CN112523206A - Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof - Google Patents
Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof Download PDFInfo
- Publication number
- CN112523206A CN112523206A CN202011282628.7A CN202011282628A CN112523206A CN 112523206 A CN112523206 A CN 112523206A CN 202011282628 A CN202011282628 A CN 202011282628A CN 112523206 A CN112523206 A CN 112523206A
- Authority
- CN
- China
- Prior art keywords
- pile
- steel
- permeable
- toughness concrete
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 45
- 238000002360 preparation method Methods 0.000 title claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 143
- 239000010959 steel Substances 0.000 claims abstract description 143
- QNRATNLHPGXHMA-XZHTYLCXSA-N (r)-(6-ethoxyquinolin-4-yl)-[(2s,4s,5r)-5-ethyl-1-azabicyclo[2.2.2]octan-2-yl]methanol;hydrochloride Chemical compound Cl.C([C@H]([C@H](C1)CC)C2)CN1[C@@H]2[C@H](O)C1=CC=NC2=CC=C(OCC)C=C21 QNRATNLHPGXHMA-XZHTYLCXSA-N 0.000 claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 38
- 229910000746 Structural steel Inorganic materials 0.000 claims description 6
- 239000004746 geotextile Substances 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 6
- 230000035699 permeability Effects 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 4
- 239000006004 Quartz sand Substances 0.000 claims description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 3
- 239000000835 fiber Substances 0.000 claims description 3
- 239000010881 fly ash Substances 0.000 claims description 3
- 238000002156 mixing Methods 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 2
- 239000012466 permeate Substances 0.000 claims 3
- 238000006073 displacement reaction Methods 0.000 abstract description 2
- 239000002689 soil Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000005452 bending Methods 0.000 description 3
- 238000007596 consolidation process Methods 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000012528 membrane Substances 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011380 pervious concrete Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000005204 segregation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a prefabricated horizontal bearing type high-toughness concrete permeable pile, which comprises a pile body and a pile head body, wherein the pile body is of a cylindrical structure, rhombic convex blocks are uniformly arranged on the circumference of the surface of the pile body, a cylindrical connecting convex block is arranged in the middle of the top end of the pile body, a supporting steel beam is transversely and crossly welded on the inner side surface of a main steel beam, a triangular steel part is arranged on the inner layer of each rhombic convex block, and the pile head body is a conical drill bit. And can allow this end of body of the pile to take place the horizontal displacement of certain degree, application scope is wider.
Description
Technical Field
The invention belongs to the technical field of civil engineering, and particularly relates to a prefabricated horizontal bearing type high-toughness concrete permeable pile.
Background
The existing permeable pile technology uses materials with large porosity and strong permeability, such as permeable concrete piles or gravel piles, which can play a role in bearing the pile body and can form vertical drainage channels to accelerate the dissipation of hyperstatic pore water pressure in the soil body, thereby improving the consolidation rate of the foundation. However, the existing permeable pile technology still has the following defects: first, its ability to withstand horizontal loading is low. The common pervious concrete pile cannot bear larger horizontal load due to weaker bending resistance of the material, and the common gravel pile needs to provide bearing capacity by virtue of the constraint action provided by the surrounding soil body, so that the horizontal load bearing capacity of the pile body is lower, and when the bearing capacity of the soil body around the pile is insufficient, the pile body is easy to expand and damage under the action of vertical load; secondly, the construction process is particularly complex. Particularly, the common permeable concrete pile is easy to generate the segregation phenomenon of concrete in the construction process, and the slow consolidation speed is easy to generate the hole blocking phenomenon, so that the site construction speed of the permeable concrete pile is slow, and the construction quality is difficult to control, which limits the continuous popularization and application of the existing permeable pile technology in civil engineering.
Disclosure of Invention
The invention aims to provide a prefabricated horizontal bearing type high-toughness concrete permeable pile and a preparation method thereof, and aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a prefabricated horizontal bearing type high-toughness concrete water permeable pile comprises a pile body and a pile head body, wherein the pile body is of a cylindrical structure, rhombic convex blocks are uniformly arranged on the circumference of the surface of the pile body, a cylindrical connecting convex block is arranged in the middle of the top end of the pile body, the interior of the pile body is of a double-layer structure, a plurality of annular steel frames are arranged on one layer of the interior of the pile body, main steel beams are uniformly and vertically welded on the inner sides of the annular steel frames, fixing steel parts are welded among the main steel beams, supporting steel beams are transversely and crosswise welded on the inner side surfaces of the main steel beams, connecting bolt parts are welded at the bottom ends of the main steel beams, a plurality of triangular steel parts are arranged on the inner layer of the rhombic convex blocks, one end of each triangular steel part is fixedly welded with the outer side surface of the annular steel frame, the triangular steel parts are uniformly welded on the periphery of the annular, and the top end of the conical drill bit is provided with a connecting steel pile, and the pile head body is connected with the bottom of a main steel beam arranged in the pile body through the connecting steel pile arranged at the top end.
Preferably, the pile head body is connected with the bottom of a main steel beam arranged in the pile body through a connecting steel pile arranged at the top end, and the pile head body is formed by steel bars.
Preferably, the lateral wall setting of pile body is permeated water the hole a plurality of, and the hole of just permeating water is the heliciform setting of arranging.
Preferably, the triangular steel piece arranged in the pile head body and the supporting steel beam, the fixing steel piece and the circumferential surface of the annular steel frame arranged in the pile body are poured with high-toughness concrete.
Preferably, the high-toughness concrete is prepared by mixing cement, fly ash, quartz sand, water and short fibers through stirring.
Preferably, the outer surface of the high-toughness concrete is coated with a permeable geotextile.
Preferably, the outer diameter of the cylindrical connecting convex block arranged on the pile body is 30-40 cm, the outer diameter of the pile body is 60-70 cm, and the diameter of the pile body is smaller than the diameter of the top surface of the pile head body and is 8-10 cm.
Preferably, the main steel beams are uniformly provided with 8 steel beams in the annular steel frame, the annular steel frame is uniformly provided with a plurality of 8 main steel beams, and the welding distance between the annular steel frames is 20 cm to 25 cm on the main steel beams.
The invention also provides a preparation method of the prefabricated horizontal bearing type high-toughness concrete permeable pile, which comprises the following steps:
s1, firstly, forming diamond-shaped convex blocks formed by triangular steel pieces, and fixing pile body formed by supporting steel beams, fixed steel pieces and annular steel frames and pile head body formed by reinforcing steel bars into a whole by welding to form a prefabricated water permeable pile steel frame;
s2, hoisting the prefabricated water-permeable pile steel frame into a prefabricated mould by using a truss crane, after hoisting the prefabricated water-permeable pile steel frame into a steel mould, fixing two ends of a pile body by adopting an annular steel plate and a pile head body by adopting a conical structural steel plate, and hoisting a plurality of bolts corresponding to nuts through the annular steel plate and the conical structural steel plate, wherein the gap in the steel mould is a tensioning gap;
s3, pouring high-toughness concrete into the inner side of the steel membrane and the steel frame of the water-permeable pile, reserving corresponding water-permeable holes according to the required water permeability when pouring the pile body (1), then after the high-toughness concrete is poured, surrounding a circle of water-permeable geotextile around the steel mould, hanging the other half of the steel mould, sealing, vibrating and maintaining;
and S4, pouring, solidifying and molding the prefabricated water permeable pile steel frame and the high-toughness concrete, and then removing the steel film to obtain the water permeable pile.
The invention provides a precast horizontal bearing type high-toughness concrete permeable pile and a preparation method thereof, the precast horizontal bearing type high-toughness concrete permeable pile has the formed water permeability and strength when put into use compared with a permeable pile technology adopting a cast-in-place method, the drainage efficiency and the foundation consolidation speed are accelerated, the construction period can be shortened to a certain extent, the precast permeable pile is convenient by arranging a cylindrical connecting lug at the upper end of the pile body, the installation can be carried out according to the depth of the precast permeable pile to be driven into a soil layer, the length of the pile body is extended, the disassembly and the connection extension are convenient, the high-toughness concrete in the precast permeable pile can provide good bending resistance and damage resistance for the pile body to prevent the precast permeable pile from generating excessive deformation or cracking, and the end part of the pile body can be allowed to generate a certain degree of horizontal displacement, application scope is wider, through the even setting of rhombus lug on the pile body, can make this prefabricated stake and the inside abundant contact in soil layer of permeating water, increases the stability and the fastness that prefabricated stake of permeating water used after pre-buried to only rely on the rigidity of self can bear the load, and need not to rely on the confining force of the all soil body of stake.
Drawings
FIG. 1 is a schematic illustration of an explosive structure according to the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a schematic top view of the pile head body of the present invention;
fig. 4 is a schematic top view of the interior of the pile body according to the present invention.
In the figure: 1 pile body, 101 annular steel frame, 102 main girder steel, 103 fixed steel, 104 support girder steel, 105 triangle steel, 2 pile head bodies, 3 cylinder connecting convex blocks, 4 connecting bolt pieces, 5 diamond-shaped convex blocks, 6 permeable holes, 7 connecting steel piles and 8 high-toughness concrete.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a prefabricated horizontal bearing type high-toughness concrete permeable pile as shown in figures 1-4, which comprises a pile body 1 and a pile head body 2, wherein the pile body 1 is of a cylindrical structure, rhombic convex blocks 5 are uniformly arranged on the circumference of the surface of the pile body 1, a cylindrical connecting convex block 3 is arranged in the middle of the top end of the pile body 1, the outer diameter of the cylindrical connecting convex block 3 arranged on the pile body 1 is 30-40 cm, the outer diameter of the pile body 1 is 60-70 cm, the diameter of the pile body 1 is smaller than the diameter of the top surface of the pile head body 2 and is 8-10 cm, the interior of the pile body 1 is of a double-layer structure, a plurality of annular steel frames 101 are arranged on one layer inside the pile body 1, main steel beams 102 are uniformly and vertically welded on the inner side of each annular steel frame 101, the pile head body 2 is connected with the bottoms of the main steel beams 102 arranged inside the pile body 1 through connecting steel piles 7 arranged at the top end, and the pile head body 2 is made of steel bars.
Fixed steel parts 103 are welded between the main steel beams 102, supporting steel beams 104 are transversely and crossly welded on the inner side surfaces of the main steel beams 102, connecting bolt parts 4 are welded at the bottom ends of the main steel beams 102, a plurality of triangular steel parts 105 are arranged on the inner layers of the rhombic convex blocks 5, one ends of the triangular steel parts 105 are fixedly welded with the outer side surfaces of the annular steel frames 101, water permeable holes 6 are formed in the side walls of the pile body 1, the triangular steel parts 105 arranged in the pile head body 2 and the supporting steel beams 104 arranged in the pile body 1 are spirally arranged in the water permeable holes 6, the fixed steel parts 103, high-toughness concrete 8 is poured on the circumferential surface of the annular steel frames 101, the high-toughness concrete 8 is formed by mixing cement, fly ash, quartz sand, water and short fibers, and water permeable geotextile are wrapped on the outer surfaces of the high-toughness concrete 8.
The invention also provides a preparation method of the prefabricated horizontal bearing type high-toughness concrete permeable pile, which comprises the following steps:
s1, firstly, forming diamond-shaped convex blocks 5 formed by triangular steel pieces 105, and forming a prefabricated water permeable pile steel frame integrally with a pile body 1 formed by supporting steel beams 104, fixed steel pieces 103 and annular steel frames 101 and a pile head body 2 formed by reinforcing steel bars through welding and fixing;
s2, hoisting the prefabricated water-permeable pile steel frame into a prefabricated mould by using a truss crane, after hoisting the prefabricated water-permeable pile steel frame into a steel mould, fixing two ends of the pile body 1 by adopting an annular steel plate and the pile head body 2 by adopting a conical structural steel plate, and arranging a plurality of bolts corresponding to nuts on the annular steel plate and the conical structural steel plate, wherein a gap in the steel mould is a tensioning gap;
s3, pouring high-toughness concrete 8 into the inner side of the steel membrane and the steel frame of the water-permeable pile, reserving corresponding water-permeable holes 6 according to the required water permeability when pouring the pile body 1, then after pouring the high-toughness concrete 8, surrounding a circle of water-permeable geotextile around the steel mould, hanging the other half of the steel mould, sealing, vibrating and maintaining;
and S4, pouring, solidifying and molding the prefabricated water permeable pile steel frame and the high-toughness concrete 8, and then removing the steel film to obtain the water permeable pile.
In summary, compared with the prior art, the prefabricated water permeable pile is convenient to install according to the depth of the prefabricated water permeable pile to be driven into a soil layer through the arrangement of the cylindrical connecting convex blocks 3 at the upper end of the pile body 1, the length of the pile body 1 is extended, the prefabricated water permeable pile is convenient to detach and connect and extend, through the use of the high-toughness concrete 8 in the prefabricated water permeable pile, the prefabricated water permeable pile can be prevented from being excessively deformed or cracked through providing good bending resistance and damage resistance for the pile body 1, the end portion of the pile body 1 can be allowed to horizontally displace to a certain degree, the application range is wider, through the uniform arrangement of the rhombic convex blocks 5 on the pile body 1, the prefabricated water permeable pile can be in full contact with the soil layer, and the use stability and firmness of the prefabricated water permeable pile after being embedded are improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (9)
1. The utility model provides a precast horizontal bearing formula high tenacity concrete pile that permeates water, includes pile body (1), pile head body (2), its characterized in that: the pile body (1) is of a cylindrical structure, rhombic convex blocks (5) are uniformly arranged on the surface circumference of the pile body (1), cylindrical connecting convex blocks (3) are arranged in the middle of the top end of the pile body (1), the pile body (1) is of a double-layer structure, an annular steel frame (101) is arranged on one layer inside the pile body (1) in a plurality of layers, main steel beams (102) are uniformly and vertically welded on the inner sides of the annular steel frame (101), fixed steel parts (103) are welded between the main steel beams (102), supporting steel beams (104) are transversely and crossly welded on the inner side surfaces of the main steel beams (102), connecting bolt parts (4) are welded on the bottom ends of the main steel beams (102), triangular steel parts (105) are arranged on the inner layer of the rhombic convex blocks (5), one ends of the triangular steel parts (105) are fixedly welded on the outer side surfaces of the annular steel frame (101), and the triangular steel members (105) are uniformly welded on the annular steel frame (101) in a circle, the pile head body (2) is a conical drill bit, the top end of the conical drill bit is provided with a connecting steel pile (7), and the pile head body (2) is connected with the bottom of a main steel beam (102) arranged in the pile body (1) through the connecting steel pile (7) arranged at the top end.
2. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1, characterized in that: the pile head body (2) is connected with the bottom of a main steel beam (102) arranged in the pile body (1) through a connecting steel pile (7) arranged at the top end, and the pile head body (2) is formed by steel bars.
3. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1, characterized in that: the lateral wall of pile body (1) sets up and permeates water hole (6) a plurality of, and permeates water hole (6) and be the heliciform setting of arranging.
4. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1, characterized in that: and high-toughness concrete (8) is poured on the circumferential surfaces of the triangular steel part (105) arranged in the pile head body (2), the supporting steel beam (104) arranged in the pile body (1), the fixed steel part (103) and the annular steel frame (101).
5. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 4, characterized in that: the high-toughness concrete (8) is prepared by mixing cement, fly ash, quartz sand, water and short fibers through stirring.
6. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1, characterized in that: the outer surface of the high-toughness concrete (8) is coated with permeable geotextile.
7. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1, characterized in that: the outer diameter of a cylindrical connecting lug (3) arranged on the pile body (1) is 30-40 cm, the outer diameter of the pile body (1) is 60-70 cm, and the diameter of the pile body (1) is smaller than the diameter of the top surface of the pile head body (2) and is 8-10 cm.
8. The prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1, characterized in that: the steel frame is characterized in that 8 main steel beams (102) are uniformly arranged in the annular steel frame (101), the annular steel frame (101) is uniformly provided with a plurality of main steel beams (102), and the welding distance between the annular steel frames (101) is 20 cm-25 cm on the main steel beams (102).
9. The preparation method of the prefabricated horizontal bearing type high-toughness concrete permeable pile according to claim 1 is characterized by comprising the following steps of: the method specifically comprises the following steps:
s1, firstly, forming a diamond-shaped convex block (5) formed by a triangular steel piece (105), and forming a prefabricated water permeable pile steel frame integrally with a pile body (1) formed by a support steel beam (104), a fixed steel piece (103) and an annular steel frame (101) and a pile head body (2) formed by a steel bar through welding;
s2, hoisting the prefabricated water-permeable pile steel frame into a prefabricated mould by using a truss crane, after hoisting the prefabricated water-permeable pile steel frame into a steel mould, fixing two ends of a pile body (1) by adopting an annular steel plate and a pile head body (2) by adopting a conical structural steel plate, and arranging a plurality of bolts corresponding to nuts on the annular steel plate and the conical structural steel plate, wherein a gap in the steel mould is a tensioning gap;
s3, pouring high-toughness concrete (8) into the inner side of the steel film and the steel frame of the water permeable pile, reserving corresponding water permeable holes (6) according to the required water permeability when pouring the pile body (1), then after pouring the high-toughness concrete (8), surrounding a circle of water permeable geotextile around the steel die, hanging the other half of the steel die, sealing, vibrating and curing;
and S4, pouring, solidifying and molding the prefabricated water permeable pile steel frame and the high-toughness concrete (8), and then removing the steel film to obtain the water permeable pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011282628.7A CN112523206A (en) | 2020-11-17 | 2020-11-17 | Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011282628.7A CN112523206A (en) | 2020-11-17 | 2020-11-17 | Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112523206A true CN112523206A (en) | 2021-03-19 |
Family
ID=74981013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011282628.7A Pending CN112523206A (en) | 2020-11-17 | 2020-11-17 | Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112523206A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020195274A1 (en) * | 2001-06-20 | 2002-12-26 | Qing-Dao Xie | Underground shell-pile continuous wall job practice and its special drill |
CN2816130Y (en) * | 2005-06-08 | 2006-09-13 | 曹析风 | Hollow drainage prefabricated pile capable of largely increasing single-pile bearing capacity |
CN200974971Y (en) * | 2006-12-01 | 2007-11-14 | 郭晶 | Polygonal pre-tensioned reinforced concrete hollow pile |
CN108385667A (en) * | 2018-05-11 | 2018-08-10 | 山东大学 | A kind of geotextiles anti-block water permeable pile driving construction device and method |
CN110016922A (en) * | 2019-05-14 | 2019-07-16 | 河北工业大学 | A kind of novel integral draining anti-slide pile structure and its construction method |
CN111485547A (en) * | 2020-06-03 | 2020-08-04 | 山东大学 | Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof |
-
2020
- 2020-11-17 CN CN202011282628.7A patent/CN112523206A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020195274A1 (en) * | 2001-06-20 | 2002-12-26 | Qing-Dao Xie | Underground shell-pile continuous wall job practice and its special drill |
CN2816130Y (en) * | 2005-06-08 | 2006-09-13 | 曹析风 | Hollow drainage prefabricated pile capable of largely increasing single-pile bearing capacity |
CN200974971Y (en) * | 2006-12-01 | 2007-11-14 | 郭晶 | Polygonal pre-tensioned reinforced concrete hollow pile |
CN108385667A (en) * | 2018-05-11 | 2018-08-10 | 山东大学 | A kind of geotextiles anti-block water permeable pile driving construction device and method |
CN110016922A (en) * | 2019-05-14 | 2019-07-16 | 河北工业大学 | A kind of novel integral draining anti-slide pile structure and its construction method |
CN111485547A (en) * | 2020-06-03 | 2020-08-04 | 山东大学 | Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109356169B (en) | Foundation pit row pile supporting system and construction method thereof | |
CN108589769B (en) | Construction method of super-long rock-socketed T-shaped combined column plate high retaining wall | |
CN108755663B (en) | Construction method of large-diameter overlong variable-cross-section cast-in-situ bored pile | |
CN213508424U (en) | Water-rich stratum gravel filtering pile tip drilling cast-in-place pile | |
CN106013834A (en) | Device and method for storey addition of basement | |
CN110206020B (en) | Prefabricated snowflake type concrete steel sheet pile and construction method thereof | |
CN112302007B (en) | Pile bearing frame for pile foundation and construction method | |
CN112523206A (en) | Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof | |
CN106381810A (en) | Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket | |
CN108643215B (en) | Construction method of anchor pier type foundation after rotary spraying and pressing into variable cross section | |
CN217175201U (en) | Assembled concrete column connected node | |
CN103061334B (en) | I-section prestressed reinforced concrete support pile by centrifugal pouring | |
CN212612031U (en) | Pushing track support | |
CN210049264U (en) | Assembled foundation | |
CN213137167U (en) | Box girder steel ground child | |
CN211447882U (en) | Elevator shaft with bottom plate prefabricated reinforcement cage | |
CN210857267U (en) | Pile sheet type retaining wall integral casting template structure | |
CN202881971U (en) | Combined retaining wall structure | |
CN113957886A (en) | Cast-in-situ connection construction method for integral underground continuous wall | |
CN203129133U (en) | Centrifugal poured prestressed steel bar concrete H-shaped section support pile | |
CN208219667U (en) | Foundation pit supporting construction based on campshed and inner support | |
CN108342937B (en) | Prefabricated pier and plate suspension type cylindrical shear support connection structure | |
CN113832997B (en) | Construction method of combined steel sheet pile cofferdam | |
CN212772363U (en) | Civil building foundation construction reinforcing apparatus | |
CN220117274U (en) | Interior step prestressing force embankment retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210319 |