CN112431098A - Appurtenance of curb transport installation - Google Patents

Appurtenance of curb transport installation Download PDF

Info

Publication number
CN112431098A
CN112431098A CN202011293314.7A CN202011293314A CN112431098A CN 112431098 A CN112431098 A CN 112431098A CN 202011293314 A CN202011293314 A CN 202011293314A CN 112431098 A CN112431098 A CN 112431098A
Authority
CN
China
Prior art keywords
pull rod
kerbstone
shaped clamping
holes
clamping arms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011293314.7A
Other languages
Chinese (zh)
Inventor
薛志博
陈志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202011293314.7A priority Critical patent/CN112431098A/en
Publication of CN112431098A publication Critical patent/CN112431098A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • E01C19/526Apparatus for laying individual preformed surfacing elements, e.g. kerbstones hand operated

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The utility model provides an appurtenance of curb transport installation, includes pull rod, a pair of anchor clamps, its characterized in that: the pull rod comprises an upper pull rod and a lower pull rod, the diameters of the upper pull rod and the lower pull rod are the same, a sleeved pipe section with a plurality of through holes is fixedly welded at the lower end of the upper pull rod, the pair of clamps are left and right corresponding [ shaped clamping arms ], the connecting ends at the upper parts of the [ shaped clamping arms are provided with through holes and can be movably connected with the through holes of the pull rods through bolts, and stainless steel gaskets are arranged at the bottoms of the [ shaped clamping arms. The auxiliary tool for carrying and installing the kerbstone has the advantages that the auxiliary tool is simple in structure and convenient to manufacture, the inclined plane grooving of the tool can effectively prevent the kerbstone from sliding off in the process of carrying and installing the kerbstone, construction operation safety is improved, the stainless steel gasket can effectively separate from the kerbstone under the condition that the kerbstone is placed in place, and construction efficiency is improved.

Description

Appurtenance of curb transport installation
Technical Field
The invention relates to a kerbstone carrying and mounting tool, in particular to an auxiliary tool for carrying and mounting kerbstones.
Background
Kerbstones can be divided into vertical kerbstones and flat kerbstones. Generally speaking, concrete curb prefabricated blocks are all heavier, the weight of a curb prefabricated block with the geometric dimension of 75 multiplied by 38 multiplied by 12cm can reach 80kg, the weight of a curb made of granite can reach 200kg, the operation burden in the process of transportation, installation and maintenance is heavier, the traditional operation mode is that a user carries the curb to an installation site and simultaneously manually embraces a pointing point to install or adopts a simple hoisting tool formed by bending an iron wire, the manual operation burden is heavier, and the construction efficiency is slower.
The known way of handling kerbs therefore suffers from the inconveniences and problems described above.
Disclosure of Invention
The invention aims to provide an auxiliary tool for carrying and installing a curb, which reduces the manual construction strength.
In order to achieve the purpose, the technical solution of the invention is as follows:
the utility model provides an appurtenance of curb transport installation, includes pull rod, a pair of anchor clamps, its characterized in that:
the pull rod comprises an upper pull rod and a lower pull rod, the diameters of the upper pull rod and the lower pull rod are the same, a sleeved pipe section provided with a plurality of through holes is fixedly welded at the lower end of the upper pull rod, the upper part of the lower pull rod is provided with a through hole matched with the through hole of the sleeved pipe section, so that the upper pull rod and the lower pull rod can be mutually sleeved through the sleeved pipe section and are movably connected through a bolt, and the length of the pull rod can be freely adjusted; the top end of the upper pull rod is provided with a cross rod grip which is connected with the upper pull rod in a T shape;
the pair of clamps are left and right corresponding [ shaped clamping arms ], the upper connecting ends of the [ shaped clamping arms are provided with through holes and can be movably connected with the through holes of the pull rods through bolts, and the bottoms of the [ shaped clamping arms are provided with stainless steel gaskets.
The auxiliary tool for carrying and installing the kerbstone can be further realized by adopting the following technical measures.
In the method, the lower surface of the handle is provided with a finger groove for facilitating the gripping of the hand.
In the method, the end of the hooking part of the stainless steel gasket is provided with a sawtooth groove inclined plane.
After the technical scheme is adopted, the auxiliary tool for carrying and installing the kerbstone has the advantages that:
1. the auxiliary tool has simple structure and convenient manufacture;
2. the inclined plane grooving of the tool can effectively prevent the kerbstone from sliding off in the process of carrying and mounting, and improve the construction operation safety;
3. the stainless steel gasket can be effectively separated from the kerbstone under the condition that the kerbstone is placed in place, and construction efficiency is improved.
Drawings
FIG. 1 is a schematic view of the adjustment of the length of the tie rod of the curb handling and installing tool according to the embodiment of the invention;
FIG. 2 is a left side view of a curb handling installation tool of an embodiment of the present invention;
FIG. 3 is a front view of a curb handling installation tool of an embodiment of the present invention;
fig. 4 is a schematic view illustrating a state of use of the curb handling and mounting tool according to the embodiment of the present invention.
In the figure: 1 handle, 2 pull rods, 3 handle grooving, 4 bolts, 5 curb stones, 6 right clamps, 8 left clamps, 9 left hook parts, 10 right hook parts, 11 left hook parts inclined plane grooving, 12 right hook parts inclined plane grooving, 13 stainless steel gaskets, 14 emboliaed pipe sections, 15 bolt holes, 16 upper pull rods, 17 lower pull rods.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention relates to an auxiliary tool for carrying and installing curb, which comprises a pull rod and a pair of clamps.
Referring to fig. 1, fig. 1 is a schematic view illustrating a length adjustment of a drawbar of a curb handling and mounting tool according to an embodiment of the present invention. As shown in the figure, the pull rod 2 comprises an upper pull rod 16 and a lower pull rod 17, the diameters of the upper pull rod and the lower pull rod are the same, the lower end of the upper pull rod is fixedly welded with a sleeved pipe section 14 provided with a plurality of through holes, the upper part of the lower pull rod is provided with a through hole matched with the through hole of the sleeved pipe section, so that the upper pull rod and the lower pull rod can be mutually sleeved through the sleeved pipe section and are movably connected through a bolt 4, and the length of the pull rod can be freely adjusted; the top end of the upper pull rod is provided with a cross rod handle 1 which is connected with the upper pull rod in a T shape; the lower surface of the handle is provided with a finger groove which is convenient for the hand to grip.
Fig. 2 is a left side view of the curb handling and mounting tool according to the embodiment of the present invention, and fig. 3 is a front view of the curb handling and mounting tool according to the embodiment of the present invention. The pair of clamps are left and right corresponding [ shaped clamping arms ], and the clamping arms are marked as a right clamp 6 and a left clamp 8 in the embodiment. The connecting end of the upper part of the [ shaped clamping arm is provided with a through hole and can be movably connected with the through hole of the pull rod through a bolt, and the bottom of the [ shaped clamping arm is provided with a stainless steel gasket 13. The end part of the hook-starting part of the stainless steel gasket is provided with a sawtooth groove inclined plane. The hook-up end parts are marked as a left hook-up part 9, a right hook-up part 10, a left hook-up part inclined plane groove 11 and a right hook-up part inclined plane groove 12 in the embodiment.
Example 2
Fig. 4 is a schematic view illustrating a state of use of the curb handling and mounting tool according to the embodiment of the present invention. The invention discloses a use method of a kerbstone carrying and mounting tool, which comprises the following steps:
the first step is as follows: when in use, the left lifting hook part 9 and the right lifting hook part 10 are inserted into the bottom of the kerbstone 5, and the right clamp 6 and the left clamp 8 are used for fixing the kerbstone by adjusting the bolt 4.
The second step is as follows: further fastening the bolt 4, and simultaneously adjusting the bolt 4 to adjust the upper pull rod 16, the lower pull rod 17 to reach the proper operation height.
The third step: further fastening bolts 4, holding the handle 1 and carrying to the position where the curb is required to be placed.
The fourth step: further adjusting the bolt 4, loosening the right clamp 6 and the left clamp 8, and enabling the left hook lifting part inclined plane grooving 11 and the right hook lifting part inclined plane grooving 12 to be separated from the bottom of the curb and then manually fine-adjusting.
The auxiliary tool for carrying and installing the kerbstone has the substantial characteristics and obvious technical progress, can finish short-distance kerbstone carrying and installing work under the condition that personnel are nervous, can effectively prevent the kerbstone from sliding off in the carrying and installing process by adopting the inclined plane grooving, can prevent the tools from sliding off in the operating process of the personnel by using the special handle, greatly improves the safety during construction operation, and can effectively separate from the kerbstone under the condition that the kerbstone is placed in place by using the stainless steel gasket, thereby improving the construction efficiency.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (3)

1. The utility model provides an appurtenance of curb transport installation, includes pull rod, a pair of anchor clamps, its characterized in that:
the pull rod comprises an upper pull rod and a lower pull rod, the diameters of the upper pull rod and the lower pull rod are the same, a sleeved pipe section provided with a plurality of through holes is fixedly welded at the lower end of the upper pull rod, the upper part of the lower pull rod is provided with a through hole matched with the through hole of the sleeved pipe section, so that the upper pull rod and the lower pull rod can be mutually sleeved through the sleeved pipe section and are movably connected through a bolt, and the length of the pull rod can be freely adjusted; the top end of the upper pull rod is provided with a cross rod grip which is connected with the upper pull rod in a T shape;
the pair of clamps are left and right corresponding [ shaped clamping arms ], the upper connecting ends of the [ shaped clamping arms are provided with through holes and can be movably connected with the through holes of the pull rods through bolts, and the bottoms of the [ shaped clamping arms are provided with stainless steel gaskets.
2. A curb handling installation aid as claimed in claim 1 wherein the lower surface of the handle is provided with finger grooves to facilitate gripping by a hand.
3. A curb handling installation aid as claimed in claim 1 wherein the hooked portion end of the stainless steel shim is provided with a serrated slot bevel.
CN202011293314.7A 2020-11-18 2020-11-18 Appurtenance of curb transport installation Pending CN112431098A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011293314.7A CN112431098A (en) 2020-11-18 2020-11-18 Appurtenance of curb transport installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011293314.7A CN112431098A (en) 2020-11-18 2020-11-18 Appurtenance of curb transport installation

Publications (1)

Publication Number Publication Date
CN112431098A true CN112431098A (en) 2021-03-02

Family

ID=74693285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011293314.7A Pending CN112431098A (en) 2020-11-18 2020-11-18 Appurtenance of curb transport installation

Country Status (1)

Country Link
CN (1) CN112431098A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1046597A1 (en) * 1999-04-19 2000-10-25 Eberhard Geist Lifting device for moulded articles, especially concrete slabs
JP2013133634A (en) * 2011-12-26 2013-07-08 Masahiro Furukawa Gripper of pavement block
CN211547221U (en) * 2019-11-29 2020-09-22 中交一公局海威工程建设有限公司 Lump material paving device
CN211711742U (en) * 2020-03-10 2020-10-20 中国建筑一局(集团)有限公司 Simple and easy handling tool of curb

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1046597A1 (en) * 1999-04-19 2000-10-25 Eberhard Geist Lifting device for moulded articles, especially concrete slabs
JP2013133634A (en) * 2011-12-26 2013-07-08 Masahiro Furukawa Gripper of pavement block
CN211547221U (en) * 2019-11-29 2020-09-22 中交一公局海威工程建设有限公司 Lump material paving device
CN211711742U (en) * 2020-03-10 2020-10-20 中国建筑一局(集团)有限公司 Simple and easy handling tool of curb

Similar Documents

Publication Publication Date Title
CN209817430U (en) Template supporting structure of tower crane reserved hole
CN211624389U (en) Opposite-pulling trolley for mounting large-caliber PCCP (prestressed concrete cylinder pipe)
CN112431098A (en) Appurtenance of curb transport installation
CN210104741U (en) Pile feeder adopting manipulator for pile sinking
CN203794430U (en) Lifting appliance for binding vertical reinforcing steel bars
CN209867230U (en) Reinforcing steel bar fixing tool used in process of binding reinforcing steel bar cage
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN212609067U (en) Large-diameter concrete pipe lifting appliance
CN217997746U (en) Curbstone carrying and laying tool
CN216882514U (en) Tool for installing and positioning steel structure welding beam
CN208068133U (en) One kind quickly pulling out grouting cap spanner
CN213730301U (en) Device for laying lining stainless steel plate of urea prilling tower
CN201695968U (en) Pipeline holding clamp
CN213234218U (en) Device is installed and removed fast in construction combination encorbelment
CN215289611U (en) Simple and easy string line support of road surface construction
CN210147328U (en) Pile foundation upper and lower section steel reinforcement cage main reinforcement welded fastening structure
CN215626209U (en) Hoisting clamp for H-shaped steel
CN220949654U (en) Marble slab clamping device
CN217264504U (en) Roof embedded sleeve lifting device
CN205590148U (en) Steel pipe hoist device
CN213859246U (en) Movable clamp for mounting kerbstone
CN214399584U (en) Positioning structure of embedded sleeve of wall-attached embedded part of tower crane
CN218756889U (en) Caliper tool for laying underwater precast block
CN219604864U (en) Beam template clamping and supporting device for construction site
CN219429484U (en) Tensioning spring lifting appliance of bulldozer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210302