CN112359881A - Supporting construction of pipeline of crossing foundation ditch - Google Patents

Supporting construction of pipeline of crossing foundation ditch Download PDF

Info

Publication number
CN112359881A
CN112359881A CN202011157721.5A CN202011157721A CN112359881A CN 112359881 A CN112359881 A CN 112359881A CN 202011157721 A CN202011157721 A CN 202011157721A CN 112359881 A CN112359881 A CN 112359881A
Authority
CN
China
Prior art keywords
foundation pit
pipeline
crown beam
supporting
crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011157721.5A
Other languages
Chinese (zh)
Inventor
王位赢
王炳华
李志南
潘珂
罗文静
袁江
农兴中
雷振宇
何旭升
杨磊
李晓峰
钟火第
程帆
吴党
刘军
黄展案
徐文平
黄全强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanning Rail Transit Co ltd
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Nanning Rail Transit Co ltd
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanning Rail Transit Co ltd, Guangzhou Metro Design and Research Institute Co Ltd filed Critical Nanning Rail Transit Co ltd
Priority to CN202011157721.5A priority Critical patent/CN112359881A/en
Publication of CN112359881A publication Critical patent/CN112359881A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention relates to the technical field of supporting structures, and discloses a supporting structure of a pipeline traversing a foundation pit, which comprises a suspension structure, a support member and a pair of foundation pit supporting structures, wherein the foundation pit supporting structures are oppositely arranged, a space for arranging the foundation pit is arranged between the foundation pit supporting structures, two ends of the support member are respectively connected with each foundation pit supporting structure, the suspension structure is arranged above each foundation pit supporting structure, and the suspension structure is used for suspending the pipeline. The invention can support the pipeline penetrating through the foundation pit, has small restriction on the pipeline migration and transformation by sites, has wider adaptation stratum, smaller influence on the pipeline, simple construction, smaller influence on the construction of the foundation pit and lower economic cost, can prevent the risk of water and sand gushing of the foundation pit, and is easy to control the construction quality.

Description

Supporting construction of pipeline of crossing foundation ditch
Technical Field
The invention relates to the technical field of supporting structures, in particular to a supporting structure of a pipeline crossing a foundation pit.
Background
In areas of tight land, there may be situations where underground pipelines conflict with proposed structures. When a pipeline is moved and modified, a net is hung and an anchor is sprayed on soil below the pipeline, and supporting structures are arranged on two sides of the pipeline. The pressure of the side soil below the pipeline is firstly transmitted to the spray anchor and then transmitted to the supporting structures at the two sides of the pipeline. However, the net hanging spray anchor is not suitable for the areas with abundant underground water or poor stratums, and if the reverse construction method is adopted for construction, the economic cost is high, and the construction quality cannot be guaranteed. Therefore, a supporting structure capable of adapting to a wide range of strata is required.
Disclosure of Invention
The purpose of the invention is: the supporting structure of the pipeline crossing the foundation pit is wide in adaptation to stratum and small in influence on the pipeline.
In order to achieve the purpose, the invention provides a supporting structure of a pipeline traversing a foundation pit, which comprises a suspension structure, a support member and a pair of foundation pit supporting structures, wherein the foundation pit supporting structures are oppositely arranged, a space for arranging the foundation pit is arranged between the two foundation pit supporting structures, two ends of the support member are respectively connected with each foundation pit supporting structure, the suspension structure is arranged above each foundation pit supporting structure, and the suspension structure is used for suspending the pipeline.
Optionally, the foundation pit supporting structure comprises a top beam assembly and a supporting assembly which are arranged up and down, the top beam assembly is connected with the supporting piece, and the pipeline can penetrate through the top beam assembly.
Optionally, the crown beam assembly includes a first crown beam and a second crown beam, the first crown beam is transversely disposed, the second crown beam is disposed below the first crown beam and forms a rectangular frame with the first crown beam, the pipeline passes through the rectangular frame, the first crown beam is connected with the supporting member, the supporting assembly includes a first supporting member, and the first supporting member is disposed below the second crown beam.
Optionally, the crown beam assembly further includes a third crown beam, the third crown beam is disposed at the top end of the second crown beam and extends outward along the extending direction of the first crown beam, and the supporting assembly further includes a second supporting member, and the second supporting member is disposed below the third crown beam.
Optionally, the third crown beam is also provided with the support.
Optionally, two ends of the suspension structure are respectively disposed on each first crown beam.
Optionally, a retaining wall is arranged in the rectangular frame, so that the rectangular frame is blocked, and a through hole for the pipeline to pass through is formed in the retaining wall.
Optionally, a hidden beam is arranged between the hole wall of the through hole and the outer wall of the pipeline.
Optionally, the suspension structure includes a truss and a lifting appliance, two ends of the truss are respectively disposed on each of the foundation pit supporting structures, the lifting appliance is disposed on the truss, and the lifting appliance is used for suspending a pipeline.
Optionally, the hanger is a steel frame or a steel wire rope.
The embodiment of the invention provides a supporting structure of a pipeline crossing a foundation pit, which has the following beneficial effects compared with the prior art:
the supporting structure of the pipeline crossing the foundation pit comprises a suspension structure, a support piece and a pair of foundation pit supporting structures, wherein the foundation pit supporting structures are arranged oppositely, a space for arranging the foundation pit is formed between the two supporting structures, two ends of the support piece are respectively connected with the foundation pit supporting structures, the suspension structure is arranged above the foundation pit supporting structures, and the suspension structure is used for suspending the pipeline. Through such structure, can strut the pipeline that passes through the foundation ditch, and the pipeline moves and changes and receives the place restriction little, and the adaptation stratum is comparatively extensive, and is also less to the pipeline influence, and construction is simple, and economic cost is lower.
Drawings
Fig. 1 is a schematic structural plan view of an embodiment of the present invention.
Fig. 2 is a cross-sectional view of an embodiment of the present invention.
Fig. 3 is a schematic structural view at a-a of fig. 1 before plugging according to an embodiment of the present invention.
Fig. 4 is a schematic structural view at a-a of fig. 1 after plugging in accordance with an embodiment of the present invention.
In the figure, 1, a suspension structure; 2. a support member; 3. a foundation pit supporting structure; 4. a foundation pit; 5. a pipeline; 11. a truss; 12. a spreader; 31. a crown beam assembly; 32. a support assembly; 33. retaining walls; 34. hidden beams; 311. a first crown beam; 312. a second crown beam; 313. a third crown beam; 321. a first support member; 322. a second support member.
Detailed Description
The following detailed description of embodiments of the present invention is provided in connection with the accompanying drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In addition, in the description of the present invention, "a plurality" means two or more unless otherwise specified.
The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 4, a supporting structure of a pipeline crossing a foundation pit according to a preferred embodiment of the present invention includes a suspension structure 1, a support member 2, and a pair of foundation pit supporting structures 3, the foundation pit supporting structures 3 are disposed opposite to each other with a space for disposing the foundation pit 4 therebetween, two ends of the support member 2 are respectively connected to the foundation pit supporting structures 3, the suspension structure 1 is disposed above each foundation pit supporting structure 3, and the suspension structure 1 is used for suspending a pipeline 5. Support piece 2 and excavation supporting construction 3 can guarantee construction safety to the strutting of the soil body of 4 both sides in excavation, can also prevent that 4 gushes water of excavation from gushing out husky risk, easily control construction quality. And the suspension structure 1 can suspend the pipeline 5, so that the safety of the pipeline 5 is ensured. Especially for longer pipelines 5, the suspension structure 1 is more able to secure the pipeline 5. The support 2 may be provided as a concrete or steel pipe. Through such structure, can strut pipeline 5 that passes through foundation ditch 4, and pipeline 5 changes to be restricted for a short time by the place, and the adaptation stratum is comparatively extensive, and is also less to pipeline 5 influence, and the construction is simple, and is also less to foundation ditch 4's construction influence moreover, and economic cost is lower, can prevent foundation ditch 4 gushing water simultaneously and gush sand risk, easily control construction quality.
Referring to fig. 3 and 4, the foundation pit supporting structure 3 includes a top beam assembly 31 and a bottom beam assembly 32, the top beam assembly 31 is connected to the supporting member 2, the pipeline 5 can pass through the top beam assembly 31, and the pipeline 5 does not affect the supporting of the bottom beam assembly 32 on the soil on both sides of the foundation pit 4. The crown beam assembly 31 comprises a first crown beam 311 and a second crown beam 312, the first crown beam 311 is transversely arranged, the second crown beam 312 is arranged below the first crown beam 311 and forms a rectangular frame with the first crown beam 311, the pipeline 5 passes through the rectangular frame, the first crown beam 311 is connected with the supporting member 2, the supporting assembly 32 comprises a first supporting member 321, and the first supporting member 321 is arranged below the second crown beam 312. Because the length of the foundation pit 4 is long, the arrangement crown beam assembly 31 further comprises a third crown beam 313, the third crown beam 313 is arranged at the top end of the second crown beam 312 and extends outwards along the extending direction of the first crown beam 311, the support assembly 32 further comprises a second support member 322, and the second support member 322 is arranged below the third crown beam 313. The third crown beam 313 is also provided with a support 2. By the arrangement, the supporting quality can be ensured. Both ends of the suspension structure 1 are respectively provided on the first crown beams 311. The stability of the suspension structure 1 is ensured, and the pipeline 5 can be smoothly suspended. A retaining wall 33 is arranged in the rectangular frame, so that the rectangular frame is blocked, and a through hole for the pipeline 5 to pass through is formed in the retaining wall 33. The retaining wall 33 can support soil around the pipeline 5, and the supporting capability of the foundation pit supporting structure 3 is further improved. A hidden beam 34 is arranged between the wall of the through hole and the outer wall of the pipeline 5. The arrangement of the hidden beam 34 can ensure the stability of the opening of the retaining wall 33. The second crown beam 312 is constructed before the first crown beam 311, and the connection condition of the retaining wall 33 is reserved on the second crown beam 312. Then the retaining wall 33 and the first crown beam 311 are cast at the same time.
Referring to fig. 1, 2 and 4, the suspension structure 1 includes a truss 11 and a spreader 12, two ends of the truss 11 are respectively disposed on the foundation pit supporting structures 3, the spreader 12 is disposed on the truss 11, and the spreader 12 is used for suspending the pipeline 5. A truss 11 spans over the foundation pit 4, and the truss 11 is disposed over the support members 2. The spreader 12 is a steel frame or a steel wire rope. The pipeline 5 is suspended by the hanger 129 to ensure the safety of the pipeline 5.
The embodiment of the invention also provides a construction method of the supporting structure of the pipeline crossing the foundation pit, which comprises the following steps:
the method comprises the following steps: second crown beam 312, third crown beam 313, bracing assembly 32 and support 2 are constructed.
Step two: moving and modifying the pipeline 5, and moving and modifying the pipeline 5 to be modified to the position above the second crown beam 312; if the pipeline 5 must be suspended in situ, the pipeline 5 may be temporarily moved to another place, and the second crown beam 312 may be moved back to the original place after the movement is completed.
Step three: the hidden beam 34, the retaining wall 33 and the first crown beam 311 are constructed.
Step four: the suspension structure 1 is erected and the pipeline 5 is suspended by means of a spreader 12.
To sum up, the embodiment of the invention provides a supporting structure of a pipeline traversing a foundation pit, which can support the pipeline 5 traversing the foundation pit 4, the migration and the transformation of the pipeline 5 are limited by a place, the adaptability to the stratum is wide, the influence on the pipeline 5 is small, the construction is simple, the influence on the construction of the foundation pit 4 is small, the economic cost is low, the risk of gushing water and sand of the foundation pit 4 can be prevented, and the construction quality is easy to control.
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.

Claims (10)

1. The supporting structure of the pipeline crossing the foundation pit is characterized by comprising suspension structures, support pieces and a pair of foundation pit supporting structures, wherein the foundation pit supporting structures are oppositely arranged, a space for arranging the foundation pit is formed between the two foundation pit supporting structures, two ends of each support piece are respectively connected with each foundation pit supporting structure, the suspension structures are arranged above each foundation pit supporting structure, and the suspension structures are used for suspending the pipeline.
2. The supporting structure of a pipeline traversing a foundation pit according to claim 1, wherein the supporting structure of the foundation pit comprises a top beam assembly and a bottom beam assembly, the top beam assembly is connected with the supporting member, and the pipeline can pass through the top beam assembly.
3. The supporting structure for the pipeline crossing the foundation pit according to claim 2, wherein the crown beam assembly comprises a first crown beam and a second crown beam, the first crown beam is transversely disposed, the second crown beam is disposed under the first crown beam and forms a rectangular frame with the first crown beam, the pipeline passes through the rectangular frame, the first crown beam is connected with the supporting member, and the supporting assembly comprises a first supporting member disposed under the second crown beam.
4. The support structure for a pipeline traversing a foundation pit according to claim 3, wherein the crown beam assembly further includes a third crown beam provided at a top end of the second crown beam and extending outward in an extending direction of the first crown beam, and the support assembly further includes a second brace provided below the third crown beam.
5. The support structure for a pipeline traversing a foundation pit of claim 4, wherein the brace member is also provided on the third crown beam.
6. The support structure for a pipeline traversing a foundation pit according to claim 3, wherein both ends of the suspension structure are respectively provided on each of the first crown beams.
7. The supporting structure of the pipeline crossing the foundation pit according to claim 3, wherein a retaining wall is arranged in the rectangular frame, so that the rectangular frame is blocked, and a through hole for the pipeline to pass through is arranged on the retaining wall.
8. The support structure for a pipeline traversing a foundation pit according to claim 3, wherein a hidden beam is provided between the wall of the through-hole and the outer wall of the pipeline.
9. The supporting structure for the pipeline crossing the foundation pit according to claim 1, wherein the suspension structure comprises a truss and a hanger, both ends of the truss are respectively provided to each of the foundation pit supporting structures, the hanger is provided on the truss, and the hanger is used for suspending the pipeline.
10. The support structure for the pipeline traversing the foundation pit of claim 9, wherein the spreader is a steel frame or a wire rope.
CN202011157721.5A 2020-10-26 2020-10-26 Supporting construction of pipeline of crossing foundation ditch Pending CN112359881A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011157721.5A CN112359881A (en) 2020-10-26 2020-10-26 Supporting construction of pipeline of crossing foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011157721.5A CN112359881A (en) 2020-10-26 2020-10-26 Supporting construction of pipeline of crossing foundation ditch

Publications (1)

Publication Number Publication Date
CN112359881A true CN112359881A (en) 2021-02-12

Family

ID=74510519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011157721.5A Pending CN112359881A (en) 2020-10-26 2020-10-26 Supporting construction of pipeline of crossing foundation ditch

Country Status (1)

Country Link
CN (1) CN112359881A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160557A (en) * 1998-11-27 2000-06-13 Taisei Corp Landslide protection construction method
CN103233432A (en) * 2013-04-26 2013-08-07 济南城建集团有限公司 Bailey beam reverse lifting support system and construction method thereof
CN103321245A (en) * 2013-06-18 2013-09-25 中铁十六局集团地铁工程有限公司 Protection device and construction method for underground pipeline in shield driving
CN103486403A (en) * 2013-10-17 2014-01-01 中国建筑第六工程局有限公司 In-situ protection construction method of pipeline above foundation pit
CN105972313A (en) * 2016-05-30 2016-09-28 广州地铁设计研究院有限公司 Overhang method and overhang structure for engineering pipeline stretching across foundation pit
CN109296825A (en) * 2018-09-29 2019-02-01 中铁第勘察设计院集团有限公司 Major diameter bell and spigot water supply concrete pipe suspension protection system and its construction method
CN111173027A (en) * 2019-12-25 2020-05-19 北京正和恒基滨水生态环境治理股份有限公司 Construction method for reinforcing and protecting existing pipeline

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160557A (en) * 1998-11-27 2000-06-13 Taisei Corp Landslide protection construction method
CN103233432A (en) * 2013-04-26 2013-08-07 济南城建集团有限公司 Bailey beam reverse lifting support system and construction method thereof
CN103321245A (en) * 2013-06-18 2013-09-25 中铁十六局集团地铁工程有限公司 Protection device and construction method for underground pipeline in shield driving
CN103486403A (en) * 2013-10-17 2014-01-01 中国建筑第六工程局有限公司 In-situ protection construction method of pipeline above foundation pit
CN105972313A (en) * 2016-05-30 2016-09-28 广州地铁设计研究院有限公司 Overhang method and overhang structure for engineering pipeline stretching across foundation pit
CN109296825A (en) * 2018-09-29 2019-02-01 中铁第勘察设计院集团有限公司 Major diameter bell and spigot water supply concrete pipe suspension protection system and its construction method
CN111173027A (en) * 2019-12-25 2020-05-19 北京正和恒基滨水生态环境治理股份有限公司 Construction method for reinforcing and protecting existing pipeline

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金辉等: "某地铁站深基坑开挖过程中的管线悬吊保护技术", 《陕西建筑》 *

Similar Documents

Publication Publication Date Title
JP6200550B1 (en) Temporary deadline method, temporary deadline structure
CN103485363B (en) Three-dimensional continuous frame formula reinforced concrete structure retaining wall
JP2017210865A (en) Temporary cut-off method, temporary cut-off structure, supporting, supporting unit
CN204898537U (en) Half gentle semi -rigid hangar tunnel protective structure
CN110485430A (en) A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall
CN210529712U (en) Construction structure for foundation pit crossing underground pipeline area
CN107574826A (en) A kind of concrete purlin and the general attachment structure and connection construction method gone along with sb. to guard him
CN104652419A (en) Construction method for preserving curtain grouting pipe in underground impervious wall
CN208293427U (en) A kind of bent cap concrete cast template steel hoop support system
CN205917601U (en) Integrally lift up device of bridge arch rib
CN204826211U (en) Outer wall hanging plate connecting device of precast concrete
CN109723081A (en) Subway station lattice column construction method
CN110485431A (en) A kind of interlocking pile combines foundation pit supporting construction with ground-connecting-wall
CN112359881A (en) Supporting construction of pipeline of crossing foundation ditch
CN103628408B (en) The construction method of bridge cast in place concrete form Eight characters bracing frame
CN208201658U (en) A kind of steel trestle rapid construction device
CN113756364B (en) Non-column subway station structure and track panel construction method
CN211371492U (en) Formula antidetonation pipeline bracket sways
CN211171994U (en) Occlusive pile and diaphragm wall combined foundation pit supporting structure
CN104695447B (en) deep basement support
CN205975631U (en) Supporting device is propped in throwing with adjustable
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN113668399A (en) Construction method of half-through tied steel box arch bridge
CN113430909A (en) Arched bent suspension bridge structure
CN206722402U (en) Waterproofing for basement moulding wall formwork erecting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210212