CN112465407A - Capital construction site safety monitoring system - Google Patents

Capital construction site safety monitoring system Download PDF

Info

Publication number
CN112465407A
CN112465407A CN202011574477.2A CN202011574477A CN112465407A CN 112465407 A CN112465407 A CN 112465407A CN 202011574477 A CN202011574477 A CN 202011574477A CN 112465407 A CN112465407 A CN 112465407A
Authority
CN
China
Prior art keywords
module
construction
personnel
supervision
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011574477.2A
Other languages
Chinese (zh)
Inventor
申杰
丁炜
王默
刘晓航
郑清瀚
郭通
杨敏
李强
刘一泽
钟铭
聂思怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Qinmei Ruijin Power Generation Co Ltd
Original Assignee
Huaneng Qinmei Ruijin Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Qinmei Ruijin Power Generation Co Ltd filed Critical Huaneng Qinmei Ruijin Power Generation Co Ltd
Priority to CN202011574477.2A priority Critical patent/CN112465407A/en
Publication of CN112465407A publication Critical patent/CN112465407A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C9/00Individual registration on entry or exit
    • G07C9/20Individual registration on entry or exit involving the use of a pass
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1097Protocols in which an application is distributed across nodes in the network for distributed storage of data in networks, e.g. transport arrangements for network file system [NFS], storage area networks [SAN] or network attached storage [NAS]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/181Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a plurality of remote sources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/029Location-based management or tracking services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Signal Processing (AREA)
  • Operations Research (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Technology (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Multimedia (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a capital construction site safety monitoring system, which comprises a display layer, an application layer, a data layer and a network layer; the display layer mainly carries out data display through a PC (personal computer) end, a mobile end and a big data center, the application layer is mainly embodied in a headquarters and a power plant, and the network layer comprises an access control module, a positioning module, a video monitoring module, a two-dimensional code module and an intelligent wearing module. The infrastructure site safety monitoring system can acquire operation risk management and control data and hidden danger data, realizes inspection and evaluation of work results, double supervision, and closed-loop management of supervision, rectification and acceptance, can effectively reduce personnel illegal operation, accurately point out hidden danger positions and personnel illegal conditions, and carry out quick rectification, so that early discovery and early elimination are formed, and risks, hidden dangers and accidents are effectively managed and processed in three stages, namely before, in the middle of a project and after the project; the safety precaution consciousness of constructors is improved.

Description

Capital construction site safety monitoring system
Technical Field
The invention relates to the field of capital construction site safety monitoring, in particular to a capital construction site safety monitoring system.
Background
All modules of the infrastructure site safety risk management and control system can be independently deployed and operated to achieve modularization of a software system, after all modules are integrated together, cross sharing of internal data is achieved through detailed and scientific configuration, and an intelligent data safety management mode is achieved. The system is based on the actual environment and the requirements of authority. At present, safety production accidents of various industries in China occur frequently, the number of casualties is high every year, and investigation and statistics on past accident cases show that 90% of accidents are caused by unsafe behaviors of people, and meanwhile, responsible people in the accidents have low cultural level, low safety consciousness and lack of due safety knowledge and safety skills, so that the execution condition of safe work is recorded, and the work is in charge; the collection of operation risk management and control data and hidden danger data is realized; carrying out inspection and evaluation on the working result; double supervision is realized, the closed-loop management of supervision-rectification-acceptance check is realized, the illegal operation of personnel can be effectively reduced, the position of hidden danger and the violation condition of personnel can be accurately pointed out, rapid rectification is carried out, early discovery and early elimination are formed, and risks, hidden dangers and accidents are effectively controlled and processed in the three stages of before, in the middle of and after;
the existing infrastructure field safety monitoring system cannot record the safety work execution condition in real time, cannot acquire operation risk management and control data and hidden danger data, is poor in management effect, is easy for constructors to operate in violation of rules and regulations, and is low in safety precaution consciousness, and therefore the infrastructure field safety monitoring system is provided.
Disclosure of Invention
The invention aims to provide a capital construction site safety monitoring system, and aims to solve the problems that the existing capital construction site safety monitoring system proposed in the background art cannot record the execution condition of safety work in real time, cannot acquire operation risk management and control data and hidden danger data, is poor in management effect, is easy for constructors to operate in violation of rules and regulations, and is not strong in safety precaution consciousness.
In order to achieve the purpose, the invention provides the following technical scheme: the capital construction site safety monitoring system comprises a display layer, an application layer, a data layer and a network layer;
the display layer mainly displays data through a PC (personal computer) end, a mobile end and a big data center, the application layer is mainly embodied in a headquarters and a power plant, and the network layer comprises an access control module, a positioning module, a video monitoring module, a two-dimensional code module and an intelligent wearing module;
entrance guard's module passes through constructor scanning two-dimensional code module restriction exotic personnel and gets into the job site, intelligence is dressed the module and is mainly dressed on one's body in constructor to carry out real time monitoring through its inside orientation module to constructor's position, video monitoring module mainly sets up in entrance guard's module and job site each and corner for carry out real time monitoring to job site and each position of entrance guard, and the cloud storage through its communication hookup saves, sends simultaneously to hidden danger investigation administration module and anti-management module violating the regulations.
As a further scheme of the invention: the system comprises a headquarter, a power plant, a construction planning module, a hidden danger investigation and treatment module, a construction side management module, a infrastructure responsibility system module, a violation management module, a infrastructure emergency management module, a infrastructure supervision management module, a field safety evaluation module, a personnel management module and a infrastructure comprehensive evaluation module, wherein the headquarter comprises a risk analysis module, a supervision and evaluation module, a hidden danger statistics module, a supervision module and a system regulation module;
the application layer comprises the following specific implementation steps:
s1, the construction party formulates a detailed construction plan A through a construction plan module, and inspects hidden dangers of the construction plan through a hidden danger inspection and treatment module, treats and modifies the hidden dangers to obtain a construction plan B;
s2, supervising the construction schedules of the construction plan B through the capital construction supervision management module, wherein the constructor management module is used for managing the affairs in construction:
s3 the risk analysis module is used for carrying out risk analysis according to the safety assessment report in SS2, and lists corresponding risk factor, the supervision evaluation module is used for supervising each power plant and makes corresponding evaluation report, hidden danger statistics module is used for making statistics of the hidden danger that each power plant exists, each construction progress that the supervision module is used for each power plant is supervised, realizes that the work is notified-is carried out-is checked and is accepted the closed loop flow and carry out standardization and reinforcement to corresponding system regulation is formulated through system regulation module, and sends to each power plant through PC end, mobile terminal or big data center.
As a further scheme of the invention: the transactions in step S2 are mainly embodied as:
the SS1 monitors violation personnel through violation management, sets personnel with excessive violation times as unqualified training personnel, and conducts re-examination, wherein the personnel management module is used for counting the personnel passing through the safety cultivation and leading the personnel into the system in batches, and the supervision department, the engineering department and the security department conduct batch number examination and approval of the personnel entering the factory;
the SS2 and the site safety evaluation module carry out site investigation on each construction of the construction plan B through establishing a personnel site, make a safety evaluation report, make a corresponding emergency channel through the capital construction emergency management module aiming at a safety problem, and make clear responsibility attributes through the capital construction responsibility module;
and the SS3 and the capital construction comprehensive evaluation module are used for comprehensively evaluating the construction plan B according to various indexes during construction and making a comprehensive evaluation report.
As a further scheme of the invention: the data layer is used for receiving various data information obtained by analyzing the application layer and sending the data information to the display layer, and the display layer receives the various data information through the PC end, the mobile end or the big data center and displays constructors in a safety training mode.
As a further scheme of the invention: the construction plan A and the construction plan B comprise a construction plan list and a construction operation list.
As a further scheme of the invention: the data information comprises laws and regulations, double-control data, evaluation data, liability data and an external interface.
Compared with the prior art, the invention has the beneficial effects that: the infrastructure site safety monitoring system can acquire operation risk management and control data and hidden danger data by arranging the video monitoring modules at each corner and each of an access control module and a construction site, and checks and evaluates work results through the infrastructure supervision management module and the supervision module, and performs double supervision, so that closed-loop management of supervision-rectification-acceptance is realized, personnel violation operation can be effectively reduced, hidden danger positions and personnel violation conditions are accurately pointed out, quick rectification is performed, early finding is formed and eliminated early, and risks, hidden dangers and accidents are effectively managed and processed in the three stages of the advance, the middle and the back; meanwhile, the display layer receives various data information through the PC end, the mobile end or the big data center, displays constructors in a safety training mode, and carries out personnel factory-entering batch number approval through supervision, engineering department and safety department in an examination, so that safety precaution consciousness of the constructors is greatly improved.
Drawings
Fig. 1 is a flow chart of a capital construction site safety monitoring system.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: the capital construction site safety monitoring system comprises a display layer, an application layer, a data layer and a network layer;
the display layer mainly displays data through a PC (personal computer) end, a mobile end and a big data center, the application layer is mainly embodied in a headquarters and a power plant, and the network layer comprises an access control module, a positioning module, a video monitoring module, a two-dimensional code module and an intelligent wearing module;
the entrance guard module passes through constructor scanning two-dimensional code module restriction exotic personnel and gets into the job site, intelligence is dressed the module and is mainly dressed on one's body in constructor to carry out real time monitoring to constructor's position through its inside locating module, video monitoring module mainly sets up in entrance guard module and job site each and corner, be used for carrying out real time monitoring to job site and each position of entrance guard, and the cloud storage through its communication hookup saves, send to hidden danger investigation administration module and anti-management module violating regulations simultaneously.
Through the scheme: the operation risk management and control data and the hidden danger data can be collected, the work result can be checked and evaluated, double supervision is realized, closed-loop management of supervision, rectification and acceptance is realized, the violation operation of personnel can be effectively reduced, the hidden danger position and the violation situation of the personnel can be accurately pointed out, rapid rectification is carried out, early discovery and early elimination are formed, and the risk, the hidden danger and the accident can be effectively managed, controlled and processed in the three stages of before, in the middle of and after;
the system comprises a headquarter, a power plant, a construction plan module, a hidden danger investigation and treatment module, a construction side management module, a capital construction responsibility system module, a violation management module, a capital construction emergency management module, a capital construction supervision management module, a field safety evaluation module, a personnel management module and a capital construction comprehensive evaluation module, wherein the headquarter comprises a risk analysis module, a supervision and evaluation module, a hidden danger statistic module, a supervision and treatment module and a system regulation module;
the application layer comprises the following specific implementation steps:
s1, the construction party formulates a detailed construction plan A through a construction plan module, and inspects hidden dangers of the construction plan through a hidden danger inspection and treatment module, treats and modifies the hidden dangers to obtain a construction plan B;
s2, supervising the construction schedules of the construction plan B through the capital construction supervision management module, wherein the constructor management module is used for managing the affairs in construction:
s3, a risk analysis module is used for carrying out risk analysis according to the safety assessment report in SS2 and listing corresponding risk factors, a supervision evaluation module is used for supervising each power plant to make corresponding evaluation reports, a hidden danger statistic module is used for counting hidden dangers existing in each power plant, and a supervision module is used for supervising each construction progress of each power plant, so that the work notification, execution and acceptance closed loop flow is standardized and strengthened, corresponding system rules are formulated through a system rule module, and the system rules are sent to each power plant through a PC (personal computer) terminal, a mobile terminal or a big data center.
In step S2, the transactions are mainly embodied as:
SS1, anti-violation management module monitors violation personnel through violation management, sets personnel with excessive violation times as unqualified training personnel, and rechecks the personnel, the personnel management module is used for counting passing safety cultivation personnel, leads the personnel into the system in batches, and carries out personnel entering factory batch number examination and approval by supervision, engineering department and safety department;
SS2, a site safety evaluation module carries out site investigation on each construction of the construction plan B through establishing a personnel site, makes a safety evaluation report, works out a corresponding emergency channel through a capital construction emergency management module aiming at safety problems, and simultaneously determines responsibility attributes through a capital construction responsibility module;
and the SS3 and the capital construction comprehensive evaluation module are used for comprehensively evaluating the construction plan B according to various indexes during construction and making a comprehensive evaluation report.
The data layer is used for receiving various data information obtained by analyzing the application layer and sending the data information to the display layer, and the display layer receives the various data information through the PC end, the mobile end or the big data center and displays constructors in a safety training mode.
The construction plan A and the construction plan B comprise a construction schedule and a construction operation list, and each item of data information comprises laws and regulations, double-control data, evaluation data, liability data and an external interface.
The working principle is as follows: for the safety monitoring system of the capital construction site, firstly, a constructor formulates a detailed construction plan A through a construction plan module, inspects, controls and modifies the hidden dangers of the construction plan through a hidden danger inspection and treatment module to obtain a construction plan B, supervises each construction progress of the construction plan B through a capital construction supervision management module, the constructor management module is used for managing each affair in construction, a risk analysis module is used for carrying out risk analysis according to a safety assessment report in SS2 and paralleling out corresponding risk factors, a supervision evaluation module is used for supervising each power plant to make a corresponding assessment report, a hidden danger statistic module is used for counting the hidden dangers of each power plant, the supervision module is used for supervising each construction progress of each power plant to realize the standardization and the reinforcement of a work notification-execution-acceptance closed loop flow, corresponding system rules are made through a system rule module and are sent to each power plant through a PC end, a mobile end or a big data center, wherein, a video monitoring module is arranged at each corner of an entrance guard module and a construction site, operation risk control data and hidden danger data can be collected, real-time monitoring is convenient, then an anti-violation management module monitors violation personnel through violation management, personnel with excessive violation times are set as unqualified training personnel and reexamined, the personnel management module is used for counting passing safety cultivation personnel and leading the personnel into the system in batches, the supervision department, an engineering department and an quality security department carry out personnel-in-plant batch number approval, the site safety evaluation module carries out site investigation on various constructions of the construction plan B through establishing the personnel site and makes safety evaluation reports, and corresponding emergency channels are made through a foundation emergency management module aiming at safety problems, meanwhile, the responsibility attribute is determined through a capital construction responsibility system module, the work result is checked and evaluated, double supervision is realized, closed-loop management of supervision, rectification and acceptance is realized, the illegal operation of personnel can be effectively reduced, the position of hidden danger and the condition of violation of the personnel are accurately pointed out, rapid rectification is carried out, early finding and early elimination are formed, risks, hidden dangers and accidents are effectively controlled and processed in the three stages of advance, in the middle of the accident and after the accident, the capital construction comprehensive evaluation module is used for carrying out comprehensive evaluation on the construction plan B according to various indexes during construction and making a comprehensive evaluation report, a data layer is used for receiving various data information obtained by analysis of an application layer and sending the data information to a display layer, and finally the display layer receives various data information through a PC end, a mobile end or a large data center and displays the construction personnel in a safety training mode, and the supervision department, the engineering department and the quality security department examine and approve the batch number of the personnel entering the factory through the examination, so that the safety precaution consciousness of the constructors is greatly improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Capital construction scene safety monitoring system, its characterized in that: the system comprises a display layer, an application layer, a data layer and a network layer;
the display layer mainly displays data through a PC (personal computer) end, a mobile end and a big data center, the application layer is mainly embodied in a headquarters and a power plant, and the network layer comprises an access control module, a positioning module, a video monitoring module, a two-dimensional code module and an intelligent wearing module;
entrance guard's module passes through constructor scanning two-dimensional code module restriction exotic personnel and gets into the job site, intelligence is dressed the module and is mainly dressed on one's body in constructor to carry out real time monitoring through its inside orientation module to constructor's position, video monitoring module mainly sets up in entrance guard's module and job site each and corner for carry out real time monitoring to job site and each position of entrance guard, and the cloud storage through its communication hookup saves, sends simultaneously to hidden danger investigation administration module and anti-management module violating the regulations.
2. The capital construction site safety monitoring system according to claim 1, wherein: the system comprises a headquarter, a power plant, a construction planning module, a hidden danger investigation and treatment module, a construction side management module, a infrastructure responsibility system module, a violation management module, a infrastructure emergency management module, a infrastructure supervision management module, a field safety evaluation module, a personnel management module and a infrastructure comprehensive evaluation module, wherein the headquarter comprises a risk analysis module, a supervision and evaluation module, a hidden danger statistics module, a supervision module and a system regulation module;
the application layer comprises the following specific implementation steps:
s1, the construction party formulates a detailed construction plan A through a construction plan module, and inspects hidden dangers of the construction plan through a hidden danger inspection and treatment module, treats and modifies the hidden dangers to obtain a construction plan B;
s2, supervising the construction schedules of the construction plan B through the capital construction supervision management module, wherein the constructor management module is used for managing the affairs in construction:
s3 the risk analysis module is used for carrying out risk analysis according to the safety assessment report in SS2, and lists corresponding risk factor, the supervision evaluation module is used for supervising each power plant and makes corresponding evaluation report, hidden danger statistics module is used for making statistics of the hidden danger that each power plant exists, each construction progress that the supervision module is used for each power plant is supervised, realizes that the work is notified-is carried out-is checked and is accepted the closed loop flow and carry out standardization and reinforcement to corresponding system regulation is formulated through system regulation module, and sends to each power plant through PC end, mobile terminal or big data center.
3. The capital construction site safety monitoring system according to claim 2, wherein: the transactions in step S2 are mainly embodied as:
the SS1 monitors violation personnel through violation management, sets personnel with excessive violation times as unqualified training personnel, and conducts re-examination, wherein the personnel management module is used for counting the personnel passing through the safety cultivation and leading the personnel into the system in batches, and the supervision department, the engineering department and the security department conduct batch number examination and approval of the personnel entering the factory;
the SS2 and the site safety evaluation module carry out site investigation on each construction of the construction plan B through establishing a personnel site, make a safety evaluation report, make a corresponding emergency channel through the capital construction emergency management module aiming at a safety problem, and make clear responsibility attributes through the capital construction responsibility module;
and the SS3 and the capital construction comprehensive evaluation module are used for comprehensively evaluating the construction plan B according to various indexes during construction and making a comprehensive evaluation report.
4. The capital construction site safety monitoring system according to claim 1, wherein: the data layer is used for receiving various data information obtained by analyzing the application layer and sending the data information to the display layer, and the display layer receives the various data information through the PC end, the mobile end or the big data center and displays constructors in a safety training mode.
5. The capital construction site safety monitoring system according to claim 2, wherein: the construction plan A and the construction plan B comprise a construction plan list and a construction operation list.
6. The capital construction site safety monitoring system according to claim 4, wherein: the data information comprises laws and regulations, double-control data, evaluation data, liability data and an external interface.
CN202011574477.2A 2020-12-28 2020-12-28 Capital construction site safety monitoring system Pending CN112465407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011574477.2A CN112465407A (en) 2020-12-28 2020-12-28 Capital construction site safety monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011574477.2A CN112465407A (en) 2020-12-28 2020-12-28 Capital construction site safety monitoring system

Publications (1)

Publication Number Publication Date
CN112465407A true CN112465407A (en) 2021-03-09

Family

ID=74803917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011574477.2A Pending CN112465407A (en) 2020-12-28 2020-12-28 Capital construction site safety monitoring system

Country Status (1)

Country Link
CN (1) CN112465407A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113159633A (en) * 2021-05-11 2021-07-23 河北云酷科技有限公司 Method for evaluating risk level of field operating personnel in industrial field
CN115313632A (en) * 2022-07-19 2022-11-08 国网江苏省电力有限公司苏州供电分公司 Construction site violation night construction checking method based on power grid real-time data analysis
CN117422293A (en) * 2023-09-21 2024-01-19 华能山东发电有限公司烟台发电厂 Infrastructure safety management method of distributed combustion engine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107480370A (en) * 2017-08-10 2017-12-15 嘉兴恒创电力设计研究院有限公司 A kind of construction speed Forecasting Methodology and system based on BIM models
KR20180058443A (en) * 2016-11-24 2018-06-01 주식회사 이윰 House building intermediating system based on web interface
CN211266994U (en) * 2019-12-18 2020-08-14 广西电网有限责任公司电力科学研究院 Power production operation video monitoring system suitable for capital construction site
CN111598734A (en) * 2020-05-25 2020-08-28 中建三局第二建设工程有限责任公司 Intelligent building site integrated management system of BIM and Internet of things

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180058443A (en) * 2016-11-24 2018-06-01 주식회사 이윰 House building intermediating system based on web interface
CN107480370A (en) * 2017-08-10 2017-12-15 嘉兴恒创电力设计研究院有限公司 A kind of construction speed Forecasting Methodology and system based on BIM models
CN211266994U (en) * 2019-12-18 2020-08-14 广西电网有限责任公司电力科学研究院 Power production operation video monitoring system suitable for capital construction site
CN111598734A (en) * 2020-05-25 2020-08-28 中建三局第二建设工程有限责任公司 Intelligent building site integrated management system of BIM and Internet of things

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鹿焕然: "建筑工程智慧工地构建研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113159633A (en) * 2021-05-11 2021-07-23 河北云酷科技有限公司 Method for evaluating risk level of field operating personnel in industrial field
CN115313632A (en) * 2022-07-19 2022-11-08 国网江苏省电力有限公司苏州供电分公司 Construction site violation night construction checking method based on power grid real-time data analysis
CN115313632B (en) * 2022-07-19 2024-02-02 国网江苏省电力有限公司苏州供电分公司 Construction site violation night construction investigation method based on power grid real-time data analysis
CN117422293A (en) * 2023-09-21 2024-01-19 华能山东发电有限公司烟台发电厂 Infrastructure safety management method of distributed combustion engine

Similar Documents

Publication Publication Date Title
CN112465407A (en) Capital construction site safety monitoring system
CN110378606B (en) Mobile visual safety management and control system
CN113449959A (en) Mine personnel behavior governance system and platform
CN112651642A (en) Hydraulic engineering field personnel safety management system based on multi-device perception
CN114548656B (en) Safe emergency management commanding and dispatching system
CN111726577A (en) Power distribution network engineering auditing method based on unmanned aerial vehicle inspection
CN113469544A (en) Risk control method and system for safety operation
KR102438757B1 (en) Smart Safety Platform
CN111222830A (en) System and method for intelligently managing and monitoring pledge objects based on block chain of Internet of things
CN116050840B (en) Information security risk discovery method and discovery system
CN112819374A (en) System and method for risk management of railway bridge constructors
CN116957341A (en) Intelligent safety risk management and control system based on steel mill
CN115239144A (en) Dual prevention mechanism information system based on regional risk management
CN114140030A (en) Risk management and control early warning and troubleshooting management and control system based on double control platforms
CN110555674A (en) Intelligent safety management and control system for oil and gas field drilling site
CN109657954A (en) A kind of HSE-ACT risk control method and system
CN116882729A (en) Security management platform based on 5g wisdom power plant
CN113869758A (en) Intelligent two-ticket management and operation site risk early warning system
CN116797151A (en) Engineering supervision system utilizing artificial intelligence mode
CN116109045A (en) Intelligent police command scheduling system
CN105930968A (en) Passenger line construction risk control and early warning system
Fang et al. Design and Development of Industrial Safety APPs
CN113487146A (en) Mine safety operation control method and device, electronic equipment and storage medium
CN111741064A (en) Mobile terminal for dispatching and monitoring human resource labor service and monitoring system thereof
CN111724498A (en) Supervision system and supervision method for fire safety of oil field station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210309

WD01 Invention patent application deemed withdrawn after publication