CN112392196B - Building construction ceiling suspender structure and positioning and mounting method thereof - Google Patents

Building construction ceiling suspender structure and positioning and mounting method thereof Download PDF

Info

Publication number
CN112392196B
CN112392196B CN202011434165.1A CN202011434165A CN112392196B CN 112392196 B CN112392196 B CN 112392196B CN 202011434165 A CN202011434165 A CN 202011434165A CN 112392196 B CN112392196 B CN 112392196B
Authority
CN
China
Prior art keywords
bolt
spring
fixed
hole
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011434165.1A
Other languages
Chinese (zh)
Other versions
CN112392196A (en
Inventor
路顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Kunlun Investment Group Co Ltd
Original Assignee
China Railway Construction Kunlun Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Kunlun Investment Group Co Ltd filed Critical China Railway Construction Kunlun Investment Group Co Ltd
Priority to CN202011434165.1A priority Critical patent/CN112392196B/en
Publication of CN112392196A publication Critical patent/CN112392196A/en
Application granted granted Critical
Publication of CN112392196B publication Critical patent/CN112392196B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to the field of engineering equipment, and particularly relates to a building construction ceiling suspender structure which comprises a rotary table and a suspender, wherein a straight groove is formed in the rotary table, a first sliding groove is formed in the side wall of the straight groove, a moving rod is arranged in the straight groove, a second sliding groove is formed in the moving rod, a positioning block is connected in the second sliding groove in a sliding mode, a mounting hole is formed in the positioning block, a fixed wheel disc is fixedly connected to the rotary table, and the rotary table and the fixed wheel disc are connected to a fixed shaft in a rotating mode. According to the invention, through the arrangement of the rotary disc, the moving rod, the positioning block and the fixed wheel disc, the rotary disc can rotate for 360 degrees, and the moving rod provided with the sliding groove can be linearly stretched, so that the rotary stretching structure can position all positions in the annular area, the positioning can be more accurate when the suspender is installed, and meanwhile, the suspender is fixedly installed on the positioning block, so that the suspender is prevented from being righted manually, and the condition that the suspender inclines during installation is avoided.

Description

Building construction ceiling suspender structure and positioning and mounting method thereof
Technical Field
The invention belongs to the field of engineering equipment, and particularly relates to a building construction ceiling suspender structure and a positioning and mounting method thereof.
Background
The structural layer or decoration layer on the upper part of the indoor space is a ceiling (suspended ceiling) for the requirements of indoor beauty and heat preservation and heat insulation, and the structural layer of the roof is concealed so as to meet the indoor use requirement. Also known as smallpox, ceiling, flat top. There are two types of conventional ceilings: the ceiling is exposed, and the structure of the roof or floor layer is directly exposed in the indoor space. The modern buildings usually adopt reinforced concrete cross beams or steel pipe net racks to show beautiful structures. Secondly, hanging a ceiling, and hanging another ceiling under the structure of the roof or the floor layer. Can save energy and arrange pipelines between the structural layer and the suspended ceiling.
The installation of current construction ceiling jib is all that many people cooperate and install, the jib slope when the installation need the people to right the jib with the jib and prevent the installation when the installation, and when many jibs of installation, current positioning method work load is great moreover, and the work efficiency that wastes time and energy is not high, has seriously influenced the construction progress, and when many jibs lifted an object simultaneously, other jibs fracture can be influenced to one of them jib fracture takes place the fracture to cause loss of property.
Therefore, we propose a ceiling suspender structure for building construction and a positioning and mounting method thereof to solve the above problems.
Disclosure of Invention
The invention aims to solve the problems and provides a construction ceiling suspender and a positioning and mounting method thereof, wherein the construction ceiling suspender can be quickly positioned and mounted and has a fracture buffering effect.
In order to achieve the purpose, the invention adopts the following technical scheme: a ceiling suspender structure for building construction comprises a turntable and a suspender, wherein the turntable is provided with a straight groove, a first chute is arranged on the side wall of the straight chute, a moving rod is arranged in the straight chute, a second chute is arranged on the moving rod, a positioning block is connected in the second sliding groove in a sliding manner, a mounting hole is formed in the positioning block, a fixed wheel disc is fixedly connected to the rotary disc, the turntable and the fixed wheel disc are rotationally connected on the fixed shaft, the fixed wheel disc is provided with a through hole, an inner cavity is arranged in the through hole, a fixing mechanism for fixing the wheel disc is arranged in the through hole, the fixed shaft is provided with a second threaded hole, the suspender is fixedly arranged in the mounting hole, the suspender is fixedly provided with a fixed plate, the fixed plate is connected with an expansion screw in a threaded manner, and one end, far away from the mounting hole, of the suspender is fixedly provided with a connector.
In foretell construction ceiling jib structure, the one end fixed mounting of motion pole has first stopper, install first spring in the straight flute, the one end fixed connection of first spring is on first stopper, the one end fixed connection that first stopper was kept away from to first spring is on the inner wall of straight flute, the one end that the motion pole kept away from first stopper is rotated and is connected with the baffle, the baffle does not rotate the one end of being connected with first stopper through first bolt and motion pole fixed connection, first screw hole has been seted up on the motion pole, first bolt and first screw hole threaded connection.
In the above-mentioned ceiling suspender structure for building construction, the number of the straight grooves is a plurality of, the straight grooves are in an annular array with respect to the center of a circle of the turntable, a motion rod is arranged in each straight groove, and each motion rod is connected with a plurality of positioning blocks in a sliding manner.
In foretell construction ceiling jib structure, fixed establishment includes second bolt, second stopper and second spring, the second bolt is pegged graft in the through-hole, fixed mounting has the second stopper on the second bolt, the inner wall sliding connection of second stopper and inner chamber, the winding has the second spring on the second bolt, the one end fixed connection of second spring is on the second stopper, the one end fixed connection that the second stopper was kept away from to the second spring is on the lateral wall of inner chamber.
In the above-mentioned ceiling suspender structure for building construction, the number of the second bolts is plural, the plural second bolts are in an annular array with respect to the fixed shaft, and one of the second bolts is in threaded connection with the second threaded hole.
In foretell construction ceiling jib structure, fixed mounting has the block rubber on the jib, the quantity of block rubber is a plurality of and evenly distributed on the jib, sliding connection has the rubber sleeve on the jib, the quantity of rubber sleeve is a plurality of, the block rubber cup joints outside the rubber sleeve, two fixed mounting has the third spring between the block rubber, the third spring winding is on the jib, the both ends difference fixed connection of third spring is on two block rubbers.
A positioning and mounting method of a hanger rod structure of a building construction ceiling comprises the following steps:
s1, sequentially and fixedly installing a plurality of hanging rods in each installation hole;
s2, conveying the rotary table provided with the hanging rod to a construction ceiling, fixedly installing the fixed shaft on the construction ceiling, then rotating the second bolt to enable the second bolt to be separated from the second threaded hole, and pushing the second bolt to be completely separated from the second threaded hole by the second spring to enable the rotary table and the fixed rotary table to rotate relative to the fixed shaft;
s3, rotating the rotary table, rotating one of the motion rods to the direction in which the hanging rod needs to be installed, then pulling the motion rod outwards, sliding the outermost positioning block to adjust, install and position, then finely adjusting the positioning hole by rotating the fixed rotary table, after the adjustment is completed, rotating a second bolt aligned with a second threaded hole to enable the second bolt to be in threaded connection with the second threaded hole to fix the rotary table and the fixed rotary table, and then rotating the expansion screw to enable the hanging rod to be fixedly installed on the construction ceiling;
s4, after the installation is completed, rotating the first bolt to enable the first bolt to be separated from the first threaded hole, opening the baffle, releasing the motion rod at the moment, retracting the motion rod into the straight groove under the action of the first spring, and fixedly installing the installed suspension rod and the installed positioning block on the construction ceiling; and after all the suspenders to be installed are installed, separating the fixed shaft from the construction ceiling and taking down the whole device.
Compared with the prior art, the invention has the advantages that:
1. according to the invention, through the arrangement of the rotary disc, the moving rod, the positioning block and the fixed wheel disc, the rotary disc can rotate for 360 degrees, and the moving rod provided with the sliding groove can be linearly stretched, so that the rotary stretching structure can position all positions in the annular area, the positioning can be more accurate when the suspender is installed, and meanwhile, the suspender is fixedly installed on the positioning block, so that the suspender is prevented from being righted manually, and the condition that the suspender inclines during installation is avoided.
2. According to the invention, by arranging the rubber sleeve, the rubber block and the third spring, for an object hoisted by a plurality of suspenders, when one suspender is fractured, the rubber sleeve and the rubber block buffer the stress generated by the fracture of the suspender, and then the third spring performs secondary buffering, so that the influence of damage of one suspender on other suspenders is reduced, vicious circle generated by the fracture of the suspender is avoided, the life safety of property and personnel is ensured, and the safety of the device in use is increased.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of a boom portion of the present invention;
FIG. 3 is a schematic illustration of the fixed sheave of FIG. 1 according to the present invention;
FIG. 4 is an enlarged view of portion A of FIG. 1 according to the present invention;
FIG. 5 is an enlarged view of the portion B of FIG. 1 according to the present invention.
In the figure, 1 rotary table, 2 straight grooves, 3 first sliding grooves, 4 moving rods, 5 second sliding grooves, 6 positioning blocks, 7 mounting holes, 8 first limiting blocks, 9 first springs, 10 baffle plates, 11 first bolts, 12 first threaded holes, 13 fixed wheel discs, 14 through holes, 15 inner cavities, 16 second bolts, 17 second limiting blocks, 18 second springs, 19 fixed shafts, 20 second threaded holes, 21 hanging rods, 22 fixed plates, 23 expansion screws, 24 rubber sleeves, 25 rubber blocks, 26 third springs and 27 connectors.
Detailed Description
The following examples are for illustrative purposes only and are not intended to limit the scope of the present invention.
Examples
As shown in fig. 1-5, a ceiling hanger rod structure for building construction comprises a rotary table 1 and a hanger rod 21, a straight groove 2 is formed on the rotary table 1, a first sliding groove 3 is formed on the side wall of the straight groove 2, a moving rod 4 is arranged in the straight groove 2, a second sliding groove 5 is formed on the moving rod 4, a positioning block 6 is slidably connected in the second sliding groove 5, a mounting hole 7 is formed in the positioning block 6, a fixed wheel disc 13 is fixedly connected on the rotary table 1, the rotary table 1 and the fixed wheel disc 13 are rotatably connected on a fixed shaft 19, a through hole 14 is formed in the fixed wheel disc 13, an inner cavity 15 is formed in the through hole 14, and a fixing mechanism for fixing the fixed wheel disc 13 is installed in the through hole 14.
The fixing mechanism comprises a second bolt 16, a second limiting block 17 and a second spring 18, the second bolt 16 is inserted into the through hole 14, the second limiting block 17 is fixedly mounted on the second bolt 16, the second limiting block 17 is connected with the inner wall of the inner cavity 15 in a sliding mode, the second spring 18 is wound on the second bolt 16, one end of the second spring 18 is fixedly connected onto the second limiting block 17, and one end, far away from the second limiting block 17, of the second spring 18 is fixedly connected onto the side wall of the inner cavity 15. The fixing mechanism is used for fixing the fixed wheel disc 13 and preventing the deviation of the installation position caused by the rotation of the rotary disc 1 when the suspender 21 is installed after the positioning is finished; the second stopper 17 is used for preventing the second bolt 16 from being separated from the through hole 14, and the second spring 18 is used for keeping the second bolt 16 separated from the second threaded hole 20, so that the rotary table 1 is more smoothly rotated and adjusted.
The fixing shaft 19 is provided with a second threaded hole 20, the suspender 21 is fixedly installed in the mounting hole 7, the suspender 21 is fixedly installed with a fixing plate 22, the fixing plate 22 is in threaded connection with an expansion screw 23, and one end of the suspender 21 far away from the mounting hole 7 is fixedly installed with a connector 27.
One end fixed mounting of motion pole 4 has first stopper 8, install first spring 9 in the straight flute 2, the one end fixed connection of first spring 9 is on first stopper 8, the one end fixed connection that first stopper 8 was kept away from to first spring 9 is on the inner wall of straight flute 2, the one end rotation that first stopper 8 was kept away from to motion pole 4 is connected with baffle 10, baffle 10 does not rotate the one end of being connected with first stopper 8 through first bolt 11 and motion pole 4 fixed connection, first screw hole 12 has been seted up on the motion pole 4, first bolt 11 and first screw hole 12 threaded connection. The first limiting block 8 is used for preventing the moving rod 4 from slipping off the straight groove 2, the first spring 9 is used for retracting the moving rod 4 into the straight groove 2 after the suspension rod 21 is installed, and the suspension rod 21 and the positioning block 6 which are convenient to install are separated from the moving rod 4 due to the action of the baffle 10.
The quantity of straight flute 2 is a plurality of, and a plurality of straight flutes 2 are annular array about the centre of a circle of carousel 1, all is equipped with motion rod 4 in every straight flute 2, all has a plurality of locating pieces 6 on every motion rod 4 sliding connection. The plurality of positioning blocks 6 can be simultaneously provided with a plurality of hanging rods 21, so that a certain number of hanging rods 21 can be selected for installation according to installation requirements.
The number of the second bolts 16 is plural, and the plural second bolts 16 are in an annular array with respect to the fixed shaft 19, wherein one second bolt 16 is screw-coupled with the second screw hole 20. The plurality of second bolts 16 can ensure the accuracy of the boom 21 in mounting positioning.
Fixed mounting has the block rubber 25 on jib 21, and the quantity of block rubber 25 is a plurality of and evenly distributed on jib 21, and sliding connection has rubber sleeve 24 on jib 21, and the quantity of rubber sleeve 24 is a plurality of, and block rubber 25 cup joints outside rubber sleeve 24, and fixed mounting has third spring 26 between two block rubbers 25, and third spring 26 twines on jib 21, and the both ends difference fixed connection of third spring 26 is on two block rubbers 25. For objects hoisted by a plurality of suspenders 21, when one suspender 21 is fractured, the rubber sleeve 24 and the rubber block 25 buffer the stress generated by the fracture of the suspender 21, and then the third spring 26 performs secondary buffering, thereby reducing the influence of the damage of one suspender 21 on other suspenders 21, avoiding vicious circle generated by the fracture of the suspender 21, ensuring the life safety of property and personnel, and increasing the safety of the device during use.
The specific working principle of the above embodiment is as follows:
the worker fixedly mounts a plurality of booms 21 in turn in each mounting hole 7.
Then the rotary table 1 with the hanging rod 21 is conveyed to a construction ceiling, the fixed shaft 19 is fixedly arranged on the construction ceiling, then the second bolt 16 is rotated, so that the second bolt 16 is separated from the second threaded hole 20, the second spring 18 pushes the second bolt 16 to be completely separated from the second threaded hole 20, and the rotary table 1 and the fixed rotary table 13 can rotate relative to the fixed shaft 19.
Through rotating carousel 1, rotate one of them motion bar 4 to the direction that needs installation jib 21, then outwards pull out motion bar 4, and slide locating piece 6 of outermost circle and adjust the installation location, then finely tune the locating hole through rotating fixed rim plate 13, after the regulation is accomplished, rotate the second bolt 16 who aligns with second screw hole 20, make second bolt 16 and second screw hole 20 threaded connection fix carousel 1 and fixed rim plate 13, then rotate expansion screw 23, make jib 21 fixed mounting on the construction ceiling.
After the installation is finished, the first bolt 11 is rotated to enable the first bolt 11 to be separated from the first threaded hole 12, the baffle 10 is opened, the motion rod 4 is released at the moment, the motion rod 4 can be retracted into the straight groove 2 under the action of the first spring 9, and the installed suspension rod 21 and the installed positioning block 6 are fixedly installed on a construction ceiling; after all the hanger rods 21 to be installed are installed, the fixing shaft 19 is separated from the construction ceiling, and the whole device is taken down.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (7)

1. A ceiling suspender structure for building construction comprises a turntable (1) and a suspender (21), and is characterized in that a straight groove (2) is formed in the turntable (1), a first chute (3) is formed in the side wall of the straight groove (2), a moving rod (4) is arranged in the straight groove (2), a second chute (5) is formed in the moving rod (4), a positioning block (6) is connected in the second chute (5) in a sliding manner, a mounting hole (7) is formed in the positioning block (6), a fixed wheel disc (13) is fixedly connected to the turntable (1), the turntable (1) and the fixed wheel disc (13) are rotatably connected to a fixed shaft (19), a through hole (14) is formed in the fixed wheel disc (13), an inner cavity (15) is formed in the through hole (14), and a fixing mechanism for fixing the fixed wheel disc (13) is installed in the through hole (14), second screw hole (20) have been seted up on fixed axle (19), jib (21) fixed mounting is in mounting hole (7), fixed mounting has fixed plate (22) on jib (21), threaded connection has expansion screw (23) on fixed plate (22), the one end fixed mounting that mounting hole (7) were kept away from in jib (21) has connector (27).
2. A construction ceiling hanger bar structure according to claim 1, a first limit block (8) is fixedly arranged at one end of the moving rod (4), a first spring (9) is arranged in the straight groove (2), one end of the first spring (9) is fixedly connected to the first limit block (8), one end of the first spring (9) far away from the first limit block (8) is fixedly connected on the inner wall of the straight groove (2), one end of the moving rod (4) far away from the first limiting block (8) is rotatably connected with a baffle (10), one end of the baffle (10) which is not rotationally connected with the first limiting block (8) is fixedly connected with the moving rod (4) through a first bolt (11), a first threaded hole (12) is formed in the moving rod (4), and the first bolt (11) is in threaded connection with the first threaded hole (12).
3. A construction ceiling suspender structure according to claim 1, wherein the number of the straight grooves (2) is plural, the plural straight grooves (2) are in an annular array with respect to the center of the rotary table (1), each straight groove (2) is provided with a motion rod (4), and each motion rod (4) is slidably connected with plural positioning blocks (6).
4. The suspension rod structure of a building construction ceiling according to claim 1, wherein the fixing mechanism comprises a second bolt (16), a second limit block (17) and a second spring (18), the second bolt (16) is inserted into the through hole (14), the second limit block (17) is fixedly installed on the second bolt (16), the second limit block (17) is slidably connected with the inner wall of the inner cavity (15), the second spring (18) is wound on the second bolt (16), one end of the second spring (18) is fixedly connected to the second limit block (17), and one end of the second spring (18) far away from the second limit block (17) is fixedly connected to the side wall of the inner cavity (15).
5. A construction ceiling hanger bar structure according to claim 4 wherein said second bolts (16) are plural in number, said plural second bolts (16) being in an annular array about a fixed shaft (19), one of the second bolts (16) being threadedly connected to the second threaded hole (20).
6. The suspension rod structure of a building construction ceiling according to claim 1, wherein a plurality of rubber blocks (25) are fixedly mounted on the suspension rod (21), the rubber blocks (25) are uniformly distributed on the suspension rod (21), a rubber sleeve (24) is slidably connected onto the suspension rod (21), the rubber sleeve (24) is provided in a plurality, the rubber blocks (25) are sleeved outside the rubber sleeve (24), a third spring (26) is fixedly mounted between the two rubber blocks (25), the third spring (26) is wound on the suspension rod (21), and two ends of the third spring (26) are respectively fixedly connected onto the two rubber blocks (25).
7. A method of locating and installing a construction ceiling boom structure according to any of claims 1 to 6, comprising the steps of:
s1, sequentially and fixedly installing a plurality of hanging rods (21) in each installation hole (7);
s2, conveying the rotary table (1) provided with the hanger rod (21) to a construction ceiling, fixedly mounting the fixed shaft (19) on the construction ceiling, then rotating the second bolt (16) to enable the second bolt (16) to be separated from the second threaded hole (20), and pushing the second bolt (16) to be completely separated from the second threaded hole (20) by the second spring (18) to enable the rotary table (1) and the fixed rotary table (13) to rotate relative to the fixed shaft (19);
s3, rotating the rotary table (1), rotating one of the motion rods (4) to the direction in which the hanger rod (21) needs to be installed, then pulling the motion rod (4) outwards, sliding the positioning block (6) on the outermost ring to adjust, install and position, then finely adjusting the positioning hole by rotating the fixed rotary table (13), after the adjustment is completed, rotating the second bolt (16) aligned with the second threaded hole (20), enabling the second bolt (16) to be in threaded connection with the second threaded hole (20) to fix the rotary table (1) and the fixed rotary table (13), and then rotating the expansion screw (23) to enable the hanger rod (21) to be fixedly installed on a ceiling construction;
s4, after the installation is completed, rotating the first bolt (11) to enable the first bolt (11) to be separated from the first threaded hole (12), opening the baffle (10), retracting the moving rod (4) into the straight groove (2) under the action of the first spring (9), and fixedly installing the installed suspension rod (21) and the installed positioning block (6) on the construction ceiling; after all the hanging rods (21) needing to be installed are installed, the fixing shaft (19) is separated from the construction ceiling, and the whole device is taken down.
CN202011434165.1A 2020-12-10 2020-12-10 Building construction ceiling suspender structure and positioning and mounting method thereof Active CN112392196B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011434165.1A CN112392196B (en) 2020-12-10 2020-12-10 Building construction ceiling suspender structure and positioning and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011434165.1A CN112392196B (en) 2020-12-10 2020-12-10 Building construction ceiling suspender structure and positioning and mounting method thereof

Publications (2)

Publication Number Publication Date
CN112392196A CN112392196A (en) 2021-02-23
CN112392196B true CN112392196B (en) 2021-11-26

Family

ID=74625180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011434165.1A Active CN112392196B (en) 2020-12-10 2020-12-10 Building construction ceiling suspender structure and positioning and mounting method thereof

Country Status (1)

Country Link
CN (1) CN112392196B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206928493U (en) * 2016-11-22 2018-01-26 中建七局第四建筑有限公司 A kind of suspended ceiling device with fixing function
CN208518352U (en) * 2018-04-13 2019-02-19 台州职业技术学院 A kind of positioning device for spatial three-dimensional fine adjusting
CN208965851U (en) * 2018-08-01 2019-06-11 上海统帅建筑装潢有限公司 A kind of plasterboard keel frame connecting structure
CN210767445U (en) * 2019-06-18 2020-06-16 佛山市佳纳装饰材料有限公司 Ceiling buckling strip component
CN110528768A (en) * 2019-09-06 2019-12-03 广东洋艺建设有限公司 A kind of public building interior decoration engineering ceiling structure and construction method
CN211447443U (en) * 2019-11-27 2020-09-08 华艺博展装饰有限公司 Integrated furred ceiling mounting structure
CN211597328U (en) * 2019-12-13 2020-09-29 无锡同艺设计顾问有限公司 Whole furred ceiling mounting structure of tall and big space aluminum plate

Also Published As

Publication number Publication date
CN112392196A (en) 2021-02-23

Similar Documents

Publication Publication Date Title
CN112279062A (en) Assembled component for building wall
CN112392196B (en) Building construction ceiling suspender structure and positioning and mounting method thereof
CN113003390A (en) Adjustable assembled hoisting sling
CN114961054B (en) Resource-saving type assembled green curtain wall structure and construction method thereof
CN110980492B (en) Automatic hoisting machine and hoisting method for building glass curtain wall
CN109462185B (en) Insulator hoisting method of high-voltage transmission line
CN213445762U (en) Assembled building element hoist device
CN212174336U (en) Auxiliary air pipe installation equipment
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN108275583B (en) Ultrahigh-rise external hanging movable arm tower crane support frame and mounting method thereof
CN209052276U (en) A kind of lifting stick for concrete prefabricated element hanging
CN219526026U (en) ALC panel processing panel anchor clamps with anti-skidding structure
CN211873813U (en) Novel single-face formwork device
CN208056672U (en) A kind of high-altitude application safety rope positioning device for building
CN219451232U (en) Suspended ceiling structure of ceiling
CN219788165U (en) Clamp dismouting device
CN219755574U (en) Hanger for house construction
CN219526055U (en) T-shaped steel mounting structure
CN105668410A (en) Installation method for monolithic movement type crane beam
CN216045862U (en) Energy-saving air pipe mounting bracket
CN210480591U (en) Steel structure transportation protection device
CN218952553U (en) Furred ceiling assembled steelframe conversion layer
CN114104963B (en) Assembled wallboard hoist and mount fixing device
CN218665115U (en) Hoisting device for steel structure engineering
CN219885487U (en) Balance beam structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211108

Address after: 610095 floor 21-22, building 4, No. 1999, middle section of Yizhou Avenue, Chengdu high tech Zone, China (Sichuan) pilot Free Trade Zone, Chengdu, Sichuan

Applicant after: China Railway Construction Kunlun Investment Group Co.,Ltd.

Address before: No.196, Yingbin Road, Luopu street, Panyu District, Guangzhou, Guangdong 510000

Applicant before: Lu Shun

GR01 Patent grant