placing plate is reduced, the safety of workers below is improved, the process that the materials are insufficient in the construction process of the workers and are repeatedly taken is reduced, and the construction efficiency of the workers is further improved;
3. the division plates are arranged on the storage plates, so that different construction materials are divided, the workers can take the construction materials conveniently, and the construction efficiency of the workers is further improved.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a schematic diagram showing the structure of the placement module.
Fig. 3 is a schematic view showing a structure of a fixing plate.
Description of reference numerals: 1. a base; 2. a work table; 3. a lifting assembly; 31. a scissor-fork type lifting frame; 32. a driving oil cylinder; 4. an article placing component; 41. a storage plate; 42. a connecting rod; 43. a lift cylinder; 44. a guide rail; 45. a slider; 46. a limiting plate; 47. a partition plate; 48. a chute; 5. a moving wheel; 6. a guardrail; 7. fixing a sleeve; 8. a fixing plate; 9. a fixed block; 10. a jack; 11. a material storage tank.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses equipment for construction of a high-altitude steel cable delivery piping of a factory building. Referring to fig. 1, the equipment for the factory building high-altitude steel cable delivery piping construction comprises a base 1 and a workbench 2 arranged above the base 1, wherein a lifting assembly 3 is arranged between the base 1 and the workbench 2, two ends of the workbench 2 in the width direction are provided with storage assemblies 4 for preventing construction materials, the bottom end of the side wall of the base 1 is provided with a plurality of moving wheels 5, and the moving wheels 5 are arranged at intervals. The movable wheel 5 is driven to rotate, so that the base 1 is driven to move, and the working personnel can adjust the construction site conveniently. Carry construction material to on putting thing subassembly 4, lifting unit 3 with 2 jacking of workstation, the ascending drive staff of workstation 2 and construction material rise, the staff takes the construction material of putting on the thing subassembly 4 on workstation 2 and carries out the installation of piping.
Referring to fig. 1, the lifting assembly 3 comprises a scissor type lifting frame 31 and a plurality of driving oil cylinders 32, one end of the scissor type lifting frame 31 is arranged on the bottom surface of the workbench 2, the other end of the scissor type lifting frame is arranged on the top surface of the base 1, the driving oil cylinders 32 are hinged in the scissor type lifting frame 31, and the driving oil cylinders 32 are arranged at intervals. The piston rod of driving oil cylinder 32 stretches out gradually, and driving oil cylinder 32 promotes to cut fork crane 31 and expandes gradually, cuts fork crane 31 and drives workstation 2 and slowly rise, realizes staff and construction material's lifting. The piston rod of the driving oil cylinder 32 retracts slowly, and the scissor-type lifting frame 31 is gradually folded under the driving of the driving oil cylinder 32, so that the falling of workers and construction materials is realized.
Referring to fig. 1, be fixed with guardrail 6 on workstation 2, guardrail 6 extends along the edge of workstation 2, and 6 restriction staff's home range on workstation 2 of guardrail reduce the condition that the staff made dangerous action on workstation 2, the security when promoting the staff construction.
Referring to fig. 2, two ends of the workbench 2 in the width direction are vertically fixed with two guide rails 44, one end of each guide rail 44, which is far away from the workbench 2, is fixed on the guardrail 6, and each guide rail 44 is provided with a sliding block 45 in a sliding manner. Put thing subassembly 4 including articulate the thing board 41, the many connecting rods 42 that articulate on the lateral wall of workstation 2 on adjacent slider 45, connecting rod 42 keeps away from 2 one end of workstation and articulates on the bottom surface of putting thing board 41, and many connecting rods 42 set up and put thing board 41 length direction both ends. The workbench 2 is fixed with two lifting oil cylinders 43, the lifting oil cylinders 43 correspond to the object placing plate 41, and a piston rod of the lifting oil cylinder 43 is hinged with one end of the object placing plate 41 close to the guide rail 44. The piston rod of lift cylinder 43 stretches out, and lift cylinder 43 promotes the backup pad and removes, and then drives slider 45 and slides along guide rail 44, puts thing board 41 and promotes connecting rod 42 and rotate, and then realizes putting thing board 41's rotation, puts thing board 41 and rotates to the level by the slope, conveniently places construction material on putting thing board 41. The piston rod of the lifting cylinder 43 gradually retracts, the object placing plate 41 is pulled to rotate downwards, the object placing plate 41 rotates to be in an inclined state, the space occupied by equipment is reduced, and the space utilization rate is improved.
Referring to fig. 2, a limiting plate 46 is fixed to one end of each object placing plate 41, and the limiting plate 46 is disposed along the longitudinal direction of the object placing plate 41. Cylindrical construction materials such as pipes are stacked on the object placing plate 41, when the object placing plate 41 vibrates under the action of external force, the construction materials tend to fall off, the limiting plate 46 blocks the tendency that the construction materials fall off from the object placing plate 41, and the stability of the construction materials on the object placing plate 41 is improved.
Referring to fig. 2, each storage plate 41 is provided with a plurality of sliding grooves 48, each sliding groove 48 extends along the length direction of the storage plate 41, and each sliding groove 48 is provided with a partition 47 in a sliding manner. The object placing plates 41 are separated by the aid of the partition plates 47, different construction materials are separated, workers can conveniently and quickly take different construction materials in the construction process, the time for the workers to find the construction materials is shortened, and construction efficiency is improved.
Referring to fig. 3, a plurality of fixing sleeves 7 are fixed on the guard rail 6, and the fixing sleeves 7 are arranged at intervals. The guardrail 6 is provided with a fixing plate 8, a fixing block 9 is fixed on the bottom surface of the fixing plate 8, and a plurality of fixing blocks 9 are arranged at intervals corresponding to the fixing sleeve 7. Seted up a plurality of jacks 10 on the fixed block 9, the diameter of jack 10 reduces along vertical downward direction gradually, and the joint has storage tank 11 in the jack 10, and storage tank 11 is provided with a plurality ofly. The fixing block 9 is inserted into the fixing sleeve 7, and the fixing plate 8 is fixed on the guardrail 6. The staff places the less construction material of equal volume of bolt, nut in storage tank 11, makes things convenient for the staff to take fast. When the construction tool that the staff used was put temporarily, can insert construction tool and establish in jack 10, make things convenient for the staff to place fast and take the instrument, further promote staff's efficiency of construction.
The implementation principle of the equipment for the construction of the high-altitude steel cable delivery piping of the factory building in the embodiment of the application is as follows: the piston rod of the lift cylinder 43 is driven to extend, the object placing plate 41 is unfolded, and the construction material is stacked in the object placing plate 41 and the material storage tank 11. The worker stands on the work table 2 with the construction tool, the piston rod of the driving oil cylinder 32 extends out, the work table 2 ascends, and the worker sets the pipe on the steel cable. After the arrangement of the piping is completed, the piston rod of the driving oil cylinder 32 retracts, the workbench 2 descends, and the worker drives the moving wheel 5 to rotate, so that the construction position is conveniently adjusted.
The embodiment of the application also discloses a construction process of the high-altitude steel cable delivery piping of the factory building, which is matched with the equipment for the high-altitude steel cable delivery piping construction of the factory building.
Step1, preparing a steel cable according to the design requirement, fixing two ends of the steel cable on the side wall of the plant support column through the turn buckle, and rotating the turn buckle to adjust the tension force at the two ends of the steel cable.
After the fixing of the steel cable is completed, a plurality of supporting blocks are welded on the side wall of the supporting column and are arranged at intervals along the length direction of the steel cable, and when the steel cable is hung with a tubing and a pipeline, the supporting blocks support the steel cable, so that the supporting stability of the steel cable is improved.
Step2, the piston rod of the lifting cylinder is driven to extend, the object placing plate 41 is unfolded, the working personnel place the construction materials needed to be used on the object placing plate 41, the partition plates 47 are additionally arranged among different construction materials for separation, and the stacking positions of the construction materials are adjusted to balance the two ends of the workbench 2. Small parts such as screws and bolts are placed in the material tank 11.
Step3, a worker stands on the workbench 2 with a tool for construction, the piston rod of the driving oil cylinder 32 extends out to drive the scissor type lifting frame 31 to unfold, and further the workbench 2 is driven to ascend, so that the worker and construction materials are lifted to the periphery of the pipe.
Step4, the staff takes the construction materials on the storage board 41 and in the storage tank 11 to install the pipe, connects the pipe to the steel cable by using the hoop, pushes the pipe to slide along the steel cable, and then continues to arrange the hoop on the outer wall of the pipe to connect the pipe and the steel cable until the whole pipe is hung on the steel cable. The next pipe is installed.
When the construction site needs to be changed, the workbench 2 is firstly lowered, the movable wheels 5 are driven to roll, and then the whole equipment is driven to move. After all the pipes are installed, the remaining construction materials are taken down, the piston rod of the lift cylinder 43 is retracted, and the object placing plate 41 is rotated and folded.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a factory building high altitude cable wire delivers piping construction and uses equipment which characterized in that: including base (1), workstation (2) of setting in base (1) top, be equipped with lifting unit (3) between workstation (2) and base (1), workstation (2) both sides relative all are equipped with and are used for placing the thing subassembly (4) of putting of construction material, base (1) bottom is equipped with removal wheel (5) that are used for driving base (1) and remove, it has a plurality ofly to remove wheel (5) interval arrangement.
2. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 1, wherein: guide rails (44) are vertically arranged at two opposite ends of the workbench (2) at intervals, and each guide rail (44) is provided with a sliding block (45) in a sliding manner;
put thing subassembly (4) including setting up put thing board (41), connecting rod (42) of setting on workstation (2) lateral wall on slider (45), connecting rod (42) one end sets up on workstation (2) lateral wall, and the other end sets up put on the bottom surface of thing board (41), be fixed with lift cylinder (43) on workstation (2), the piston rod of lift cylinder (43) is close to slider (45) one end with putting thing board (41) and is articulated.
3. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 2, wherein: and a limiting plate (46) used for blocking the falling of the construction materials is arranged at the top end of each object placing plate (41).
4. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 2, wherein: be equipped with baffle (47) on putting thing board (41), set up spout (48) that supply baffle (47) to slide on putting thing board (41), spout (48) interval arrangement is many.
5. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 1, wherein: lifting unit (3) are including cutting fork crane (31) and a plurality of driving cylinder (32), and are a plurality of driving cylinder (32) set up in cutting fork crane (31), it sets up respectively on workstation (2) bottom surface and base (1) top surface to cut fork crane (31) both ends.
6. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 1, wherein: a guardrail (6) is fixed on the workbench (2), and the guardrail (6) is arranged along the edge of the workbench (2).
7. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 6, wherein: be equipped with fixed plate (8) on guardrail (6), a plurality of jacks (10) have been seted up on fixed plate (8), the diameter of jack (10) reduces downwards gradually, be fixed with fixed block (9) on fixed plate (8) bottom surface, be fixed with on guardrail (6) the inside wall and supply fixed block (9) to insert fixed cover (7) of establishing.
8. The equipment for construction of the overhead steel cable delivery piping of the factory building according to claim 7, wherein: a storage tank (11) is arranged in the insertion hole (10), and a plurality of storage tanks (11) are arranged.
9. A process for constructing high-altitude steel cable delivery piping for factory buildings, comprising the apparatus for high-altitude steel cable delivery piping for factory buildings as claimed in any one of claims 1 to 9, wherein: step1, fixing two ends of a steel cable on the side wall of a plant support column through a turn buckle, and rotating the turn buckle to adjust the tension force at the two ends of the steel cable;
step2, a worker places construction materials to be used on the placement component, and the stacking position of the construction materials is adjusted to balance the two ends of the workbench;
step3, standing a worker on the workbench, and lifting the worker and the construction materials upwards by the lifting assembly;
step4, after the worker is in place, the worker takes the construction materials on the storage board, connects the pipe to the steel cable by using the hoop, pushes the pipe to slide along the steel cable, and then continues to arrange the hoop on the outer wall of the pipe to connect the pipe and the steel cable.
10. The construction process of the high-altitude steel cable delivery pipe of the factory building according to claim 9, wherein: after Step1 is completed, a plurality of supporting blocks are fixed on the side walls of the supporting columns, and the supporting blocks are fixed below the steel cables and attached to the steel cables.
CN202011452056.2A 2020-12-09 2020-12-09 Equipment and construction process for factory building high-altitude steel cable delivery piping construction Pending CN112523489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011452056.2A CN112523489A (en) 2020-12-09 2020-12-09 Equipment and construction process for factory building high-altitude steel cable delivery piping construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011452056.2A CN112523489A (en) 2020-12-09 2020-12-09 Equipment and construction process for factory building high-altitude steel cable delivery piping construction

Publications (1)

Publication Number Publication Date
CN112523489A true CN112523489A (en) 2021-03-19

Family

ID=74998761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011452056.2A Pending CN112523489A (en) 2020-12-09 2020-12-09 Equipment and construction process for factory building high-altitude steel cable delivery piping construction

Country Status (1)

Country Link
CN (1) CN112523489A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000351569A (en) * 1999-06-07 2000-12-19 Hitachi Building Systems Co Ltd Scaffold device for maintenance work
DE20006992U1 (en) * 2000-02-18 2000-12-28 Korte Richard Aerial work platform
TWM310891U (en) * 2006-11-08 2007-05-01 Lin I Chung Working cart
CN103183297A (en) * 2013-03-13 2013-07-03 李景海 Mobile rescue elevator and rescue vehicle
CN208071242U (en) * 2018-07-11 2018-11-09 国网河南省电力公司偃师市供电公司 A kind of electric power rush-repair vehicle
CN208440245U (en) * 2018-06-11 2019-01-29 刘梅 A kind of vegetation trimming lift of high speed greening maintenance
CN210659179U (en) * 2019-07-11 2020-06-02 杨学强 Bridge construction ladder with safety protection mechanism
CN111422796A (en) * 2020-04-26 2020-07-17 国网江苏省电力有限公司常州供电分公司 Manned lift platform of block terminal fortune dimension
CN211421792U (en) * 2019-12-14 2020-09-04 广东嘉泰建设有限公司 Safe type scaffold frame for construction
CN211899542U (en) * 2020-04-11 2020-11-10 王婷婷 All-steel intelligent building construction lifting platform

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000351569A (en) * 1999-06-07 2000-12-19 Hitachi Building Systems Co Ltd Scaffold device for maintenance work
DE20006992U1 (en) * 2000-02-18 2000-12-28 Korte Richard Aerial work platform
TWM310891U (en) * 2006-11-08 2007-05-01 Lin I Chung Working cart
CN103183297A (en) * 2013-03-13 2013-07-03 李景海 Mobile rescue elevator and rescue vehicle
CN208440245U (en) * 2018-06-11 2019-01-29 刘梅 A kind of vegetation trimming lift of high speed greening maintenance
CN208071242U (en) * 2018-07-11 2018-11-09 国网河南省电力公司偃师市供电公司 A kind of electric power rush-repair vehicle
CN210659179U (en) * 2019-07-11 2020-06-02 杨学强 Bridge construction ladder with safety protection mechanism
CN211421792U (en) * 2019-12-14 2020-09-04 广东嘉泰建设有限公司 Safe type scaffold frame for construction
CN211899542U (en) * 2020-04-11 2020-11-10 王婷婷 All-steel intelligent building construction lifting platform
CN111422796A (en) * 2020-04-26 2020-07-17 国网江苏省电力有限公司常州供电分公司 Manned lift platform of block terminal fortune dimension

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岳威主编: "《建筑电气施工技术项目教程》", 28 February 2017 *

Similar Documents

Publication Publication Date Title
CN204452526U (en) A kind of scaffold Handling device
CN201401184Y (en) Assembly rack for comprehensively mechanized hydraulic bracket
CN104627223A (en) Scaffold carrying device
CN205527614U (en) Walking work platform
CN112523489A (en) Equipment and construction process for factory building high-altitude steel cable delivery piping construction
CN110844821B (en) Multifunctional construction operation platform for comprehensive pipe rack
CN114960926B (en) Chemical pipe gallery structure and pipe replacement method
CN214834581U (en) Portable construction device is used in building engineering construction
CN213865283U (en) Movable lifting platform for directional delivery of line pipes
CN215756256U (en) Novel aerial working platform
CN202206102U (en) Unwinding rack used for construction site
CN210898303U (en) Stringing tool for bridging low-voltage lead
CN114671379A (en) Numerical control hydraulic lifting device for electromechanical installation
CN104088442B (en) Airduct erecting device and method
CN207209829U (en) A kind of oil tank transport, installation integrated apparatus
CN218597708U (en) Carrying frame for house construction
CN213540404U (en) Tunnel operation vehicle
CN215594993U (en) Liftable support for construction engineering construction
CN111962911B (en) Building safety displacement device
CN220395116U (en) Lifting type building construction platform
CN204126283U (en) Portable steel stranded wire penetrating adapter cutting chassis
CN219604843U (en) Scaffold convenient to go up piece
CN216040834U (en) Warning pile winding and unwinding devices that expressway was used
CN220566127U (en) Anchor platform device is moved back to fixed anchor of advance support
CN216464491U (en) Platform is used in agricultural machine accessory processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210319