CN112453553A - Steel pipe fixed length over-and-under type cutting equipment for construction - Google Patents

Steel pipe fixed length over-and-under type cutting equipment for construction Download PDF

Info

Publication number
CN112453553A
CN112453553A CN202011319931.XA CN202011319931A CN112453553A CN 112453553 A CN112453553 A CN 112453553A CN 202011319931 A CN202011319931 A CN 202011319931A CN 112453553 A CN112453553 A CN 112453553A
Authority
CN
China
Prior art keywords
bin
storehouse
cutting
pushing
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011319931.XA
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Xiayuan Tendering Co ltd
Original Assignee
Yunnan Xiayuan Tendering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Xiayuan Tendering Co ltd filed Critical Yunnan Xiayuan Tendering Co ltd
Priority to CN202011319931.XA priority Critical patent/CN112453553A/en
Publication of CN112453553A publication Critical patent/CN112453553A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D21/00Machines or devices for shearing or cutting tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D33/00Accessories for shearing machines or shearing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D33/00Accessories for shearing machines or shearing devices
    • B23D33/12Equipment for indicating where to cut
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q11/00Accessories fitted to machine tools for keeping tools or parts of the machine in good working condition or for cooling work; Safety devices specially combined with or arranged in, or specially adapted for use in connection with, machine tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q11/00Accessories fitted to machine tools for keeping tools or parts of the machine in good working condition or for cooling work; Safety devices specially combined with or arranged in, or specially adapted for use in connection with, machine tools
    • B23Q11/0042Devices for removing chips

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention discloses a fixed-length lifting type cutting device for a steel pipe for building construction, which comprises a dust removal bin and a collection bin, wherein a pushing bin is installed at the top of the dust removal bin, an adjusting bin is installed at one end, far away from the pushing bin, of the top of the collection bin, a cutting bin is installed at one end, close to the pushing bin, of the top of the collection bin, a cutting assembly is arranged inside the cutting bin, and a through hole is formed in the middle position, close to the bottom of one end of the adjusting bin, of the cutting bin. According to the invention, through the matched use of the pushing bin, the control panel, the dust removing bin and the pushing assembly, after the steel pipe is inserted into the pushing bin, the electric pneumatic cylinder is controlled to extend, so that the guide roller and the wire guide wheel are mutually matched to clamp the steel pipe, then the guide roller is driven to rotate by controlling the first servo motor, the steel pipe is gradually extended into the adjusting bin, and the steel pipe does not need to be manually pushed by an operator in the whole process, so that the labor intensity of the operator is reduced, and the efficiency of cutting the steel pipe by the device is also improved.

Description

Steel pipe fixed length over-and-under type cutting equipment for construction
Technical Field
The invention relates to the technical field of steel pipe cutting equipment, in particular to fixed-length lifting type steel pipe cutting equipment for building construction.
Background
The building is a general term of buildings and structures, and is an artificial environment created by people by using the grasped material technical means and applying certain scientific laws, geomantic omen concepts and aesthetic rules to meet the needs of social life.
When steel pipes are used in the current building construction, most workers place the steel pipes under the cutting wheels, and the workers continuously push the steel pipes to cut the steel pipes, so that the steel pipes are very inconvenient and low in efficiency; in addition, when the current cutting device is used for cutting the steel pipe, the cutting length of the steel pipe needs to be manually controlled by a cutting operator, so that the length of the cut steel pipe is prone to deviation, and the quality of building construction is affected; meanwhile, in the process of cutting the steel pipe by the current steel pipe cutting device, the scraps generated by cutting by the device cannot be collected and treated in a centralized manner, so that not only is the environment polluted, but also resources are wasted; and present steel pipe cutting device still needs artifical manually operation to fix the steel pipe in the use, can't carry out the centre gripping automatically to the steel pipe fixed or loosen, greatly reduced the result of use and the practicality of whole device, be unfavorable for the use widely of device.
Disclosure of Invention
The invention aims to provide a fixed-length lifting type cutting device for a steel pipe for building construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a steel pipe fixed length lifting type cutting device for building construction comprises a dust removal bin and a collection bin, wherein a pushing bin is installed at the top of the dust removal bin, an adjusting bin is installed at one end, far away from the pushing bin, of the top of the collection bin, a cutting bin is installed at one end, close to the pushing bin, of the top of the collection bin, a cutting assembly is arranged inside the cutting bin, a through hole is formed in the middle position, close to the bottom of one end of the adjusting bin, of the cutting bin, pushing assemblies are jointly arranged at the top of the dust removal bin and inside of the pushing bin, a dust removal assembly is arranged inside the dust removal bin, threaded rods are jointly arranged at the middle positions of two ends in the adjusting bin, a movable seat is arranged on the outer side of each threaded rod in a threaded manner, a gear wheel is installed at one end, far away from the cutting bin, of the outer, a small gear meshed with the large gear is mounted at the output end of the second servo motor, a square blanking hole is formed in the middle of the top of the collection bin, a control panel is mounted at the top of one side of the dust removal bin, and the control panel is electrically connected with the second servo motor through a wire;
the cutting assembly comprises a first gear, a clamp, a first sliding groove, a first sliding block, a spring, a first rack, a second gear, electric lifting rods, an installation bin, a second rack, a rotating motor and a cutting disc, wherein the electric lifting rods are symmetrically installed on two sides of the top of the cutting bin, the installation bin is jointly installed at the output ends of the two groups of electric lifting rods, the second rack is symmetrically arranged on two sides of the installation bin, the rotating motor is installed in the installation bin, the cutting disc is installed at the output end of the rotating motor, second gears matched with the second racks are symmetrically arranged at the middle positions, close to the two sides of one end of the adjusting bin, of the cutting bin, first gears meshed with the second gears are symmetrically arranged at the bottoms, close to the two sides of one end of the second gear, of the cutting bin, the first sliding groove is symmetrically formed in the two sides, close to one end of the pushing bin, of the top of, a first sliding block is arranged inside the first sliding groove, clamps which are matched with each other are arranged at the top of the first sliding block, a first rack which is meshed with the first gear is arranged at the top of one side, away from each other, of each clamp, springs are symmetrically arranged at the bottom of one side, away from each other, of each clamp, one side, away from each clamp, of each spring is fixedly connected with the inner side wall of the cutting bin, and the control panel is electrically connected with the electric lifting rod and the rotating motor through wires respectively;
the pushing assembly comprises movable bins, first servo motors, electric pneumatic cylinders, chains, wire guide wheels, chain wheels and guide rollers, the electric pneumatic cylinders are symmetrically installed at the inner tops of the pushing bins, the movable bins are installed at the output ends of the two groups of electric pneumatic cylinders together, the first servo motors are installed in the middle positions of one sides of the tops of the movable bins, the guide rollers are symmetrically arranged at two ends of the inner parts of the movable bins, the chain wheels are installed at one ends of the two groups of guide rollers close to the first servo motors and at the output ends of the first servo motors, the chains are installed at the outer sides of the three groups of chain wheels together, the wire guide wheels matched with the guide rollers are uniformly arranged at the tops of the dedusting bins, and the control panel is electrically connected with the first servo motors and the electric pneumatic cylinders through wires;
the dust removal subassembly includes aspiration pump, supplementary storehouse, filter screen and guide storehouse, the inside one end that is close to the collection storehouse of dust removal storehouse is installed and is led the feed bin, the inside one end that is close to the feed bin of dust removal storehouse is provided with supplementary storehouse, and the inside in supplementary storehouse evenly is provided with the filter screen, the one end that the collection storehouse was kept away from at the top in the dust removal storehouse is installed the aspiration pump, the input of aspiration pump and the inside intercommunication in supplementary storehouse, the inside in supplementary storehouse and the inside intercommunication in guide storehouse.
Preferably, the two sides of the top of the collecting bin are symmetrically provided with second sliding grooves, second sliding blocks are arranged inside the second sliding grooves, and the tops of the second sliding blocks are fixedly connected with the bottom of the movable seat.
Preferably, the top in dust removal storehouse is provided with the mounting groove, and the mounting groove is kept away from the one end in collection storehouse and is communicate to the inside of other end downward sloping gradually and with the guide bin, the wire wheel is located the inside of mounting groove.
Preferably, one side of regulation storehouse articulates there is first door, the both sides in cutting storehouse and propelling movement storehouse all articulate there is the second door, and the outside of second door and first door all installs the connection handle.
Preferably, a first sliding groove is formed in the middle position, close to one end of the adjusting bin, of the cutting bin, and a first sliding block fixedly connected with the mounting bin is arranged inside the first sliding groove.
Preferably, the second sliding grooves are symmetrically formed in the two inner sides of the pushing bin, and second sliding blocks fixedly connected with the movable bin are arranged inside the second sliding grooves.
Preferably, the two sides of the collecting bin are symmetrically hinged with third bin doors, and handles are mounted on the outer sides of the third bin doors.
Preferably, the interior bottom of collecting the storehouse is by both sides to intermediate position department rising, the intermediate position department of sliding seat bottom installs the connecting block, and the pushing plate is installed to the bottom of connecting block.
Preferably, the link is installed to one side that the movable seat is close to control panel, and the link is kept away from one side of movable seat and is passed the regulation storehouse and install the pointer, the intermediate position department that the regulation storehouse is close to control panel one side is provided with the length scale mark that mutually supports with the pointer.
Preferably, four groups of universal wheels are mounted at the bottoms of the dust removal bin and the collection bin together, and braking devices are arranged on the universal wheels.
Compared with the prior art, the invention provides a steel pipe fixed-length lifting type cutting device for building construction, which has the following beneficial effects:
1. according to the invention, through the matched use of the pushing bin, the control panel, the dust removing bin and the pushing assembly, after the steel pipe is inserted into the pushing bin, the electric pneumatic cylinder is controlled to extend, so that the guide roller and the wire guide wheel are mutually matched to clamp the steel pipe, then the guide roller is driven to rotate by controlling the first servo motor, the steel pipe is gradually extended into the adjusting bin, and the steel pipe does not need to be manually pushed by an operator in the whole process, so that the labor intensity of the operator is reduced, and the efficiency of cutting the steel pipe by the device is also improved.
2. According to the invention, through the matching use of the adjusting bin, the collecting bin, the pushing plate, the square blanking hole, the large gear, the threaded rod, the small gear, the second servo motor, the movable seat, the second sliding groove and the second sliding block, before the device cuts the steel pipe, the threaded rod is driven by the second servo motor to rotate, so that the movable seat is forced to horizontally move in the adjusting bin, and the movable seat is stopped at a specified position according to the pointer and the length scale mark, and the length of the cut steel pipe does not need to be manually controlled by an operator, so that the length of the steel pipe cut by the device is more accurate, and the influence on the quality of building construction caused by inaccurate length of the cut steel pipe is avoided.
3. According to the invention, through the matching use of the dust removal bin and the dust removal assembly, when the device is used for cutting a steel pipe, scraps generated by cutting can be sucked into the auxiliary bin for centralized treatment, and the vibration generated by the work of the air suction pump also promotes impurities falling to the top of the dust removal bin on the surface of the steel pipe to enter the interior of the material guide bin and then enter the interior of the auxiliary bin, so that the influence of the scraps generated by cutting on the surrounding environment is avoided, the collected scraps can be further treated and then recycled, and the waste of resources is avoided.
4. According to the invention, through the matching use of the cutting bin and the cutting assembly, the electric pneumatic cylinder is used for extending, so that the rotating cutting disc cuts the steel pipe below, after the mounting bin descends, the second gear and the second rack are not meshed any more, at the moment, due to the elastic force of the spring, two groups of clamps are forced to tightly clamp the steel pipe, the stability of the steel pipe in the cutting process is improved, in the ascending process of the mounting bin, the second rack is gradually meshed with the second gear to drive the second gear and the first gear to rotate, so that the two groups of clamps are forced to be away from each other, the cut steel pipe falls into the collecting bin due to the self gravity, and no auxiliary fixing is required by an operator in the whole process, the use effect and the practicability of the device are greatly improved, and the device is beneficial to popularization and use.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a front cross-sectional view of the present invention;
FIG. 3 is a top cross-sectional view of the present invention;
FIG. 4 is a schematic view of the present invention after the installation bin has been raised;
FIG. 5 is a schematic view of the present invention after the mounting bin has been lowered;
FIG. 6 is a perspective view of a pusher plate according to the present invention;
FIG. 7 is an enlarged view taken at A of FIG. 2 according to the present invention.
In the figure: 1. a regulating bin; 2. cutting the bin; 3. a pushing bin; 4. a control panel; 5. a dust removal bin; 6. a collection bin; 7. a cutting assembly; 701. a first gear; 702. a clamp; 703. a first chute; 704. a first slider; 705. a spring; 706. a first rack; 707. a second gear; 708. an electric lifting rod; 709. installing a bin; 710. a second rack; 711. a rotating electric machine; 712. cutting the disc; 8. a push assembly; 801. a movable bin; 802. a first servo motor; 803. an electric pneumatic cylinder; 804. a chain; 805. a wire guide wheel; 806. a sprocket; 807. a guide roller; 9. a dust removal assembly; 901. an air pump; 902. an auxiliary bin; 903. a filter screen; 904. a material guiding bin; 10. a push plate; 11. a square blanking hole; 12. a bull gear; 13. a threaded rod; 14. a pinion gear; 15. a second servo motor; 16. a movable seat; 17. a second chute; 18. a second slider; 19. and a through hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a steel pipe fixed-length lifting type cutting device for building construction comprises a dust removing bin 5 and a collecting bin 6, wherein four groups of universal wheels are jointly installed at the bottoms of the dust removing bin 5 and the collecting bin 6, braking devices are arranged on the universal wheels, the whole device can be conveniently moved to a specified position to be used, a pushing bin 3 is installed at the top of the dust removing bin 5, an adjusting bin 1 is installed at one end, far away from the pushing bin 3, of the top of the collecting bin 6, a third bin door is symmetrically hinged to two sides of the collecting bin 6, a handle is installed on the outer side of the third bin door, a steel pipe cut by the collecting bin 6 can be conveniently taken out and used, a cutting bin 2 is installed at one end, close to the pushing bin 3, of the top of the collecting bin 6, a cutting assembly 7 is arranged inside the cutting bin 2, a first bin door is hinged to one side of the adjusting bin 1, a second bin door is hinged to two sides of the cutting bin 2 and the pushing bin 3, and connecting handles are installed on, the regular maintenance of the components in the adjusting bin 1, the cutting bin 2 and the pushing bin 3 is facilitated, the normal use of the device is ensured, a through hole 19 is formed in the middle position of the cutting bin 2 close to the bottom of one end of the adjusting bin 1, the pushing components 8 are arranged on the top of the dust removing bin 5 and the inside of the pushing bin 3 together, the dust removing component 9 is arranged in the dust removing bin 5, a threaded rod 13 is arranged at the middle position of two ends in the adjusting bin 1 together, a movable seat 16 is arranged on the outer side of the threaded rod 13 in a threaded manner, second sliding grooves 17 are symmetrically formed in two sides of the top of the collecting bin 6, a second sliding block 18 is arranged in the second sliding groove 17, the top of the second sliding block 18 is fixedly connected with the bottom of the movable seat 16, the stability of the movable seat 16 in the horizontal moving process is improved, the inner bottom of the collecting bin 6 rises from two sides to the middle position, and a connecting block, the pushing plate 10 is arranged at the bottom end of the connecting block, so that the pushing plate 10 is driven to move by the movable seat 16, and steel pipes in the collecting bin 6 are extruded neatly;
one end of the outer side of the threaded rod 13 far away from the cutting bin 2 is provided with a bull gear 12, one end of the inner top of the adjusting bin 1 close to the bull gear 12 is provided with a second servo motor 15, a pinion 14 which is meshed with the gearwheel 12 is arranged at the output end of the second servo motor 15, a square blanking hole 11 is arranged at the middle position of the top of the collection bin 6, a control panel 4 is arranged at the top of one side of the dust removal bin 5, the control panel 4 is electrically connected with the second servo motor 15 through a lead, a connecting frame is arranged at one side of the movable seat 16, which is close to the control panel 4, one side of the connecting frame, which is far away from the movable seat 16, penetrates through the adjusting bin 1 and is provided with a pointer, and length scale marks matched with the pointer are arranged at the middle position of one side of the adjusting bin 1, which is close to the control panel 4, so that the accuracy of the moving position of the movable seat 16 is improved, and the accuracy of the length of the cut steel pipe is ensured;
the cutting component 7 comprises a first gear 701, a clamp 702, a first sliding chute 703, a first sliding block 704, a spring 705, a first rack 706, a second gear 707, electric lifting rods 708, an installation bin 709, a second rack 710, a rotating motor 711 and a cutting disc 712, wherein the electric lifting rods 708 are symmetrically installed at two sides of the top of the cutting bin 2, the installation bin 709 is installed at the output ends of the two groups of electric lifting rods 708 together, a first sliding groove is formed in the middle position of one end, close to the adjustment bin 1, of the cutting bin 2, a first sliding block fixedly connected with the installation bin 709 is arranged inside the first sliding groove, the stability of the installation bin 709 in the lifting process is improved, the second rack 710 is symmetrically arranged at two sides of the installation bin 709, the rotating motor 711 is installed inside the installation bin 709, the cutting disc 712 is installed at the output end of the rotating motor 711, the second gear 707 matched with the second rack 710 is symmetrically arranged at the middle position of two sides, close to one end of the adjustment bin 1, of the cutting bin 2, the bottom of the cutting bin 2 close to the two sides of one end of the second gear 707 is symmetrically provided with a first gear 701 meshed with the second gear 707, the two sides of the top of the collecting bin 6 close to one end of the pushing bin 3 are symmetrically provided with first sliding chutes 703, the first sliding chutes 703 are internally provided with first sliding blocks 704, the top of the first sliding blocks 704 is provided with mutually matched clamps 702, the top of one side of the clamps 702 far away from each other is provided with a first rack 706 meshed with the first gear 701, the bottom of one side of the clamps 702 far away from each other is symmetrically provided with springs 705, one side of the springs 705 far away from the clamps 702 is fixedly connected with the inner side wall of the cutting bin 2, and the control panel 4 is respectively and electrically connected with the electric lifting rod 708 and the rotating motor;
the pushing assembly 8 comprises a movable bin 801, a first servo motor 802, electric pneumatic cylinders 803, chains 804, wire guiding wheels 805, chain wheels 806 and guiding rollers 807, the electric pneumatic cylinders 803 are symmetrically installed at the inner top of the pushing bin 3, the movable bin 801 is installed at the output ends of the two groups of electric pneumatic cylinders 803 together, second sliding grooves are symmetrically formed in the inner two sides of the pushing bin 3, second sliding blocks fixedly connected with the movable bin 801 are arranged inside the second sliding grooves, the improvement of the stability of the lifting process of the movable bin 801 is facilitated, the first servo motor 802 is installed in the middle position of one side of the top of the movable bin 801, the guiding rollers 807 are symmetrically arranged at the two ends inside the movable bin 801, the chain wheels 806 are installed at one ends of the two groups of guiding rollers 807 close to the first servo motor 802 and the output ends of the first servo motor 802, the chains 804 are jointly arranged at the outer sides of the three groups of chain wheels 806, the wire guiding wheels 805 matched with the guiding rollers 807 are uniformly arranged, the control panel 4 is electrically connected with the first servo motor 802 and the electric pneumatic cylinder 803 through wires respectively;
dust removal subassembly 9 includes aspiration pump 901, supplementary storehouse 902, filter screen 903 and guide storehouse 904, the inside one end that is close to collection storehouse 6 in dust removal storehouse 5 is installed and is led storehouse 904, the inside one end that is close to guide storehouse 904 in dust removal storehouse 5 is provided with supplementary storehouse 902, and the inside of supplementary storehouse 902 evenly is provided with filter screen 903, the top is kept away from the one end of collecting storehouse 6 in dust removal storehouse 5 and is installed aspiration pump 901, the input of aspiration pump 901 and the inside intercommunication of supplementary storehouse 902, the inside and the inside intercommunication of guide storehouse 904 of supplementary storehouse 902, the top of dust removal storehouse 5 is provided with the mounting groove, and the mounting groove is kept away from the one end of collecting storehouse 6 and is gradually to the other end downward sloping and with the inside intercommunication of guide storehouse 904, wire wheel 805 is located the inside of mounting groove, help collecting the inside of supplementary storehouse into with dust or impurity collection that the steel pipe falls to dust.
Embodiment 1, as shown in fig. 1-3, when the steel pipe needs to be pushed to move towards the interior of the conditioning chamber 1, the steel pipe is manually inserted into the interior of the conditioning chamber 1, and the steel pipe is located in the groove of the wire guide wheel 805, and then the electric pneumatic cylinder 803 is controlled by the control panel 4 to extend, so that the guide rollers 807 and the wire guide wheel 805 clamp and fix the steel pipe, and then the first servo motor 802 is controlled to rotate, and through the cooperation of the chain 804 and the chain wheel 806, the two sets of guide rollers 807 are driven to synchronously rotate in the same direction, so as to push the steel pipe towards the interior of the conditioning chamber 1 until the top end of the steel pipe abuts against the square groove on the movable seat 16, thereby completing the pushing operation.
Embodiment 2, as shown in fig. 1, 2, 3 and 6, when the length of the steel pipe to be cut needs to be controlled, the second servo motor 15 is controlled to rotate by the control panel 4, the second servo motor 15 drives the threaded rod 13 to rotate through the cooperation of the pinion 14 and the gearwheel 12, so that the movable seat 16 is forced to horizontally move inside the adjusting bin 1 until the pointer on the movable seat 16 points on the designated length scale line, and when the steel pipe inside the collecting bin 6 is irregular, the movable seat 16 can be controlled to move towards one end close to the pushing bin 3, and the steel pipe inside the collecting bin 6 can be neatly stacked by the extrusion of the pushing plate 10 and the inner wall of the collecting bin 6.
Embodiment 3, as shown in fig. 1, 2, 3, 4, 5 and 7, when cutting of the steel pipe is started, the rotary motor 711 is controlled to rotate the cutting disc 712, then, the electric lift rod 708 is controlled to extend, so that the mounting bin 709 and the rotating motor 711 are lowered, and in the process, the second gear 707 gradually disengages from the second rack 710, at this time, due to the elastic force of the spring 705, the two sets of clamps 702 are forced to tightly clamp the steel pipe, and then the cutting of the steel pipe is started after the cutting disc 712 contacts the steel pipe, after the steel pipe is cut, the installation bin 709 and the rotating motor 711 are controlled to ascend to the original height, in the process, the second gear 710 is gradually meshed with the second gear 707 to drive the second gear 707 and the first gear 701 to rotate, thereby forcing the two sets of clamps 702 away from each other and allowing the cut steel pipe to fall into the interior of the collecting bin 6 through the square blanking hole 11 due to its own weight.
The working principle is as follows: before use, the device is powered on, firstly, according to the length of the steel pipe to be cut, the second servo motor 15 is controlled to rotate through the control panel 4, the second servo motor 15 drives the threaded rod 13 to rotate through the matching of the pinion 14 and the gearwheel 12, so that the movable seat 16 is forced to horizontally move in the adjusting bin 1 until a pointer on the movable seat 16 points on a specified length scale mark, then, the steel pipe is manually inserted into the adjusting bin 1, the steel pipe is positioned in the groove of the wire guide wheel 805, then, the electric pneumatic cylinder 803 is controlled to extend through the control panel 4, so that the guide roller 807 and the wire guide wheel 805 clamp and fix the steel pipe, then, the first servo motor 802 is controlled to rotate, through the matching of the chain 804 and the sprocket 806, the two groups of guide rollers 807 are driven to synchronously rotate in the same direction, the steel pipe is pushed towards the inside of the adjusting bin 1 until the top end of the steel pipe passes through the through hole, then, the steel pipe is cut, the rotating motor 711 is controlled to drive the cutting disc 712 to rotate, the electric lifting rod 708 is controlled to extend, the mounting bin 709 and the rotating motor 711 are lowered, the second gear 707 is gradually not meshed with the second rack 710 in the process, the two groups of clamps 702 are forced to tightly clamp the steel pipe due to the elastic force of the spring 705, then the steel pipe is cut after the cutting disc 712 contacts the steel pipe, the mounting bin 709 and the rotating motor 711 are controlled to ascend to the original height after the steel pipe is cut, and in the process, the second rack 710 is gradually meshed with the second gear 707 to drive the second gear 707 and the first gear 701 to rotate, so that the two groups of clamps 702 are forced to be away from each other, and the cut steel pipe falls into the collecting bin 6 due to the self gravity; when the device cuts steel pipes, the suction pump 901 can be controlled by the control panel 4 to start working, the suction pump 901 enables the inside of the auxiliary bin 902 to be in a negative pressure state, so that outside air can flow into the inside of the material guide bin 904 from the top of the material guide bin 904 and then enter the inside of the auxiliary bin 902, in the process, waste scraps generated by cutting the steel pipes by the cutting disc 712 are sucked into the inside of the auxiliary bin 902 by the flowing air, and impurities falling to the top of the dust removal bin 5 on the surfaces of the steel pipes are also driven to enter the inside of the material guide bin 904 by vibration generated by the working of the suction pump 901, and finally enter the inside of the auxiliary bin 902, the steel pipes entering the collecting bin 6 can gradually roll to two sides inside the collecting bin 6, when the steel pipes inside the collecting bin 6 are irregular, the movable seat 16 can be controlled to move, the steel pipes inside the collecting bin 6 can be pushed by the push plate 10, so that the steel pipes are, regularly opening third bin doors at two sides of the collection bin 6, taking out the steel pipes collected in the collection bin 6, regularly opening bin doors at the outer side of the dust removal bin 5, and performing centralized treatment on the scraps and dust collected in the auxiliary bin 902; also regularly open first door and second door, overhaul the inside subassembly in regulation storehouse 1, cutting storehouse 2 and propelling movement storehouse 3, guarantee the normal use of device.
Finally, it should be noted that the above-mentioned contents are only used for illustrating the technical solutions of the present invention, and not for limiting the protection scope of the present invention, and that the simple modifications or equivalent substitutions of the technical solutions of the present invention by those of ordinary skill in the art can be made without departing from the spirit and scope of the technical solutions of the present invention.

Claims (10)

1. The utility model provides a steel pipe fixed length over-and-under type cutting equipment for construction, includes dust removal storehouse (5) and collection storehouse (6), its characterized in that: the dust removing device is characterized in that a pushing bin (3) is installed at the top of the dust removing bin (5), a regulating bin (1) is installed at one end, far away from the pushing bin (3), of the top of the collecting bin (6), a cutting bin (2) is installed at one end, near the pushing bin (3), of the top of the collecting bin (6), a cutting assembly (7) is arranged inside the cutting bin (2), a through hole (19) is formed in the middle position, near the bottom of one end of the regulating bin (1), of the cutting bin (2), pushing assemblies (8) are jointly arranged at the top of the dust removing bin (5) and inside of the pushing bin (3), a dust removing assembly (9) is arranged inside the dust removing bin (5), a threaded rod (13) is jointly arranged at the middle positions of two ends in the regulating bin (1), a movable seat (16) is arranged on an outer side thread of the threaded rod (13), one end, far away from the cutting bin (2), outside the, a second servo motor (15) is installed at one end, close to the large gear (12), of the top in the adjusting bin (1), a small gear (14) meshed with the large gear (12) is installed at the output end of the second servo motor (15), a square blanking hole (11) is formed in the middle of the top of the collecting bin (6), a control panel (4) is installed at the top of one side of the dust removing bin (5), and the control panel (4) is electrically connected with the second servo motor (15) through a conducting wire;
the cutting assembly (7) comprises a first gear (701), a clamp (702), a first sliding groove (703), a first sliding block (704), a spring (705), a first rack (706), a second gear (707), electric lifting rods (708), an installation bin (709), a second rack (710), a rotating motor (711) and a cutting disc (712), wherein the electric lifting rods (708) are symmetrically installed on two sides of the top of the cutting bin (2), the installation bin (709) is installed at the output ends of the two groups of electric lifting rods (708) together, the second racks (710) are symmetrically arranged on two sides of the installation bin (709), the rotating motor (711) is installed inside the installation bin (709), the cutting disc (712) is installed at the output end of the rotating motor (711), the second gear (707) matched with the second rack (710) is symmetrically arranged at the middle position of the cutting bin (2) close to two sides of one end of the adjusting bin (1), the bottom of the cutting bin (2) close to the two sides of one end of the second gear (707) is symmetrically provided with a first gear (701) which is meshed with the second gear (707), two sides of the top of the collecting bin (6) close to one end of the pushing bin (3) are symmetrically provided with first sliding chutes (703), a first sliding block (704) is arranged in the first sliding groove (703), clamps (702) which are matched with each other are arranged at the top of the first sliding block (704), the top of one side of the clamps (702) far away from each other is provided with a first rack (706) meshed with the first gear (701), the bottom of the clamp (702) at the side far away from each other is symmetrically provided with a spring (705), and one side of the spring (705) far away from the clamp (702) is fixedly connected with the inner side wall of the cutting bin (2), the control panel (4) is respectively and electrically connected with the electric lifting rod (708) and the rotating motor (711) through wires;
the pushing assembly (8) comprises a movable bin (801), a first servo motor (802), electric pneumatic cylinders (803), a chain (804), a wire guide wheel (805), a chain wheel (806) and guide rollers (807), wherein the electric pneumatic cylinders (803) are symmetrically installed at the top of the inner part of the pushing bin (3), the movable bin (801) is installed at the output end of two groups of electric pneumatic cylinders (803) together, the first servo motor (802) is installed at the middle position of one side of the top of the movable bin (801), the guide rollers (807) are symmetrically arranged at two ends inside the movable bin (801), the two groups of guide rollers (807) are close to one end of the first servo motor (802) and the output end of the first servo motor (802) and are provided with the chain wheel (806) together, the chain wheel (804) is arranged outside the chain wheel (806) together, and the wire guide wheels (805) matched with the guide rollers (807) are uniformly arranged at the top of the dust removing bin (5), the control panel (4) is electrically connected with the first servo motor (802) and the electric pneumatic cylinder (803) through leads respectively;
dust removal subassembly (9) include aspiration pump (901), supplementary storehouse (902), filter screen (903) and guide storehouse (904), dust removal storehouse (5) inside one end that is close to collection storehouse (6) is installed and is led feed bin (904), the inside one end that is close to guide feed bin (904) of dust removal storehouse (5) is provided with supplementary storehouse (902), and the inside of supplementary storehouse (902) evenly is provided with filter screen (903), aspiration pump (901) are installed to the one end of collecting storehouse (6) is kept away from at the top in dust removal storehouse (5), the input of aspiration pump (901) and the inside intercommunication in supplementary storehouse (902), the inside of supplementary storehouse (902) and the inside intercommunication in guide storehouse (904).
2. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: second sliding grooves (17) are symmetrically formed in two sides of the top of the collecting bin (6), second sliding blocks (18) are arranged inside the second sliding grooves (17), and the top of each second sliding block (18) is fixedly connected with the bottom of the corresponding movable seat (16).
3. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: the top in dust removal storehouse (5) is provided with the mounting groove, and the mounting groove is kept away from the one end of collecting storehouse (6) and is communicate gradually to the inside of other end downward sloping and with guide feed bin (904), wire wheel (805) are located the inside of mounting groove.
4. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: one side of adjusting bin (1) articulates there is first door, the both sides of cutting storehouse (2) and propelling movement storehouse (3) all articulate there is the second door, and the outside of second door and first door all installs the connection handle.
5. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: a first sliding groove is formed in the middle position, close to one end of the adjusting bin (1), of the cutting bin (2), and a first sliding block fixedly connected with the mounting bin (709) is arranged inside the first sliding groove.
6. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: second sliding grooves are symmetrically formed in the two inner sides of the pushing bin (3), and second sliding blocks fixedly connected with the movable bin (801) are arranged inside the second sliding grooves.
7. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: and third bin doors are symmetrically hinged to two sides of the collecting bin (6), and handles are mounted on the outer sides of the third bin doors.
8. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: the interior bottom of collecting storehouse (6) is by both sides to intermediate position department rising, the intermediate position department of sliding seat (16) bottom installs the connecting block, and pushing plate (10) are installed to the bottom of connecting block.
9. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: the link is installed in one side that sliding seat (16) are close to control panel (4), and the link is kept away from one side of sliding seat (16) and is passed regulation storehouse (1) and install the pointer, the intermediate position department that regulation storehouse (1) is close to control panel (4) one side is provided with the length scale mark that mutually supports with the pointer.
10. The fixed-length lifting type cutting equipment for the steel pipes for building construction, according to claim 1, is characterized in that: four groups of universal wheels are jointly installed at the bottoms of the dust removal bin (5) and the collection bin (6), and braking devices are arranged on the universal wheels.
CN202011319931.XA 2020-11-23 2020-11-23 Steel pipe fixed length over-and-under type cutting equipment for construction Withdrawn CN112453553A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011319931.XA CN112453553A (en) 2020-11-23 2020-11-23 Steel pipe fixed length over-and-under type cutting equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011319931.XA CN112453553A (en) 2020-11-23 2020-11-23 Steel pipe fixed length over-and-under type cutting equipment for construction

Publications (1)

Publication Number Publication Date
CN112453553A true CN112453553A (en) 2021-03-09

Family

ID=74798441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011319931.XA Withdrawn CN112453553A (en) 2020-11-23 2020-11-23 Steel pipe fixed length over-and-under type cutting equipment for construction

Country Status (1)

Country Link
CN (1) CN112453553A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113369568A (en) * 2021-06-28 2021-09-10 江苏众信绿色管业科技有限公司 Nonrust steel pipe cutting device of reinforcing
CN117086388A (en) * 2023-10-14 2023-11-21 临西县华源轴承有限公司 Numerical control pipe cutting machine for bearing treatment
CN117548732A (en) * 2023-12-28 2024-02-13 维格斯湖北流体技术有限公司 Stainless steel pipe cutting equipment with adjusting and positioning mechanism

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113369568A (en) * 2021-06-28 2021-09-10 江苏众信绿色管业科技有限公司 Nonrust steel pipe cutting device of reinforcing
CN117086388A (en) * 2023-10-14 2023-11-21 临西县华源轴承有限公司 Numerical control pipe cutting machine for bearing treatment
CN117086388B (en) * 2023-10-14 2023-12-15 临西县华源轴承有限公司 Numerical control pipe cutting machine for bearing treatment
CN117548732A (en) * 2023-12-28 2024-02-13 维格斯湖北流体技术有限公司 Stainless steel pipe cutting equipment with adjusting and positioning mechanism
CN117548732B (en) * 2023-12-28 2024-05-31 维格斯湖北流体技术有限公司 Stainless steel pipe cutting equipment with adjusting and positioning mechanism

Similar Documents

Publication Publication Date Title
CN112453553A (en) Steel pipe fixed length over-and-under type cutting equipment for construction
CN211218799U (en) Glass mold drilling device
CN114905090A (en) Novel be used for battery tray dysmorphism aluminium alloy to saw cut equipment
CN211101758U (en) Numerical control vertical milling machine
CN115556195B (en) Intelligent environment-friendly PTP processing platform for custom board production
CN212706656U (en) Multifunctional workbench for machining
CN204473228U (en) A kind of film pasting mechanism of full-automatic battery slice
CN110369640B (en) Energy-saving steel bar cutting equipment for constructional engineering
CN112122933A (en) Punching, cutting and cleaning device for door frame aluminum profile
CN220462424U (en) Steel cutting equipment for civil air defense door
CN214552164U (en) Automatic change vertical workshop pulse dust removal case
CN112916923A (en) Numerical control vertical milling machine
CN219171070U (en) Multifunctional supporting frame
CN218701648U (en) Device is tailor with high efficiency to corrugated paper carton production
CN219358124U (en) Automatic change equipment spare part processing cutting equipment
CN117533738B (en) Auxiliary feeding device for thin-wall steel sandal wood strip forming processing
CN212385047U (en) Elevator car produces cutting device
CN218965569U (en) Brick tea deburring device
CN218310573U (en) Cable cutting device
CN216398205U (en) Automatic cutting device
CN219705428U (en) Paper cutting device
CN217073117U (en) Light guide plate forming die
CN219747199U (en) Door and window section bar cutting equipment
CN220329862U (en) Bearing ring forging and bottom cutting machine
CN216858897U (en) Adjustable aluminum alloy processing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210309

WW01 Invention patent application withdrawn after publication