CN112282330A - Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant - Google Patents

Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant Download PDF

Info

Publication number
CN112282330A
CN112282330A CN202011116101.7A CN202011116101A CN112282330A CN 112282330 A CN112282330 A CN 112282330A CN 202011116101 A CN202011116101 A CN 202011116101A CN 112282330 A CN112282330 A CN 112282330A
Authority
CN
China
Prior art keywords
platform
wind turbine
supporting
mountain
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011116101.7A
Other languages
Chinese (zh)
Inventor
郑俊斌
吕鸿恩
段瑞龙
王向伟
齐始旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Branch Of Huaneng New Energy Co ltd
Original Assignee
Hebei Branch Of Huaneng New Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Branch Of Huaneng New Energy Co ltd filed Critical Hebei Branch Of Huaneng New Energy Co ltd
Priority to CN202011116101.7A priority Critical patent/CN112282330A/en
Publication of CN112282330A publication Critical patent/CN112282330A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/17Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/06Pits or building structures for inspection or services
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses an impeller assembling and hoisting platform of a wind turbine generator in a mountain wind power plant, and relates to the technical field of wind turbine impeller installation auxiliary devices; comprises a base and a plurality of supporting platforms; the cross section of the supporting platform is of a rectangular structure, the supporting platforms are sequentially overlapped and fixedly connected from top to bottom, and the bottom of the supporting platform positioned at the lowest position is fixedly connected with the base; one side of the supporting platform is connected with a climbing ladder; the utility model discloses a monitoring device, including base, support platform, monitor and alarm device, fixed mounting has the branch that the slope set up on the base, branch top and the top fixed connection who is located the below supporting platform, install monitor and alarm device on the supporting platform lateral wall, monitor and alarm device electricity are connected with data processing system. According to the assembling and hoisting platform for the wind turbine generator of the mountain wind farm, wind power equipment is hoisted and then placed on the assembling and hoisting platform for the wind turbine generator of the mountain wind farm. The security is high, has improved work efficiency.

Description

Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant
Technical Field
The invention relates to the technical field of wind power impeller installation auxiliary devices, in particular to a wind turbine assembly and hoisting platform for a mountain wind power plant.
Background
Wind power generation is to convert the kinetic energy of wind into electric energy, and wind energy is a clean renewable energy source and is increasingly paid more attention by various countries in the world. Most wind power generation equipment is arranged in remote fields, wind power in the remote fields can meet the power generation requirement, but the remote fields have complex terrains, are uneven and even have no roads, so that the wind power generation equipment is difficult to install, the construction progress is slow, at present, most of wind turbine generator set impellers are installed in forest lands around the installation positions, trees cannot be cut down under ecological protection, the ground installation space is small, and the installation is inconvenient, the efficiency is low, and the safety is low.
Disclosure of Invention
The invention aims to provide a mountain wind power plant wind turbine impeller assembling and hoisting platform, which is used for solving the problems in the prior art and enabling wind power equipment to be placed on the mountain wind power plant wind turbine impeller assembling and hoisting platform after being hoisted. The security is high, has improved work efficiency.
In order to achieve the purpose, the invention provides the following scheme:
the invention provides a mountain wind power plant wind turbine generator impeller assembling and hoisting platform, which comprises a base and a plurality of supporting platforms, wherein the base is provided with a plurality of supporting platforms; the cross section of the supporting platform is of a rectangular structure, the supporting platforms are sequentially overlapped and fixedly connected from top to bottom, and the bottom of the supporting platform positioned at the lowest position is fixedly connected with the base; one side of the supporting platform is connected with a climbing ladder; the utility model discloses a monitoring device, including base, support platform, monitor and alarm device, fixed mounting has the branch that the slope set up on the base, branch top and the top fixed connection who is located the below supporting platform, install monitor and alarm device on the supporting platform lateral wall, monitor and alarm device electricity are connected with data processing system.
Optionally, the support platform includes a vertical column and a horizontal connecting rod; the upright posts are uniformly distributed in a virtual rectangular frame at equal intervals; and two adjacent upright columns are fixedly connected through a horizontal connecting rod.
Optionally, the vertical columns and the horizontal connecting rods have the same structure and are made of 200mm by 200mm H-shaped steel.
Optionally, guard rails are arranged around the top of the uppermost supporting platform.
Optionally, an extension portion is horizontally formed on the base in an integrated manner, and the lower portion of the supporting rod is fixedly connected with the extension portion.
Optionally, the climbing ladder is detachable.
Optionally, the center of the top of the supporting platform located at the top is fixedly connected with an installation platform.
Optionally, the monitor includes a level meter and a vibration sensor, the level meter and the vibration sensor are respectively connected with the data processing system, and the data processing system is connected with an alarm device.
Compared with the prior art, the invention has the following technical effects:
the height of the assembling and hoisting platform of the wind turbine generator in the mountain wind farm can be increased or decreased according to installation requirements, the use is convenient, the climbing ladder is convenient for operators to climb, and the safety of the operators at the top of the platform is greatly improved due to the guardrail. When the wind turbine generator impeller is installed, the wind turbine generator impeller can be hoisted to a mountain wind power plant wind turbine generator impeller assembling and hoisting platform, stability is good, and working efficiency is high. The invention overcomes the problem of uneven ground, the installation is safer, and the height of the hoisting platform is greater than the height of the forest at the installation site, so the installation can be carried out above the forest space, and a larger installation space is ensured under the condition of not influencing the forest.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic front view of an impeller assembling and hoisting platform of a wind turbine generator in a mountain wind farm according to the present invention;
FIG. 2 is a schematic view of a supporting platform of the assembling and hoisting platform for the impeller of the wind turbine generator in the mountain wind farm;
FIG. 3 is a schematic side view of an impeller assembling and hoisting platform of a wind turbine generator in a mountain wind farm according to the present invention;
FIG. 4 is a schematic top view of a supporting platform of the assembling and hoisting platform for the impeller of the wind turbine generator in the mountain wind farm according to the present invention;
wherein, 1 is a base, 101 is an extension part, 2 is a supporting platform, 201 is a column, 202 is a horizontal connecting rod, 3 is a climbing ladder, 4 is a supporting rod, and 5 is a protective guard.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention aims to provide a mountain wind power plant wind turbine impeller assembling and hoisting platform, which is used for solving the problems in the prior art and enabling wind power equipment to be placed on the mountain wind power plant wind turbine impeller assembling and hoisting platform after being hoisted. The security is high, has improved work efficiency.
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
The invention provides a mountain wind power plant wind turbine impeller assembling and hoisting platform, which comprises a base 1 and a plurality of supporting platforms 2, as shown in figures 1-4; the cross section of each supporting platform 2 is of a rectangular structure, a plurality of supporting platforms 2 are sequentially overlapped and fixedly connected from top to bottom, the upper supporting platform 2 and the lower supporting platform 2 are connected through riveting, welding or binding, and the bottom of the supporting platform 2 located at the lowest position is fixedly connected with the base 1; one side of the supporting platform 2 is connected with a climbing ladder 3, and the climbing ladder 3 can be detached; fixed mounting has branch 4 that the slope set up on base 1, 4 tops of branch and the top fixed connection who is located below supporting platform 2, install monitor and alarm device on the supporting platform lateral wall, monitor and alarm device electricity are connected with data processing system, thereby can real-time supervision hoist and mount platform's stable situation, can in time transmit data to data processing system when the slope takes place or the vibration, data processing system triggers alarm device and sends out the police dispatch newspaper, avoid appearing the incident.
Further preferably, the support platform 2 comprises a vertical column 201 and a horizontal connecting rod 202; the upright posts 201 are uniformly distributed in a virtual rectangular frame at equal intervals, namely the upright posts 201 are distributed in a rectangular array; two adjacent upright columns 201 are fixedly connected through a horizontal connecting rod 202. The upright column 201 and the horizontal connecting rod 202 have the same structure and are both made of 200mm x 200mm H-shaped steel. Guard rails 5 are arranged on the periphery of the top of the uppermost supporting platform 2. An extension part 101 horizontally arranged is integrally formed on the base 1, and the lower part of the support rod 4 is fixedly connected with the extension part 101. The center of the top of the supporting platform 2 positioned at the top is fixedly connected with an installation platform, and the installation platform is convenient for placing equipment and standing and treading of operators.
The device is simple in structure and convenient to use, when the device works, the base 1 is fixedly arranged on the ground of an installation position, the supporting platform 2 is fixedly connected to the base 1, the supporting platform 2 is fixedly connected with the extension part 101 of the base 1 through the supporting rod 4, the stability of the device is further improved, the supporting platforms 2 with proper height are sequentially built according to needs, a climbing ladder 3 is hung on the side walls of the supporting platforms 2 after the building is completed, personnel can conveniently lift the device up and down, the device is placed on an impeller assembling and hoisting platform of a wind turbine generator of a mountain wind farm, and the personnel can install and maintain the impeller of the wind turbine generator on the assembling and hoisting platform of the wind turbine generator of the mountain wind farm, so that the device is high in safety and good in stability.
The principle and the implementation mode of the invention are explained by applying a specific example, and the description of the embodiment is only used for helping to understand the method and the core idea of the invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, the specific embodiments and the application range may be changed. In view of the above, the present disclosure should not be construed as limiting the invention.

Claims (8)

1. The utility model provides a mountain region wind-powered electricity generation field wind turbine generator system impeller equipment and hoist and mount platform which characterized in that: comprises a base and a plurality of supporting platforms; the cross section of the supporting platform is of a rectangular structure, the supporting platforms are sequentially overlapped and fixedly connected from top to bottom, and the bottom of the supporting platform positioned at the lowest position is fixedly connected with the base; one side of the supporting platform is connected with a climbing ladder; the base is fixedly provided with a support rod which is obliquely arranged, and the upper part of the support rod is fixedly connected with the top of the support platform positioned at the lowest part; and a monitor and an alarm device are installed on the side wall of the supporting platform, and the monitor and the alarm device are electrically connected with a data processing system.
2. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: the supporting platform comprises an upright post and a horizontal connecting rod; the upright posts are uniformly distributed in a virtual rectangular frame at equal intervals; and two adjacent upright columns are fixedly connected through a horizontal connecting rod.
3. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: the upright post and the horizontal connecting rod are identical in structure and are made of 200 mm-200 mm H-shaped steel.
4. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: guard railings are arranged on the periphery of the top of the supporting platform positioned at the top.
5. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: the base is integrally formed with an extension portion which is horizontally arranged, and the lower portion of the supporting rod is fixedly connected with the extension portion.
6. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: the climbing ladder can be detached.
7. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: and the center of the top of the supporting platform positioned at the uppermost part is fixedly connected with an installation platform.
8. The mountain wind farm wind turbine impeller assembling and hoisting platform of claim 1, wherein: the monitoring instrument comprises a level meter and a vibration sensor, wherein the level meter and the vibration sensor are respectively connected with the data processing system, and the data processing system is connected with an alarm device.
CN202011116101.7A 2020-10-19 2020-10-19 Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant Pending CN112282330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011116101.7A CN112282330A (en) 2020-10-19 2020-10-19 Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011116101.7A CN112282330A (en) 2020-10-19 2020-10-19 Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant

Publications (1)

Publication Number Publication Date
CN112282330A true CN112282330A (en) 2021-01-29

Family

ID=74497805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011116101.7A Pending CN112282330A (en) 2020-10-19 2020-10-19 Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant

Country Status (1)

Country Link
CN (1) CN112282330A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125524Y (en) * 2007-11-12 2008-10-01 上海市安装工程有限公司 Construction site climbing mobile platform
WO2012007226A2 (en) * 2010-07-13 2012-01-19 Siemens Aktiengesellschaft An assembly rig for assembling a wind turbine tower or wind turbine tower sections and a respective method
CN104047417A (en) * 2014-06-24 2014-09-17 刘庶民 Foldable type multi-layer construction working platform
CN104662290A (en) * 2012-10-16 2015-05-27 马克斯·博格风能股份公司 Supply frame for a tower, tower with a supply frame and method for erecting a supply frame in the interior of a tower
CN204626915U (en) * 2015-05-22 2015-09-09 中冶建工集团有限公司 A kind of large span heavy in section truss is across interior assembling rack platform
CN206397105U (en) * 2016-10-08 2017-08-11 霍尔果斯新国金新能源科技有限公司 The mounting platform having for wind-driven generator concrete towers cylinder mould
CN207484921U (en) * 2017-10-27 2018-06-12 四川华西安装工程有限公司 Assembled moving operating platform
CN110130626A (en) * 2018-02-09 2019-08-16 石家庄中鑫瑞尔威科技发展有限公司 Ready-package aluminium alloy scaffold
CN110506161A (en) * 2017-04-18 2019-11-26 西门子歌美飒可再生能源公司 Method for mounting a component of a wind turbine
CN210342609U (en) * 2019-05-22 2020-04-17 贵州建工集团第六建筑工程有限责任公司 Scaffold for building with slope early warning function
CN211110946U (en) * 2019-11-25 2020-07-28 重庆建工机电安装工程有限公司 Aerial work platform
CN111561140A (en) * 2020-06-01 2020-08-21 深圳市人和智聚科技开发有限公司 Green building supporting platform convenient to quick construction
CN211341705U (en) * 2019-09-26 2020-08-25 中建钢构有限公司 Operation platform
CN213572906U (en) * 2020-10-19 2021-06-29 华能新能源股份有限公司河北分公司 Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125524Y (en) * 2007-11-12 2008-10-01 上海市安装工程有限公司 Construction site climbing mobile platform
WO2012007226A2 (en) * 2010-07-13 2012-01-19 Siemens Aktiengesellschaft An assembly rig for assembling a wind turbine tower or wind turbine tower sections and a respective method
CN104662290A (en) * 2012-10-16 2015-05-27 马克斯·博格风能股份公司 Supply frame for a tower, tower with a supply frame and method for erecting a supply frame in the interior of a tower
CN104047417A (en) * 2014-06-24 2014-09-17 刘庶民 Foldable type multi-layer construction working platform
CN204626915U (en) * 2015-05-22 2015-09-09 中冶建工集团有限公司 A kind of large span heavy in section truss is across interior assembling rack platform
CN206397105U (en) * 2016-10-08 2017-08-11 霍尔果斯新国金新能源科技有限公司 The mounting platform having for wind-driven generator concrete towers cylinder mould
CN110506161A (en) * 2017-04-18 2019-11-26 西门子歌美飒可再生能源公司 Method for mounting a component of a wind turbine
CN207484921U (en) * 2017-10-27 2018-06-12 四川华西安装工程有限公司 Assembled moving operating platform
CN110130626A (en) * 2018-02-09 2019-08-16 石家庄中鑫瑞尔威科技发展有限公司 Ready-package aluminium alloy scaffold
CN210342609U (en) * 2019-05-22 2020-04-17 贵州建工集团第六建筑工程有限责任公司 Scaffold for building with slope early warning function
CN211341705U (en) * 2019-09-26 2020-08-25 中建钢构有限公司 Operation platform
CN211110946U (en) * 2019-11-25 2020-07-28 重庆建工机电安装工程有限公司 Aerial work platform
CN111561140A (en) * 2020-06-01 2020-08-21 深圳市人和智聚科技开发有限公司 Green building supporting platform convenient to quick construction
CN213572906U (en) * 2020-10-19 2021-06-29 华能新能源股份有限公司河北分公司 Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant

Similar Documents

Publication Publication Date Title
EP3077666A1 (en) An internal tower structure for a wind turbine generator
EP3129643B1 (en) A method for installation of a power control module in a wind power unit tower and an aggregate component
CN213572906U (en) Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant
CN202175917U (en) Safety ladder
CN112282330A (en) Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant
CN215889538U (en) Novel steel pylons based on power transmission uses
CN103195660A (en) Truss-structured tower
CN203361737U (en) Electric power tower facilitating overhauling
CN215057909U (en) Tower of vertical axis wind power generation system
CN206722732U (en) A kind of electrician pole climbing cat ladder
CN206468084U (en) A kind of anti-climbing electric power pylon
CN201883932U (en) Hoop-type vertical insulating single ladder
CN207583047U (en) A kind of electric tower of easy access
CN211775606U (en) Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
JP6919877B2 (en) Wind condition observation tower and its installation method
CN207526644U (en) A kind of wind power generating set concrete tower internal structure
CN206546177U (en) Wind measuring device and wind power generating set for wind power generating set
CN213870128U (en) Support structure based on wind power conversion
CN211456474U (en) Cable termination tower overhauls platform
CN210264119U (en) Synthesize lightning grounding's communication base station iron tower structure
CN221373428U (en) Multifunctional ladder stand device for steel structure constructor to ascend up and down
CN205777804U (en) A kind of overhead line structures being easily maintained
CN221031328U (en) Photovoltaic module construction platform
CN221305792U (en) Photovoltaic bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination