CN107870312A - A kind of intelligent electric energy meter kinematic error remote calibration method - Google Patents

A kind of intelligent electric energy meter kinematic error remote calibration method Download PDF

Info

Publication number
CN107870312A
CN107870312A CN201710788718.5A CN201710788718A CN107870312A CN 107870312 A CN107870312 A CN 107870312A CN 201710788718 A CN201710788718 A CN 201710788718A CN 107870312 A CN107870312 A CN 107870312A
Authority
CN
China
Prior art keywords
electric energy
energy meter
intelligent electric
data
cluster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710788718.5A
Other languages
Chinese (zh)
Inventor
董得龙
郭景涛
张萌
张一萌
李野
贺欣
付保军
于树明
于蓬勃
于香英
张应田
李刚
曹国瑞
滕永兴
杨光
孙淑娴
朱逸群
何泽昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
TIANJIN ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd filed Critical TIANJIN ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201710788718.5A priority Critical patent/CN107870312A/en
Publication of CN107870312A publication Critical patent/CN107870312A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Abstract

It is the present invention relates to a kind of intelligent electric energy meter kinematic error remote calibration method, the step of this method:This method concretely comprises the following steps:(1) intelligent electric energy meter cluster is installed to form tree topology;(2) the flow conservation basic model of the intelligent electric energy meter cluster is obtained;(3) virtual tributary dynamic corrections intelligent electric energy meter cluster topology model is introduced, obtains flow conservation algorithm model;(4) the current increment data of multiple intelligent electric energy meter cluster are obtained, calculate relative error;(5) result of calculation is modified and Evaluation of Uncertainty;(6) error calculation result is drawn.The intelligent electric energy meter that the present invention has on-line operation for Guo Wang companies 4.8 hundred million uses the full data sample mode of thinking, excavate power user power consumption information acquisition system magnanimity energy data, without external perimysium reference instrument, carry out intelligent electric energy meter remote verification technical research, so that the accuracy of electric power meter can be understood in real time for electricity consumption both sides, meet the client's property it is expected demand, improve corporate image.

Description

A kind of intelligent electric energy meter kinematic error remote calibration method
Technical field
The invention belongs to electric energy metrical field, especially a kind of intelligent electric energy meter kinematic error remote calibration method.
Background technology
The hot issue that operating electric power meter accuracy is resident all the time and Guo Wang companies most pay close attention to.Mesh Before, Guo Wang companies are using the means such as statistical analysis technique or addition online detection instrument, to realize that intelligent electric energy meter operation misses The supervision and evaluation of difference.Although statistical analysis method change over resident's single-phase electric energy meter by rotate at regular intervals for sampling observation, but still It is the control to overall batch;Will be that enterprise brings buying, the increase of maintenance cost, the party by adding on-line monitoring equipment Method maintenance cost is high and has limitation.
The technical program is aimed to the intelligent electric energy meter that Guo Wang companies 4.8 hundred million have on-line operation with totally according to sample This mode of thinking, power user power consumption information acquisition system magnanimity energy data is excavated, without external perimysium reference instrument, carried out Intelligent electric energy meter remote verification technical research so that the accuracy of electric power meter can be understood in real time for electricity consumption both sides, it is full The sufficient client property it is expected demand, improves corporate image.
By retrieving, the disclosed patent document of analogous technical is not found.
The content of the invention
It is an object of the invention in place of overcome the deficiencies in the prior art, there is provided a kind of intelligent electric energy meter kinematic error is long-range Calibration method.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of intelligent electric energy meter kinematic error remote calibration method, it is characterised in that:This method concretely comprises the following steps:
(1) intelligent electric energy meter cluster is installed to form tree topology, can remotely obtain in the intelligent electric energy meter cluster Summary table and each point of flow-meter data;
(2) the tree topology formed according to intelligent electric energy meter cluster, the flow conservation of the intelligent electric energy meter cluster is obtained Basic model;
(3) line loss error is corrected, virtual tributary dynamic corrections intelligent electric energy meter cluster topology model is introduced, repaiies simultaneously Positive flow conservation basic model, obtain flow conservation algorithm model;
(4) the current increment data of multiple intelligent electric energy meter cluster are obtained, by the electric current of the intelligent electric energy meter cluster got Flow increasing data substitute into flow conservation algorithm model, calculate relative error;
(5) result of calculation is modified and Evaluation of Uncertainty;
(6) error calculation result is drawn.
Moreover, the virtual tributary replaces the failure values sum of circuit consume, the virtual tributary includes Virtual Intelligent electric energy Table and dummy load.
Moreover, the flow conservation basic model is:Y ε=- η.
Moreover, the outflow of the virtual tributary is cluster summary table M0Reading increment subtract each point of table Mj(j=1, n) Sum, and by this value be multiplied by one by empirical value judge loss factor;After adding virtual tributary, revised flow conservation Algorithm model isα is amendment experience.
Moreover, the method for solving of the revised flow conservation algorithm model is:
The current increment data of the intelligent electric energy meter cluster of m=n-1 times are obtained, substitute into flow conservation algorithm model, wherein,yiFor ith measurement result vector;ε=(ε1 ε2 εn-1)T;η= (y1,0ε0-α(y1,0x1,n) y2,0ε0-α(y2,0x2,n) yn-1,0ε0-α(y1,0xn-1,n))T
To solve equation group, matrix Y is done into LU and decomposes Y=LU, z=U ε is made, equation group Lz=- η is obtained, under being due to L Triangle battle array, easily solves z;Again because U is upper triangular matrix, ε is easily solved, and then obtain relative error δj
Moreover, (4) the step obtains the current increment data of multiple intelligent electric energy meter cluster, it is before the computation, it is necessary to right Continuous data storehouse carries out data prediction, filters out the stronger data of independence;The step of method of the data prediction according to It is secondary to be:Real-time test, data integrity inspection, data integration, lacuna processing, data analysis note abnormalities data and orthogonal Property examine.
Moreover, the computational methods of the Evaluation of Uncertainty:In the case of given initial experience value α=0, electricity is calculated Energy table cluster error condition, if the result of calculation meets confidence level requirement, that is, the overproof electric energy meter quantity calculated is less than regulation In the range of, then the algorithm terminates;Otherwise α value section is adjusted upward, returns to Algorithm for Solving.
The advantages and positive effects of the present invention are:
1st, this method utilizes flow conservation principle and big data analytical technology, is not adding standard device, is not changing meter Structure, in the case of not changing electric energy meter cluster topology, realize the remote detection of magnanimity on-line operation electric energy meter error.
2nd, this method establishes the amendment topological model based on virtual tributary, realizes that the measurement of on-line operation electric energy meter error is reliable Property 100%, instructs electric energy meter more to change jobs to more lean.
3rd, the big data Predicting Technique of this method combination electric energy meter error variation tendency, before the appearance of overproof problem Complete user's unaware to change the outfit operation, remove a hidden danger, avoid the occurrence of unnecessary metering accuracy dispute.
4th, the present invention can effectively reduce marketing operation cost, and the money such as personnel in checking procedure, vehicle, equipment can be greatly decreased The consumption in source, save marketing maintenance O&M cost;Also, by realizing that remote verification can be realized to the accurate of failure electric energy meter Change, tear back reduction fault-free electric energy meter open quantity 95%, the generation of less electronic waste is green;If this technology Extend in the range of nationwide integrated power grid and apply, this technology is estimated after realizing can to reduce by 12000 tons of electronic wastes every year, save electric energy meter About 136.31 hundred million yuan of procurement payment, is greatly reduced enterprise's O&M cost, realizes upgrading synergy, has significant economic benefit and society Can benefit.
5th, this technology can not only realize comprehensive remote detection of residential households electric energy meter kinematic error and diagnosis, can be with Whole broad sense flow measurements are generalized to, such as natural gas and water, heat field, are had a extensive future.
6th, the present invention has the intelligent electric energy meter of on-line operation for Guo Wang companies 4.8 hundred million, with full data sample thinking side Formula, power user power consumption information acquisition system magnanimity computer data is excavated, without external perimysium reference instrument, carries out intelligent electric energy Table remote verification technical research so that the accuracy of electric energy meter metering device can be understood in real time for electricity consumption both sides, meet client The property it is expected demand, lifting incorporated business image.
Brief description of the drawings
Fig. 1 is error remote verification flow of the present invention;
Fig. 2 is intelligent electric energy meter cluster schematic diagram under tree topology;
Fig. 3 is the electric energy meter cluster schematic diagram for introducing virtual tributary;
Fig. 4 is Measurement reliability R (t) change schematic diagrams;
Fig. 5 is that electric energy meter and power network in-site modeling run work block diagram;
Fig. 6 is load simulation cell operation theory diagram;
Fig. 7 is PWM rectification boosting circuits;
Fig. 8 is conductive discharge circuit.
Embodiment
Below in conjunction with the accompanying drawings and the invention will be further described by specific embodiment, and following examples are descriptive , it is not limited, it is impossible to which protection scope of the present invention is limited with this.
A kind of intelligent electric energy meter kinematic error remote calibration method, it is characterised in that:This method concretely comprises the following steps:
(1) intelligent electric energy meter cluster is installed to form tree topology, can remotely obtain in the intelligent electric energy meter cluster Summary table and each point of flow-meter data;
(2) the tree topology formed according to intelligent electric energy meter cluster, the flow conservation of the intelligent electric energy meter cluster is obtained Basic model;
(3) line loss error is corrected, virtual tributary dynamic corrections intelligent electric energy meter cluster topology model is introduced, repaiies simultaneously Positive flow conservation basic model, obtain flow conservation algorithm model;
(4) the current increment data of multiple intelligent electric energy meter cluster are obtained, by the electric current of the intelligent electric energy meter cluster got Flow increasing data substitute into flow conservation algorithm model, calculate relative error;
(5) result of calculation is modified and Evaluation of Uncertainty;
(6) error calculation result is drawn.
This method calculates electric energy meter error by day electricity is freezed, by algorithm, realizes to the real-time remote of electric energy meter error Range monitoring.Remote calibration is carried out to electric energy meter using electric energy meter acquisition system meter reading data.
Electric energy is considered as a kind of broad sense flow for meeting law of conservation by this method, and the common trait that such instrument has is peace The cluster formed after dress has tree topology.Therefore about fixed in flow conservation, the actual flow increment of summary table in the same period Equal to the actual flow increment sum of each point of table.Because actual flow increment can be represented with reading increment and relative error, therefore An equation comprising all meter reading increments and relative error can be obtained.If it is known that any one instrument in cluster Relative error and using the relative error of other instrument as unknown quantity, and notice and can make equation by increasing measurement period Meet or exceed the quantity of unknown number, then the relative error of other instrument can be determined by solving equation group.This is autonomous Formula algorithm is by the mutual contrast conting error of cluster internal instrument, without external perimysium reference instrument.
When tree topology flow tube, which exists, to be leaked, it is necessary to which equation group is modified.In electric energy metrical, leakage is shown as Line electrical leakage, resistance loss and ammeter power consumption.In the method, loss is considered as the load of virtual tributary, and introduces virtual Electric energy meter.Using the electric parameter measurement function of intelligent electric energy meter, loss correction item is determined.Provide revised algorithm flow and Simulation result.
This method can not only be applied to intelligent electric meter, can apply intellectual water meter, intelligent gas meter and Intelligent heat quantity Among the remote calibration of the intelligent electric energy meters such as table.
It is specific decomposable process below:
For the ease of clearly describing this method, provide be defined as below first:
Stream:Flow in or out a certain occluding surface S scalar (shown in Fig. 2 arrows).It is negative to flow into just, to flow out.Convection current Do following agreement:Stream will not be accumulated and any moment is in compliance with law of conservation.I.e. through any enclosed curved surface S current algebra and wait In zero.Stream is with the integer mark since 0.
Broad sense flow:Abbreviation flow, flow the integration to the time.Flow conservation can be released by stream conservation.That is random time In section, the flow increment algebraical sum through occluding surface S is equal to zero.
Intelligent electric energy meter:Abbreviation flow instrument or flowmeter (M in Fig. 20~M4), record the corresponding instantaneous delivery flowed.Flow Meter is with MjMark, j are the numbering of corresponding stream.
Cluster:Through the set of the flow instrument corresponding to a certain occluding surface S all streams.
Meter reading:Obtain the reading of all instrument in a certain moment cluster.In logic, it is identical should to return to each instrument for meter reading action The reading at moment.If but in fact, each meter reading return time interval it is short enough, be regarded as mutually in the same time.
Measurement:One-shot measurement is the meter reading twice to cluster certain interval of time, the result is that the increasing of front and rear reading twice Amount.
First, flow conservation ideally:
Relative error δ:
Wherein x is the actual increment by the flow of certain instrument in a period of time, and y is the instrument in the same period The increment of reading.
Certain occluding surface S defines flow instrument cluster AS={ Mj| stream j passes through occluding surface S }, flow instrument in cluster Number NS=n.If flowmeter MjIth measurement result is yij, corresponding actual value is xij.Wherein i=1,2, m, m For pendulous frequency.Had according to flow conservation agreement
If δjRepresent flowmeter MjRelative error, then by definition save relative error definition can obtain (2) formula is substituted into, is hadSet up.Without loss of generality, it is assumed that δ0, it is known that then have
Order
(3) formula of substitution has
(5) formula can be write as matrix form
Y ε=- η (6)
Wherein
yiFor instrument M1~Mn-1The result vector of ith measurement.
ε=(ε1 ε2 εn-1)T, η=(y1,0ε0 y2,0ε0 ym,0ε0)T
(6) formula shows, if in known cluster a certain instrument relative error δ0, then multigroup survey of all instrument can be passed through Amount result extrapolates the relative error δ of other each instrumentj, j=1,2, n-1.
We focus primarily upon related variable and the calculating of error of electric energy meter for the understanding of electric energy meter error at present Method.And in practice, actual power Watch Error might have some variations.Here, we discuss the deviation and result Relation between calculated value:
Without loss of generality, perturbation matrix matrix Δ Y is added, coefficient matrix is changed into Y+ Δs Y, corresponding error vector and total Meter reading addition perturbation vector is changed into ε+Δ ε, η+Δ η
Equation Group is changed into (Y+ Δ Y) (ε+Δ ε)=η+Δ η.We have following theorem:
(1) equation group (Y+ Δ Y) (ε+Δ ε)=η+Δ η solution is ε+Δ ε
(2)Prove as follows:
(Y+ Δ Y) (ε+Δ ε)=η+Δ η
Y ε+Δ Y ε+Δ Y/delta ε+Y/delta ε=η+Δ η
Δ Y ε+Δ Y/delta ε+Y/delta ε=Δ η
Δ ε=Y-1Δη-Y-1ΔYε-Y-1ΔYΔε
| | Δ ε | |=| | Y-1Δη-Y-1ΔYε-Y-1ΔYΔε||
||Δε||≤||Y-1||||Δη||+||Y-1||||ΔY||||ε||+||Y-1||||ΔY||||Δε||
Therefore in actual applications, the constant interval of solution of equation exists when conditional matrix Y changesIt is interior.
Definition:For nonsingular matrix A, claim product | | A | | | | A-1| | it is the conditional number of matrix A, is designated as cond (A), Cond (A)=| | A | | | | A-1||.
For system of linear equations Y ε=- η, if cond (Y) is relatively very big, it is an ill-conditioned linear systems to claim Y ε=- η, most The good solution for not using equation group.If cond (Y) is relatively small, can use.
Amendment topological model based on virtual tributary
The general principle of algorithm is discussed without considering various losses.Leakage or damage in actual broad sense flow tube often be present Consumption, such as leakage loss, resistance loss and electric energy meter power consumption in power circuit.Requiring the occasion needs of exact computation results Further consider these factors.
Loss (electric energy meter loss, leakage loss, line resistance loss etc.), traditional side be present in actual electric energy meter cluster Method assumes that electric energy meter loss is proportional with electric energy meter cluster influx, is yet with electric energy meter line lossrjFor the line resistance of j-th strip branch road;Leakage loss eL=U2σTi, U is that line voltage distribution (generally takes 220V), σ is that cluster always leaks electricity conductance;Electric energy meter is lost For MjAverage active power, and these damage Consumption value is difficult to simply judge whether and flows into whether electricity is presented linearly or nonlinearly relation, and virtual tributary is introduced for this, instead of The loss value sum being the theme in problem with line loss.The branch road includes virtual electric energy meter and dummy load.Cluster total losses The energy consumption of dummy load can be equivalent to.In figure 3, imaginary occluding surface S defines an electric energy meter cluster, and electric energy meter is to accord with Number Mj(j=0,1, n) represent.MnFor virtual electric energy meter.Agreement flows into S energy as just, it is negative to flow out.
Due to the presence of virtual tributary, if the loss of virtual tributary can be exactly equal to cluster loss, then equation or so two Side is naturally equal, and each electric energy meter error calculated value is equal to its true value.But due in actual conditions, loss be it is unknown, I Be not directly available the solution.
2nd, virtual tributary computed losses are added:
There is loss (electric energy meter loss, leakage loss, line resistance loss etc.) in actual electric energy meter cluster, we introduce The concept of virtual tributary, instead of the loss value sum being the theme in problem with line loss.The branch road include virtual electric energy meter and Dummy load.Cluster total losses can be equivalent to the energy consumption of dummy load.In figure 3, imaginary occluding surface S defines an electricity Energy table cluster, electric energy meter is with symbol Mj(j=0,1, n) represent.MnFor virtual electric energy meter.The energy that agreement flows into S is just stream It is negative for going out.
It is located at ith measurement period TiInside flow through MjElectric energy be xi,j(i=1,2, m, to identify each measurement period Sequence number;M is pendulous frequency), then following formula establishment is had according to law of conservation of energy.
It has been generally acknowledged that in the ith measurement period, MjReading increment yi,jWith xi,jWith following relation.
yi,j=(1+ δj)xi,j (10)
(10) in formula, δjFor Mj(average) relative error.If order
Then (11) formula can turn to
Without loss of generality, it is assumed that known M0Relative error δ0, so as to understand ε0.Provide virtual electric energy meter MnIt is relative by mistake Poor δn=0, so as to there is εn=1 and xi,n=yi,nSet up.Therefore (2-22) formula turns to
3rd, the expression being lost in virtual tributary
(13) Section 3 x in the left side in formulai,nRepresent measurement period TiThe energy consumption (the total loss of cluster) of interior dummy load, On the premise of the conservation of energy, if in known cluster a certain instrument relative error δ0, it is likely that pass through multigroup measurement result yi,j Extrapolate the ε of other all electric energy metersj, and then obtain relative error δj(j=1,2, n-1).In actually calculating, virtual branch The outflow on road is cluster summary table M0Reading increment subtract each point of table MjThe sum of (j=1, n), and this value is multiplied by one The loss factor judged by empirical value.Energy loss of the loss factor as electric energy meter cluster, by circulation described below Alternative manner is tried to achieve.On the other hand, after adding virtual tributary, equation respective change is α is amendment experience, is a range of random value.
Data screening:
This method is omitted firstly the need of electric energy meter correlation meter reading data is obtained from power information acquisition system by filling up Data, eliminate abnormal data, smooth noise data, and correct inconsistent data, remove noise in data, filling null value, Missing value and processing inconsistent data, so as to obtain valid data.
We need to obtain the measurement result of all meters in whole tree-structured system first, and measurement together has not In the case of deterministic, we can more acquisition data as far as possible, to ensure the accuracy of the result under rational calculation error With completeness requirement.Data volume minimum should add one not less than ammeter quantity.Data screening has the following steps:1. real-time inspection. 2. integrity checking and missing values processing.3. method for visualizing notes abnormalities, the orthogonality of data 4. is examined
Real-time inspection:Whether we check same group of meter meter reading value in same time point copy reading.If it is unsatisfactory for this It is required that data can not use.
Data integration:Data integration is on the basis of original meter reading data, and electric energy meter reading data are added into the table Count in history meter reading data.
Integrity checking and missing values processing:We need to carry out integrity checking to data first.Integrity checking Groundwork is missing values processing.For missing values processing, traditional method has direct deletion, or utilizes average value, intermediate value, divides Digit, mode, random value etc. substitute.It is general so to do effect, because being modified equal to people to data.The side that we use Method gives a forecast model to calculate missing values by history error and other margins of error, is added to after calculating missing values in algorithm and carries out Whether secondary checking, judging the situation of missing values can meet that missing requires.Specifically, if in one group of data missing values compared with More, missing amount is excessive, and we directly can fall the rejection of data, because if larger noise can be produced by introducing, result is caused Harmful effect.Empirically value judges, if missing values are more than 10%, we are more likely to wait more meter reading datas.If energy Meet to require, missing gathered data electric energy meter reading is added in the power consumption of virtual tributary by we first, uses master mould Calculate electric energy meter error situation.If data are maintained within zone of reasonableness added to result of calculation after virtual tributary renewal, we Further according to the average line loss experience accounting of the taiwan area, deduction line loss is filled to data from the electricity of virtual tributary.After filling, Error condition is recalculated using the form of filling, if meeting other meters change twice less and lacking meter to calculate with history It is worth the little condition of deviation, it is correct that we are considered as the filling of its result.Without loss of generality, we are using missing values electric energy meter as table 1, In the case where pendulous frequency m is not less than n-1, (14) formula is write as matrix form
Y ε=- η ' (15)
WhereinyiFor ith measurement result vector;ε=(ε2 ε3 εn-1)T;η '=η-y·1=(y1,0ε0-α(y1,0x1,n)-y11 y2,0ε0-α(y2,0x2,n)-y12 yn-1,0ε0-α(y1,0xn-1,n)-y1n )T.By mentioned earlier, similarly equation (15) can solve.If ε=(ε2 ε3 εn-1)TMeeting the requirement, then equation is reasonable, according to Virtual tributary value recovers the result.
Data analysis notes abnormalities data (by visualization tool):Using the daily meter reading data of electric energy meter as one to Amount, then multigroup copy reading can form a Vector Groups.In multidimensional data analysis technology, by by each vector visualization table Show, therefrom find out the special vector changed extremely.Using Crystal Analysis visualization tool method, it can be found that special The different point value that peels off, special analysis are done to this point value, further enhance data monitoring, optimize core data.In addition, calculated using cluster Method analyzes the vector clusters, as a kind of special discovery method to be noted abnormalities in visable representation in data basis.
Orthogonality is examined:Error analysis algorithm requires there is weak dependence between each equation of equation group, and otherwise equation group is in disease State causes error calculated to exceed tolerance interval.When meeting enough requirements, equation can just calculate.
Computational methods:Electric energy meter error iterative calculation method based on uncertainty of measurement
What it is due to this method measurement is electric energy meter mean error interior for a period of time, and the result of measurement is estimating of being measured Evaluation, the uncertain factor in measurement process can cause the uncertainty of measurement.After being modified for known systemic effect Measurement result still simply measured estimate, consider Evaluation of Uncertainty method, guarantee makes not exclusively preferably multiple In the case that existing or representativeness of sample not enough waits, measuring still can reflect truth.
Iterative method is a kind of process being constantly newly worth with the old value recursion of variable, and iterative algorithm is a kind of base solved the problems, such as This method.Its basic thought is to release the new value of its one from the initial value of variable.In our method, iteration is applied to pair Virtual circuit amendment experience α estimation.
Provide hypothesis first herein:The quantity of the overproof table of error is less than the 5% of summary table quantity in a taiwan area, is me Think the reliability of measurement instrument 95%.
In general, the reliability of measurement instrument can be increased over time and reduced, therefore for the ratio in difference Taiwan area we perform the calibrating reliability objectives scope of floating.Fig. 4 is Measurement reliability and the change schematic diagram of time.According to platform The average usage time length situation of meter in area, we are modified to the value.
Our method is summarized as follows:In the case of given initial experience value α=0, electric energy meter cluster error is calculated Situation, if the result of calculation meets confidence level requirement, that is, the overproof electric energy meter quantity calculated is less than in prescribed limit, then the calculation Method terminates.Otherwise α value section is adjusted upward, returns to Algorithm for Solving.
Joint Evaluation of Uncertainty method:
Mathematical modeling:δ=1/ (Y-1η)-1
Due to Y, η meets independence, then has:
So we have joint expanded uncertainty U=kucK=2 is taken, is had:
If the electric energy meter error solved meets actual desired, independent repeated measures then are carried out to being measured, pass through gained A series of measured values arrived, experimental standard deviation s (x) is obtained with statistical analysis technique, when by the use of arithmetic mean of instantaneous value as measured During estimate, the uncertainty of estimate is measured by calculating:
Using Bessel Formula method, it is measured independent repeated measures n time to same under the conditions of repeatability, obtains n and survey Obtain value xi=(i=1,2 ..., n), the best estimate for being measured X is the arithmetic average of n independent measured valuesBy as follows Formula calculates:
Single measured value xkExperimental variance s2(x):
Single measured value xkExperimental standard deviation s (x):
It is measured estimateUncertainty
The cell stage body model structure that the present embodiment is built
To promote the reproduction of site problems and more preferable analysis solves site problems, this project simulation built electric energy meter and The technical scheme of power network scene running status, its operation principle block diagram are as shown in Figure 5.The theory diagram is mainly by PC units, more Road Communications service unit, high-power program control alternating-current voltage source, gate energy meter, line loss analogue unit, subject electric energy meter and phase The part such as load simulation unit answered forms.
Its operation principle:Overall control is carried out to its each equipment by multiplex communication service unit by PC, to high-power journey Amplitude, frequency and the harmonic content of control alternating-current voltage source can carry out any setting, be changed pair with the simulating grid quality of power supply The influence brought is measured, while mould is carried out with line loss analogue unit to gate energy meter to the line loss between ordinary electric meter Intend.It is usually active loss to consider line loss unit, therefore this line loss analogue unit is using resistive load in kind of impedance adjustable etc. Effect, in the range of the Ω continuously adjustabes of 0 Ω~10.For load simulation unit, consider existing domestic loads characteristic more it is next it is changeable, Become increasingly complex, realized in this programme using electronic load mode., can be to the work(of electronic load by the parameter setting of PC softwares Rate factor and watt level carry out any setting, more preferably to simulate the actual metered operating load at electric energy scene.Emphasis pair below The operation principle of load simulation unit does an introduction.
Load simulation unit comprehensive is set using Power Electronic Technique, embedded software technology and power system automation technology Meter realize, can analog regulation load power factor (PF) and watt level.The operation principle block diagram of fictitious load as shown in fig. 6, its Basic functional principle:First, the input voltage of sampling test power supply, is analyzed input voltage signal, is done with the voltage signal For current reference signal Iref reference signal.According to set mode of operation (constant pressure, constant current, invariable power and constant-resistance) and work( Rate factor generates corresponding current reference signal Iref by single-chip microcomputer.Reference signal carries out differential amplification with actually entering electric current Is Ierr signals are obtained, the triangular wave of Ierr signals and 23kHz is compared, produce SPWM pulse signals, the signal is through overdriving Isolation circuit is used for the turn-on and turn-off for controlling H bridges IGBT, and Boost boosts to DC voltage Udc.Rear class discharge circuit is according to adopting The DC voltage Udc of sample, the PWM ripples of corresponding dutycycle are generated by single-chip microcomputer, and leading for IGBT is controlled through overdriving isolation circuit It is the logical and turn-off time, equivalent into needs so as to control nickel filament resistance (being divided to two kinds of small resistor and big resistance) to switch on and off Resistance.PWM dutycycle is adjusted according to Udc variable quantity, to keep Udc in the value of design.
Fictitious load designed by the program meets that test power supply is tested under different conditions.The fictitious load of design For resistance consumption type, i.e. in test process, caused energy is fallen fictitious load by resistance consumption.According to its operation principle, mould Intend load circuit implementation and be broadly divided into two-stage.Prime PWM rectification boosting circuits (such as Fig. 7), using wholly-controled device, work In high frequency state.By using turning on and off for suitable SPWM impulse waves control device for power switching so that input AC Boost in voltage is to design load Udc.
Rear class is conductive discharge circuit, sees Fig. 8.According to the DC voltage Udc of sampling, suitable PWM is generated by single-chip microcomputer Ripple, IGBT turn-on and turn-off are driven, so as to reach the purpose of different resistances.This partial circuit is completed test power supply and tested Energy expenditure in journey.
The experimental verification of algorithm:
We have chosen a certain 19 pieces of electric energy meter clusters of taiwan area in Efficiency in Buildings in Tianjin Area, obtain 150 workaday days of the cluster Freezing data.For the data, we are to this above-mentioned algorithm of execution.It was found that after 8 iteration, virtual tributary is taken For empirical value at section [0.8,0.9], the calculating for electric energy meter error is by larger improvement and good result:
(α=0) error calculation amount under the original state of form 1
Label Error calculation value Label Error calculation value
1 1.5590% 10 - 14.5640%
2 - 2.7938% 11 - 9.0017%
3 - 5.1089% 12 5.5293%
4 - 0.2388% 13 0.0485%
5 - 3.1209% 14 - 0.4204%
6 3767.6317% 15 - 3.8429%
7 - 0.3551% 16 - 5.7363%
8 - 4.0477% 17 - 3.1323%
9 - 2.9027% 18 - 2.2543%
Final (α ∈ [the 0.8,0.9]) result of calculation of the iteration of form 2
We have found that electric energy meter error is in reasonable level in this section, according to evaluation of uncertainty in measurement method, 10 electric energy meter error data are calculated in slippage method, provide the result of calculation under the evaluation of standard inaccuracy and half-breadth section:
The result of calculation of form 3 and its half-breadth section
Label Error calculation value Half-breadth section Label Error calculation value Half-breadth section
1 0.09% 0.02% 10 0.13% 0.09%
2 0.35% 0.02% 11 0.04% 0.02%
3 - 0.21% 0.02% 12 - 0.11% 0.09%
4 0.54% 0.02% 13 0.00% 0.00%
5 0.60% 0.02% 14 - 0.50% 0.03%
6 - 1.90% 0.09% 15 0.43% 0.02%
7 - 0.56% 0.02% 16 - 0.26% 0.07%
8 0.08% 0.01% 17 0.10% 0.02%
9 - 0.09% 0.01% 18 0.06% 0.01%
After experimental result is obtained, find that the electric energy meter in above table 3 marked as 6 misses after analyzing electric energy meter error Difference is in higher situation, i.e., will be overproof, then the table is carried out at random by field personnel checking
Experimental verification shows using the algorithm without external perimysium reference instrument, actual relatively by mistake in known any electric energy meter On the premise of difference, only pass through the analysis to electric energy meter cluster reading in tree topology, you can calculate other all electric energy meters Error.The error calculation method of this autonomous type can perform online, so as to be expected to be substantially reducing at the maintenance of electric energy meter into This.When known a certain instrument available accuracy grade rather than practical relative error, although other electric energy meters can not be calculated really Relative error is cut, but the estimation of error range can be realized.This method can effectively lock doubtful overproof electric energy meter, make calibrating and school Standard is shot the arrow at the target.
Although disclosing embodiments of the invention and accompanying drawing for the purpose of illustration, those skilled in the art can manage Solution:Do not departing from the present invention and spirit and scope of the appended claims in, it is various replace, change and modifications all be it is possible, Therefore, the scope of the present invention is not limited to embodiment and accompanying drawing disclosure of that.

Claims (7)

  1. A kind of 1. intelligent electric energy meter kinematic error remote calibration method, it is characterised in that:This method concretely comprises the following steps:
    (1) intelligent electric energy meter cluster is installed to form tree topology, can remotely obtain the summary table in the intelligent electric energy meter cluster And each point of flow-meter data;
    (2) the tree topology formed according to intelligent electric energy meter cluster, the flow conservation basis of the intelligent electric energy meter cluster is obtained Model;
    (3) line loss error is corrected, introduces virtual tributary dynamic corrections intelligent electric energy meter cluster topology model, while correct stream Conservation basic model is measured, obtains flow conservation algorithm model;
    (4) the current increment data of multiple intelligent electric energy meter cluster are obtained, by the electric current flow increasing of the intelligent electric energy meter cluster got Measure data and substitute into flow conservation algorithm model, calculate relative error;
    (5) result of calculation is modified and Evaluation of Uncertainty;
    (6) error calculation result is drawn.
  2. 2. intelligent electric energy meter kinematic error remote calibration method according to claim 1, it is characterised in that:The virtual branch Road replaces the failure values sum of circuit consume, and the virtual tributary includes Virtual Intelligent electric energy meter and dummy load.
  3. 3. intelligent electric energy meter kinematic error remote calibration method according to claim 1, it is characterised in that:The flow is kept Permanent basic model is:Y ε=- η.
  4. 4. intelligent electric energy meter kinematic error remote calibration method according to claim 1, it is characterised in that:The virtual branch The outflow on road is cluster summary table M0Reading increment subtract each point of table MjThe sum of (j=1 ..., n), and this value is multiplied by one The loss factor judged by empirical value;After adding virtual tributary, revised flow conservation algorithm model isα is amendment experience.
  5. 5. intelligent electric energy meter kinematic error remote calibration method according to claim 1, it is characterised in that:After the amendment The method for solving of flow conservation algorithm model be:
    The current increment data of the intelligent electric energy meter cluster of m=n-1 times are obtained, substitute into flow conservation algorithm model, wherein,yiFor ith measurement result vector;ε=(ε1 ε2 … εn-1)T;η= (y1,0ε0-α(y1,0x1,n) y2,0ε0-α(y2,0x2,n) … yn-1,0ε0-α(y1,0xn-1,n))T
    To solve equation group, matrix Y is done into LU and decomposes Y=LU, z=U ε is made, obtains equation group Lz=- η, because L is lower triangle Battle array, easily solves z;Again because U is upper triangular matrix, ε is easily solved, and then obtain relative error δj
  6. 6. intelligent electric energy meter kinematic error remote calibration method according to claim 1, it is characterised in that:The step is (4) The current increment data of multiple intelligent electric energy meter cluster are obtained, are located in advance, it is necessary to carry out data to continuous data storehouse before the computation Reason, filters out the stronger data of independence;The step of method of the data prediction, is followed successively by:Real-time test, data are complete Whole property inspection, data integration, lacuna processing, note abnormalities data and orthogonality of data analysis are examined.
  7. 7. intelligent electric energy meter kinematic error remote calibration method according to claim 1, it is characterised in that:It is described uncertain Spend the computational methods of evaluation:In the case of given initial experience value α=0, electric energy meter cluster error condition is calculated, if the meter Calculate result and meet confidence level requirement, that is, the overproof electric energy meter quantity calculated is less than in prescribed limit, then the algorithm terminates;Otherwise α value section is adjusted upward, returns to Algorithm for Solving.
CN201710788718.5A 2017-09-05 2017-09-05 A kind of intelligent electric energy meter kinematic error remote calibration method Pending CN107870312A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710788718.5A CN107870312A (en) 2017-09-05 2017-09-05 A kind of intelligent electric energy meter kinematic error remote calibration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710788718.5A CN107870312A (en) 2017-09-05 2017-09-05 A kind of intelligent electric energy meter kinematic error remote calibration method

Publications (1)

Publication Number Publication Date
CN107870312A true CN107870312A (en) 2018-04-03

Family

ID=61762162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710788718.5A Pending CN107870312A (en) 2017-09-05 2017-09-05 A kind of intelligent electric energy meter kinematic error remote calibration method

Country Status (1)

Country Link
CN (1) CN107870312A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109061544A (en) * 2018-08-23 2018-12-21 广东工业大学 A kind of electric energy metering error estimation method
CN110082699A (en) * 2019-05-10 2019-08-02 国网天津市电力公司电力科学研究院 A kind of low-voltage platform area intelligent electric energy meter kinematic error calculation method and its system
CN110471024A (en) * 2019-08-08 2019-11-19 天津大学 A kind of online remote checking method of intelligent electric meter based on metric data analysis
CN110531304A (en) * 2019-08-07 2019-12-03 深圳供电局有限公司 A kind of calculation method, equipment and medium for monitoring platform area misalignment rate on-line
CN110780259A (en) * 2019-09-10 2020-02-11 中国电力科学研究院有限公司 Data cleaning and quality evaluation system based on remote error diagnosis of electric energy meter
CN111210149A (en) * 2020-01-06 2020-05-29 河南康派智能技术有限公司 Power distribution network topology identification method and device
CN112684399A (en) * 2020-11-23 2021-04-20 国网江苏省电力有限公司营销服务中心 Electric energy meter operation error monitoring data fitting method and system based on artificial intelligence
CN113094652A (en) * 2021-03-30 2021-07-09 中国科学院生态环境研究中心 Water meter water quantity metering loss determination method and system
CN113484819A (en) * 2021-07-14 2021-10-08 国网四川省电力公司营销服务中心 High-frequency current sampling-based method for diagnosing metering fault of electric energy meter in limited range
CN113625028A (en) * 2021-08-11 2021-11-09 东南大学溧阳研究院 Electricity larceny prevention monitoring method
CN114152789A (en) * 2020-09-08 2022-03-08 武汉国测数据技术有限公司 Three-meter method three-phase electric energy meter structure for user self-checking error and checking method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102340414A (en) * 2010-09-15 2012-02-01 上海复展照明科技有限公司 Construction layout-based topological system for data collection and implementation method thereof
CN103500496A (en) * 2013-10-10 2014-01-08 华立仪表集团股份有限公司 Electric power data multi-way communication system and multi-way centralized meter reading system
EP2728314A2 (en) * 2012-11-08 2014-05-07 Krohne Messtechnik GmbH Measuring arrangement for determination of a measurement value

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102340414A (en) * 2010-09-15 2012-02-01 上海复展照明科技有限公司 Construction layout-based topological system for data collection and implementation method thereof
EP2728314A2 (en) * 2012-11-08 2014-05-07 Krohne Messtechnik GmbH Measuring arrangement for determination of a measurement value
CN103500496A (en) * 2013-10-10 2014-01-08 华立仪表集团股份有限公司 Electric power data multi-way communication system and multi-way centralized meter reading system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭景涛: "面向智能电网AMI的网络计量关键技术与用户用电数据挖掘研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109061544B (en) * 2018-08-23 2020-11-06 广东工业大学 Electric energy metering error estimation method
CN109061544A (en) * 2018-08-23 2018-12-21 广东工业大学 A kind of electric energy metering error estimation method
CN110082699A (en) * 2019-05-10 2019-08-02 国网天津市电力公司电力科学研究院 A kind of low-voltage platform area intelligent electric energy meter kinematic error calculation method and its system
CN110082699B (en) * 2019-05-10 2021-03-19 国网天津市电力公司电力科学研究院 Low-voltage transformer area intelligent electric energy meter operation error calculation method and system
CN110531304A (en) * 2019-08-07 2019-12-03 深圳供电局有限公司 A kind of calculation method, equipment and medium for monitoring platform area misalignment rate on-line
CN110531304B (en) * 2019-08-07 2021-11-16 深圳供电局有限公司 Calculation method, equipment and medium for online monitoring of platform area misalignment rate
CN110471024B (en) * 2019-08-08 2021-07-09 天津大学 Intelligent electric meter online remote calibration method based on measurement data analysis
CN110471024A (en) * 2019-08-08 2019-11-19 天津大学 A kind of online remote checking method of intelligent electric meter based on metric data analysis
CN110780259A (en) * 2019-09-10 2020-02-11 中国电力科学研究院有限公司 Data cleaning and quality evaluation system based on remote error diagnosis of electric energy meter
CN111210149A (en) * 2020-01-06 2020-05-29 河南康派智能技术有限公司 Power distribution network topology identification method and device
CN111210149B (en) * 2020-01-06 2023-11-07 河南康派智能技术有限公司 Power distribution network topology identification method and device
CN114152789B (en) * 2020-09-08 2024-04-02 武汉国测数据技术有限公司 Three-meter-method three-phase electric energy meter structure with user self-checking error and checking method
CN114152789A (en) * 2020-09-08 2022-03-08 武汉国测数据技术有限公司 Three-meter method three-phase electric energy meter structure for user self-checking error and checking method
CN112684399B (en) * 2020-11-23 2022-04-22 国网江苏省电力有限公司营销服务中心 Electric energy meter operation error monitoring data fitting method and system based on artificial intelligence
CN112684399A (en) * 2020-11-23 2021-04-20 国网江苏省电力有限公司营销服务中心 Electric energy meter operation error monitoring data fitting method and system based on artificial intelligence
CN113094652B (en) * 2021-03-30 2023-04-25 中国科学院生态环境研究中心 Water meter water quantity metering loss determining method and system
CN113094652A (en) * 2021-03-30 2021-07-09 中国科学院生态环境研究中心 Water meter water quantity metering loss determination method and system
CN113484819A (en) * 2021-07-14 2021-10-08 国网四川省电力公司营销服务中心 High-frequency current sampling-based method for diagnosing metering fault of electric energy meter in limited range
CN113484819B (en) * 2021-07-14 2024-02-13 国网四川省电力公司营销服务中心 Method for diagnosing metering faults of electric energy meter in limited range based on high-frequency current sampling
CN113625028A (en) * 2021-08-11 2021-11-09 东南大学溧阳研究院 Electricity larceny prevention monitoring method
CN113625028B (en) * 2021-08-11 2024-04-09 东南大学溧阳研究院 Anti-electricity-theft monitoring method

Similar Documents

Publication Publication Date Title
CN107621621A (en) A kind of intelligent electric energy meter is in Line synthesis error calibration method
CN107870312A (en) A kind of intelligent electric energy meter kinematic error remote calibration method
CN107643507A (en) A kind of lean line loss analyzing and management-control method based on power network line kinematic error remote calibration
CN107817395A (en) A kind of stealing investigation method based on power network line kinematic error remote calibration
CN107703475A (en) Check method during a kind of on-line operation intelligent electric energy meter
CN107944652A (en) A kind of broad sense flow instrument kinematic error remote calibration method
CN107727955A (en) A kind of transformer loss analysis and management-control method based on power network line kinematic error remote calibration
CN107818395A (en) A kind of electric energy meter error iterative calculation method based on uncertainty of measurement
CN106338706B (en) A kind of methods, devices and systems of electric energy metering device global error detection
CN107561481A (en) A kind of on-line operation intelligent electric energy meter error control method based on bulk sample notebook data thinking
CN102116857B (en) Method for checking electric quantity at power grid gate
CN112035784A (en) Method and system for determining loss of low-voltage transformer area based on power consumption acquisition data
Rashid AMI smart meter big data analytics for time series of electricity consumption
CN107741578A (en) A kind of original meter reading data processing method for intelligent electric energy meter kinematic error remote calibration
CN112379177A (en) Method and system for determining low-voltage line loss and electric energy meter operation error of transformer area
CN107657083A (en) A kind of intellectual water meter is in Line synthesis error calibration method
CN113625217B (en) Low-voltage transformer area electric energy meter operation error calculation method and system
CN107621298A (en) A kind of intelligent gas meter kinematic error remote calibration method
CN103473602A (en) Theoretical line loss data prediction system and prediction method of power grid
CN107257130A (en) The low-voltage network loss computing method of decoupling is measured based on region
CN111009893A (en) Household user short-term load prediction method based on load decomposition technology
CN106372440B (en) A kind of adaptive robust state estimation method of the power distribution network of parallel computation and device
CN110880055A (en) Building intelligent ammeter system
CN114198644A (en) DMA (direct memory access) monitoring-based water supply network leakage detection control method for related flow data
CN107655549A (en) A kind of intelligent gas meter is in Line synthesis error calibration method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180403

RJ01 Rejection of invention patent application after publication