CN112465456A - Engineering evaluation data information management method, system and electronic equipment - Google Patents

Engineering evaluation data information management method, system and electronic equipment Download PDF

Info

Publication number
CN112465456A
CN112465456A CN202011357558.7A CN202011357558A CN112465456A CN 112465456 A CN112465456 A CN 112465456A CN 202011357558 A CN202011357558 A CN 202011357558A CN 112465456 A CN112465456 A CN 112465456A
Authority
CN
China
Prior art keywords
project
engineering
evaluation
rating
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011357558.7A
Other languages
Chinese (zh)
Inventor
张玉芳
苏志嘉
黄崇卿
丁小勇
保旻韬
王帅
洪文宝
苏尔好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huadong Civil Aviation Airport Construction Supervision Co ltd
Original Assignee
Shanghai Huadong Civil Aviation Airport Construction Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huadong Civil Aviation Airport Construction Supervision Co ltd filed Critical Shanghai Huadong Civil Aviation Airport Construction Supervision Co ltd
Priority to CN202011357558.7A priority Critical patent/CN112465456A/en
Publication of CN112465456A publication Critical patent/CN112465456A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2282Tablespace storage structures; Management thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/14Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation using light without selection of wavelength, e.g. sensing reflected white light
    • G06K7/1404Methods for optical code recognition
    • G06K7/1408Methods for optical code recognition the method being specifically adapted for the type of code
    • G06K7/14172D bar codes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management

Abstract

The application relates to a method, a system and electronic equipment for managing engineering evaluation data information, which belong to the technical field of engineering management, wherein the method comprises the following steps: acquiring a division result of a contract project, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract project is divided into a unit project, a subsection project and a subentry project; identifying two-dimensional codes on the rating tables to collect rating tables of the same grade; and acquiring related data on the rating table of the same grade, and compiling the related data on the rating table of the next grade. The method and the device have the effects of reducing workload of engineering personnel and improving efficiency.

Description

Engineering evaluation data information management method, system and electronic equipment
Technical Field
The present application relates to the field of engineering management technologies, and in particular, to a method, a system, and an electronic device for managing engineering assessment data information.
Background
The engineering quality assessment is to determine the quality grade of a construction project according to the current standard and method uniformly formulated by the country or the department. The significance lies in unifying the evaluation standard and method, correctly reflecting the quality of the engineering, and making it comparable; meanwhile, the enterprise grade and the technical level are also checked, and the quality of construction enterprises is improved. The evaluation of the engineering quality is based on the self evaluation of construction units, and is rechecked and identified by the construction (supervision) units, and the construction (supervision) units report the quality of government supervision agencies to check or approve. The project quality assessment is based on the project quality assessment, and the sequence of assessment is project, subsection project and unit project.
At present, the management of the civil aviation professional engineering assessment information is relatively traditional manual management, the most original record is formed from the actual measurement actual quantity of the original entity engineering, then data personnel carry out statistical analysis on each detection index of the engineering according to a standard assessment mode (calculation qualification rate, mathematical analysis and the like), filling is carried out according to the category according to a standard 'project quality detection assessment table', assessment conclusions are obtained, and the project data are formed after signature, approval and sealing of a responsible person. When the next grade of division is to be evaluated, all the subentry data contained in the division needs to be collected, the subentry data are filled and summarized according to the standardized 'subsection project quality evaluation table', so that a division evaluation conclusion is obtained, and the subsection data are formed after signing, approval and stamping by a responsible person. When the unit project is completely checked, all the sub-project evaluation data of the unit project need to be collected, the data is summarized according to the standard 'unit project quality detection evaluation table' to obtain a unit evaluation conclusion, and the unit project data is formed after signature approval and stamping of a responsible person.
The above prior art solutions have the following drawbacks: in the process from project division, project division to unit project, the data in the evaluation table needs to be collected by the engineering personnel one by one, so that the workload of the engineering personnel is large.
Disclosure of Invention
In order to reduce the workload of engineering personnel, the application provides an engineering assessment data information management method, an engineering assessment data information management system and electronic equipment.
In a first aspect, the present application provides a method for managing engineering assessment data information, which adopts the following technical scheme:
a method for managing engineering assessment data information, the method comprising:
acquiring a division result of a contract project, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract project is divided into a unit project, a subsection project and a subentry project;
identifying two-dimensional codes on the rating tables to collect rating tables of the same grade;
and acquiring related data on the rating table of the same grade, and compiling the related data on the rating table of the next grade.
By adopting the technical scheme, the contract project is divided according to the drawing, the evaluation tables of the electronic versions of the corresponding unit project, the subsection project and the project are made according to the division result, and the engineers can print the evaluation tables. The engineering personnel collects the data of the project and records the data of the project into the evaluation table of the project in the server. When the data entry of all the project items in a certain project is finished, reading the data in the evaluation table of the project items and compiling the data in the evaluation table of the project items; when the data of all the partial projects in a unit project are recorded, the data in the evaluation table of the partial projects are read and compiled in the evaluation table of the unit project. By reading the data in the project and the data in the branch project, the data collection of engineering personnel in the branch project and the unit project is reduced, and the workload of the engineering personnel is further reduced.
Further: the acquiring the related data on the rating table of the same grade and compiling the related data on the rating table of the next grade comprises the following steps:
receiving a printing request and printing the evaluation table;
acquiring an uploading request of a scanning piece of an evaluation table, and identifying uploading information of the scanning piece;
and judging whether the same-grade rating table is completely uploaded or not according to the uploading information, if so, collecting related data, and compiling the related data on the rating table of the next grade.
By adopting the technical scheme, after the data of the evaluation form is complete, a person in charge can obtain the evaluation form of the paper edition by printing, fill in an acceptance report on the paper edition, and stamp or sign, then scan the evaluation form of the paper edition, upload a scanned part of the evaluation form, back up the evaluation form, reduce the data loss, and simultaneously identify the information on the scanned part by scanning and complete the content of the evaluation form of the electronic edition. After all the scanning pieces of the project are uploaded, the data on the electronic version rating table is collected, and then the relevant data is compiled on the next-level electronic version rating table.
Further: acquiring an uploading request of a scanning piece of the evaluation table, and identifying uploading information of the scanning piece, wherein the uploading request comprises:
and identifying the two-dimensional code on the scanning piece, judging whether the scanning piece corresponds to the current evaluation table according to the identification result of the two-dimensional code, and if not, displaying an uploading error.
By adopting the technical scheme, the two-dimension code is identified to obtain the engineering information corresponding to the scanning piece, namely the scanning piece belongs to the engineering project, whether the engineering project is consistent with the engineering project corresponding to the evaluation table of the current electronic version is judged, if not, an uploading error is displayed to remind related personnel, and the condition of data uploading errors can be reduced.
Further: the method comprises the following steps of identifying a two-dimensional code on a scanning piece, judging whether the scanning piece corresponds to a current evaluation table according to the identification result of the two-dimensional code, and if not, displaying an uploading error, wherein the method comprises the following steps:
if yes, entering an engineering drawing link of the engineering project under the corresponding engineering project of the current evaluation table;
receiving a viewing request of an engineering drawing, displaying the engineering drawing according to the viewing request, and identifying an engineering project corresponding to the engineering drawing, wherein the identification represents that the engineering project has been spot checked.
By adopting the technical scheme, when spot check is carried out, the data of the evaluation table can be compared with the engineering drawing by checking the engineering drawing of the corresponding engineering project, so that the data can be more visually corresponding to the site. By marking on the project which is subjected to spot check, the spot check condition can be saved to a certain extent, and repeated spot check can be reduced.
Further: the collecting of the relevant data on the rating table of the grade and the compiling of the relevant data on the rating table of the next grade are specifically as follows:
obtaining evaluation information, wherein the evaluation information comprises an actual measurement project and engineering data, the actual measurement project comprises a qualification rate and an extreme value, and a subentry evaluation table is formed according to a first preset format according to the qualification rate and the extreme value and a first preset regulation evaluation quality grade;
acquiring a subentry evaluation table and function detection of the same subsection project, forming a subsection project evaluation result by the quality grade, the function detection and the project data according to a second preset rule, and forming a subsection evaluation table according to a second preset format;
acquiring a branch evaluation table and system function detection of the same unit project, and forming a unit evaluation table according to a third preset format; and the number of the first and second groups,
and acquiring unit engineering evaluation results, completion acceptance reports and completion acceptance check sheets of all unit engineering, and forming completion acceptance opinions according to a fourth preset format.
By adopting the technical scheme, the quality grade is evaluated according to the qualification rate and the extreme value by acquiring the evaluation information, and then a subentry evaluation table is formed; forming a unit evaluation table by obtaining quality grade of the branch evaluation table and system function detection; the completion acceptance opinion is formed by obtaining the unit engineering evaluation result, the completion acceptance report and the completion acceptance inspection sheet.
Further: the method for judging whether all the same-grade rating tables are uploaded according to the uploaded information, if so, collecting related data on the same-grade rating tables, and compiling the related data on the next-grade rating tables comprises the following steps:
and the related data is assembled, and prompt information is sent to the client of the next-level related responsible person.
By adopting the technical scheme, the prompt information is sent to the next-level related responsible person, so that the responsible person can know that the related data is collected in time and can examine and approve the data in time.
In a second aspect, the present application provides an information management system for engineering assessment data, which adopts the following technical solutions:
an engineering assessment data information management system, comprising:
the first processing module is used for acquiring the division result of the contract engineering, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract engineering is divided into unit engineering, subsection engineering and project division engineering;
the identification and collection module is used for identifying the two-dimensional codes on the rating table so as to collect the rating table with the same grade;
and the second processing module is used for acquiring the related data on the same-level rating table and compiling the related data on the next-level rating table.
By adopting the technical scheme, the contract project is divided according to the drawing, the evaluation tables of the electronic versions of the corresponding unit project, the subsection project and the project are made according to the division result, and the engineers can print the evaluation tables. The engineering personnel collects the data of the project and records the data of the project into the evaluation table of the project in the server. When the data entry of all the project items in a certain project is finished, reading the data in the evaluation table of the project items and compiling the data in the evaluation table of the project items; when the data of all the partial projects in a unit project are recorded, the data in the evaluation table of the partial projects are read and compiled in the evaluation table of the unit project. By reading the data in the project and the data in the branch project, the data collection of engineering personnel in the branch project and the unit project is reduced, and the workload of the engineering personnel is further reduced.
In a third aspect, the present application provides an electronic device, which adopts the following technical solutions:
an electronic device comprising a memory and a processor, the memory having stored thereon a computer program that can be loaded by the processor and executed to perform the above-described method.
In a fourth aspect, the present application provides a computer storage medium, which adopts the following technical solutions:
a computer-readable storage medium storing a computer program that can be loaded by a processor and executes the above-mentioned method.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the data entry of all the project items in a certain project is finished, reading the data in the evaluation table of the project items and compiling the data in the evaluation table of the project items; when the data of all the partial projects in a unit project are recorded, the data in the evaluation table of the partial projects are read and compiled in the evaluation table of the unit project. By reading the data in the project and the data in the branch project, the data collection of engineering personnel in the branch project and the unit project is reduced, and the workload of the engineering personnel is further reduced.
2. After the data of the evaluation form is complete, a person in charge can obtain the evaluation form of the paper edition by printing, fill in an acceptance report on the paper edition, and stamp or sign, then scan the evaluation form of the paper edition, upload a scanned part of the evaluation form, back up the evaluation form, reduce the situation of data loss, and simultaneously identify the information on the scanned part by scanning and complete the content of the evaluation form of the electronic edition.
3. When the spot check is carried out, the data of the evaluation table can be compared with the engineering drawing by checking the engineering drawing of the corresponding engineering project, so that the data can be more intuitively corresponding to the site. By marking on the project which is subjected to spot check, the spot check condition can be saved to a certain extent, and repeated spot check can be reduced.
Drawings
FIG. 1 is a flowchart illustrating a method for managing engineering assessment data information according to an embodiment of the present disclosure;
fig. 2 is a schematic flow chart in S3 in fig. 1;
FIG. 3 is a block diagram of an engineering assessment data information management system according to an embodiment of the present application.
In the figure, 1, a first processing module; 2. a recognition collection module; 3. and a second processing module.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses a method for managing engineering assessment data information, which refers to fig. 1 and comprises the following steps:
s1: the method comprises the steps of obtaining a division result of a contract project, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract project is divided into a unit project, a subsection project and a sub project.
Specifically, the whole plan of the same project is divided from the minimum unit (project) to the branch project and the unit project. Two-dimension codes are pre-distributed to each project, and corresponding two-dimension codes are matched on an evaluation table, wherein the two-dimension codes comprise branch two-dimension codes, branch two-dimension codes and unit two-dimension codes. The evaluation table is an electronic evaluation table and is stored in the server, and the evaluation table of the paper edition can be printed on the server and comprises a branch evaluation table, a branch evaluation table and a unit evaluation table.
The project quality inspection system comprises a project quality inspection table, a unit evaluation table, project two-dimensional codes, project quality inspection tables and project quality inspection tables, wherein the project quality inspection table is a project quality inspection evaluation table, the unit evaluation table is a project quality inspection evaluation table, the project two-dimensional codes are arranged on the project quality inspection table, and the project two-dimensional codes on different project quality inspection tables are different; the two-dimensional codes of the parts are arranged on the part evaluation tables, and the two-dimensional codes of the parts on the different part evaluation tables are different; the unit two-dimensional codes are arranged on the unit evaluation tables, and the unit two-dimensional codes on the unit evaluation tables are different in different unit evaluation tables.
S2: and identifying the two-dimensional codes on the rating tables to collect the same-grade rating tables.
Specifically, the project rating tables corresponding to the projects under the same project are rating tables of the same grade, and the project rating tables of the projects among different projects are rating tables of different grades; the branch evaluation tables corresponding to the branch projects under the same unit project are the same grade evaluation tables, and the branch evaluation tables of the branch projects among different unit projects are different grade evaluation tables.
For example, the project a includes project a1, project a2 and project a3, and the project B includes project B1, project B2 and project B3, wherein the project rating tables in the project a1, project a2 and project a3 are rating tables with the same grade, the project rating tables in the project B1, project B2 and project B3 are rating tables with the same grade, and the project rating table in the project a and the project rating table in the project B are rating tables with different grades.
S3: and acquiring related data on the rating table of the same grade, and compiling the related data on the rating table of the next grade.
The method specifically comprises the following steps: and obtaining evaluation information, wherein the evaluation information comprises an actual measurement project and engineering data, the actual measurement project comprises a qualification rate and an extreme value, and a subentry evaluation table is formed according to a first preset format by the qualification rate and the extreme value according to a first preset specified evaluation quality grade.
And acquiring a branch evaluation table and a function test of the same branch project, forming a branch project evaluation result by the quality grade, the function test and the project data according to a second preset rule, and forming a branch evaluation table according to a second preset format.
Acquiring a branch evaluation table and system function detection of the same unit project, and forming a unit evaluation table according to a third preset format; and the number of the first and second groups,
and acquiring unit engineering evaluation results, completion acceptance reports and completion acceptance check sheets of all unit engineering, and forming completion acceptance opinions according to a fourth preset format.
The method comprises the following steps that an actual measurement project is a project for quality inspection of an engineering entity by adopting methods such as measurement, test and the like in a project division project, spot location sampling inspection is carried out on the project in the actual measurement project, and the qualification rate is the ratio of qualified points to total detection points; the extreme value is a limit value specified for the project in the project division, the actual measurement project has a specified extreme value, and any single detection value cannot exceed the specified extreme value; the quality grade comprises qualified and unqualified; and if the actual qualified rate exceeds the preset qualified rate and any single detection value does not exceed the extreme value, the quality grade of the item is qualified, otherwise, the item is unqualified, and then the data is assembled into the position specified by the item rating table to form the branch rating table. And (4) evaluating the project quality of the unqualified project, and after the project is reinforced, reinforced or reworked and meets the design requirement, re-evaluating the project quality. The engineering data are inspection, test, control and product quality certification documents which are formed in the construction process of the project and are related to the engineering quality, and the engineering data can be uploaded through scanning and stored in the server.
Acquiring a project rating table of the same project, compiling the names and quality grades of the projects to the positions designated by the project rating table, wherein the quality grades of all the projects in the project are qualified, and the quality grades of the projects are qualified.
And acquiring a branch evaluation table of the same unit project, compiling the names and quality grades of the branch projects to the positions specified by the unit evaluation table, wherein the quality grades of all the branch projects in the unit project are qualified, and the quality grade of the unit project is qualified.
And acquiring the quality grades, completion acceptance reports and completion acceptance check sheets of all unit projects, compiling the quality grades of the unit projects into the specified positions of the acceptance table, and agreeing to the acceptance check to form completion acceptance opinions.
In this embodiment, referring to fig. 2, step S3 further includes:
s31: a print request is received, and the evaluation table is printed.
Specifically, the person in charge selects the corresponding evaluation table, a paper edition of the evaluation table is printed on the server, the evaluation band of the paper edition is provided with two-dimensional codes, and an acceptance report, a seal or a signature are filled on the paper edition.
S32: and acquiring an uploading request of the scanning piece of the evaluation table, and identifying the uploading information of the scanning piece.
Specifically, the responsible person scans the evaluation table approved by the seal or the signature to obtain a scanning piece of the evaluation table, the scanning piece is uploaded to the server, and the server obtains the uploaded information of the evaluation table to backup the evaluation table. And simultaneously, the information on the scanning piece is identified through scanning, and the content of the evaluation table of the electronic edition is perfected.
S321: and identifying the two-dimensional code on the scanning piece, judging whether the scanning piece corresponds to the current evaluation table according to the identification result of the two-dimensional code, and if not, displaying an uploading error.
Specifically, after the scanning piece of the evaluation table is uploaded, the two-dimensional code on the scanning piece is identified to obtain the engineering information corresponding to the scanning piece, namely the engineering project to which the scanning piece belongs, whether the engineering project is consistent with the engineering project corresponding to the evaluation table of the current electronic edition is judged, and if not, an uploading error is displayed to remind related personnel.
S322: if yes, entering an engineering drawing link of the engineering project under the corresponding engineering project of the current evaluation table.
S323: receiving a viewing request of an engineering drawing, displaying the engineering drawing according to the viewing request, and identifying an engineering project corresponding to the engineering drawing, wherein the identification represents that the engineering project has been spot checked.
Specifically, for example, a certain part of the engineering includes bridge engineering, the engineering drawing of the bridge engineering is linked and recorded into the table corresponding to the bridge engineering in the part evaluation table, and the engineering drawing of the bridge engineering is displayed in the display screen by clicking the bridge engineering. The mark is that the bridge engineering is clicked, and the bridge engineering is displayed in a subsection evaluation table in a distinguishing way, for example, the bridge engineering is displayed through a red font.
S33: and judging whether the same-grade rating table is completely uploaded or not according to the uploading information, if so, collecting related data, and compiling the related data on the rating table of the next grade.
Specifically, in the project A, the project A comprises a project a, a project b and a project c, scanning pieces of the project a, the project b and the project c evaluation tables obtained by identifying the two-dimensional codes are uploaded, data and results of the project a, the project b and the project c are respectively read, and the data and the results are written into the evaluation tables of the project A.
S331: and the related data is assembled, and prompt information is sent to the client of the next-level related responsible person.
Specifically, in the project A, the project A comprises a project a, a project b and a project c, when data and results of the project a, the project b and the project c are all written into an evaluation table of the project A, prompt information is sent to a client of a related responsible person of a unit project, the responsible person can conveniently examine and approve in time, and the client can be a mobile phone, a tablet computer, a notebook computer and the like.
The embodiment of the present application further discloses an information management system for engineering assessment data, referring to fig. 3, including:
the first processing module 1 is used for acquiring a division result of a contract project, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract project is divided into a unit project, a subsection project and a project.
And the identification and collection module 2 is used for identifying the two-dimensional codes on the rating tables so as to collect the same-grade rating tables.
And the second processing module 3 is used for acquiring related data on the same-level rating table and compiling the related data on the next-level rating table.
The embodiment of the application also discloses an electronic device, which comprises a memory and a processor, wherein the memory is stored with a computer program which can be loaded by the processor and can execute the engineering assessment data information management method.
The embodiment of the present application further discloses a computer-readable storage medium, which stores a computer program that can be loaded by a processor and execute the above engineering assessment data information management method, and the computer-readable storage medium includes, for example: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
The above examples are only used to illustrate the technical solutions of the present application, and do not limit the scope of protection of the application. It is to be understood that the embodiments described are only some of the embodiments of the present application and not all of them. All other embodiments, which can be derived by a person skilled in the art from these embodiments without making any inventive step, are within the scope of the present application.

Claims (9)

1. A method for managing engineering assessment data information, the method comprising:
acquiring a division result of a contract project, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract project is divided into a unit project, a subsection project and a subentry project;
identifying two-dimensional codes on the rating tables to collect rating tables of the same grade;
and acquiring related data on the rating table of the same grade, and compiling the related data on the rating table of the next grade.
2. The method for managing engineering rating data information according to claim 1, wherein the obtaining related data on the same rating table and compiling the related data on the next rating table comprises:
receiving a printing request and printing the evaluation table;
acquiring an uploading request of a scanning piece of an evaluation table, and identifying uploading information of the scanning piece;
and judging whether the same-grade rating table is completely uploaded or not according to the uploading information, if so, collecting related data, and compiling the related data on the rating table of the next grade.
3. The method of claim 2, wherein the obtaining of the upload request of the scan part of the evaluation form and the identification of the upload information of the scan part comprises:
and identifying the two-dimensional code on the scanning piece, judging whether the scanning piece corresponds to the current evaluation table according to the identification result of the two-dimensional code, and if not, displaying an uploading error.
4. The method as claimed in claim 3, wherein the identifying the two-dimensional code on the scanning member, determining whether the scanning member corresponds to the current evaluation table according to the identification result of the two-dimensional code, and if not, displaying an upload error, comprises:
if yes, entering an engineering drawing link of the engineering project under the corresponding engineering project of the current evaluation table;
receiving a viewing request of an engineering drawing, displaying the engineering drawing according to the viewing request, and identifying an engineering project corresponding to the engineering drawing, wherein the identification represents that the engineering project has been spot checked.
5. The method as claimed in claim 2, wherein the collecting the related data on the rating table and compiling the related data on the next rating table are specifically:
obtaining evaluation information, wherein the evaluation information comprises an actual measurement project and engineering data, the actual measurement project comprises a qualification rate and an extreme value, and a subentry evaluation table is formed according to a first preset format according to the qualification rate and the extreme value and a first preset regulation evaluation quality grade;
acquiring a subentry evaluation table and function detection of the same subsection project, forming a subsection project evaluation result by the quality grade, the function detection and the project data according to a second preset rule, and forming a subsection evaluation table according to a second preset format;
acquiring a branch evaluation table and system function detection of the same unit project, and forming a unit evaluation table according to a third preset format; and the number of the first and second groups,
and acquiring unit engineering evaluation results, completion acceptance reports and completion acceptance check sheets of all unit engineering, and forming completion acceptance opinions according to a fourth preset format.
6. The method as claimed in claim 2, wherein the step of determining whether all the rating tables of the same level are uploaded according to the uploaded information, and if so, collecting the related data on the rating table of the same level and compiling the related data on the rating table of the next level comprises:
and the related data is assembled, and prompt information is sent to the client of the next-level related responsible person.
7. An information management system for engineering assessment data, comprising:
the first processing module is used for acquiring the division result of the contract engineering, forming a corresponding evaluation table according to the division result, and endowing the evaluation table with a corresponding two-dimensional code, wherein the contract engineering is divided into unit engineering, subsection engineering and project division engineering;
the identification and collection module is used for identifying the two-dimensional codes on the rating table so as to collect the rating table with the same grade;
and the second processing module is used for acquiring the related data on the same-level rating table and compiling the related data on the next-level rating table.
8. An electronic device comprising a memory and a processor, the memory having stored thereon a computer program that can be loaded by the processor and that executes the method according to any of claims 1 to 6.
9. A computer-readable storage medium, in which a computer program is stored which can be loaded by a processor and which executes the method of any one of claims 1 to 6.
CN202011357558.7A 2020-11-27 2020-11-27 Engineering evaluation data information management method, system and electronic equipment Pending CN112465456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011357558.7A CN112465456A (en) 2020-11-27 2020-11-27 Engineering evaluation data information management method, system and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011357558.7A CN112465456A (en) 2020-11-27 2020-11-27 Engineering evaluation data information management method, system and electronic equipment

Publications (1)

Publication Number Publication Date
CN112465456A true CN112465456A (en) 2021-03-09

Family

ID=74809099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011357558.7A Pending CN112465456A (en) 2020-11-27 2020-11-27 Engineering evaluation data information management method, system and electronic equipment

Country Status (1)

Country Link
CN (1) CN112465456A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115774986A (en) * 2022-11-15 2023-03-10 蜀道投资集团有限责任公司 Highway quality evaluation table generation method, electronic device, and computer-readable medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004272435A (en) * 2003-03-06 2004-09-30 Mitsubishi Electric Corp Software process diagnostic consultation supporting device, and method and program for making computer execute same method
CN102208053A (en) * 2011-05-17 2011-10-05 香港华艺设计顾问(深圳)有限公司 Two-dimensional code-based design drawing management system and method
CN107025460A (en) * 2016-08-17 2017-08-08 广州市力融计算机技术有限公司 The system and method for improving contract management level and efficiency
CN109190724A (en) * 2018-07-02 2019-01-11 链家网(北京)科技有限公司 A kind of method of calibration and electronic equipment of electron scanning file
CN109784843A (en) * 2018-12-29 2019-05-21 福建华闽通达信息技术有限公司 A kind of building cost management method and system based on WBS
CN110659793A (en) * 2019-08-07 2020-01-07 河北省高速公路石安管理处 Highway engineering quality inspection automatic evaluation management system based on big data

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004272435A (en) * 2003-03-06 2004-09-30 Mitsubishi Electric Corp Software process diagnostic consultation supporting device, and method and program for making computer execute same method
CN102208053A (en) * 2011-05-17 2011-10-05 香港华艺设计顾问(深圳)有限公司 Two-dimensional code-based design drawing management system and method
CN107025460A (en) * 2016-08-17 2017-08-08 广州市力融计算机技术有限公司 The system and method for improving contract management level and efficiency
CN109190724A (en) * 2018-07-02 2019-01-11 链家网(北京)科技有限公司 A kind of method of calibration and electronic equipment of electron scanning file
CN109784843A (en) * 2018-12-29 2019-05-21 福建华闽通达信息技术有限公司 A kind of building cost management method and system based on WBS
CN110659793A (en) * 2019-08-07 2020-01-07 河北省高速公路石安管理处 Highway engineering quality inspection automatic evaluation management system based on big data

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115774986A (en) * 2022-11-15 2023-03-10 蜀道投资集团有限责任公司 Highway quality evaluation table generation method, electronic device, and computer-readable medium
CN115774986B (en) * 2022-11-15 2023-10-20 蜀道投资集团有限责任公司 Highway quality evaluation table generation method, electronic device, and computer-readable medium

Similar Documents

Publication Publication Date Title
CN109784758B (en) Engineering quality supervision early warning system and method based on BIM model
CN108846102B (en) Laboratory data management system and computer program for quality inspection center of medium-stored grains
CN113407517B (en) Data quality health degree analysis method and system based on multidimensional analysis technology
CN114519498A (en) Quality evaluation method and system based on BIM (building information modeling)
CN108985187A (en) A kind of method that automatic quality inspection is realized in self verification of digital archive
US20120173307A1 (en) Visualizing and Auditing Elections and Election Results
CN110728422A (en) Building information model, method, device and settlement system for construction project
CN112465456A (en) Engineering evaluation data information management method, system and electronic equipment
Kuntum Effect of implementation of enterprise resource planning system on quality of accounting information
CN112598260A (en) Grain and oil quality inspection management method, device and system, storage medium and electronic equipment
CN115423421A (en) Method and device for automatically auditing process of inspection report, electronic equipment and medium
CN109345112A (en) A kind of maintenance technician's ranking method, system and electronic equipment and storage medium
CN112699014A (en) Method and device for testing and displaying storage performance prediction function
CN115907519A (en) Information security compliance detection method and system
CN117522322A (en) Rule compliance report automatic generation and analysis system based on artificial intelligence
CN117172729B (en) Labor affair subcontracting personnel management system based on big data
CN116630069A (en) Method and storage medium for automatically generating tax audit report
Devos et al. The first year of implementation of the LPIS Quality Assessment in the frame of COMM. Reg. No 1122/2009 Art. 6.2
Elnaggar et al. The effect of Digitalization on Customer Engagement Applied on Microfinance Non-Banking Companies in Egypt
CN117952552A (en) Project management method, system, equipment and medium for street engineering construction
Wong Issues of software quality and management in practice: an empirical investigation of use of explicit documents in software review
CN114185877A (en) Customs declaration data self-checking method, system, computer equipment and computer storage medium
CN112000361A (en) Software security development capability maturity difference analysis method and system
Jia et al. Investigating Risk-Management Disclosure: Manual Analysis Versus Computer-Based Analysis
CN115099623A (en) Quality control management model and approval process for chemical analysis of nuclear power plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination