CN112282029B - 一种城市高水位大直径钢筋砼污水管道的接驳施工方法 - Google Patents
一种城市高水位大直径钢筋砼污水管道的接驳施工方法 Download PDFInfo
- Publication number
- CN112282029B CN112282029B CN202011223310.1A CN202011223310A CN112282029B CN 112282029 B CN112282029 B CN 112282029B CN 202011223310 A CN202011223310 A CN 202011223310A CN 112282029 B CN112282029 B CN 112282029B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- well
- existing pipeline
- cutting
- port
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011223310.1A CN112282029B (zh) | 2020-11-05 | 2020-11-05 | 一种城市高水位大直径钢筋砼污水管道的接驳施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011223310.1A CN112282029B (zh) | 2020-11-05 | 2020-11-05 | 一种城市高水位大直径钢筋砼污水管道的接驳施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112282029A CN112282029A (zh) | 2021-01-29 |
CN112282029B true CN112282029B (zh) | 2022-01-18 |
Family
ID=74352241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011223310.1A Active CN112282029B (zh) | 2020-11-05 | 2020-11-05 | 一种城市高水位大直径钢筋砼污水管道的接驳施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112282029B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113445609B (zh) * | 2021-07-13 | 2022-12-20 | 中国建筑第四工程局有限公司 | 一种市政雨、污水预制的井室及井室管口封堵施工方法 |
CN116752623B (zh) * | 2023-08-09 | 2024-03-12 | 乐昌市市政建设工程有限公司 | 一种新旧污水井不停水接驳施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH684546A5 (de) * | 1992-01-29 | 1994-10-14 | Eisenhut Max Ag | Rohr zum Rohr-in-Rohr-Sanieren von Rohrleitungen sowie Verfahren zum Einbauen dieses Rohres und Vorrichtung zur Ausführung des Verfahrens. |
CN106368241A (zh) * | 2016-01-27 | 2017-02-01 | 郑州市市政工程总公司 | 一种快速接入新建管道的检查井及其施工方法 |
CN108867814A (zh) * | 2018-07-18 | 2018-11-23 | 中国水利水电第七工程局有限公司 | 新建截污次支管与既有污水管网接驳工法 |
CN109208737B (zh) * | 2018-10-09 | 2024-02-06 | 中铁十一局集团城市轨道工程有限公司 | 一种大型污水管道改迁中新管接驳及原管封堵的施工方法 |
CN109403444A (zh) * | 2018-11-26 | 2019-03-01 | 广西建工集团第建筑工程有限责任公司 | 大直径地下钢筋混凝土给排水管不停水接驳装置及方法 |
-
2020
- 2020-11-05 CN CN202011223310.1A patent/CN112282029B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN112282029A (zh) | 2021-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11143027B2 (en) | Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof | |
CN112282029B (zh) | 一种城市高水位大直径钢筋砼污水管道的接驳施工方法 | |
CN212896422U (zh) | 一种深基坑截排水装置 | |
CN113266392B (zh) | 一种穿越既有锚索群的顶管施工方法 | |
CN108385627B (zh) | 基于喀斯特地貌的水电站导流洞封堵施工方法 | |
CN112761188A (zh) | 适用于淤泥质土的混凝土倒挂井的施工结构及其施工方法 | |
CN110700280A (zh) | 一种狭小地带基坑支护施工导流装置及施工方法 | |
CN114411756A (zh) | 一种富水砂层地铁车站明挖基坑无降水施工方法及施工装置 | |
CN215105880U (zh) | 适用于新旧给排水管道连接的混凝土倒挂井 | |
CN104775439A (zh) | 一种基坑支护止水一体化结构及其施工方法 | |
CN108179759B (zh) | 导向井水下钻芯掏槽无封底方法 | |
CN112302136A (zh) | 一种不截流工况下新老排水管道接驳构造及其施工方法 | |
CN111305218A (zh) | 一种基坑开挖的施工方法 | |
CN112095644A (zh) | 一种深基坑截排水装置及其施工方法 | |
CN110117959B (zh) | 一种临近江河基坑支护施工方法 | |
CN211816279U (zh) | 新老地连墙接口处理结构 | |
CN111733853A (zh) | 榫槽式预制地下连续墙结构 | |
CN111827705A (zh) | 既有地下车库内扩建井桶状地下车库的方法 | |
CN114855822A (zh) | 一种公路上雨污水管道深基坑的施工方法 | |
CN217734268U (zh) | 一种斜交高差水位既有污水管道的接驳结构 | |
CN111894103A (zh) | 顶管接驳导排结构及顶管接驳方法 | |
CN115404888B (zh) | 已完工主体结构的深基坑坑底涌水处理方法 | |
CN109024652A (zh) | 一种富水地区桩基旋挖成孔泥浆的排放结构及其施工方法 | |
CN115404889B (zh) | 一种城市市政工程沉井施工装置及施工方法 | |
CN114382157B (zh) | 一种混凝土透气井施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Hu Zheng Inventor after: Pei Xuchuan Inventor after: Tao Mingming Inventor after: Mo Jianbo Inventor after: Li Shaojun Inventor after: Zhou Jiacheng Inventor after: Lu Lixing Inventor after: Zhu Ruiyang Inventor after: Li Xueci Inventor before: Hu Zheng Inventor before: Pei Xuchuan Inventor before: Tao Mingming Inventor before: Mo Jianbo Inventor before: Li Shaojun Inventor before: Zhou Jiacheng Inventor before: Lu Lixing Inventor before: Zhu Ruiyang Inventor before: Li Xueci |
|
GR01 | Patent grant | ||
GR01 | Patent grant |