CN112464570B - 基于bp-lstm的大坝监测物理量智能预测方法 - Google Patents
基于bp-lstm的大坝监测物理量智能预测方法 Download PDFInfo
- Publication number
- CN112464570B CN112464570B CN202011439998.7A CN202011439998A CN112464570B CN 112464570 B CN112464570 B CN 112464570B CN 202011439998 A CN202011439998 A CN 202011439998A CN 112464570 B CN112464570 B CN 112464570B
- Authority
- CN
- China
- Prior art keywords
- dam
- lstm
- physical quantity
- upstream
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 71
- 238000000034 method Methods 0.000 title claims abstract description 34
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 21
- 238000013528 artificial neural network Methods 0.000 claims description 24
- 238000004590 computer program Methods 0.000 claims description 15
- 230000006870 function Effects 0.000 claims description 9
- 238000012549 training Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 5
- 238000012545 processing Methods 0.000 claims description 5
- 238000005457 optimization Methods 0.000 claims description 3
- 238000000053 physical method Methods 0.000 claims description 3
- 238000009529 body temperature measurement Methods 0.000 claims description 2
- 230000001419 dependent effect Effects 0.000 claims description 2
- 230000006399 behavior Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 5
- 238000007726 management method Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000002159 abnormal effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000013277 forecasting method Methods 0.000 description 1
- 238000013178 mathematical model Methods 0.000 description 1
- 230000003204 osmotic effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/045—Combinations of networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/049—Temporal neural networks, e.g. delay elements, oscillating neurons or pulsed inputs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/08—Learning methods
- G06N3/084—Backpropagation, e.g. using gradient descent
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/08—Thermal analysis or thermal optimisation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- Software Systems (AREA)
- Artificial Intelligence (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Computing Systems (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Molecular Biology (AREA)
- Computational Linguistics (AREA)
- Biophysics (AREA)
- Biomedical Technology (AREA)
- Mathematical Physics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Data Mining & Analysis (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Medical Informatics (AREA)
- Computer Hardware Design (AREA)
- Geometry (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011439998.7A CN112464570B (zh) | 2020-12-10 | 2020-12-10 | 基于bp-lstm的大坝监测物理量智能预测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011439998.7A CN112464570B (zh) | 2020-12-10 | 2020-12-10 | 基于bp-lstm的大坝监测物理量智能预测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112464570A CN112464570A (zh) | 2021-03-09 |
CN112464570B true CN112464570B (zh) | 2022-12-20 |
Family
ID=74800906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011439998.7A Active CN112464570B (zh) | 2020-12-10 | 2020-12-10 | 基于bp-lstm的大坝监测物理量智能预测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112464570B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113359573A (zh) * | 2021-06-30 | 2021-09-07 | 华能澜沧江水电股份有限公司 | 一种大坝安全智能预测方法及其装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374047A (zh) * | 2019-05-28 | 2019-10-25 | 中国水利水电科学研究院 | 基于变形的拱坝运行期实时安全监控阈值确定方法 |
CN111259590A (zh) * | 2020-01-17 | 2020-06-09 | 南昌大学 | 一种混凝土坝变形安全监控模型的构建方法 |
-
2020
- 2020-12-10 CN CN202011439998.7A patent/CN112464570B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374047A (zh) * | 2019-05-28 | 2019-10-25 | 中国水利水电科学研究院 | 基于变形的拱坝运行期实时安全监控阈值确定方法 |
CN111259590A (zh) * | 2020-01-17 | 2020-06-09 | 南昌大学 | 一种混凝土坝变形安全监控模型的构建方法 |
Non-Patent Citations (1)
Title |
---|
基于BP神经网络的土石坝变形预测模型研究;林智艳;《人民珠江》;20200616(第06期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN112464570A (zh) | 2021-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5510642B2 (ja) | 予測・診断モデルの構築装置 | |
CN113325721B (zh) | 一种工业系统无模型自适应控制方法及系统 | |
EP3904987B1 (en) | Control support apparatus, control support method, control support program, computer readable medium with control support program recorded thereon and control system | |
CN111400850B (zh) | 设备故障分析方法、装置、设备和存储介质 | |
CN112464570B (zh) | 基于bp-lstm的大坝监测物理量智能预测方法 | |
CN112100711A (zh) | 一种基于arima和pso-elm的混凝土坝变形组合预报模型构建方法 | |
CN117891644B (zh) | 一种基于数字孪生技术的数据采集系统及其采集方法 | |
JP2015083731A (ja) | 作業機械の管理装置及び作業機械の異常判定方法 | |
CN117709488B (zh) | 基于RUN-XGBoost的大坝渗流预测方法 | |
JP5582487B2 (ja) | プロセスの状態予測方法 | |
CN110414734B (zh) | 一种计及风资源利用率预测评估的方法 | |
CN117195647A (zh) | 变压器套管震后评估方法、装置、设备、介质和程序产品 | |
JP2022010913A (ja) | データ管理システム、データ管理方法、および、データ管理プログラム | |
JP2021196316A (ja) | データ管理システム、データ管理方法、および、データ管理プログラム | |
CN111695300A (zh) | 一种汽轮机阀门流量拟合方法及系统 | |
CN116663126A (zh) | 一种基于通道注意力BiLSTM模型的桥梁温度效应预测方法 | |
CN114417549B (zh) | 一种基于超级计算机的数字孪生目标场数据处理系统 | |
CN115034121B (zh) | 一种基于组织性能智能预报模型的带钢工艺调控方法 | |
CN113569324A (zh) | 边坡形变监测异常数据分析与优化方法 | |
CN110322063A (zh) | 一种耗电功率仿真预测方法及存储介质 | |
CN111625525A (zh) | 一种环境数据修复/填充方法及系统 | |
Li et al. | Power plant fan fault warning based on bidirectional feature compression and state estimation | |
CN109670243A (zh) | 一种基于勒贝格空间模型的寿命预测方法 | |
CN118504270A (zh) | 热载荷计算方法、装置、设备、存储介质和程序产品 | |
CN117828831A (zh) | 一种用于核电厂给水加热器运行状态跟踪的模型优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231109 Address after: 310014 No. 22 Chao Wang Road, Zhejiang, Hangzhou Patentee after: POWERCHINA HUADONG ENGINEERING Corp.,Ltd. Patentee after: LARGE DAM SAFETY SUPERVISION CENTER, NATIONAL ENERGY ADMINISTRATION OF THE PEOPLE'S REPUBLIC OF CHINA Patentee after: TIANSHENGQIAO TWO HYDROPOWER Co.,Ltd. Address before: 310014 No. 22 Chao Wang Road, Xiacheng District, Zhejiang, Hangzhou Patentee before: POWERCHINA HUADONG ENGINEERING Corp.,Ltd. Patentee before: LARGE DAM SAFETY SUPERVISION CENTER, NATIONAL ENERGY ADMINISTRATION OF THE PEOPLE'S REPUBLIC OF CHINA |
|
TR01 | Transfer of patent right |