CN112379177A - Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area - Google Patents
Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area Download PDFInfo
- Publication number
- CN112379177A CN112379177A CN202110059440.4A CN202110059440A CN112379177A CN 112379177 A CN112379177 A CN 112379177A CN 202110059440 A CN202110059440 A CN 202110059440A CN 112379177 A CN112379177 A CN 112379177A
- Authority
- CN
- China
- Prior art keywords
- metering
- sub
- area
- user
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/26—Measuring inductance or capacitance; Measuring quality factor, e.g. by using the resonance method; Measuring loss factor; Measuring dielectric constants ; Measuring impedance or related variables
- G01R27/2688—Measuring quality factor or dielectric loss, e.g. loss angle, or power factor
- G01R27/2694—Measuring dielectric loss, e.g. loss angle, loss factor or power factor
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a method and a system for determining the loss of a low-voltage line in a transformer area and the running error of an electric energy meter, wherein the method and the system are based on tree topology and a general mathematical relation of the transformer area, a transformer area low-voltage line loss model is established by utilizing kirchhoff's law, an electric energy meter running error mathematical model is established according to an energy conservation law, collected power supply data of a total meter and frozen power consumption data of a sub-meter are substituted into the running error mathematical model to obtain a set of equations, the equivalent resistance of each branch in the transformer area and the calculation error of each metering point are determined by solving the set of equations, and the loss of the low-voltage line and the running error of each metering point are determined according to the equivalent resistance and the calculation error of the branch. According to the method and the system, the real power topology of the transformer area is not required to be known, the main power supply table and the sub-power supply table of the transformer area, the power supply quantity of the main power supply table of the transformer area and the freezing power consumption quantity of the sub-power supply table are only required to be known, the accurate values of the low-voltage line loss and the fixed loss of the transformer area can be obtained by utilizing the big data, the operation is simple, and the efficiency is extremely high.
Description
Technical Field
The present invention relates to the field of power data analysis, and more particularly, to a method and system for determining transformer bay low voltage line loss and power meter operating errors.
Background
The traditional method for calibrating the metering error of the electric energy meter is to compare the electric energy meter to be calibrated with a standard device with higher accuracy grade to obtain the error of the electric energy meter. Comparing a typical high accuracy grade electric energy meter as in a laboratory to calibrate a low accuracy grade electric energy meter; and in the running process of the electric energy meter, comparing the metering difference between the electric energy meter and the on-site calibration instrument in the same period of time by adopting the on-site calibration instrument with higher accuracy to obtain the running error of the electric energy meter.
The traditional method is mainly used for carrying out on-site verification or dismantling laboratory verification on the intelligent electric energy meter installed and transported, and has the following problems:
(1) the efficiency is low and the workload is large;
(2) various problems of the intelligent electric energy meter are difficult to find in time;
(3) the intelligent electric energy meter cannot be operated in full.
In the method for researching and calculating the loss of the low-voltage line of the transformer area and the operation errors of the intelligent electric energy meters under the transformer area by taking the transformer area as a unit through a big data technology in the prior art, the loss rate of the low-voltage line of the transformer area in an observation time period is taken as a fixed value, which is actually inconsistent with the operation of the transformer area, so that the calculated operation errors of the metering points are inaccurate.
Disclosure of Invention
In order to solve the technical problem that when the operation error of a metering point is calculated by using the law of conservation of energy in the prior art, the loss rate of a low-voltage line is used as a fixed value, so that the calculated operation error of the metering point is inaccurate, the invention provides a method for determining the loss of the low-voltage line of a distribution room and the operation error of an electric energy meter, which comprises the following steps:
collecting the archive information of the table area general table and the user sub-table, and collecting according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaFreezing electricity consumption data of metering points of the individual users in a sub-metering mode;
generating a low-voltage line loss model and an electric energy meter operation error mathematical model according to the total meter power supply quantity data, the freezing power consumption quantity data, the pre-established low-voltage line loss model and the pre-established electric energy meter operation error mathematical modelA system of equations;
solving includes theA system of equations defining said regionCalculating errors of sub-metering points of each user and equivalent resistance of each branch of the transformer area;
according to the station areaThe calculation error of the metering point of each user sub-meter, the equivalent resistance of each branch of the distribution area, and the distribution areaIndividual subscriber sub-meter measurement point voltage and power factor, and pre-established low voltage line loss model determinationA period of equal timeThe line loss of (1); and according to said station areaDetermining the area according to the calculation error of the sub-metering point of each userAnd (4) dividing the running error of the metering point by each user.
Further, before acquiring archive information of the distribution area general table and the user sub-tables, the method further comprises the following steps:
establishing a transformer area low-voltage line loss model by using kirchhoff's law, wherein the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the equivalent resistance of each branch of the platform area,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe freezing electricity consumption of the electric power source,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe error in the calculation of (a) is,andis the first stage of the platformIndividual user sub-metering point andthe individual users divide the meter into the voltage of the metering point,andis the first stage of the platformMetering points and users are divided into metering points andthe power factor of each user sub-metering point is measured by each user,is the number of metering points of the subscriber sub-table of the station area,,;
according to the law of conservation of energy, an electric energy meter operation error mathematical model is established based on the established transformer area low-voltage line loss model, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the amount of power supplied to the station area summary table,is the said platform areaThe freezing electricity consumption sum of the metering points is divided into the metering points by each metering point and each user,is the statistical line loss of the distribution room,is the low voltage line loss of the station area,is the fixed loss of the station area,is of said areaThe electric energy loss caused by the metering error of each metering point and each user sub-metering point,。
further, collecting the archive information of the distribution area general table and the user sub-tables comprises the following steps:
acquiring archive information of a district general table and user sub-tables through a marketing business application system;
collecting according to the archive informationA period of timeStation area summary table power supply amount data and said station areaThe frozen power consumption data of the metering points of the individual users comprise:
collecting through a power consumption information collecting system according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaAnd (4) metering the frozen power consumption data of the metering points by each user.
Further, collecting the information according to the archiveA period of timeStation area summary table power supply amount data and said station areaAfter freezing the electricity consumption data of the metering points of the individual users, the method also comprises the following steps:
and carrying out data cleaning on the collected electric quantity data of the summary table and the frozen electric quantity data, and removing data with missing items, data with wrong archive information and data with abnormal judgment in the data.
Further, the station area is determined according to the station areaDetermining the area according to the calculation error of the sub-metering point of each userThe calculation formula of the operation error of the metering point of each user is as follows:
in the formula (I), the compound is shown in the specification,is the station areaThe individual users can measure the running error of the metering point,is the station areaThe calculation error of the metering point is divided into the sub-metering points of each user,。
according to another aspect of the present invention, there is provided a system for determining a station area low voltage line loss and an electric energy meter operation error, the system comprising:
a data acquisition unit for acquiring the file information of the distribution area general table and the user sub-table and acquiring the file information according to the file informationA period of equal timeStation area summary table power supply amount data and said station areaFreezing electricity consumption data of metering points of the individual users in a sub-metering mode;
the system of equations unit is used for generating a system of equations according to the total meter power supply quantity data and the frozen power consumption quantity data, and a pre-established low-voltage line loss model and an electric energy meter operation error mathematical modelA system of equations;
a first computing unit for solving for a solution comprising theA system of equations defining said regionCalculating errors of sub-metering points of each user and equivalent resistance of each branch of the transformer area;
a second calculation unit for calculating a second calculation result according to the regionThe calculation error of the metering point of each user sub-meter, the equivalent resistance of each branch of the distribution area, and the distribution areaIndividual subscriber sub-meter measurement point voltage and power factor, and pre-established low voltage line loss model determinationA period of equal timeThe line loss of (1); and according to said station areaDetermining the area according to the calculation error of the sub-metering point of each userAnd (4) dividing the running error of the metering point by each user.
Further, the system further comprises:
the first model unit is used for establishing a transformer area low-voltage line loss model by utilizing kirchhoff law, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the equivalent resistance of each branch of the platform area,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe freezing electricity consumption of the electric power source,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe error in the calculation of (a) is,andis the first stage of the platformIndividual user sub-metering point andthe individual users divide the meter into the voltage of the metering point,andis the first stage of the platformMetering points and users are divided into metering points andthe power factor of each user sub-metering point is measured by each user,is the number of metering points of the subscriber sub-table of the station area,,;
the second model unit is used for establishing an electric energy meter operation error mathematical model based on the established transformer area low-voltage line loss model according to the energy conservation law, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the amount of power supplied to the station area summary table,is the said platform areaThe freezing electricity consumption sum of the metering points is divided into the metering points by each metering point and each user,is the statistical line loss of the distribution room,is the low voltage line loss of the station area,is the fixed loss of the station area,is of said areaThe electric energy loss caused by the metering error of each metering point and each user sub-metering point,。
furthermore, the data acquisition unit acquires the file information of the district general table and the user sub-tables through the marketing business application system and acquires the file information through the power utilization information acquisition system according to the file informationA period of equal timeStation area summary table power supply amount data and said station areaAnd (4) metering the frozen power consumption data of the metering points by each user.
Further, the system also comprises a data processing unit, which is used for carrying out data cleaning on the collected electric quantity data of the summary table and the frozen electric quantity data, and removing data with missing items, data with wrong archive information and data with abnormal judgment in the data.
Further, the second calculation unit calculates a second calculation result according to the distribution areaDetermining the area according to the calculation error of the sub-metering point of each userThe calculation formula of the operation error of the metering point of each user is as follows:
in the formula (I), the compound is shown in the specification,is the station areaThe individual users can measure the running error of the metering point,is the station areaThe calculation error of the metering point is divided into the sub-metering points of each user,。
the method and the system for determining the loss of the low-voltage line of the transformer area and the running error of the electric energy meter are based on the tree topology and the total-branch mathematical relationship of the transformer area, a transformer area low-voltage line loss model is established by utilizing the kirchhoff law, an electric energy meter running error mathematical model is established according to the energy conservation law, then the collected power supply data of the total meter and the frozen power consumption data of the branch meter are substituted into the running error mathematical model to obtain a set of equations, the equivalent resistance of each branch of the transformer area is determined by solving the set of equations, the calculation error of each calculation point is determined, and the loss of the low-voltage line and the running error of each metering point are determined according to the determined equivalent resistance of the branch. According to the method and the system, the real power topology of the transformer area is not required to be known, the accurate values of the low-voltage line loss and the fixed loss of the transformer area can be obtained by using the big data only by knowing the main power consumption data and the sub-power consumption data of the transformer area, and the running errors of the intelligent electric energy meters under the transformer area are obtained in batches by taking the transformer area as a unit.
Drawings
A more complete understanding of exemplary embodiments of the present invention may be had by reference to the following drawings in which:
fig. 1 is a flow chart of a method of determining a loss of a low voltage line and an operation error of an electric energy meter in a distribution room according to a preferred embodiment of the present invention;
FIG. 2 is a schematic diagram of a platform circuit topology used to derive a platform low voltage line loss model;
FIG. 3 is a schematic diagram of a platform topology according to a preferred embodiment of the present invention;
fig. 4 is a schematic diagram of a system for determining station area low voltage line loss and power meter operation error according to a preferred embodiment of the present invention.
Detailed Description
The exemplary embodiments of the present invention will now be described with reference to the accompanying drawings, however, the present invention may be embodied in many different forms and is not limited to the embodiments described herein, which are provided for complete and complete disclosure of the present invention and to fully convey the scope of the present invention to those skilled in the art. The terminology used in the exemplary embodiments illustrated in the accompanying drawings is not intended to be limiting of the invention. In the drawings, the same units/elements are denoted by the same reference numerals.
Unless otherwise defined, terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Further, it will be understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the relevant art and will not be interpreted in an idealized or overly formal sense.
Fig. 1 is a flowchart of a method for determining a station area low voltage line loss and an electric energy meter operation error according to a preferred embodiment of the present invention. As shown in fig. 1, the method 100 for determining the station area low voltage line loss and the power meter operation error according to the preferred embodiment starts with step 101.
In step 101, a transformer area low-voltage line loss model is established by using kirchhoff's law, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the equivalent resistance of each branch of the platform area,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe freezing electricity consumption of the electric power source,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe error in the calculation of (a) is,andis the first stage of the platformIndividual user sub-metering point andthe individual users divide the meter into the voltage of the metering point,andis the first stage of the platformMetering points and users are divided into metering points andthe power factor of each user sub-metering point is measured by each user,is the number of metering points of the subscriber sub-table of the station area,,. Said period of timeUsually means 1 dayAt 24 hours, the voltage at the measuring point is normally 220V, and the power factor at the measuring point is 1.
Fig. 2 is a schematic diagram of a zone circuit topology for deriving a zone low voltage line loss model. As shown in fig. 2, the current relationship of each branch has been marked in the circuit according to kirchhoff's law, wherein the current passing through branch 1 isThe current through branch 2 isThe current through branch 3 isThe current through branches 2 and 3 isThe current through the branches 1, 2, 3 isAssuming that all the users in the platform area are resistive loads, R represents the resistance on the line, wherein the equivalent resistance of the branch 1 isThe equivalent resistance of branch 2 isThe equivalent resistance of branch 3 isThe equivalent resistance of the line comprising branches 2 and 3 isThe equivalent resistance of the line comprising branches 1, 2, 3 isThe voltage input value of the platform area isThe voltage output value of branch 1 isThe voltage output of branch 2 isThe voltage output of branch 3 isIf the low-voltage line loss LL generated in the distribution area in the time period t is:
real electricity consumption using user meterDivided by (voltage)Power factorTime of change) To estimate the current,,The equivalent resistance of the common line representing the branch j and the branch k of the transformer area is a undetermined constant. Then generalizing to haveThe individual subscriber is divided into zones of metering points and time periodsShould have a low voltage line loss of
Because of the real power consumption of the userCannot be obtained, so by introducing calculation errorsUsing the time period of the userFreezing power consumptionTo represent the actual power usage of the userI.e. by
The low-voltage line loss LL of the final stage area is expressed by the following relation:
in the formula (I), the compound is shown in the specification,the equivalent resistance of the common line representing the branch j and the branch k of the transformer area is a undetermined constant. Once the power supply topology of the cell is determined, the resistances throughout the legs of the cell are already determinedAnd the method is determined, so that the method is reasonable to establish an equation system by taking the determined constant as a undetermined constant to solve. The information such as the real power supply topology of the transformer area does not need to be measured in the traditional transformer area loss rate method.
According to the law of conservation of energy, an electric energy meter operation error mathematical model is established based on the established transformer area low-voltage line loss model, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the amount of power supplied to the station area summary table,is the said platform areaThe freezing electricity consumption sum of the metering points is divided into the metering points by each metering point and each user,is the statistical line loss of the distribution room,is the low voltage line loss of the station area,is the fixed loss of the station area,is of said areaThe electric energy loss caused by the metering error of each metering point and each user sub-metering point,。
fig. 3 is a schematic diagram of a topology of a station area according to a preferred embodiment of the present invention. As shown in fig. 3, a distribution area generally refers to a transformer-powered area, and a summary table provides energy input for a plurality of user meters under the distribution area. Then the statistical line loss tl (total lose) of the region goes to total 3 classes according to the law of conservation of energy: the loss of the low-voltage line in the region ll (line loss), the fixed loss of the region fl (fixed loss), and the power loss el (error loss) generated by the sub-meter error of each user in the region, i.e. the loss of the low-voltage line in the region ll (line loss), the fixed loss of the region fl (fixed loss), and the power loss el (error loss) generated by the sub-meter error of
Since the three types of metering losses of the platform area are supported by completely different physical principles, wherein the platform area is fixed in lossThe fixed loss is caused by the energy consumption of the electric energy meter, and the like, does not change along with the change of the power consumption of a user, and is a constant value; the metering loss caused by the operation error of the electric energy meter is in a linear relation with the power consumption, namely if the operation error of a certain sub-meter is a percent and the real power consumption is X, the metering loss caused by the operation error of the electric energy meter of the sub-meter is X X a percent and is in a linear relation; the relation between the low-voltage line loss and the power consumption of the transformer area can utilize a model for estimating the low-voltage line loss of the transformer area by utilizing kirchhoff law:
thus, based on expressions
For the power supply quantity of the station area general table being y, the freezing power consumption quantity of the jth user sub-table metering point being yCalculating an error ofThe distribution area with P user sub-table metering points is established, and the equation expression of the statistical line loss is as follows:
the left side of the above equation is statistical line loss TL, the first term on the right side is low-voltage line loss LL, the second term is fixed loss FL, and the third term is metering loss EL caused by errors of the electric energy meter. Then, accumulating the power supply quantity data of the total table of the station areas and the freezing power consumption quantity data of the sub-tables of the users in N equal time periods t, establishing an equation set consisting of N equations, and solving the equation set to obtain the estimation of the error of the electric energy meter, the loss of the low-voltage line and the fixed loss.
In step 102, collecting the archive information of the table area general table and the user sub-table, and collecting the archive information according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaAnd (4) metering the frozen power consumption data of the metering points by each user.
At step 103, the collected data is processedA period of timeThe power supply quantity data of the total table of the transformer area and the freezing power consumption data of the sub-tables are subjected to data cleaning, the data with missing items, the data with wrong archive information and the data with abnormal judgment in the data are removed, and the data are generatedA period of equal timeThe data of the total table power supply quantity and the data of the sub-table frozen power consumption quantity of the effective station area;
in step 104, generating a total power supply data and a frozen power consumption data according to the total power supply data and the frozen power consumption data, and a pre-established low-voltage line loss model and an electric energy meter operation error mathematical modelA system of equations;
at step 105, solving includesA system of equations defining said regionCalculating errors of sub-metering points of each user and equivalent resistance of each branch of the transformer area;
in step 106, according to the station areaThe calculation error of the metering point of each user sub-meter, the equivalent resistance of each branch of the distribution area, and the distribution areaIndividual subscriber sub-meter measurement point voltage and power factor, and pre-established low voltage line loss model determinationA period of equal timeThe line loss of (1); and according to said station areaDetermining the area according to the calculation error of the sub-metering point of each userAnd (4) dividing the running error of the metering point by each user.
Preferably, the acquiring archive information of the distribution area summary table and the user sub-table includes:
acquiring archive information of a district general table and user sub-tables through a marketing business application system;
collecting according to the archive informationA period of timeStation area summary table power supply amount data and said station areaThe frozen power consumption data of the metering points of the individual users comprise:
collecting through a power consumption information collecting system according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaAnd (4) metering the frozen power consumption data of the metering points by each user.
Preferably, said station area is selected according to said station areaDetermining the area according to the calculation error of the sub-metering point of each userThe calculation formula of the operation error of the metering point of each user is as follows:
in the formula (I), the compound is shown in the specification,is the station areaThe individual users can measure the running error of the metering point,is the station areaThe calculation error of the metering point is divided into the sub-metering points of each user,。
fig. 4 is a schematic diagram of a system for determining station area low voltage line loss and power meter operation error according to a preferred embodiment of the present invention. As shown in fig. 4, the system 400 for determining the loss of the low-voltage line and the operation error of the electric energy meter in the station area according to the preferred embodiment includes:
the first model unit 401 is configured to establish a transformer area low-voltage line loss model by using kirchhoff's law, and a calculation formula of the model unit is as follows:
in the formula (I), the compound is shown in the specification,is the equivalent resistance of each branch of the platform area,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe freezing electricity consumption of the electric power source,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe error in the calculation of (a) is,andis the first stage of the platformIndividual user sub-metering point andthe individual users divide the meter into the voltage of the metering point,andis the first stage of the platformMetering points and users are divided into metering points andthe power factor of each user sub-metering point is measured by each user,is the number of metering points of the subscriber sub-table of the station area,,;
a second model unit 402, configured to build an electric energy meter operation error mathematical model based on the established transformer area low-voltage line loss model according to the law of conservation of energy, where a calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the amount of power supplied to the station area summary table,is the said platform areaThe freezing electricity consumption sum of the metering points is divided into the metering points by each metering point and each user,is the statistical line loss of the distribution room,is the low voltage line loss of the station area,is the fixed loss of the station area,is of said areaThe electric energy loss caused by the metering error of each metering point and each user sub-metering point,。
a data collecting unit 403 for collecting the archive information of the district summary table and the user sub-tables and collecting the archive information according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaFreezing electricity consumption data of metering points of the individual users in a sub-metering mode;
a data processing unit 404, configured to perform data cleaning on the summary table power supply amount and the frozen power consumption amount data, remove data with missing items, data with wrong archive information, and data with abnormal judgment in the data, and generateA period of equal timeThe data of the power supply quantity and the data of the frozen power consumption quantity of the effective station area general table;
an equation set unit 405 for generating a mathematical model containing the data of the power supply amount and the frozen power consumption amount of the total table of the effective station areas, and a pre-established low-voltage line loss model and an electric energy meter operation errorA system of equations;
a first calculation unit 406 for solving for a solution comprising saidA system of equations defining said regionCalculating errors of sub-metering points of each user and equivalent resistance of each branch of the transformer area;
a second calculation unit 407 for calculating a second calculation result according to the station areaThe calculation error of the metering point of each user sub-meter, the equivalent resistance of each branch of the distribution area, and the distribution areaIndividual subscriber sub-meter measurement point voltage and power factor, and pre-established low voltage line loss model determinationA period of equal timeThe line loss of (1); and according to said station areaIndividual user sub-metering pointsDetermining the station area by calculating errorAnd (4) dividing the running error of the metering point by each user.
Preferably, the data collecting unit 403 collects archive information of the district general table and the user sub-table through the marketing service application system, and collects the archive information through the electricity consumption information collecting system according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaAnd (4) metering the frozen power consumption data of the metering points by each user.
Preferably, the second calculation unit 407 is based on the station areaDetermining the area according to the calculation error of the sub-metering point of each userThe calculation formula of the operation error of the metering point of each user is as follows:
in the formula (I), the compound is shown in the specification,is the station areaThe individual users can measure the running error of the metering point,is the station areaThe calculation error of the metering point is divided into the sub-metering points of each user,。
the system for determining the loss of the low-voltage line of the transformer area and the running error of the electric energy meter acquires the power supply quantity of a total transformer area and the freezing power consumption quantity of sub-transformers, and the steps of calculating the loss model of the low-voltage line of the transformer area and the calculation error and the running error of each metering point according to the pre-established mathematical models of the loss model of the low-voltage line and the running error of the electric energy meter are the same as the steps adopted by the method for determining the loss of the low-voltage line of the transformer area and the running error of the electric energy meter, and the technical effects are the same and are not repeated herein.
The invention has been described with reference to a few embodiments. However, other embodiments of the invention than the one disclosed above are equally possible within the scope of the invention, as would be apparent to a person skilled in the art from the appended patent claims.
Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a/an/the [ device, component, etc ]" are to be interpreted openly as referring to at least one instance of said device, component, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not have to be performed in the exact order disclosed, unless explicitly stated.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting the same, and although the present invention is described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: modifications and equivalents may be made to the embodiments of the invention without departing from the spirit and scope of the invention, which is to be covered by the claims.
Claims (10)
1. A method for determining district low voltage line loss and power meter operating errors, the method comprising:
collecting the archive information of the table area general table and the user sub-table, and collecting according to the archive informationA period of equal timeStation area summary table power supply amount data and said station areaFreezing electricity consumption data of metering points of the individual users in a sub-metering mode;
generating a low-voltage line loss model and an electric energy meter operation error mathematical model according to the total meter power supply quantity data, the freezing power consumption quantity data, the pre-established low-voltage line loss model and the pre-established electric energy meter operation error mathematical modelA system of equations;
solving includes theA system of equations defining said regionCalculating errors of sub-metering points of each user and equivalent resistance of each branch of the transformer area;
according to the station areaCalculation error of individual user sub-metering point, each branch of the station areaThe equivalent resistance of, the said mesa regionThe voltage and power factor of the metering point of each user sub-meter and the pre-established low-voltage line loss model are determinedA period of equal timeThe line loss of (1); and according to said station areaDetermining the area according to the calculation error of the sub-metering point of each userAnd (4) dividing the running error of the metering point by each user.
2. The method of claim 1, wherein before collecting the profile information of the distribution area summary table and the subscriber sub-table, the method further comprises:
establishing a transformer area low-voltage line loss model by using kirchhoff's law, wherein the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the equivalent resistance of each branch of the platform area,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe freezing electricity consumption of the electric power source,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe error in the calculation of (a) is,andis the first stage of the platformIndividual user sub-metering point andindividual user sub-listThe voltage at the point of the metering is measured,andis the first stage of the platformMetering points and users are divided into metering points andthe power factor of each user sub-metering point is measured by each user,is the number of metering points of the subscriber sub-table of the station area,,;
according to the law of conservation of energy, an electric energy meter operation error mathematical model is established based on the established transformer area low-voltage line loss model, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the amount of power supplied to the station area summary table,is the said platform areaThe freezing electricity consumption sum of the metering points is divided into the metering points by each metering point and each user,is the statistical line loss of the distribution room,is the low voltage line loss of the station area,is the fixed loss of the station area,is of said areaThe electric energy loss caused by the metering error of each metering point and each user sub-metering point,。
3. the method of claim 1, wherein collecting profile information of the distribution area summary table and the subscriber sub-table comprises:
acquiring archive information of a district general table and user sub-tables through a marketing business application system;
collecting according to the archive informationA period of timeStation area summary table power supply amount data and said station areaThe freezing electricity consumption of the metering point is divided into the sub-metering points by each user, and the freezing electricity consumption comprises the following steps:
4. The method of claim 1, wherein collecting is based on the profile informationA period of timeStation area summary table power supply amount data and said station areaAfter freezing the electricity consumption data of the metering points of the individual users, the method also comprises the following steps:
and carrying out data cleaning on the collected electric quantity data of the summary table and the frozen electric quantity data, and removing data with missing items, data with wrong archive information and data with abnormal judgment in the data.
5. The method of claim 1, wherein the station is based on the station areaDetermining the area according to the calculation error of the sub-metering point of each userThe calculation formula of the operation error of the metering point of each user is as follows:
6. a system for determining district low voltage line loss and power meter operating errors, the system comprising:
a data acquisition unit for acquiring the file information of the distribution area general table and the user sub-table and acquiring the file information according to the file informationA period of equal timeStation area summary table power supply amount data and said station areaFreezing electricity consumption data of metering points of the individual users in a sub-metering mode;
the system of equations unit is used for generating a system of equations according to the total meter power supply quantity data and the frozen power consumption quantity data, and a pre-established low-voltage line loss model and an electric energy meter operation error mathematical modelA system of equations;
a first computing unit for solving for a solution comprising theA system of equations defining said regionCalculating errors of sub-metering points of each user and equivalent resistance of each branch of the transformer area;
a second calculation unit for calculating a second calculation result according to the regionThe calculation error of the metering point of each user sub-meter, the equivalent resistance of each branch of the distribution area, and the distribution areaIndividual subscriber sub-meter measurement point voltage and power factor, and pre-established low voltage line loss model determinationA period of equal timeAccording to the line loss of the station areaDetermining the area according to the calculation error of the sub-metering point of each userAnd (4) dividing the running error of the metering point by each user.
7. The system of claim 6, further comprising:
the first model unit is used for establishing a transformer area low-voltage line loss model by utilizing kirchhoff law, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the equivalent resistance of each branch of the platform area,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe freezing electricity consumption of the electric power source,andis the first stage of the platformIndividual user sub-metering point andeach user sub-metering point in equal time periodThe error in the calculation of (a) is,andis the first stage of the platformIndividual user sub-metering point andthe individual users divide the meter into the voltage of the metering point,andis the first stage of the platformMetering points and users are divided into metering points andthe power factor of each user sub-metering point is measured by each user,is the number of metering points of the subscriber sub-table of the station area,,;
the second model unit is used for establishing an electric energy meter operation error mathematical model based on the established transformer area low-voltage line loss model according to the energy conservation law, and the calculation formula is as follows:
in the formula (I), the compound is shown in the specification,is the amount of power supplied to the station area summary table,is the said platform areaThe freezing electricity consumption sum of the metering points is divided into the metering points by each metering point and each user,is the statistical line loss of the distribution room,is the low voltage line loss of the station area,is the fixed loss of the station area,is of said areaThe electric energy loss caused by the metering error of each metering point and each user sub-metering point,。
8. the system of claim 6, wherein the data collecting unit collects profile information of the district general table and the user sub-table through a marketing service application system, and collects profile information through the electricity consumption information collecting system according to the profile informationA period of equal timeStation area summary table power supply amount data and said station areaAnd (4) metering the frozen power consumption data of the metering points by each user.
9. The system according to claim 6, further comprising a data processing unit, configured to perform data cleaning on the collected summary table power supply amount data and frozen power consumption amount data, remove data with missing items, data with wrong archive information, and data with abnormal judgment in the data.
10. The system of claim 6, wherein the second computing unit is based on the station areaFor one to useDetermining the distribution area by the calculation error of the household sub-meter metering pointThe calculation formula of the operation error of the metering point of each user is as follows:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110059440.4A CN112379177A (en) | 2021-01-18 | 2021-01-18 | Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110059440.4A CN112379177A (en) | 2021-01-18 | 2021-01-18 | Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112379177A true CN112379177A (en) | 2021-02-19 |
Family
ID=74581943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110059440.4A Pending CN112379177A (en) | 2021-01-18 | 2021-01-18 | Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112379177A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113281697A (en) * | 2021-05-20 | 2021-08-20 | 国网河南省电力公司营销服务中心 | Operation error online analysis method and system |
CN113625217A (en) * | 2021-07-16 | 2021-11-09 | 国网浙江省电力有限公司营销服务中心 | Low-voltage transformer area electric energy meter operation error calculation method and system |
CN113655425A (en) * | 2021-07-16 | 2021-11-16 | 国网浙江省电力有限公司营销服务中心 | Metering point operation error monitoring method and system suitable for 10KV wiring line |
CN113805138A (en) * | 2021-10-18 | 2021-12-17 | 国网湖南省电力有限公司 | Intelligent electric meter error estimation method and device based on parameter directed traversal |
CN113945881A (en) * | 2021-07-27 | 2022-01-18 | 国网浙江省电力有限公司营销服务中心 | Electric energy meter running error monitoring device in meter box |
CN115015828A (en) * | 2022-05-27 | 2022-09-06 | 云南电网有限责任公司 | Error out-of-tolerance ammeter determining method, device, equipment and computer storage medium |
CN115201743A (en) * | 2022-09-16 | 2022-10-18 | 北京志翔科技股份有限公司 | Method and device for determining error of metering point of low-voltage transformer area and storage medium |
CN115561699A (en) * | 2022-12-05 | 2023-01-03 | 北京志翔科技股份有限公司 | Operation error estimation method and device |
CN115600414A (en) * | 2022-10-24 | 2023-01-13 | 中国电力科学研究院有限公司(Cn) | Electric energy meter operation error solving method and device based on AI algorithm |
CN115980656A (en) * | 2022-11-03 | 2023-04-18 | 中国电力科学研究院有限公司 | Low-voltage transformer area line loss determination method and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617357A (en) * | 2013-11-30 | 2014-03-05 | 国网河南省电力公司南阳供电公司 | Public transformer district low-voltage line loss analysis system and using method thereof |
US20170310404A1 (en) * | 2016-04-26 | 2017-10-26 | Intel Corporation | Technologies for pcb and cable loss characterization and fixture de-embedding |
CN107462863A (en) * | 2017-09-05 | 2017-12-12 | 中国电力科学研究院 | A kind of intelligent electric energy meter kinematic error operational diagnostics analysis method and system |
CN111693928A (en) * | 2020-06-22 | 2020-09-22 | 广东电网有限责任公司计量中心 | Electric energy meter metering error calculation method and device and computer equipment |
CN111969604A (en) * | 2020-08-17 | 2020-11-20 | 清华大学 | Dynamic calculation method and device for line loss of transformer area based on measured data |
CN112035784A (en) * | 2020-07-16 | 2020-12-04 | 中国电力科学研究院有限公司 | Method and system for determining loss of low-voltage transformer area based on power consumption acquisition data |
-
2021
- 2021-01-18 CN CN202110059440.4A patent/CN112379177A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617357A (en) * | 2013-11-30 | 2014-03-05 | 国网河南省电力公司南阳供电公司 | Public transformer district low-voltage line loss analysis system and using method thereof |
US20170310404A1 (en) * | 2016-04-26 | 2017-10-26 | Intel Corporation | Technologies for pcb and cable loss characterization and fixture de-embedding |
CN107462863A (en) * | 2017-09-05 | 2017-12-12 | 中国电力科学研究院 | A kind of intelligent electric energy meter kinematic error operational diagnostics analysis method and system |
CN111693928A (en) * | 2020-06-22 | 2020-09-22 | 广东电网有限责任公司计量中心 | Electric energy meter metering error calculation method and device and computer equipment |
CN112035784A (en) * | 2020-07-16 | 2020-12-04 | 中国电力科学研究院有限公司 | Method and system for determining loss of low-voltage transformer area based on power consumption acquisition data |
CN111969604A (en) * | 2020-08-17 | 2020-11-20 | 清华大学 | Dynamic calculation method and device for line loss of transformer area based on measured data |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113281697A (en) * | 2021-05-20 | 2021-08-20 | 国网河南省电力公司营销服务中心 | Operation error online analysis method and system |
CN113625217A (en) * | 2021-07-16 | 2021-11-09 | 国网浙江省电力有限公司营销服务中心 | Low-voltage transformer area electric energy meter operation error calculation method and system |
CN113655425A (en) * | 2021-07-16 | 2021-11-16 | 国网浙江省电力有限公司营销服务中心 | Metering point operation error monitoring method and system suitable for 10KV wiring line |
CN113625217B (en) * | 2021-07-16 | 2023-09-26 | 国网浙江省电力有限公司营销服务中心 | Low-voltage transformer area electric energy meter operation error calculation method and system |
CN113945881B (en) * | 2021-07-27 | 2023-09-22 | 国网浙江省电力有限公司营销服务中心 | Electric energy meter running error monitoring device in meter box |
CN113945881A (en) * | 2021-07-27 | 2022-01-18 | 国网浙江省电力有限公司营销服务中心 | Electric energy meter running error monitoring device in meter box |
CN113805138A (en) * | 2021-10-18 | 2021-12-17 | 国网湖南省电力有限公司 | Intelligent electric meter error estimation method and device based on parameter directed traversal |
CN113805138B (en) * | 2021-10-18 | 2023-10-13 | 国网湖南省电力有限公司 | Smart electric meter error estimation method and device based on directed parameter traversal |
CN115015828A (en) * | 2022-05-27 | 2022-09-06 | 云南电网有限责任公司 | Error out-of-tolerance ammeter determining method, device, equipment and computer storage medium |
CN115201743A (en) * | 2022-09-16 | 2022-10-18 | 北京志翔科技股份有限公司 | Method and device for determining error of metering point of low-voltage transformer area and storage medium |
CN115600414A (en) * | 2022-10-24 | 2023-01-13 | 中国电力科学研究院有限公司(Cn) | Electric energy meter operation error solving method and device based on AI algorithm |
CN115980656A (en) * | 2022-11-03 | 2023-04-18 | 中国电力科学研究院有限公司 | Low-voltage transformer area line loss determination method and system |
CN115980656B (en) * | 2022-11-03 | 2024-03-26 | 中国电力科学研究院有限公司 | Low-voltage transformer area line loss determination method and system |
CN115561699A (en) * | 2022-12-05 | 2023-01-03 | 北京志翔科技股份有限公司 | Operation error estimation method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112379177A (en) | Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area | |
CN112035784B (en) | Method and system for determining loss of low-voltage transformer area based on electricity consumption acquisition data | |
CN107643507B (en) | Lean line loss analysis and control method based on power grid line operation error remote calibration | |
CN108593990B (en) | Electricity stealing detection method based on electricity consumption behavior mode of electric energy user and application | |
CN107817395B (en) | Electricity stealing troubleshooting method based on power grid line operation error remote calibration | |
CN107621621A (en) | A kind of intelligent electric energy meter is in Line synthesis error calibration method | |
EP2321657B1 (en) | Improvements in virtual metering | |
CN112381476B (en) | Method and device for determining electric energy meter with abnormal state | |
CN107870312A (en) | A kind of intelligent electric energy meter kinematic error remote calibration method | |
CN107818395A (en) | A kind of electric energy meter error iterative calculation method based on uncertainty of measurement | |
CN107727955B (en) | Transformer loss analysis and control method based on power grid line operation error remote calibration | |
CN112684401B (en) | Method and system for processing operation error data of electric energy meter in light-load station area | |
CN107944652A (en) | A kind of broad sense flow instrument kinematic error remote calibration method | |
CN112130109A (en) | Method for detecting metering performance abnormity of intelligent electric energy meter | |
CN115508770B (en) | KL-NB algorithm-based electric energy meter operation state online evaluation method | |
CN115015828A (en) | Error out-of-tolerance ammeter determining method, device, equipment and computer storage medium | |
CN111969604A (en) | Dynamic calculation method and device for line loss of transformer area based on measured data | |
CN113484819A (en) | High-frequency current sampling-based method for diagnosing metering fault of electric energy meter in limited range | |
CN108595814B (en) | Method for simulating daily rainfall by using measured perennial rainfall data | |
CN112556798B (en) | Flow measurement system and error verification method convenient for error verification | |
CN113484818B (en) | Sliding window-based accurate positioning method for high-frequency acquisition anomaly-resistant electric energy meter | |
CN105488302A (en) | Energy saving amount measuring method for energy saving reconstruction of public building | |
CN114152806B (en) | Electric energy sensor with three-way array structure and measurement system and method formed by same | |
CN115453447A (en) | Online detection method for out-of-tolerance electric meter based on suspected electric meter stepwise compensation rejection | |
Fungyai et al. | Determination of ZIP load model parameters based on synchrophasor data by genetic algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210219 |
|
RJ01 | Rejection of invention patent application after publication |