CN204452526U - A kind of scaffold Handling device - Google Patents

A kind of scaffold Handling device Download PDF

Info

Publication number
CN204452526U
CN204452526U CN201520094475.1U CN201520094475U CN204452526U CN 204452526 U CN204452526 U CN 204452526U CN 201520094475 U CN201520094475 U CN 201520094475U CN 204452526 U CN204452526 U CN 204452526U
Authority
CN
China
Prior art keywords
clamping plate
steel pipe
ply wood
platform
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520094475.1U
Other languages
Chinese (zh)
Inventor
朱毅
康耕强
李琨
贾善杰
卢兆军
吴观斌
许乃媛
王洪伟
卢志鹏
李勃
赵鹏飞
靳海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520094475.1U priority Critical patent/CN204452526U/en
Application granted granted Critical
Publication of CN204452526U publication Critical patent/CN204452526U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of scaffold Handling device, relate to scaffolding steel pipe carrying technical field, during for solving carrying scaffolding steel pipe, pick up inconvenience, the scaffolding steel pipe of scaffolding steel pipe easily pound the problem on workman's pin, to improve the handling efficiency of scaffolding steel pipe.A kind of scaffold Handling device that the utility model provides, base is provided with road wheel, so that the walking of whole device.Platform is set above base, and spring is set between, to play the effect of damping.Platform arranges support, and support arranges the first clamping plate set gradually from bottom to top, some second clamping plate and three ply wood, and first, second, and third clamping plate arrange semicircle orifice, and the semicircle orifice between adjacent cleats surrounds the circular hole holding steel pipe.The utility model can realize clamping to steel pipe and transport, avoids the danger of manually lifting and easily injuring pin when sending steel pipe by a crashing object, and is convenient to the loading and unloading of steel pipe, can be transported to camp site efficiently.

Description

A kind of scaffold Handling device
Technical field
The utility model relates to scaffolding steel pipe carrying technical field, specifically a kind of device facilitating scaffolding steel pipe to carry.
Background technology
In building operation or power construction, scaffold is indispensable instrument, and it both can provide support for build labourer, can provide safeguard again for the vertical of material in building and axial transport.Build in the transportation on ground to scaffold with stacking at scaffolding steel pipe, be generally that workman is free-hand to carry out, people takes on anti-or two people and lifts and deliver to workyard, in the process picking up scaffolding steel pipe or carrying scaffolding steel pipe, scaffolding steel pipe is easy to roll and pounds on the pin of workman, and scaffolding steel pipe is deposited in one piece is not easy to be picked up.
Utility model content
The purpose of this utility model is to provide a kind of scaffold Handling device, and during for solving carrying scaffolding steel pipe, pick up inconvenience, the scaffolding steel pipe of scaffolding steel pipe easily pound the problem on workman's pin, to improve the handling efficiency of scaffolding steel pipe.
The technical scheme in the invention for solving the technical problem is: a kind of scaffold Handling device, comprise base, road wheel is provided with in the bottom of described base, it is characterized in that, also comprise platform, support, the first clamping plate, the second clamping plate and three ply wood, be provided with some columns at the top of described base, on column described in each, cover has a spring, and the bottom of described spring is fixed on base; Above described base, be provided with the platform of a horizontal positioned, the top of described spring is fixed on the bottom of platform, has gap between the bottom of described platform and the top of column; Also be provided with some vertical position-limited levers at the top of described base, the bottom of described platform is provided with the hole be positioned at directly over position-limited lever, and the top of described position-limited lever to extend in hole and has gap between the top of position-limited lever and hole wall; Described support is separately positioned on the rear and front end of platform, be provided with some second clamping plate setting up and down on the bracket, described in each, the top of the second clamping plate and bottom are respectively equipped with some semicircle orifices, be provided with one in the below of the second clamping plate of bottom and be fixed on the first clamping plate on platform, semicircle orifice is provided with at described first clamping plate top, be provided with three ply wood being positioned at above the second clamping plate of the top, be provided with semicircle orifice in the bottom of described three ply wood; Semicircle orifice between described first clamping plate and the second clamping plate, between often adjacent two second clamping plate and between the second clamping plate and three ply wood surrounds the circular hole clamping steel pipe, in described semicircle orifice, be provided with rubber pad.
Further, described support is two and is separately fixed at the left and right sides of platform, described three ply wood and some second clamping plate are articulated and connected with corresponding support, the bottom surface of the second clamping plate of top and the either flush of the second clamping plate of below is positioned at during clamping steel pipe, described three ply wood and some second clamping plate stagger in the horizontal direction mutually, and the second clamping plate and first clamping plate of bottom are positioned at same vertical plane; Described first clamping plate free end and the second clamping plate free end, two second often adjacent clamping plate free ends and between the second clamping plate free end and three ply wood free end detouchable be provided with attaching parts.
Further, be respectively equipped with jack at described first clamping plate, the second clamping plate and three ply wood free end, described attaching parts is U-shaped structure, and the two ends of described attaching parts lay respectively in corresponding jack, and are provided with nut at the two ends of described attaching parts.
Further, described support is four and is arranged in pairs in the rear and front end of platform, on the platform of described first Boards wall between paired two stands, support described in each is respectively equipped with the first slot, be placed with some second clamping plate setting up and down in the first slot on paired two stands, be provided with three ply wood at the top of described first slot; Two second often adjacent clamping plate contact with each other, and the second clamping plate and three ply wood, the second clamping plate being positioned at bottom and the first clamping plate that are positioned at the top contact with each other; At the hinged installation one in the top of described support push rod, be provided with a plate at the free end of described push rod, the groove fit at described plate and three ply wood top, between described plate and three ply wood, be provided with bolt.
Further, described in each, the two ends of the second clamping plate and the two ends of three ply wood are respectively equipped with handle, are provided with the second slot coordinated with handle on the bracket, and described second slot runs through the first slot.
Further, the semicircle orifice of described second clamping plate top and bottom staggers mutually.
The beneficial effects of the utility model are: a kind of scaffold Handling device that the utility model provides, and base are provided with road wheel, so that the walking of whole device.Platform is set above base, and spring is set between, to play the effect of damping.Platform arranges support, and support arranges the first clamping plate set gradually from bottom to top, some second clamping plate and three ply wood, and first, second, and third clamping plate arrange semicircle orifice, and the semicircle orifice between adjacent cleats surrounds the circular hole holding steel pipe.The utility model can realize clamping to steel pipe and transport, avoids the danger of manually lifting and easily injuring pin when sending steel pipe by a crashing object, and is convenient to the loading and unloading of steel pipe, can be transported to camp site efficiently.
Accompanying drawing explanation
Fig. 1 is the front elevation of the utility model embodiment one;
Fig. 2 is the A place partial enlarged drawing in Fig. 1;
Fig. 3 is the schematic top plan view of Fig. 1;
Fig. 4 is the schematic diagram of the first clamping plate;
Fig. 5 is the first clamping plate and the second clip board engagement schematic diagram;
Fig. 6 is that steel pipe vertically stacks schematic diagram;
Fig. 7 is the second clamping plate graphics;
Fig. 8 is the front view of Fig. 7;
Fig. 9 is the schematic diagram of rubber pad;
Figure 10 is that B in Fig. 9 is to local direction view;
Figure 11 is the another kind of form of Figure 10;
Figure 12 is that the steel pipe of embodiment one stacks schematic diagram;
Figure 13 is the schematic diagram of embodiment two;
Figure 14 is the second clamping plate graphics of embodiment two;
Figure 15 is the birds-eye view of Figure 14;
Figure 16 is the bearing graphics of embodiment two;
Figure 17 is the front view of Figure 16;
Figure 18 is the birds-eye view of Figure 16;
Figure 19 is that the steel pipe of embodiment two stacks schematic diagram;
Figure 20 is the birds-eye view of Figure 19;
In figure: 1 base, 11 road wheels, 12 columns, 13 springs, 14 bolts, 2 platforms, 3 position-limited levers, 4 supports, 41 push rods, 411 plates, 42 first slots, 43 second slots, 5 first clamping plate, 6 second clamping plate, 61 handles, 7 three ply woods, 8 attaching partss, 81 semicircle orifices, 82 jacks, 83 circular holes, 9 rubber pads, 91 decorative patterns, 92 projections, 10 steel pipes.
Detailed description of the invention
As shown in Fig. 1 to Figure 20, the utility model comprise base 1, platform 2, position-limited lever 3, support 4, first clamping plate 5, the second clamping plate 6, three ply wood 7 and attaching parts 8, below in conjunction with accompanying drawing, the utility model embodiment one is described.
As shown in Figure 1, base 1 is matrix of the present utility model, is provided with road wheel 11 in the bottom of base.Four root posts 12 are provided with at the top of base, the identical length etc. of column, as shown in Figure 2, on column, cover has spring 13, the bottom of spring is fixedly connected with base, above base, be provided with platform 2, platform is metal sheet or the section bar weldment of horizontal positioned, and the bottom of platform is fixedly connected with the top of four springs.Under the action of the spring, between the top of column and mesa base, there is a gap.Four vertical square position-limited levers 3 are also provided with at the top of base, the bottom of position-limited lever is fixed on base, the top of position-limited lever extend in the bottom of platform, the hole adapted with position-limited lever is provided with in the bottom of platform, have gap between at the bottom of the top of position-limited lever and hole, four of position-limited lever also have gap between side and the madial wall in hole.When platform sway, arranging of position-limited lever can limit the action radius of platform in horizontal surface.As shown in Figure 3, support 4 is respectively equipped with in the rear and front end of table top, some clamping plate are provided with in the inner chamber of support, be respectively the first clamping plate 5 being positioned at bottom, the three ply wood 7 being positioned at middle some second clamping plate 6, being positioned at the top, as shown in Figure 4, first clamping plate are square metal sheet, and the bottom of the first clamping plate is fixed on platform, are provided with the semicircle orifice 81 of some even settings at the top of the first clamping plate.Some second clamping plate are hingedly mounted on support, and some second clamping plate are setting up and down, the either flush of the bottom surface being positioned at the second clamping plate of top and the second clamping plate being positioned at below.As shown in Figure 7, some semicircle orifices 81 are respectively equipped with at the top of each the second clamping plate and bottom, wherein, as shown in Figure 5, semicircle orifice bottom the second clamping plate being positioned at bottom coordinates with the semicircle orifice on the first clamping plate and forms circular hole 83, and the semicircle orifice being positioned at the second clamping plate top of below forms circular hole with the semicircle orifice bottom the second clamping plate being positioned at top.Above the second clamping plate of the top, be provided with three ply wood 7, be provided with some semicircle orifices 81 in the bottom of three ply wood, and three ply wood and support be articulated and connected.As shown in Figure 6, the second clamping plate and the first clamping plate that are positioned at bottom are positioned at same perpendicular, and some second clamping plate and three ply wood stagger in the horizontal direction mutually.As shown in Figure 8, be provided with two jacks 82 setting up and down at the second clamping plate free end, the first clamping plate be provided with a jack, three ply wood is provided with a jack.When whole Handling device is in off working state, the second clamping plate and three ply wood can be hidden in the inner chamber of support.During use, the second clamping plate and three ply wood are extracted out from rack bore.
The hole wall of each semicircle orifice is provided with rubber pad 9, as shown in Figure 9, rubber pad is the Rubber Parts of semi-circular shape, as shown in Figure 10, the inwall of rubber pad is provided with gripping pattern 91, as shown in figure 11, protruding 92 can also be arranged on the inwall of rubber pad, to increase the friction force between steel pipe and rubber pad.During use, as shown in figure 12, first the two ends of steel pipe are placed on respectively in the semicircle orifice on the clamping plate of front and back two first, until the semicircle orifice on the first clamping plate all piles steel pipe, then the second clamping plate of bottom are extracted out from support, the bottom surface of the second clamping plate is contacted with the end face of the first clamping plate, and the semicircle orifice at the semicircle orifice now bottom the second clamping plate and the first clamping plate top surrounds the circular hole 83 clamping steel pipe, spacing with what realize steel pipe.Grafting a connection piece 8 between the first clamping plate free end and the second clamping plate free end, attaching parts is U-shaped structure, the two ends of attaching parts are inserted in the jack on the first clamping plate and the second clamping plate respectively, screw thread is provided with at the two ends of attaching parts, now coordinate mounting nuts at the two ends of attaching parts, relative fixing with what realize between the first clamping plate with the second clamping plate.Then placing steel tubes in the semicircle orifice at this second clamping plate top, until pile.Then progressively put down by remaining second clamping plate, the second adjacent between two clamping plate contact with each other clamping steel pipe.After being fallen by three ply wood, the semicircle orifice bottom three ply wood coordinates with the semicircle orifice at the second clamping plate top of the top and clamps steel pipe, now just completes the loading of steel pipe.Attaching parts is provided with between two second often adjacent clamping plate free ends, relatively fixing with what realize between adjacent two second clamping plate.Attaching parts is provided with, being relatively fixedly connected with of both realizations between three ply wood free end and the second clamping plate free end of the top.
The second clamping plate being positioned at below can upwards turn down, and the second clamping plate being positioned at top can turn down downwards, to realize hiding of the second clamping plate.After having been loaded by steel pipe 10, spring pressurized, can promote base and make to move integrally, when road wheel rolls into low lying areas, spring the effect can playing damping is set.Between the steel pipe be located in the same horizontal plane, there is interval, between the steel pipe of differing heights position, there is interval and mutually stagger, taking when being convenient to loading and unloading.
Embodiment two:
As shown in figure 13, embodiment two also comprises base 1, platform 2, position-limited lever 3, support 4, first clamping plate 5, second clamping plate 6 and three ply wood 7, the planform of base 1, platform 2 and position-limited lever 3 and annexation each other identical with embodiment one, embodiment two and the difference of embodiment one be the structure of the quantity of support and structure, the second clamping plate and three ply wood, the second clamping plate and three ply wood and support matching relationship different with embodiment one.
Support 4 is four, is divided into two groups, is separately positioned on the rear and front end of platform.In embodiment one, support has two, and the right setting of a first from left, with counterweight.As shown in Figure 16 to Figure 18, support is provided with the first vertical slot 42, first slot and is used for and the second clip board engagement, support is provided with the second slot 43, second slot running through the first slot and is used for coordinating with handle.Hinged at the top of support a push rod 41 is installed, is provided with a plate 411 at the free end of push rod, plate is provided with the first through hole.As shown in Figure 14, Figure 15, the second clamping plate are square metal plate, be respectively equipped with semicircle orifice 81, and the semicircle orifice of the semicircle orifice at top and bottom stagger mutually at the second clamping plate top and bottom.Handle 61 is respectively equipped with, to facilitate taking of the second clamping plate at the two ends of the second clamping plate.First clamping plate are arranged between the two stands of homonymy, and fix with platform bottom the first clamping plate, some semicircle orifices are provided with at the first clamping plate top, second clamping plate and the first slot bearing fit, some setting up and down and the second clamping plate contacted with each other are placed with in the first slot, be provided with three ply wood in the top, the semicircle orifice at the second clamping plate top of the some semicircle orifices bottom three ply wood and the top surrounds circular hole 83.Be provided with groove at the top of three ply wood, this groove coordinates with plate, and is provided with the second through hole of through-going recess in the side of three ply wood.Also rubber pad 9 is provided with in each semicircle orifice.
As shown in figure 19, when loading steel pipe, first steel pipe is placed in the semicircle orifice on the first clamping plate, until pile steel pipe, then be placed in paired two stands by the second clamping plate of bottom, now the semicircle orifice bottom the second clamping plate and the semicircle orifice on the first clamping plate surround circular hole, entangle steel pipe.Then progressively in paired two stands, the second clamping plate are placed, until the second clamping plate of the top are put in the bracket.Three ply wood is placed in paired two stands, then by the push rod upset on each support, make inserting board in the groove at three ply wood top, the first through hole now on plate communicates with the second through hole on three ply wood, in the first through hole with the second through hole, insert bolt 14 realize the relative fixing of three ply wood and support, what also just achieve between three ply wood with some second clamping plate is relative fixing, and now, some steel pipes are limited in the first clamping plate, between the second clamping plate and three ply wood.First clamping plate, the second clamping plate and three ply wood constitute and hold assembly, and as shown in figure 20, what the two ends of each steel pipe 10 were stuck in rear and front end holds in assembly, now can ground-engaging wheel walking, realize transport.

Claims (6)

1. a scaffold Handling device, comprise base, road wheel is provided with in the bottom of described base, it is characterized in that, also comprise platform, support, the first clamping plate, the second clamping plate and three ply wood, be provided with some columns at the top of described base, on column described in each, cover has a spring, and the bottom of described spring is fixed on base; Above described base, be provided with the platform of a horizontal positioned, the top of described spring is fixed on the bottom of platform, has gap between the bottom of described platform and the top of column; Also be provided with some vertical position-limited levers at the top of described base, the bottom of described platform is provided with the hole be positioned at directly over position-limited lever, and the top of described position-limited lever to extend in hole and has gap between the top of position-limited lever and hole wall; Described support is separately positioned on the rear and front end of platform, be provided with some second clamping plate setting up and down on the bracket, described in each, the top of the second clamping plate and bottom are respectively equipped with some semicircle orifices, be provided with one in the below of the second clamping plate of bottom and be fixed on the first clamping plate on platform, semicircle orifice is provided with at described first clamping plate top, be provided with three ply wood being positioned at above the second clamping plate of the top, be provided with semicircle orifice in the bottom of described three ply wood; Semicircle orifice between described first clamping plate and the second clamping plate, between often adjacent two second clamping plate and between the second clamping plate and three ply wood surrounds the circular hole clamping steel pipe, in described semicircle orifice, be provided with rubber pad.
2. a kind of scaffold Handling device according to claim 1, it is characterized in that, described support is two and is separately fixed at the left and right sides of platform, described three ply wood and some second clamping plate are articulated and connected with corresponding support, the bottom surface of the second clamping plate of top and the either flush of the second clamping plate of below is positioned at during clamping steel pipe, described three ply wood and some second clamping plate stagger in the horizontal direction mutually, and the second clamping plate and first clamping plate of bottom are positioned at same vertical plane; Described first clamping plate free end and the second clamping plate free end, two second often adjacent clamping plate free ends and between the second clamping plate free end and three ply wood free end detouchable be provided with attaching parts.
3. a kind of scaffold Handling device according to claim 2, it is characterized in that, jack is respectively equipped with at described first clamping plate, the second clamping plate and three ply wood free end, described attaching parts is U-shaped structure, the two ends of described attaching parts lay respectively in corresponding jack, and are provided with nut at the two ends of described attaching parts.
4. a kind of scaffold Handling device according to claim 1, it is characterized in that, described support is four and is arranged in pairs in the rear and front end of platform, on the platform of described first Boards wall between paired two stands, support described in each is respectively equipped with the first slot, be placed with some second clamping plate setting up and down in the first slot on paired two stands, be provided with three ply wood at the top of described first slot; Two second often adjacent clamping plate contact with each other, and the second clamping plate and three ply wood, the second clamping plate being positioned at bottom and the first clamping plate that are positioned at the top contact with each other; At the hinged installation one in the top of described support push rod, be provided with a plate at the free end of described push rod, the groove fit at described plate and three ply wood top, between described plate and three ply wood, be provided with bolt.
5. a kind of scaffold Handling device according to claim 4, it is characterized in that, described in each, the two ends of the second clamping plate and the two ends of three ply wood are respectively equipped with handle, are provided with the second slot coordinated with handle on the bracket, and described second slot runs through the first slot.
6. a kind of scaffold Handling device according to claim 3 or 5, is characterized in that, the semicircle orifice of described second clamping plate top and bottom staggers mutually.
CN201520094475.1U 2015-02-10 2015-02-10 A kind of scaffold Handling device Withdrawn - After Issue CN204452526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520094475.1U CN204452526U (en) 2015-02-10 2015-02-10 A kind of scaffold Handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520094475.1U CN204452526U (en) 2015-02-10 2015-02-10 A kind of scaffold Handling device

Publications (1)

Publication Number Publication Date
CN204452526U true CN204452526U (en) 2015-07-08

Family

ID=53659450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520094475.1U Withdrawn - After Issue CN204452526U (en) 2015-02-10 2015-02-10 A kind of scaffold Handling device

Country Status (1)

Country Link
CN (1) CN204452526U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105172854A (en) * 2015-09-30 2015-12-23 苏州市灵通玻璃制品有限公司 Washing machine panel glass transport vehicle
CN105329291A (en) * 2015-09-29 2016-02-17 国网山东济阳县供电公司 Scaffold steel pipe carrying device
CN105926923A (en) * 2016-05-26 2016-09-07 黄标城 Hexagonal rubber cylinder sleeve capable of storing round pipe components of scaffold conveniently
CN104627223B (en) * 2015-02-10 2016-10-05 国家电网公司 A kind of scaffold Handling device
CN107323503A (en) * 2017-07-20 2017-11-07 芜湖市泰能电热器具有限公司 A kind of pushing equipment of large-scale aluminum pipe transport
CN108502002A (en) * 2018-05-21 2018-09-07 平顶山市美伊金属制品有限公司 It is a kind of to avoid the casting iron pan transfer car(buggy) that pot body scratches when transhipment
CN109017952A (en) * 2018-09-11 2018-12-18 广东宏穗晶科技服务有限公司 A kind of shopping cart robot
CN109109736A (en) * 2018-07-14 2019-01-01 中铁贵州工程有限公司 A kind of PCCP pipe mountainous region means of transport

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104627223B (en) * 2015-02-10 2016-10-05 国家电网公司 A kind of scaffold Handling device
CN105329291A (en) * 2015-09-29 2016-02-17 国网山东济阳县供电公司 Scaffold steel pipe carrying device
CN105172854A (en) * 2015-09-30 2015-12-23 苏州市灵通玻璃制品有限公司 Washing machine panel glass transport vehicle
CN105926923A (en) * 2016-05-26 2016-09-07 黄标城 Hexagonal rubber cylinder sleeve capable of storing round pipe components of scaffold conveniently
CN105926923B (en) * 2016-05-26 2019-05-31 黄标城 A kind of six face shape rubber sleeves facilitating storage scaffold dome-like roof
CN107323503A (en) * 2017-07-20 2017-11-07 芜湖市泰能电热器具有限公司 A kind of pushing equipment of large-scale aluminum pipe transport
CN108502002A (en) * 2018-05-21 2018-09-07 平顶山市美伊金属制品有限公司 It is a kind of to avoid the casting iron pan transfer car(buggy) that pot body scratches when transhipment
CN109109736A (en) * 2018-07-14 2019-01-01 中铁贵州工程有限公司 A kind of PCCP pipe mountainous region means of transport
CN109109736B (en) * 2018-07-14 2019-11-05 中铁贵州工程有限公司 A kind of PCCP pipe mountainous region means of transport
CN109017952A (en) * 2018-09-11 2018-12-18 广东宏穗晶科技服务有限公司 A kind of shopping cart robot

Similar Documents

Publication Publication Date Title
CN204452526U (en) A kind of scaffold Handling device
CN104627223A (en) Scaffold carrying device
CN201193183Y (en) Crane portal frame with adjustable width and height
CN201263057Y (en) Rack for paying off cable
CN103253518A (en) Physical distribution tray stacking support
CN203079581U (en) Crane trolley
CN209367377U (en) A kind of code material device of wood splicing machine
CN105151691A (en) Carrier for LED street lamp pole
CN210947649U (en) Safe lifting platform for building construction
CN201264879Y (en) Hoisting combined rack
CN209538645U (en) A kind of high security exterior wall finishing lifting type workbench
CN203241594U (en) Pneumatic lifting device for buried type optical cable cross-connecting box
CN203473395U (en) Special placing rack for construction site pipeline
CN206806788U (en) A kind of lifting base for box-type substation
CN101767758A (en) Liftable platform
CN202206102U (en) Unwinding rack used for construction site
CN209507471U (en) A kind of packaged type equipment handling apparatus
CN206502559U (en) The jack lifting platform of ship's space unit
CN208560532U (en) Adjustable height shelf scaffold
CN211736259U (en) Scaffold structure for construction site
CN214942202U (en) Portable quick detach fitment scaffold frame
CN214059653U (en) Stabilize hoist base structure
CN203855364U (en) Paying-off device used in engineering
CN216478845U (en) Installation device of traction box planetary mechanism of echoff coal mining machine
CN215948965U (en) Precast concrete stair transfer device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150708

Effective date of abandoning: 20161005

C25 Abandonment of patent right or utility model to avoid double patenting