CN1124384C CN 00130630 CN00130630A CN1124384C CN 1124384 C CN1124384 C CN 1124384C CN 00130630 CN00130630 CN 00130630 CN 00130630 A CN00130630 A CN 00130630A CN 1124384 C CN1124384 C CN 1124384C
Authority
CN
China
Prior art keywords
arch
splayed
bridge
vertical columns
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00130630
Other languages
English (en)
Other versions
CN1293287A (zh
Inventor
周志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING COMMUNICATIONS CONSTRUCTION GROUP CO LTD
Zhou Zhi Xiang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00130630 priority Critical patent/CN1124384C/zh
Publication of CN1293287A publication Critical patent/CN1293287A/zh
Application granted granted Critical
Publication of CN1124384C publication Critical patent/CN1124384C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明属于建筑结构技术领域,公开了一种由立柱竖转形成八字形拱桥的施工方法,其主要实施步骤是:以立柱施工的方式完成八字形拱的斜腿部分施工,其上端联结钢管桁架作为八字形拱水平撑的劲性骨架;拆除立柱与基础的临时固结形成铰结,使其在竖直平面缓慢转动至合拢;浇注水平撑区段混凝土使其形成八字形拱圈;完成拱上建筑的施工,并适时施加预应力和固结拱脚以改善拱圈的内力。本发明所需设备少、工艺简单、施工安全、工期缩短。

Description

由立柱竖转形成的八字形拱桥的施工方法
本发明属于建筑结构技术领域,尤其涉及一种由立柱竖转形成八字形拱桥的施工方法。
现有技术中,跨度在100米以上拱桥通常采用分节段预制、天线吊运就位、逐段悬臂拼装合拢来形成其主拱圈,需要大量的机具设备及附属设施,施工过程中悬拼结构存在诸多不安全因素,工艺复杂,工序繁多、技术难度大、措施费用高、建设工期长;为此,也有提出整体成拱再运输吊装就位的设想,若能实施,施工速度将显著提高,但如此庞大的结构对整体运输和吊装设备的要求以及由此产生的费用非常之高昂,以致通常情况下对建设方和施工方均是不可接受的。
本发明的目的在于提供一种仅需少量机具设备、工艺简单、施工安全快速、具有明显经济技术效益的由立柱竖转形成八字形拱桥施工方法。
本发明的目的以如下技术步骤实现:A、在桥位的设定位置完成基础施工;B、在基础上以立柱施工的方式完成八字形拱的斜腿部分施工,其下端与基础作临时固结;C、按设计要求制造钢管桁架作为八字形拱水平撑的劲性骨架;D、用钢缆绳系住立柱的顶端,拆除立柱与基础的临时固结形成铰结,控制钢缆绳的放松速度,使两岸的立柱及劲性骨架在竖直平面内绕立柱下端缓慢转动直至合拢,并联结成八字形拱;E、在对水平撑劲性骨架的主钢管填充混凝土并达到强度后,拆除钢缆绳,对钢管混凝土劲性骨架区段外包混凝土形成完整的八字形拱圈;F、按设计要求对八字形拱的斜腿及横撑施加预应力;G、完成拱上立柱及桥台的施工,封闭拱脚的临时铰使其成为固结;H、在立柱和桥台上搭设桥面板,完成桥面铺装等工作形成全桥。
本发明具有的积极效果是:以立柱方式完成八字形拱斜腿部分的施工,再竖转合拢成拱,较常规大跨度混凝土拱圈的施工极大的简化了工艺,节省了大量模板及支架,避免了昂贵的天线吊运设备,以及用作拱圈节段临时承重及稳定的扣索和浪风等高昂的措施费,提高了工效;施工过程中结构的整体性和稳定性显著提高,保证了施工安全;八字形拱圈为分段直线型结构,易于通过施加预应力来调整各截面的应力至期望程度,为拱圈结构优化提供了一条可行的途径。
下面结合附图对本发明的实施例作进一步的详述:
图6是本发明的实施结构示意图
图1是本发明实施的第一道主要工序
图2是图1的I-I剖视图
图3是本发明实施的第二道主要工序
图4是本发明实施的第三道主要工序
图5是图4的II-II剖视图
图6是本发明实施的第四道主要工序
图7是图6的III-III剖视图
件1是桥位河床地面,件2是拱桥基础,件3是八字形拱的斜腿部分,件4是钢缆绳,件5是八字形拱水平撑的劲性钢管骨架,件6是八字形拱水平撑劲性钢管骨架的外包混凝土,件7是拱上立柱,件8是桥台,件9是使拱脚由临时铰成为固定端的封闭混凝土,件10是桥面板。
本发明以如下技术步骤按四道主要工序实现:
第一道主要工序:A、在桥位河床地面1的设定位置完成拱桥基础2的施工;B、在基础2上以立柱施工的方式完成八字形拱的斜腿部分3的施工,斜腿部分3的下端与基础2作临时固结;C、按设计要求安装八字形拱水平撑的劲性钢管骨架5,其下端与斜腿部分3的顶端固结形成整体;
第二道主要工序:D、用钢缆绳4系住斜腿部分3的顶端,拆除斜腿部分3与基础2的临时固结形成铰结,控制钢缆绳4的放松速度,使斜腿部分3和劲性骨架5在竖直平面内绕斜腿部分3下端缓慢地整体转动直至合拢,并联结成八字形拱;
第三道主要工序:E、在对劲性骨架5的主钢管填充混凝土并达到强度后,拆除钢缆绳4,对钢管劲性骨架区段5外包混凝土形成完力;
第四道主要工序:G、完成拱上立柱7及桥台8的施工,浇注封闭混凝土9,使拱脚由临时铰成为固定端;H、在拱上立柱7及桥台8上铺设桥面板10,并完成桥面铺装等工作形成全桥。

Claims (2)

1、一种由立柱竖转形成八字形拱桥的施工方法,其特征在于:A、在桥位河床地面(1)的设定位置完成拱桥基础(2)的施工;B、在基础(2)上以立柱施工的方式完成八字形拱的斜腿部分(3)的施工,斜腿部分(3)的下端与基础(2)作临时固结;C、按设计要求安装八字形拱水平撑的钢管劲性骨架(5),其下端与八字形拱的斜腿部分(3)的顶端固结形成整体;D、用钢缆绳(4)系住斜腿部分(3)的顶端,拆除的斜腿部分(3)与基础(2)的临时固结形成铰结,控制钢缆绳(4)的放松速度,使八字形拱的斜腿部分(3)和劲性骨架(5)整体地在竖直平面内绕斜腿部分(3)的下端缓慢转动直至合拢,并联结成八字形拱。
2、根据权力要求1所述的由立柱竖转形成八字形拱桥的施工方法,其特征在于:E、对八字形拱水平撑的劲性钢管骨架(5)的主钢管填充混凝土并达到强度后,拆除钢缆绳(4),对劲性钢管骨架区段(5)外包混凝土(6)形成完整的八字形拱圈;F、按设计要求对八字形拱的斜腿(3)及水平撑(6)施加预应力;G、完成拱上立柱(7)及桥台(8)的施工,浇注拱脚处的封闭混凝土(9),使拱脚由临时铰成为固定端;H、在拱上立柱(7)及桥台(8)上铺设桥面板(10)。
CN 00130630 2000-10-03 2000-10-03 由立柱竖转形成的八字形拱桥的施工方法 Expired - Fee Related CN1124384C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00130630 CN1124384C (zh) 2000-10-03 2000-10-03 由立柱竖转形成的八字形拱桥的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00130630 CN1124384C (zh) 2000-10-03 2000-10-03 由立柱竖转形成的八字形拱桥的施工方法

Publications (2)

Publication Number Publication Date
CN1293287A CN1293287A (zh) 2001-05-02
CN1124384C true CN1124384C (zh) 2003-10-15

Family

ID=4594224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00130630 Expired - Fee Related CN1124384C (zh) 2000-10-03 2000-10-03 由立柱竖转形成的八字形拱桥的施工方法

Country Status (1)

Country Link
CN (1) CN1124384C (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100447338C (zh) * 2007-09-06 2008-12-31 长业建设集团有限公司 软土地基多孔双悬臂拱形桥结构及其施工方法
CN101195986B (zh) * 2007-12-27 2010-06-09 中铁六局集团太原铁路建设有限公司 客运专线悬浇连续梁临时支座固结体系
CN104711933A (zh) * 2015-03-26 2015-06-17 招商局重庆交通科研设计院有限公司 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法
CN105603858B (zh) * 2016-03-14 2017-11-03 广西大学 斜柱桥
CN114855655B (zh) * 2022-04-24 2023-08-29 广西北投交通养护科技集团有限公司 基于截面重心至验算倾覆轴距离进行连拱桥拆除的方法

Also Published As

Publication number Publication date
CN1293287A (zh) 2001-05-02

Similar Documents

Publication Publication Date Title
CN110331668B (zh) 一种无背索斜拉桥双向倾斜v型桥塔施工方法
CN103266574B (zh) 一种斜缆加固简支箱梁桥的方法
CN211815489U (zh) 一种带有自锚悬索体系的超大跨径飞燕式钢管混凝土拱桥
CN103290784B (zh) 拱梁结合桥吊装施工方法
CN110205938B (zh) 下承式梁拱组合桥的钢管拱安装方法
CN111335142A (zh) 自锚式斜拉系杆拱桥
CN113638304B (zh) 混凝土梁式桥隐盖梁结构体系及其施工方法
CN206467561U (zh) 预制装配式双柱花瓶桥墩
CN104912321A (zh) 一种用于悬空结构的钢桁架模板支撑结构及其安装方法
CN108660908A (zh) 一种塔梁预制拼装式的预应力混凝土斜拉桥
CN114108917A (zh) 一种可调节高度的装配式叠合楼板施工工法
CN113882238A (zh) 大跨度上承式索辅梁拱组合刚构桥及其施工方法
CN206267309U (zh) 一种装配式钢‑混凝土框架‑核心筒结构体系
CN1124384C (zh) 由立柱竖转形成的八字形拱桥的施工方法
CN107881924A (zh) 一种盖梁支架
Dauner et al. The Lully Viaduct, a composite bridge with steel tube truss
WO2003048469A1 (fr) Procede de construction d'un batiment a etages et systeme de verins special pour ce procede
CN216108007U (zh) 混凝土梁式桥及其现浇隐盖梁
CN204401462U (zh) 用于水中墩超长预应力盖梁施工支撑体系的支架
CN208803631U (zh) 轻钢格栅混凝土叠合柱
CN112575948A (zh) 一种张弦梁与悬挑桁架组合屋架及施工方法
CN206127855U (zh) 一种加厚钢板基础的开孔腹板式组合梁
CN206070872U (zh) 一种工字型钢开孔腹板式组合梁
CN110725208A (zh) 一种墩顶叠合梁无支架架设的施工方法
CN104404884B (zh) 用于水中墩超长预应力盖梁施工支撑体系的支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090724

Address after: No. 66, Xuefu Avenue, Nan'an District, Chongqing: 400074

Co-patentee after: Chongqing Communications Construction Group Co.,Ltd.

Patentee after: Zhou Zhi Xiang

Address before: 1-4-2, 35 building, Chongqing Jiaotong College, Chongqing, 400074

Patentee before: Zhou Zhixiang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20031015

Termination date: 20161003