CN112459468A - Template for building pouring construction - Google Patents

Template for building pouring construction Download PDF

Info

Publication number
CN112459468A
CN112459468A CN202011265902.XA CN202011265902A CN112459468A CN 112459468 A CN112459468 A CN 112459468A CN 202011265902 A CN202011265902 A CN 202011265902A CN 112459468 A CN112459468 A CN 112459468A
Authority
CN
China
Prior art keywords
fixing
template
templates
connecting rod
pouring construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011265902.XA
Other languages
Chinese (zh)
Inventor
黄友斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011265902.XA priority Critical patent/CN112459468A/en
Publication of CN112459468A publication Critical patent/CN112459468A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Abstract

The invention discloses a template for building pouring construction, relates to the technical field of building construction, and mainly solves the problems that the existing template for building construction is inconvenient to mount and dismount in the using process and influences the construction efficiency; the device comprises a base, a template is installed on the base, the template symmetry is arranged on the base, a steel bar framework is arranged between the templates, width positioning rods are evenly arranged between the steel bar frameworks, fixing sleeves are evenly arranged between the templates, internal threads are arranged at two ends of each fixing sleeve, the rotating directions of the internal threads are opposite, fixing bolts are in threaded connection with two ends of each fixing sleeve and are inserted into the templates, rubber sleeves are arranged between the fixing bolts and the templates in a limiting mode, the rubber sleeves are installed on the templates in a limiting mode, the outer side faces of the templates are provided with fixing plates, clamping jaws are arranged on the fixing plates, and the clamping jaws are connected with the fixing devices.

Description

Template for building pouring construction
Technical Field
The invention relates to the technical field of building construction, in particular to a template for building pouring construction.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.
The existing template for building pouring construction is slow in installation speed in the using process, and meanwhile, the pouring construction hook is inconvenient to detach, so that the progress of building construction is greatly influenced.
Disclosure of Invention
An embodiment of the present invention provides a form for building pouring construction, so as to solve the problems in the background art.
In order to achieve the above purpose, the embodiments of the present invention provide the following technical solutions:
the template for building pouring construction comprises a base, wherein templates are arranged on the base and symmetrically arranged on the base, reinforcing steel bar frames are arranged between the formworks, width positioning rods are uniformly arranged between the reinforcing steel bar frames, concrete is poured between the formworks and the steel bar framework, fixing sleeves are uniformly arranged between the formworks, the two ends of the fixed sleeve are provided with internal threads, the turning directions of the internal threads are opposite, the two ends of the fixed sleeve are connected with fixed bolts through threads, the fixing bolt is inserted on the template, a rubber sleeve is arranged between the fixing bolt and the template, the rubber sleeve is limited and arranged on the template, the outer side surface of the template is uniformly provided with a fixed plate, the clamping jaw is arranged on the fixing plate on the lower side of the template and connected with the fixing device, and the locking device is arranged on the fixing plate on the upper side of the template.
As a further scheme of the embodiment of the invention: the fixing device comprises a first connecting rod connected with the clamping jaw, the first connecting rod and the clamping jaw are rotatably installed, the first connecting rod is rotatably connected with a second connecting rod, the second connecting rod is vertically arranged, a telescopic column is arranged on the second connecting rod, a pre-tightening disc is installed on the telescopic column, the pre-tightening disc is installed in a contact mode with the template, the second connecting rod is connected with a supporting disc, and the supporting disc is installed in a contact mode with the ground.
As a further scheme of the embodiment of the invention: the one end of template is provided with the connecting block, the other end of template is provided with connecting groove, through connecting block and connecting groove interconnect between the template, the connecting block is trapezoidal setting.
As a further scheme of the embodiment of the invention: the fixed plate is L-shaped, the end of the fixed plate is provided with a bolt, the bolt is obliquely arranged, a matching groove is formed in the template, and the bolt is matched with the matching groove.
As a further scheme of the embodiment of the invention: the locking device comprises a fixing sleeve, a barb is arranged at one end of the fixing sleeve and is matched with one end of the fixing plate, a bolt hole is formed in the other end of the fixing sleeve, a locking bolt is installed on the bolt hole in a threaded mode, and the locking bolt and the fixing plate are installed in a contact mode.
As a further scheme of the embodiment of the invention: and a cushion block is arranged between the locking bolt and the fixing plate.
As a further scheme of the embodiment of the invention: an adjusting seat is arranged between the supporting disk and the second connecting rod, and the adjusting seat is in threaded connection with the supporting disk.
Compared with the prior art, the embodiment of the invention has the beneficial effects that:
according to the invention, the width positioning rod is arranged in the middle of the template and is combined with the width positioning rod to fix the installation width of the template, so that the accurate size positioning in the concrete pouring process is ensured; the fixing sleeve is arranged between the templates, and the templates are fixed by combining the fixing bolts, so that the fixing firmness of the templates is effectively improved; through setting up the cooperation groove on the template, combine the cooperation groove to install the fixed plate, through fixed cover and locking bolt, lock the fixed plate to realize the reliable connection between the template, avoid pouring the in-process and take place to leak, the cooperation groove is installed fixed cover simultaneously, thereby can dismantle the template fast after the concrete drying, promotes the dismantlement efficiency of template greatly.
Drawings
Fig. 1 is a schematic structural view of a form for building pouring construction.
Fig. 2 is a schematic side view of a form for use in cast-in-place construction.
Fig. 3 is a schematic view of the installation of a fixing plate and a fixing sleeve in a form for building pouring construction.
Fig. 4 is a schematic structural view of a fixing sleeve in a formwork for building pouring construction.
In the figure: the steel bar reinforced plastic composite material comprises a base 1, a template 2, a steel bar framework 3, a width positioning rod 4, a fixing sleeve 5, a fixing bolt 6, a rubber sleeve 7, a fixing plate 8, a matching groove 80, a clamping jaw 9, a first connecting rod 10, a second connecting rod 11, an adjusting seat 12, a supporting plate 13, a telescopic column 14, a pre-tightening plate 15, a connecting block 16, a connecting groove 160, a fixing sleeve 17, a bolt hole 170, a locking bolt 18 and a cushion block 180.
Detailed Description
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Example 1:
as shown in fig. 1-4, a formwork for building pouring construction comprises a base 1, wherein formworks 2 are mounted on the base 1, the formworks 2 are symmetrically arranged on the base 1, reinforcing steel frames 3 are arranged between the formworks 2, width positioning rods 4 are uniformly arranged between the reinforcing steel frames 3, concrete is poured between the formworks 2 and the reinforcing steel frames 3, fixing sleeves 5 are uniformly arranged between the formworks 2, internal threads are arranged at two ends of each fixing sleeve 5, the screwing directions of the internal threads are opposite, fixing bolts 6 are connected with two ends of each fixing sleeve 5 through threads, the fixing bolts 6 are inserted into the formworks 2, rubber sleeves 7 are arranged between the fixing bolts 6 and the formworks 2, the rubber sleeves 7 are installed on the formworks 2 in a limiting manner, fixing plates 8 are uniformly arranged on the outer side surfaces of the formworks 2, clamping claws 9 are arranged on the fixing plates 8 on the lower sides of the formworks, the clamping jaws 9 are connected with the fixing device, and a locking device is arranged on the fixing plate 8 on the upper side of the template 2.
Specifically, set up template 2 through the both sides at steel framework 3, set up width locating lever 4 simultaneously between steel framework 3, combine width locating lever 4 to fix the interval between template 2, guarantee concrete placement's accuracy nature.
More specifically, through evenly set up fixing sleeve 5 between steel framework 3, combine fixing bolt 6 to fix template 2 to guarantee template 2's accurate fixed mounting operation, the dismantlement operation in the later stage of being convenient for simultaneously.
More specifically, the lower portion of the formwork 2 is fixed by the claws 9 and the fixing means, and the stability at the initial stage of concrete pouring is ensured.
Further, the fixing device comprises a first connecting rod 10 connected with a clamping jaw 9, the first connecting rod 10 and the clamping jaw 9 are rotatably installed, the first connecting rod 10 is rotatably connected with a second connecting rod 11, the second connecting rod 11 is vertically arranged, a telescopic column 14 is arranged on the second connecting rod 11, a pre-tightening disc 15 is installed on the telescopic column 14, the pre-tightening disc 15 is installed in a contact mode with the template 2, the second connecting rod 11 is connected with a supporting disc 13, and the supporting disc 13 is installed in a contact mode with the ground.
Specifically, the lower side of the formwork 2 is fixedly installed by combining the first connecting rod 10, the second connecting rod 11, the telescopic column 14 and the pre-tightening disc 15, so that the fixed installation of the lower formwork 2 is ensured, and meanwhile, the stability of the concrete pouring initial stage is greatly improved.
Further, one end of the template 2 is provided with a connecting block 16, the other end of the template 2 is provided with a connecting groove 160, the templates 2 are connected with each other through the connecting block 16 and the connecting groove 160, and the connecting block 16 is in a trapezoidal arrangement.
Specifically, the templates 2 are connected through the connecting blocks 16 and the connecting grooves 160, so that the connecting stability between the templates 2 is effectively improved, the pouring tightness is effectively improved, and the leakage in the pouring process is avoided.
Further, fixed plate 8 is the setting of L shape, the tip of fixed plate 8 is provided with the bolt, the bolt slope sets up, be provided with cooperation groove 80 on the template 2, the bolt is mutually supported with cooperation groove 80.
Specifically, the fixing plate 8 and the fixing sleeve 17 which are arranged in an L shape are used for reliably connecting the seams of the template 2, so that the connection stability is effectively ensured.
Further, locking device includes fixed cover 17, the one end of fixed cover 17 is provided with the barb, the barb is mutually supported with the one end of fixed plate 8, the other end of fixed cover 17 is provided with bolt hole 170, threaded mounting has locking bolt 18 on the bolt hole 170, the contact installation between locking bolt 18 and the fixed plate 8.
Specifically, through the locking device, the fixing plates 8 are connected by using the barbs on the fixing sleeve 17, and the fixing plates 8 on the two sides are locked and installed by using the locking bolts 18, so that the connection stability between joints of the formwork 2 is further ensured.
Further, a spacer block 180 is disposed between the locking bolt 18 and the fixing plate 8.
Example 2:
this embodiment is a further improvement and a limitation of embodiment 1 on the basis of embodiment 1.
A form for building and casting construction, comprising all the components of embodiment 1, and further comprising:
further, an adjusting seat 12 is arranged between the supporting disk 13 and the second connecting rod 11, and the adjusting seat 12 is in threaded connection with the supporting disk 13.
Specifically, the adjusting seat 12 is arranged, and the supporting disk 13 and the adjusting seat 12 are connected by using threads, so that the stability of the adjusting support is effectively improved.
The working principle of the embodiment of the invention is as follows:
as shown in fig. 1-4, the width positioning rod 4 is arranged in the middle of the template 2, and the installation width of the template 2 is fixed by combining the width positioning rod 4, so that the accurate size positioning in the concrete pouring process is ensured; the fixing sleeve 5 is arranged between the templates 2, and the fixing bolts 6 are combined to fix the templates 2, so that the fixing firmness of the templates 2 is effectively improved; through set up cooperation groove 80 on template 2, combine cooperation groove 80 to install fixed plate 8, through fixed cover 17 and locking bolt 18, lock fixed plate 8 to realize the reliable connection between template 2, avoid pouring the in-process and take place to leak, cooperation groove 80 installs fixed cover 17 simultaneously, thereby can dismantle template 2 fast after the concrete drying, promote template 2's dismantlement efficiency greatly.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The template for building pouring construction comprises a base (1), wherein templates (2) are installed on the base (1), the templates (2) are symmetrically arranged on the base (1), and is characterized in that reinforcing steel bar frames (3) are arranged between the templates (2), width positioning rods (4) are uniformly arranged between the reinforcing steel bar frames (3), concrete is poured between the templates (2) and the reinforcing steel bar frames (3), fixing sleeves (5) are uniformly arranged between the templates (2), internal threads are arranged at two ends of each fixing sleeve (5), the rotating directions of the internal threads are opposite, fixing bolts (6) are connected with two ends of each fixing sleeve (5) in a threaded manner, the fixing bolts (6) are inserted on the templates (2), a rubber sleeve (7) is arranged between each fixing bolt (6) and the corresponding template (2), and the rubber sleeve (7) is installed on the templates (2) in a limiting manner, the outer side surface of the template (2) is uniformly provided with a fixing plate (8), a clamping jaw (9) is arranged on the fixing plate (8) on the lower side of the template (2), the clamping jaw (9) is connected with a fixing device, and a locking device is arranged on the fixing plate (8) on the upper side of the template (2).
2. The form for building pouring construction according to claim 1, wherein the fixing device comprises a first connecting rod (10) connected with a clamping jaw (9), the first connecting rod (10) and the clamping jaw (9) are rotatably installed, the first connecting rod (10) and a second connecting rod (11) are rotatably connected, the second connecting rod (11) is vertically arranged, a telescopic column (14) is arranged on the second connecting rod (11), a pre-tightening disc (15) is installed on the telescopic column (14), the pre-tightening disc (15) and the form (2) are installed in a contact mode, the second connecting rod (11) is connected with a supporting disc (13), and the supporting disc (13) is installed in a contact mode with the ground.
3. The form for building pouring construction according to claim 1, wherein one end of the form (2) is provided with a connecting block (16), the other end of the form (2) is provided with a connecting groove (160), the forms (2) are connected with each other through the connecting block (16) and the connecting groove (160), and the connecting block (16) is in a trapezoidal arrangement.
4. The form for building pouring construction according to claim 1, wherein the fixing plate (8) is L-shaped, a plug is arranged at the end of the fixing plate (8) and is inclined, and a matching groove (80) is arranged on the form (2), and the plug and the matching groove (80) are matched with each other.
5. The form for building pouring construction as claimed in claim 1, wherein said locking device comprises a fixing sleeve (17), one end of said fixing sleeve (17) is provided with a barb, said barb is matched with one end of the fixing plate (8), the other end of said fixing sleeve (17) is provided with a bolt hole (170), a locking bolt (18) is connected with said bolt hole (170) in a threaded manner, and said locking bolt (18) is installed in contact with the fixing plate (8).
6. The form for building casting according to claim 5, characterized in that a spacer (180) is provided between the locking bolt (18) and the fixing plate (8).
7. The form panel for building pouring construction according to claim 2, characterized in that an adjusting seat (12) is arranged between the support plate (13) and the second connecting rod (11), and the adjusting seat (12) is in threaded connection with the support plate (13).
CN202011265902.XA 2020-11-12 2020-11-12 Template for building pouring construction Withdrawn CN112459468A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011265902.XA CN112459468A (en) 2020-11-12 2020-11-12 Template for building pouring construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011265902.XA CN112459468A (en) 2020-11-12 2020-11-12 Template for building pouring construction

Publications (1)

Publication Number Publication Date
CN112459468A true CN112459468A (en) 2021-03-09

Family

ID=74826623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011265902.XA Withdrawn CN112459468A (en) 2020-11-12 2020-11-12 Template for building pouring construction

Country Status (1)

Country Link
CN (1) CN112459468A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152892A (en) * 2021-05-18 2021-07-23 王长财 Anti-toppling device for building construction template and using method
CN113279567A (en) * 2021-06-01 2021-08-20 叶欣欣 Novel formwork support device for building construction
CN115012645A (en) * 2022-06-29 2022-09-06 涿州天保建筑体系有限公司 Wall formwork, building wall and construction method of building wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152892A (en) * 2021-05-18 2021-07-23 王长财 Anti-toppling device for building construction template and using method
CN113152892B (en) * 2021-05-18 2022-08-19 江西省吉安市建筑安装工程总公司 Anti-toppling device for building construction template and using method
CN113279567A (en) * 2021-06-01 2021-08-20 叶欣欣 Novel formwork support device for building construction
CN115012645A (en) * 2022-06-29 2022-09-06 涿州天保建筑体系有限公司 Wall formwork, building wall and construction method of building wall
CN115012645B (en) * 2022-06-29 2023-03-24 涿州天保建筑体系有限公司 Wall formwork, building wall and construction method of building wall

Similar Documents

Publication Publication Date Title
CN112459468A (en) Template for building pouring construction
CN112900753B (en) Anti-deviation structure for vertical steel bars of constructional engineering and construction method
BR102012001954B1 (en) anchoring device for anchoring a machine, stationary crane and method for anchoring a machine to a concrete foundation
CN213710393U (en) Municipal administration road bridge construction is with novel template fastening device
CN217501668U (en) Make things convenient for assembled tunnel portal design of dismouting to use template
CN113482007B (en) Waist beam supporting structure and construction method thereof
CN212583226U (en) Building construction template with connect fixed knot to construct
CN115262966A (en) Building template locking equipment for pouring reinforced concrete
CN214834692U (en) High-strength wooden building template
CN210621480U (en) Bridge building templates link for civil engineering
CN214883695U (en) Foundation pit supporting and reinforcing device convenient to disassemble and assemble
CN214401439U (en) Bent cap template convenient to dismantle
CN211873074U (en) Steel structure reinforced foundation ring of mountain land wind driven generator foundation
CN220747661U (en) But building engineering is with quick assembly disassembly's template structure
CN112502446A (en) Socket type center barrel temporary support and using method thereof
CN212388983U (en) Fastening device
CN217104616U (en) Found quick formwork fixture device of rimstone back
CN219100529U (en) Cast-in-situ foundation template mechanism of roof photovoltaic bracket
CN214462558U (en) Frame post template reinforcing apparatus
CN217782879U (en) Adjustable clip supports formula beam type template strutting arrangement
CN219387199U (en) Quick-dismantling pre-burying device for horizontal wood formwork
CN214879776U (en) Tower crane supporting base convenient to fix and install
CN218576547U (en) Slope adjusting device for beam end of precast beam
CN220487137U (en) Vertical steel bar positioning device for slip form construction
CN214995890U (en) Supporting construction that assembled template was used

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210309