CN112462414A - Advanced forecasting method and control center for digital detonator - Google Patents

Advanced forecasting method and control center for digital detonator Download PDF

Info

Publication number
CN112462414A
CN112462414A CN202011194904.4A CN202011194904A CN112462414A CN 112462414 A CN112462414 A CN 112462414A CN 202011194904 A CN202011194904 A CN 202011194904A CN 112462414 A CN112462414 A CN 112462414A
Authority
CN
China
Prior art keywords
digital
detonator
detonation
test
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011194904.4A
Other languages
Chinese (zh)
Inventor
刘永红
宋光辉
马怀鹏
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jstigroup Testing And Certification Co ltd
JSTI Group Co Ltd
Original Assignee
Jstigroup Testing And Certification Co ltd
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jstigroup Testing And Certification Co ltd, JSTI Group Co Ltd filed Critical Jstigroup Testing And Certification Co ltd
Priority to CN202011194904.4A priority Critical patent/CN112462414A/en
Publication of CN112462414A publication Critical patent/CN112462414A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/02Generating seismic energy
    • G01V1/104Generating seismic energy using explosive charges
    • G01V1/13Arrangements or disposition of charges to produce a desired pattern in space or time

Abstract

The invention discloses an advanced prediction method for a digital detonator and a control center, wherein the method is applied to the control center, the control center is connected with a first line and a plurality of second lines, the first line is connected with each second line in parallel, the first line is connected with a digital detonator initiator, each second line is connected with a digital detonator, and the method comprises the following steps: acquiring a detonation instruction, wherein the detonation instruction is used for indicating the digital detonators to detonate in sequence according to a preset time interval; controlling the digital detonator exploder to explode the digital detonators so that the digital detonators explode in sequence according to a preset time interval; when the digital detonator is detected to be detonated, recording vibration data corresponding to the digital detonator; by applying the method provided by the embodiment of the invention, the advance forecasting construction period is greatly shortened, the working efficiency is improved, and more time can be saved for the advance forecasting of the tunnel.

Description

Advanced forecasting method and control center for digital detonator
Technical Field
The invention relates to the technical field of geological prediction, in particular to an advanced prediction method and a control center for a digital detonator.
Background
With the continuous development of roads and railways in China, medium and long tunnel construction projects are more and more, the detection of the front of an excavation face of the tunnel construction projects is more important, a seismic wave advanced prediction method is used as the most common advanced detection means, the seismic wave advanced prediction method is more and more applied to tunnel construction detection, and a large number of digital detonators and matched digital detonator initiators are popularized in China at the present stage, so that the detonators are safer to use. The induction triggering mode of advance prediction is still established on the basis of the voltage of an old-fashioned detonator, and in order to adapt to the use of the new digital detonator and the digital detonator in seismic wave advance prediction, a triggering mode suitable for the digital detonator is particularly provided.
Disclosure of Invention
The embodiment of the invention provides an advanced prediction method and a control center for a digital detonator, which are suitable for a digital detonator initiator to detonate the digital detonator, and improve the working efficiency.
The embodiment of the invention provides an advanced forecasting method for a digital detonator, which is applied to a control center, wherein the control center is connected with a first line and a plurality of second lines, the first line is connected with each second line in parallel, the first line is connected with a digital detonator initiator, and each second line is connected with a digital detonator, and the method comprises the following steps: acquiring a detonation instruction, wherein the detonation instruction is used for indicating the digital detonators to detonate in sequence according to a preset time interval; and controlling the digital detonator exploder to explode the digital detonators so that the digital detonators explode in sequence according to a preset time interval, and recording vibration data corresponding to the digital detonators when the digital detonators are detected to explode.
In an embodiment, before the obtaining the detonation instruction, the method further comprises: receiving a detonation setting instruction, wherein the detonation setting instruction comprises a preset time interval and a preset detonation frequency; the preset detonation frequency corresponds to the number of the second lines; the preset detonation times are used for determining the detonation times of the digital detonator blaster for detonating the digital detonator.
In an embodiment, before obtaining the detonation instruction, the method further comprises: acquiring identification information corresponding to all digital detonators through an information acquisition device, and sending the identification information to a monitoring end; receiving a feedback notification from the supervisory end, the feedback notification including permission information to operate the digital detonator; and setting the detonation time of the digital detonator according to the permission information and a preset time interval, so that the digital detonator is detonated in sequence according to the preset time interval after receiving the instruction of the digital detonator initiator.
In an implementation manner, the control center is further connected with a test line, the test line is connected with the first line in parallel, and the test line is connected with a test detonator; correspondingly, before obtaining the detonation instruction, the method further comprises the following steps: receiving a test detonation instruction, wherein the test detonation instruction is used for indicating a test detonator to detonate; controlling the digital detonator initiator to detonate the test detonator; when the test detonator is detected to detonate, recording test data corresponding to the test detonator; and when the test data are determined to be abnormal, controlling the digital detonator exploder to explode the digital detonators according to the explosion instruction so as to enable the digital detonators to explode sequentially according to a preset time interval.
In an implementation manner, an induction trigger box is further connected in series to the first line, and the induction trigger box is used for detecting whether the voltage of the second line is abnormal or not; correspondingly, when the detonation of the digital detonator is detected, recording vibration data corresponding to the digital detonator, including: when the digital detonator is detonated, the induction trigger box detects that the voltage of the second line corresponding to the digital detonator is abnormal, and generates a recording instruction to instruct a control center to record vibration data corresponding to the digital detonator through a detector.
In an implementation manner, the control center includes a look-ahead host and a detonation control host, and the detonation control host is in communication connection with the digital detonator initiator to control the digital detonator initiator to detonate.
Another aspect of the embodiments of the present invention provides a control center for a digital detonator, the control center being connected to a first line and a plurality of second lines, the first line being connected in parallel to each of the second lines, the first line being connected to a digital detonator initiator, each of the second lines being connected to a digital detonator, the control center comprising: the obtaining module is used for obtaining a detonation instruction, and the detonation instruction is used for indicating the digital detonators to detonate in sequence according to a preset time interval; the control module is used for controlling the digital detonator exploder to explode the digital detonators so as to enable the digital detonators to explode in sequence according to a preset time interval; and the detection recording module is used for recording vibration data corresponding to the digital detonator under the condition that the detonation of the digital detonator is detected.
In an embodiment, the control center further comprises: the receiving module is used for receiving a detonation setting instruction, and the detonation setting instruction comprises a preset time interval and a preset detonation frequency; the preset detonation frequency corresponds to the number of the second lines; the preset detonation times are used for determining the detonation times of the digital detonator blaster for detonating the digital detonator.
In an embodiment, the control center further comprises: the acquisition module is used for acquiring identification information corresponding to all digital detonators through the information acquisition device and sending the identification information to a monitoring end; the receiving module is further configured to receive a feedback notification from the supervisory end, where the feedback notification includes permission information for operating the digital detonator; and the setting module is used for setting the detonation time of the digital detonator according to the permission information and the preset time interval so that the digital detonator detonates sequentially according to the preset time interval after receiving the instruction of the digital detonator initiator.
In an implementation manner, the control center is further connected with a test line, the test line is connected with the first line in parallel, and the test line is connected with a test detonator; correspondingly, the receiving module is further configured to receive a test detonation instruction, where the test detonation instruction is used to instruct a test detonator to detonate; the control module is also used for controlling the digital detonator initiator to detonate the test detonator; the detection recording module is further used for recording test data corresponding to the test detonator when the test detonator is detected to detonate; and the control module is further used for controlling the digital detonator exploder to explode the digital detonators according to the explosion instruction under the condition that the test data are determined to be abnormal, so that the digital detonators explode sequentially according to a preset time interval.
In an implementation manner, an induction trigger box is further connected in series to the first line, and the induction trigger box is used for detecting whether the voltage of the second line is abnormal or not; correspondingly, the detection recording module comprises: when the digital detonator is detonated, the induction trigger box detects that the voltage of the second line corresponding to the digital detonator is abnormal, and generates a recording instruction to instruct a control center to record vibration data corresponding to the digital detonator through a detector.
In an implementation manner, the control center includes a look-ahead host and a detonation control host, and the detonation control host is in communication connection with the digital detonator initiator to control the digital detonator initiator to detonate.
The method for initiating the digital detonator and the control center can be used for continuously initiating the plurality of digital detonators, the initiation method can greatly shorten the construction period of the whole detonator initiation process, improve the working efficiency and save more time for subsequent operation; and the digital detonator is detonated by the digital detonator exploder, so that the time delay caused by the digital detonator in the detonation process can be reduced, the actual detonation time of each digital detonator is well matched with the vibration data, and the data acquisition work corresponding to the detonation is more accurate and convenient.
Drawings
The above and other objects, features and advantages of exemplary embodiments of the present invention will become readily apparent from the following detailed description read in conjunction with the accompanying drawings. Several embodiments of the invention are illustrated by way of example, and not by way of limitation, in the figures of the accompanying drawings and in which:
in the drawings, the same or corresponding reference numerals indicate the same or corresponding parts.
FIG. 1 is a schematic diagram of an implementation flow of an advanced forecasting method for a digital detonator according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of an implementation process of a detonation permission of an advanced prediction method for a digital detonator according to an embodiment of the invention;
FIG. 3 is a schematic diagram of an implementation flow of a detonation test of an advanced prediction method for a digital detonator according to an embodiment of the present invention;
FIG. 4 is a scene schematic diagram of an advanced forecasting method for a digital detonator according to an embodiment of the present invention;
fig. 5 is a block diagram of an implementation flow of a control center for a digital detonator according to an embodiment of the present invention.
Wherein the reference numbers are as follows: 1. a control center; 2. a first line; 21. an induction trigger box; 22. a digital detonator initiator; 3. a second line; 31. a digital detonator.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Fig. 1 is a schematic flow chart illustrating an implementation of an advanced forecasting method for a digital detonator according to an embodiment of the present invention.
Referring to fig. 1, in one aspect, an embodiment of the present invention provides a method for advanced prediction of a digital detonator, where the method is applied to a control center, the control center is connected to a first line and a plurality of second lines, the first line is connected in parallel with each of the second lines, the first line is connected to a digital detonator initiator, and each of the second lines is connected to a digital detonator, and the method includes: operation 101, acquiring a detonation instruction, wherein the detonation instruction is used for indicating that the digital detonators detonate in sequence according to a preset time interval; in operation 102, controlling a digital detonator initiator to detonate the digital detonators, so that the digital detonators are detonated in sequence according to a preset time interval; and operation 103, recording vibration data corresponding to the digital detonator when the detonation of the digital detonator is detected.
The digital detonator initiation method provided by the method can be applied to geological survey, and particularly, the method is particularly suitable for advanced tunnel prediction operation. The method can be used for continuously detonating a plurality of digital detonators, the method is characterized in that the control center is connected with the first circuit, the digital detonator of the second circuit is detonated through the digital detonator initiator of the first circuit, the control center is also connected with the plurality of second circuits in parallel, and the digital detonators on each second circuit can be independently detonated, so that the purpose that the digital detonator initiator sequentially detonates the digital detonators based on preset time intervals is achieved. Compared with the traditional detonator and the old detonator, the digital detonator is detonated by the digital detonator initiator, so that the time delay caused by the digital detonator in the detonation process can be reduced, and the actual detonation time of each digital detonator can be well matched with the recorded detonation time corresponding to the vibration data. Under the condition that the detonation of the digital detonator is detected, the control center can also synchronously acquire and record corresponding automatic records with the detonation, so that the data acquisition work corresponding to the detonation is more accurate and convenient.
Specifically, the control center of the method is used for realizing the integral control of the whole digital detonator detonation method. The control center is provided with a plurality of trigger interfaces, each trigger interface is used for connecting a circuit, for example, a first circuit is connected to a first trigger interface, each second circuit is connected to each other trigger interface, and the circuit connected to each trigger interface belongs to a parallel connection mode. The first circuit is connected with a digital detonator initiator, and the digital detonator initiator is used for initiating digital detonators. Each second line is connected with a digital detonator, and it can be understood that the digital detonators on each second line are respectively arranged on initiation points needing to be initiated, for example, when a tunnel is subjected to tunnel advance forecast, a plurality of initiation points are determined on the tunnel according to measurement and calculation, then a digital detonator is arranged at each initiation point to initiate to generate vibration, so that the control center can collect and record vibration data corresponding to the vibration generated by initiation of the digital detonators. It is to be added that when the control center performs operations 101 to 103, both the first line and the second line are closed lines.
After the line connection is completed, in the method operation 101, the initiation instruction may be from an exploder, and when the exploder determines the site safety, the initiation instruction is sent out, and the exploder may send the instruction to the control center through the user terminal. The initiation instruction is used for indicating the digital detonators to be sequentially initiated according to a preset time interval, the preset time interval can be preset on an acquisition interface of a control center by an exploder, an instructor, an operator or other operating personnel, the preset time interval is based on the maximum time interval which is not more than the maximum time interval which can be set by the digital detonator initiator, the preset time interval can be 500 plus 1200ms in general, and optionally, the preset time interval is set to 1200ms when the maximum time interval which can be set by the digital detonator initiator is 1200 ms.
In the method operation 102, after the control center receives the initiation instruction, the control center controls the digital detonator initiator to initiate the digital detonator, so that the digital detonator is sequentially initiated according to the preset time interval, and therefore, after the initiation instruction is sent once, the subsequent digital detonator can be continuously initiated, the digital detonator is sequentially initiated according to the preset time interval, and the time for advanced prediction observation is greatly saved. In another case, each digital detonator can be set with detonation time corresponding to the preset interval time, the control center controls the digital detonator exploder to send instructions to the digital detonators at the same time, and the digital detonators explode after receiving the instructions under the condition of the time detonation time, so that the digital detonators explode in sequence according to the preset time interval.
In operation 103 of the method, when the control center detects that the digital detonator is detonated, the control center may detect and record vibration data corresponding to the digital detonator through the detector. The detector is in communication connection with the control center and is arranged at a preset data acquisition place. Because the first circuit and the second circuit are connected in parallel, the control center can trigger the detector to carry out data acquisition work only by detecting any signal corresponding to the detonation of the digital detonator, and record corresponding vibration data. Specifically, in one case, the control center may determine whether the digital detonator initiator sends the trigger instruction by detecting the first line to determine whether the digital detonator is detonated, and when the control center detects that the digital detonator initiator sends the trigger instruction, the control center may determine that the control center detects that the digital detonator is detonated, where the trigger instruction is used to characterize that the digital detonator initiator detonates the digital detonator. In another case, the control center may also determine whether the digital detonator detonates by detecting a voltage change of the second line, and it is understood that when the digital detonator detonates, the second line may generate a voltage change, and when the control center detects that the second line may generate a voltage change, the control center determines that the digital detonator detonates. It should be added that the control center may also preset conditions for determining the initiation of the digital detonator, where the preset conditions may be one or more. For example, any of the following may be used: in the first case, in the case when a change in the second line voltage is detected, it is determined that the digital detonator is detonated; under the second condition, when a trigger instruction sent by the digital detonator exploder is detected, the digital detonator exploder is determined to explode; and under the third condition, when the voltage change of the second line is detected and the trigger instruction sent by the digital detonator exploder is detected, the digital detonator exploder is determined to explode. And under the fourth condition, when the voltage change of the second line is detected or a trigger instruction sent by the digital detonator exploder is detected, the digital detonator exploder is determined to explode.
In one embodiment, before obtaining the detonation instruction at operation 101, the method further includes: receiving a detonation setting instruction, wherein the detonation setting instruction comprises a preset time interval and a preset detonation frequency; the preset detonation frequency corresponds to the number of the second lines; the preset detonation times are used for determining the detonation times of the digital detonator for detonating the digital detonator.
It can be understood that the method is used for continuously detonating a plurality of digital detonators, and in the scenario, the detonation time interval between adjacent digital detonators and the number of the digital detonators needing to be detonated need to be determined. Based on this, the method determines a preset time interval and a preset initiation number through an initiation setting command before operation 101.
The detonation setting instruction is set and generated on a display interface corresponding to the control center by an exploder, an instructor, an operator or other operators, or can be sent to the control center by the exploder, the instructor, the operator or other operators through the user side, so that the control center receives the detonation setting instruction. The preset time interval is used for determining the detonation time interval between adjacent digital detonators. For convenience of understanding, a specific implementation case is provided below, the digital detonator initiator does not need to involve a preset time interval when initiating a first digital detonator, the preset time interval is set to 0s, when the digital detonator initiator initiates a second digital detonator, the preset time interval is added on the basis of the time for initiating the first digital detonator to obtain the initiation time of the second digital detonator, and when the initiation time meets the requirement, a trigger instruction is sent to the second digital detonator to initiate the second digital detonator. The preset initiation times are used for determining the number of the digital detonators needing initiation, namely the initiation times are increased by 1 every time the digital detonator initiator initiates, and the digital detonator initiator stops initiating the rest digital detonators under the condition that the initiation times meet the preset initiation times. It is necessary to supplement that the digital detonator initiator also stops the initiation when the digital detonators are all initiated and the initiation times do not meet the preset initiation times. It can be understood that after the control center obtains the detonation instruction, the control center generates an instruction based on the detonation instruction, the preset time interval and the preset detonation times, and sends the instruction to the digital detonator initiator, so as to achieve the purpose of instructing the digital detonator initiator to sequentially detonate the digital detonator according to the preset time interval and the preset detonation times.
In another case, the preset time interval is realized by delayed detonation of the digital detonators, that is, the digital detonators are provided with a timed detonation function, and corresponding detonation time is set for each digital detonator according to the preset time interval, for example, when the preset time interval is 1s, the digital detonator on the first and second lines is set to receive an instruction and then detonate immediately, the digital detonator on the second line is set to receive the instruction and then detonate for 1s, the digital detonator on the third second line is set to receive the instruction and then detonate for 2s, and so on, and details are not described below.
Fig. 2 is a schematic flow chart of the implementation of the detonation permission of the advanced prediction method for the digital detonator according to the embodiment of the invention.
Referring to fig. 2, in an embodiment, before obtaining the detonation instruction at operation 101, the method further comprises: operation 201, acquiring identification information corresponding to all digital detonators through an information acquisition device, and sending the identification information to a monitoring end; operation 202, receiving a feedback notification from the supervisory end, the feedback notification including permission information to operate the digital detonator; and operation 203, setting the digital detonator as an instantaneous digital detonator according to the permission information, so as to detonate the instantaneous digital detonator according to the detonation instruction.
The digital detonator is a controlled article and can be detonated only when the supervision end permits, and therefore the method requires permission of the supervision end to be obtained before operation 101. Specifically, in operation 201, the identification information corresponding to the digital detonators may specifically be a barcode or a two-dimensional code, in actual operation, a plurality of digital detonators may correspond to one identification information, the identification information corresponding to each digital detonator may also be different, the information acquisition device may specifically be an image acquisition device, the control center acquires the identification information corresponding to all the digital detonators through an image, and sends an approval request carrying the identification information to the supervision end to request the supervision end to approve the operation approval of the digital detonators corresponding to the identification information. It can be understood that the identification information carried in the permission request may be one or more, after obtaining the permission request, the supervision terminal sends a feedback notification containing permission information to the operation center, where the permission information contained in the feedback notification at least contains a permission identification for representing that the digital detonator is allowed to be operated; the feedback notification may also contain a permitted time for allowing operation of the digital detonator; when the identification information carried in the permission request is multiple, the permission request can also contain corresponding identification information of the digital detonator allowed to operate and the like.
In operation 203, under the condition that permission information is not obtained, the digital detonator is in a locked state, detonation operation cannot be performed on the digital detonator at this time, the control center can permit the information by analyzing feedback information, the permission information can also include unlocking information for unlocking the digital detonator, the digital detonator is unlocked through the unlocking information, so that the digital detonator is in an unlocked state, the digital detonator can be set and detonated at this time, according to the function of the digital detonator, the digital detonator can also set detonation time, and the digital detonator is set as an instantaneous digital detonator, so that the digital detonator can detonate immediately under the condition that a trigger instruction of the digital detonator initiator is obtained, time delay is avoided, and synchronization between a data acquisition process and a detonation process is further ensured. After the digital detonators are set, an exploder or other operators can send detonation instructions to the control center, so that the control center detonates the instantaneous digital detonators according to the detonation instructions.
In another operation mode, the digital detonator may be subjected to initiation time setting according to the permission information and a preset time interval, so that the digital detonator sequentially initiates according to the preset time interval after receiving the instruction of the digital detonator initiator to replace the operation 203, that is, in one case, the preset time interval for initiating the digital detonator is controlled by the digital detonator initiator, and in the case that the preset time interval meets the requirement, the digital detonator initiator sends the instruction to the corresponding digital detonator, so that the digital detonator is initiated. In another case, the preset time interval of the digital detonator initiation is controlled by the digital detonator, the digital detonator initiator sends instructions to all the digital detonators, and the digital detonators are initiated under the condition that the preset initiation time is reached after the digital detonators receive the instructions.
Fig. 3 is a schematic flow chart of an implementation of the detonation test of the advanced prediction method for the digital detonator according to the embodiment of the invention.
Referring to fig. 3, in an implementation, the control center is further connected with a test line, the test line is connected in parallel with the first line, and the test line is connected with a test detonator; accordingly, before obtaining the detonation instruction at operation 101, the method further includes: operation 301, receiving a test detonation instruction, wherein the test detonation instruction is used for indicating a test detonator to detonate; operation 302, controlling a digital detonator initiator to detonate the test detonator; operation 303, recording test data corresponding to the test detonator when the test detonator is detected to detonate; and operation 304, controlling the digital detonator exploder to explode the digital detonators according to the explosion instruction under the condition that the test data are determined to be abnormal, so that the digital detonators explode in sequence according to the preset time interval.
Before the initiation instruction is carried out, the method also needs to test whether the connecting lines among the control center, the detector, the digital detonator initiator and the digital detonator meet the test requirements. To avoid undesirable vibration data being collected due to an unsatisfactory installation. The method carries out test initiation by arranging a test circuit and a test detonator. The test circuit is also a closed-loop circuit, is connected to a trigger interface of the control center and is connected in parallel with the first circuit and the second circuit, the test detonator is also a digital detonator, and further the test detonator and the digital detonator are detonators with the same model number.
In the method operation 301, an operator sends a test detonation instruction to the control center, the control center receives the test detonation instruction, and the control center detonates the test detonator through the digital detonator initiator according to the test detonation instruction.
In operation 302, the control center may detect whether the test detonator detonates by monitoring the voltage change of the first line and/or the second line, and when it is detected that the test detonator detonates, the control center may transmit a collecting and recording instruction to the geophone to instruct the geophone to collect and record test data corresponding to the test detonator.
In operation 304, the vibration data may be compared to predicted data by a human or a control center to determine whether the test data is abnormal, and the predicted data may be predicted by known parameters of the vibration wave, such as the propagation velocity of the vibration wave. When the test data are determined to be abnormal, the connecting circuit among the control center, the detector, the digital detonator initiator and the digital detonator can be considered to meet the test requirements, and a detonation instruction can be sent to the control center, so that the control center controls the digital detonator initiator to detonate the digital detonator according to the detonation instruction, and the digital detonator is sequentially detonated according to the preset time interval.
In an implementation mode, the first line is also connected with an induction trigger box in series, and the induction trigger box is used for detecting whether the voltage of the second line is abnormal or not; correspondingly, in operation 103, when the detonation of the digital detonator is detected, recording vibration data corresponding to the digital detonator, including: when the digital detonator is detonated, the induction trigger box detects that the voltage of the second line corresponding to the digital detonator is abnormal, and generates a recording instruction to instruct the control center to record vibration data corresponding to the digital detonator through the detector.
Specifically, the method includes the steps that an induction trigger box is further connected in series with a first line, an induction hole for the second line to penetrate through is formed in the induction trigger box, the induction trigger box can sense whether the second line penetrating through the induction hole changes in voltage or not through the induction hole, and when the second line penetrating through the induction hole changes in voltage or not, the induction trigger box sends a recording instruction to a control center so that the control center can determine that the digital detonator explodes, and the control center collects and records vibration data corresponding to the digital detonator through a detector. After all the digital detonators are detonated, the control center can acquire vibration data corresponding to all the digital detonators so as to perform subsequent data analysis. It should be noted that the detector may preset the acquisition time corresponding to each recording instruction, for example, the acquisition time is set to 0.4s, that is, when the detector receives an instruction to acquire and record the vibration data recorded by one of the digital detonators, the acquisition and recording time length of the detector to the vibration record is 0.4 s. It will be appreciated that the acquisition time may be set as desired.
Furthermore, the method can also adopt a circuit breaking detection mode to determine whether the digital detonator detonates, so that the test data corresponding to the test detonator is recorded when the test detonator detonates.
In an implementation manner, the control center comprises an advance forecasting host and a detonation control host, and the detonation control host is in communication connection with the digital detonator initiator to control the digital detonator initiator to detonate. The method controls the digital detonator exploder through the explosion control host, and other control parts are realized by the advanced prediction host, so that the labor division operation of the control center is realized. The advanced forecasting host is used for advanced detection.
To facilitate a general understanding of the above embodiments, a specific implementation scenario is provided below for explanation. In this implementation scenario, including the place that needs to carry out the advanced detection, according to needs, one end in this place is provided with control center 1 and the wave detector of being connected with control center 1 communication, and the wave detector is installed at the position that needs to receive the vibration signal in this place. A plurality of initiation points which need to be detonated by the digital detonators 31 are arranged in the field at the same distance in the Shanghai. The control center 1 comprises an advance forecasting host, wherein a plurality of trigger interfaces are arranged on the advance forecasting host, one of the trigger interfaces is connected with an induction trigger box 21 and a digital detonator initiator 22 through a lead, the induction trigger box 21 is connected with the digital detonator initiator 22 in series, and two ends of the lead are connected to the trigger interfaces to form a first closed circuit, namely a first circuit 2. Other triggering interfaces on the advanced forecasting host are connected with a second closed circuit, namely a second circuit 3, and the second closed circuit is arranged in the sensing hole of the sensing triggering box 21 in a penetrating mode. The number of the second closed circuits is consistent with the number of the detonation points. Each initiation point is provided with a digital detonator 31, and each initiation point can be further provided with an explosive as a seismic source according to needs, wherein the explosive quantity can be selected from 50-100 g. Each second closed circuit corresponds to one digital detonator 31, namely one second closed circuit is wound on one digital detonator 31, and in the case that the seismic source is explosive, the second closed circuit can also be wound on the explosive corresponding to the digital detonator 31. Each second closed circuit of the first closed circuit box is connected in parallel.
After the arrangement is completed, whether the arrangement meets the requirement needs to be tested, in one testing method, an operator sends a recording instruction to the control center 1 to instruct the control center 1 to collect and record vibration data through the detector, then the wall surface or the ground near the detector is hammered, whether the vibration data collected and recorded by the detector meets the prediction data is observed, and if the vibration data meets the prediction data, the arrangement is considered to meet the requirement.
In another method, the detonation point includes a test detonation point, a test detonator is arranged in the test detonation point, a closed test coil is also connected to the advanced forecasting host, the test coil is also connected in parallel with the first closed circuit and the second closed circuit, and the test coil is arranged in an induction hole of the induction trigger box 21 in a penetrating manner. The test coil is wound on the test detonator. After obtaining the detonation permission of the test detonator, the worker sends a test instruction to the control center 1, the control center 1 detonates the test detonator through the digital detonator initiator 22, the test coil is broken due to the detonation of the detonator, the sensing trigger box 21 senses the voltage change of the test coil and sends a recording instruction to the control center 1, the recording instruction carries the information of the voltage change of the test coil, and the control center 1 instructs the detector to collect and record vibration data according to the recording instruction. When the vibration data collected and recorded by the detector is manually observed to be in accordance with the prediction data, if so, the arrangement is considered to be in accordance with the requirements.
After the test is finished, the foretell host computer collects and records the detonation time interval and the detonation frequency input by the staff through the display interface. In one particular case, the trigger interval is set to 1200 ms; the number of times of detonation is set to be any one of 2-24, and the specific number of times of detonation is determined according to the number of the initiation points.
The staff scans the two-dimensional codes of the digital detonators 31 in the initiation point in sequence through an image acquisition device such as a mobile phone, sends a request permission carrying two-dimensional code information to a supervision end to request the supervision end to permit the digital detonators 31 to detonate, and after the staff receives the permission information from the supervision end, the staff sets each digital detonator 31 as an instantaneous detonator according to the permission information. And then clicking a 'waiting trigger' button on the advanced forecasting host, and clicking a detonation button on the advanced forecasting host after the safety in the field is confirmed by workers, so that the advanced forecasting host generates a detonation instruction and instructs the digital detonator exploder 22 to detonate the digital detonators 31 of each detonation point in sequence according to the detonation time interval.
In the process of detonating the digital detonator 31 by the digital detonator initiator 22, the second closed circuit is open due to the detonation of the digital detonator 31, at this time, the sensing trigger box 21 can sense the voltage change of the second closed circuit, the sensing trigger box 21 sends a recording instruction to the advanced prediction host, and the advanced prediction host instructs the wave detector to collect and record the vibration wave corresponding to the detonated digital detonator 31 so as to obtain vibration data.
When all the digital detonators 31 finish detonating, vibration data corresponding to the site is obtained, and a surveying result of the site can be obtained by processing the vibration data.
Fig. 5 is a block diagram of an implementation flow of a control center for a digital detonator according to an embodiment of the present invention.
Referring to fig. 5, another aspect of the embodiments of the present invention provides a control center for a digital detonator, the control center being connected with a first line and a plurality of second lines, the first line being connected in parallel with each of the second lines, the first line being connected with a digital detonator initiator, each of the second lines being connected with a digital detonator, the control center comprising: the obtaining module 401 is configured to obtain a detonation instruction, where the detonation instruction is used to instruct digital detonators to detonate sequentially according to a preset time interval; the control module 402 is used for controlling the digital detonator exploder to explode the digital detonators so that the digital detonators explode in sequence according to a preset time interval; and a detection recording module 403, configured to record vibration data corresponding to the digital detonator when the digital detonator is detected to be detonated.
In one embodiment, the control center further comprises: a receiving module 404, configured to receive a detonation setting instruction, where the detonation setting instruction includes a preset time interval and a preset detonation frequency; the preset detonation frequency corresponds to the number of the second lines; the preset detonation times are used for determining the detonation times of the digital detonator for detonating the digital detonator.
In one embodiment, the control center further comprises: the acquisition module 405 is used for acquiring identification information corresponding to all digital detonators through the information acquisition device and sending the identification information to a monitoring end; a receiving module 404, further configured to receive a feedback notification from the monitoring end, where the feedback notification includes permission information for operating the digital detonator; and the setting module 406 is configured to perform detonation time setting on the digital detonator according to the permission information and the preset time interval, so that the digital detonator is detonated sequentially according to the preset time interval after receiving the instruction of the digital detonator initiator.
In one implementation mode, the control center is further connected with a test circuit, the test circuit is connected with the first circuit in parallel, and the test circuit is connected with a test detonator; correspondingly, the receiving module 404 is further configured to receive a test initiation instruction, where the test initiation instruction is used to instruct the test detonator to initiate; the control module is also used for controlling the digital detonator exploder to explode the test detonators; the detection recording module 403 is further configured to record test data corresponding to the test detonator when it is detected that the test detonator is detonated; the control module 402 is further configured to, when it is determined that the test data is not abnormal, control the digital detonator initiator to detonate the digital detonators according to the detonation instruction, so that the digital detonators are detonated sequentially according to a preset time interval.
In an implementation mode, the first line is also connected with an induction detonation box in series, and the induction detonation box is used for detecting whether the voltage of the second line is abnormal or not; correspondingly, the detection recording module comprises: when the digital detonator is detonated, the induction trigger box detects that the voltage of the second line corresponding to the digital detonator is abnormal, and generates a recording instruction to instruct the control center to record vibration data corresponding to the digital detonator through the detector.
In an implementation manner, the control center comprises an advance forecasting host and a detonation control host, and the detonation control host is in communication connection with the digital detonator initiator to control the digital detonator initiator to detonate.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. A forepoling method for digital detonators is characterized in that the method is applied to a control center, the control center is connected with a first line and a plurality of second lines, the first line is connected with each second line in parallel, the first line is connected with a digital detonator initiator, and each second line is connected with a digital detonator, and the method comprises the following steps:
acquiring a detonation instruction, wherein the detonation instruction is used for indicating the digital detonators to detonate in sequence according to a preset time interval;
controlling the digital detonator exploder to explode the digital detonators so that the digital detonators explode in sequence according to a preset time interval;
and recording vibration data corresponding to the digital detonator when the detonation of the digital detonator is detected.
2. The method of claim 1, wherein prior to said obtaining detonation instructions, the method further comprises:
receiving a detonation setting instruction, wherein the detonation setting instruction comprises a preset time interval and a preset detonation frequency;
the preset detonation frequency corresponds to the number of the second lines; the preset detonation times are used for determining the detonation times of the digital detonator blaster for detonating the digital detonator.
3. The method of claim 1, wherein prior to obtaining detonation instructions, the method further comprises:
acquiring identification information corresponding to all digital detonators through an information acquisition device, and sending the identification information to a monitoring end;
receiving a feedback notification from the supervisory end, the feedback notification including permission information to operate the digital detonator;
and setting the detonation time of the digital detonator according to the permission information and a preset time interval, so that the digital detonator is detonated in sequence according to the preset time interval after receiving the instruction of the digital detonator initiator.
4. The method according to claim 1, wherein the control center is further connected with a test line, the test line is connected with the first line in parallel, and the test line is connected with a test detonator;
correspondingly, before obtaining the detonation instruction, the method further comprises the following steps:
receiving a test detonation instruction, wherein the test detonation instruction is used for indicating a test detonator to detonate;
controlling the digital detonator initiator to detonate the test detonator;
when the test detonator is detected to detonate, recording test data corresponding to the test detonator;
and when the test data are determined to be abnormal, controlling the digital detonator exploder to explode the digital detonators according to the explosion instruction so as to enable the digital detonators to explode sequentially according to a preset time interval.
5. The method according to claim 1, characterized in that an induction trigger box is further connected in series on the first line, and the induction trigger box is used for detecting whether the voltage of the second line is abnormal or not;
correspondingly, when the detonation of the digital detonator is detected, recording vibration data corresponding to the digital detonator, including:
when the digital detonator is detonated, the induction trigger box detects that the voltage of the second line corresponding to the digital detonator is abnormal, and generates a recording instruction to instruct a control center to record vibration data corresponding to the digital detonator through a detector.
6. The method according to claim 1, wherein the control center comprises a look-ahead host and a detonation control host, and the detonation control host is in communication connection with the digital detonator initiator to control the digital detonator initiator to detonate.
7. A control center for digital detonators is characterized in that the control center is connected with a first line and a plurality of second lines, the first line is connected with each second line in parallel, the first line is connected with a digital detonator initiator, each second line is connected with a digital detonator, and the control center comprises:
the obtaining module is used for obtaining a detonation instruction, and the detonation instruction is used for indicating the digital detonators to detonate in sequence according to a preset time interval;
the control module is used for controlling the digital detonator exploder to explode the digital detonators so as to enable the digital detonators to explode in sequence according to a preset time interval;
and the detection recording module is used for recording vibration data corresponding to the digital detonator under the condition that the detonation of the digital detonator is detected.
8. The control center according to claim 7, further comprising:
the receiving module is used for receiving a detonation setting instruction, and the detonation setting instruction comprises a preset time interval and a preset detonation frequency;
the preset detonation frequency corresponds to the number of the second lines; the preset detonation times are used for determining the detonation times of the digital detonator blaster for detonating the digital detonator.
9. The control center according to claim 7, further comprising:
the acquisition module is used for acquiring identification information corresponding to all digital detonators through the information acquisition device and sending the identification information to a monitoring end;
the receiving module is further configured to receive a feedback notification from the supervisory end, where the feedback notification includes permission information for operating the digital detonator;
and the setting module is used for setting the detonation time of the digital detonator according to the permission information and the preset time interval so that the digital detonator detonates sequentially according to the preset time interval after receiving the instruction of the digital detonator initiator.
10. The control center according to claim 7, wherein the control center is further connected with a test line, the test line is connected with the first line in parallel, and the test line is connected with a test detonator;
correspondingly, the receiving module is further configured to receive a test detonation instruction, where the test detonation instruction is used to instruct a test detonator to detonate;
the control module is also used for controlling the digital detonator initiator to detonate the test detonator;
the detection recording module is further used for recording test data corresponding to the test detonator when the test detonator is detected to detonate;
and the control module is further used for controlling the digital detonator exploder to explode the digital detonators according to the explosion instruction under the condition that the test data are determined to be abnormal, so that the digital detonators explode sequentially according to a preset time interval.
CN202011194904.4A 2020-10-30 2020-10-30 Advanced forecasting method and control center for digital detonator Pending CN112462414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011194904.4A CN112462414A (en) 2020-10-30 2020-10-30 Advanced forecasting method and control center for digital detonator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011194904.4A CN112462414A (en) 2020-10-30 2020-10-30 Advanced forecasting method and control center for digital detonator

Publications (1)

Publication Number Publication Date
CN112462414A true CN112462414A (en) 2021-03-09

Family

ID=74836007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011194904.4A Pending CN112462414A (en) 2020-10-30 2020-10-30 Advanced forecasting method and control center for digital detonator

Country Status (1)

Country Link
CN (1) CN112462414A (en)

Similar Documents

Publication Publication Date Title
CN108107467A (en) A kind of tunnel geological forecast automatic monitoring system
CN103777232A (en) Deep rock mass rock blasting forecasting and early warning method based on blast vibration monitoring
CN102135445A (en) Blasting vibration predicting method
CN101349532A (en) Safe blasting system capable of alarming misfire information
CN201269721Y (en) Apparatus for alarming misfire information of blasting equipment
US20200088503A1 (en) Rfd with history log, security fence, and seismic detection
CN105954357A (en) Method for simultaneous measurement of sound velocity of multi-step horizontal rock body
CN107367203A (en) A kind of blasting parameters optimization method for ensureing above ground structure safety
RU2718598C2 (en) Information system for a detonator
CN112462414A (en) Advanced forecasting method and control center for digital detonator
AU2015252366B2 (en) Blasting system control
WO2022073043A1 (en) Blasting system
CN110749376B (en) Blasting safety analysis method and system based on continuous digital vibration measurement
CN105865280B (en) A kind of method that optimization design rock matches on-site mixed emulsion
CN208207228U (en) A kind of tunnel geological forecast automated watch-keeping facility
RU2316025C2 (en) Method of measurement of detonation degree by using seismic energy
CN108303732A (en) A kind of Artificial Seismic Wave automatic monitoring system
CN115712148A (en) Mining static load detection method, device, computer equipment, system and medium
CN116413765A (en) Method and device for acquiring earthquake prospecting well cannon
JP2001141835A (en) Method for exploring bedrock before cutting face and method for confirming state of cutting face
CN205334110U (en) Auxiliary control system is driven in source
JP7470614B2 (en) A method for estimating three-dimensional velocity structure ahead of the face in a face-ahead detection system
CN115979082A (en) Blasting management system and method based on microseismic monitoring
Gunadhar et al. Optimum blasting with precision delays and true bottom hole initiation: through e-DET ft at Jayant Project of NCL
CN113532210A (en) Aerial intelligent safety detonating controller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Song Guanghui

Inventor after: Liu Yonghong

Inventor after: Ma Huaipeng

Inventor after: Wang Tao

Inventor before: Liu Yonghong

Inventor before: Song Guanghui

Inventor before: Ma Huaipeng

Inventor before: Wang Tao