CN112268221A CN202010973939.1A CN202010973939A CN112268221A CN 112268221 A CN112268221 A CN 112268221A CN 202010973939 A CN202010973939 A CN 202010973939A CN 112268221 A CN112268221 A CN 112268221A
Authority
CN
China
Prior art keywords
cargo tank
lng
liquid cargo
gas
natural gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010973939.1A
Other languages
Chinese (zh)
Inventor
朱永凯
黄国良
时光志
韩宇
罗文忠
何金平
张�荣
张海涛
王瑛
郑坤
孙冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNOOC Energy Technology and Services Ltd
Oil Production Services Branch of CNOOC Energy Technology and Services Ltd
Original Assignee
CNOOC Energy Technology and Services Ltd
Oil Production Services Branch of CNOOC Energy Technology and Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNOOC Energy Technology and Services Ltd, Oil Production Services Branch of CNOOC Energy Technology and Services Ltd filed Critical CNOOC Energy Technology and Services Ltd
Priority to CN202010973939.1A priority Critical patent/CN112268221A/en
Publication of CN112268221A publication Critical patent/CN112268221A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/02Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0192Propulsion of the fluid by using a working fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0337Heat exchange with the fluid by cooling
    • F17C2227/0339Heat exchange with the fluid by cooling using the same fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/04Methods for emptying or filling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/02Improving properties related to fluid or fluid transfer
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/03Dealing with losses
    • F17C2260/031Dealing with losses due to heat transfer
    • F17C2260/032Avoiding freezing or defrosting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/061Fluid distribution for supply of supplying vehicles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention provides a filling method of a small LNG transport ship, which comprises the following steps of replacing nitrogen in a cabin with natural gas generated in the process of spraying a cargo tank in the transport ship in a precooling stage, and combining gas replacement and precooling into one step: the method comprises the following steps: before LNG filling, a cargo tank of an LNG transport ship is dried and inerted, so that the oxygen content in the cargo tank is reduced to less than 2 percent, and the dew point is less than minus 50 ℃; step two: before LNG filling, the liquid cargo tank in the transport ship needs to be pre-cooled and gas replaced, and an LNG receiving station provides liquefied natural gas to carry out spray pre-cooling on the liquid cargo tank; meanwhile, the natural gas generated in the spraying process is used for replacing nitrogen in the liquid cargo tank, and the mixed gas of the natural gas and the nitrogen is returned to the LNG receiving station for processing; step three: the LNG filling amount is the LNG consumption required by the gas navigation test; the invention combines the precooling and gas replacement processes, simplifies the operation flow, and has simple and convenient operation, high economy, safety and reliability.

Description

Filling method of small LNG transport ship
Technical Field
The invention relates to the field of LNG fuel transport ships and assembly, in particular to a filling method of a small LNG transport ship.
Background
With the increase of domestic LNG demand, the LNG carrier industry is also rapidly developing. Before each newly-built LNG transport ship is delivered, a certain amount of liquefied natural gas needs to be filled in an LNG receiving station, and a series of tests are carried out under the designed temperature condition to verify the performance of each system and equipment on the LNG transport ship.
The LNG transport ship filling process comprises the following steps: drying, inerting, gas displacement, precooling and LNG filling. Drying is the replacement of air in the liquid cargo tank by dry air, the dew point in the liquid cargo tank being lowered to-20 c or lower. The inerting is to replace dry air in the liquid cargo tank by inert gas, the dew point of the liquid cargo tank is less than-40 ℃, and the oxygen content is less than 2%. The gas replacement is the replacement of inert gas in the liquid cargo tank by natural gas, and the concentration content of the natural gas is more than 95 percent. The pre-cooling is that the LNG sprays and cools the liquid cargo tank. LNG filling is the filling operation of LNG according to the demand of cargo volume.
At present, a domestic LNG receiving station can not provide natural gas for gas replacement, the LNG receiving station provides liquefied natural gas, the LNG passes through a liquid phase pipe and a sweeping cabin pipe and is sent to a gasifier on a ship to generate natural gas, and the natural gas replaces inert gas in a liquid cargo tank. Because the diameter of the sweeping pipe of the small LNG transport ship is mostly 1 inch and 2 inches, the problems of air lock, small flow and the like often occur in the gas replacement process, which always troubles the filling of the small LNG transport ship.
Disclosure of Invention
Aiming at the characteristics of a small LNG transport ship, the invention provides a simplified filling process, the gas replacement and precooling processes are combined, LNG sprays the liquid cargo tank through a liquid phase pipe and a spray pipe, the gas replacement and precooling of the liquid cargo tank are completed, and the problems of gas blockage, small flow and the like are avoided; the whole process has the characteristics of simple operation, safety and reliability.
In order to solve the problems of the prior art, the invention adopts the following technical scheme:
a filling method of a small LNG transport ship is characterized by comprising the following steps: the method comprises the following steps of replacing nitrogen in a liquid cargo tank with natural gas generated in the process of spraying the liquid cargo tank of a transport ship with LNG in a precooling stage, and combining gas replacement and precooling into one step, wherein the method specifically comprises the following steps:
the method comprises the following steps: before LNG filling, a cargo tank of a transport ship is dried and inerted, so that the oxygen content in the cargo tank is reduced to less than 2 percent, and the dew point is less than minus 50 ℃;
step two: in order to realize the combination of the gas replacement and the precooling process, the dew point is required to be changed from the temperature of less than 40 ℃ below zero to the temperature of less than 50 ℃ below zero in the drying and inerting process, and the phenomenon of icing caused by direct precooling is avoided. Before LNG filling, gas replacement and precooling are needed to be carried out on a liquid cargo tank in a transport ship, and an LNG receiving station provides liquefied natural gas to carry out spray precooling on the liquid cargo tank; meanwhile, the natural gas generated in the spraying process is used for replacing nitrogen in the liquid cargo tank, and the mixed gas of the natural gas and the nitrogen is returned to the LNG receiving station for processing; wherein:
during precooling operation, the cooling temperature gradient of the liquid cargo tank is less than-10 ℃/h;
when the gas replacement and precooling are finished, the concentration content of natural gas in the liquid cargo tank is more than 95 percent, the temperature of the bottom of the liquid cargo tank is less than-140 ℃, and the temperature of the top of the liquid cargo tank is less than-120 ℃;
step three: the LNG filling amount is the LNG consumption required by the gas navigation test.
Advantageous effects
The method disclosed by the invention has the advantages that the LNG is used for spraying the liquid cargo tank, the purpose of precooling the liquid cargo tank is achieved, meanwhile, the natural gas generated in the spraying process is used for replacing the nitrogen in the liquid cargo tank, the gas replacement and precooling are combined into one step, the operation flow is simplified, the problems of gas blockage, small flow and the like in the gas replacement process are avoided, and the method is simple and convenient to operate, high in economy, safe and reliable.
The invention solves the problems of air lock, small flow and the like caused by the fact that the LNG receiving station can not provide natural gas, simplifies the filling process, saves the using amount of LNG and reduces the operation time.
Taking a 3-square LNG carrier as an example, the LNG amount and the required time for gas replacement of a liquid cargo tank by natural gas are 30 tons and 30 hours respectively, the LNG amount and the required time for precooling the liquid cargo tank by LNG are 240 tons and 20 hours respectively, and the total LNG amount and the total time for gas replacement and precooling of the liquid cargo tank are 270 tons respectively and 50 hours respectively. Therefore, the LNG filling method for simultaneously performing gas replacement and precooling on the liquid cargo tank can reduce the consumption of LNG by 30 tons and save the operation time by 20 hours.
Drawings
Fig. 1 is an operation schematic diagram of a first step of the filling method provided by the present invention.
Fig. 2 is an operation schematic diagram of a second step of the filling method provided by the present invention.
Fig. 3 is an operation schematic diagram of a third step of the filling method provided by the present invention.
Fig. 4 is a flow chart of the filling method of the present invention.
Reference numerals
1. An LNG receiving station; 2. an independent C-shaped liquid cargo tank of the LNG transport ship; 3. a nitrogen generating device; 4. a gas phase pipe; 5. a liquid phase pipe; 6. A shower pipe; 7. ventilating mast
The specific implementation mode is as follows:
the techniques and methods of the present invention are described in detail below with reference to examples and figures, which are provided to illustrate the components of the present invention and are not intended to limit the scope of the invention.
A filling method of a small LNG transport ship comprises the following steps: as shown in fig. 4;
the method comprises the following steps: the cargo tank 2 of the transport vessel is dried and inerted before the LNG refueling. To ensure that step 2 (pre-cooling and gas replacement combined) requires that the oxygen content in the cargo tank 2 be reduced to less than 2% and the dew point less than-50 ℃. The specific equipment and operation principle of the step are shown in figure 1, dry nitrogen provided by a nitrogen generating device 3 on a ship enters from the top of a liquid cargo hold 2, air in the liquid cargo hold 2 is replaced by utilizing a piston effect, and the air is exhausted from the bottom of the liquid cargo hold and is emptied through an air permeable mast 7.
Step two: before LNG filling, need carry out gas replacement and precooling to cargo tank 2, gas replacement is in order to avoid having nitrogen gas in the goods, influences combustion efficiency, and the precooling is in order to avoid cargo tank temperature sharp change, guarantees cargo tank 2's security. The specific equipment and operation principle of the step are shown in fig. 2, the LNG receiving station 1 provides Liquefied Natural Gas (LNG), and the LNG reaches the top of the cargo tank 2 through the liquid phase pipe 5 and the spray pipe 6 to spray the cargo tank 2, so that the purpose of precooling the cargo tank 2 is achieved. Meanwhile, nitrogen in the liquid cargo tank 2 is replaced by natural gas generated in the spraying process, and mixed gas of the natural gas and the nitrogen returns to the LNG receiving station 1 through the gas phase pipe 4 for processing.
During pre-cooling operation, the cargo tank 2 is allowed to cool at a temperature gradient of less than-10 ℃/hour. When the gas replacement and pre-cooling are finished, the concentration content of natural gas in the liquid cargo tank 2 is more than 95 percent, the temperature of the bottom of the liquid cargo tank 2 is less than-140 ℃, and the temperature of the top of the tank is less than-120 ℃.
Step three: the LNG filling amount is the LNG consumption required by the gas navigation test. The specific equipment and operation principle of the step are shown in fig. 3, the LNG receiving station provides liquefied natural gas, the liquefied natural gas is injected into the bottom of the liquid cargo tank through the liquid phase pipe, and the natural gas generated in the filling process is processed by returning to the shore through the gas phase pipe.
The present invention is not limited to the above-described embodiments. The foregoing description of the specific embodiments is intended to describe and illustrate the technical solutions of the present invention, and the above specific embodiments are merely illustrative and not restrictive. Those skilled in the art can make many changes and modifications to the invention without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (1)

1. A filling method of a small LNG transport ship is characterized by comprising the following steps: in the pre-cooling stage, nitrogen in the liquid cargo tank is replaced by natural gas generated in the spraying process of the liquid cargo tank in the transport ship, and gas replacement and pre-cooling are combined into one step, and the method specifically comprises the following steps:
the method comprises the following steps: before LNG filling, a cargo tank of a transport ship is dried and inerted, so that the oxygen content in the cargo tank is reduced to less than 2 percent, and the dew point is less than minus 50 ℃;
step two: before LNG filling, gas replacement and precooling are needed to be carried out on a liquid cargo tank in a transport ship, and an LNG receiving station provides liquefied natural gas to carry out spray precooling on the liquid cargo tank; meanwhile, the natural gas generated in the spraying process is used for replacing nitrogen in the liquid cargo tank, and the mixed gas of the natural gas and the nitrogen is returned to the LNG receiving station for processing; wherein:
during precooling operation, the cooling temperature gradient of the liquid cargo tank is less than-10 ℃/h;
when the gas replacement and precooling are finished, the concentration content of natural gas in the liquid cargo tank is more than 95 percent, the temperature of the bottom of the liquid cargo tank is less than-140 ℃, and the temperature of the top of the liquid cargo tank is less than-120 ℃;
step three: the LNG filling amount is the LNG consumption required by the gas navigation test.
CN202010973939.1A 2020-09-16 2020-09-16 Filling method of small LNG transport ship Pending CN112268221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010973939.1A CN112268221A (en) 2020-09-16 2020-09-16 Filling method of small LNG transport ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010973939.1A CN112268221A (en) 2020-09-16 2020-09-16 Filling method of small LNG transport ship

Publications (1)

Publication Number Publication Date
CN112268221A true CN112268221A (en) 2021-01-26

Family

ID=74348862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010973939.1A Pending CN112268221A (en) 2020-09-16 2020-09-16 Filling method of small LNG transport ship

Country Status (1)

Country Link
CN (1) CN112268221A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113357537A (en) * 2021-07-05 2021-09-07 江南造船(集团)有限责任公司 Marine LNG filling system and operation method
CN114110422A (en) * 2022-01-25 2022-03-01 中海油能源发展股份有限公司采油服务分公司 LNG ship debugging ship and debugging method
CN115370954A (en) * 2022-07-11 2022-11-22 沪东中华造船(集团)有限公司 Method for carrying out single-cabin replacement, cooling and filling in LNG transport ship

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05263997A (en) * 1992-03-23 1993-10-12 Osaka Gas Co Ltd Cold storage of cryogenic liquefied natural gas and effective utilizing method and device thereof
CN104075103A (en) * 2014-07-15 2014-10-01 中船黄埔文冲船舶有限公司 Fuel adding method for LNG powered ships
CN104482404A (en) * 2014-10-28 2015-04-01 广东珠海金湾液化天然气有限公司 Low-temperature ultra-large-type liquefied natural gas storage tank pre-cooling technology
CN104888582A (en) * 2015-06-10 2015-09-09 浙江海洋学院 Rotary type spraying device for pre-cooling of LNG ship liquid tank and spraying method of rotary type spraying device
CN207005706U (en) * 2017-06-29 2018-02-13 中海石油海南天然气有限公司 A kind of cold cabin gas displacement exhaust system of LNG carrier
CN109404715A (en) * 2018-10-29 2019-03-01 四川美丰化工股份有限公司 A kind of large size LNG tank and its forecooling method
CN110360445A (en) * 2019-07-18 2019-10-22 江南造船(集团)有限责任公司 A kind of gas charging method and device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05263997A (en) * 1992-03-23 1993-10-12 Osaka Gas Co Ltd Cold storage of cryogenic liquefied natural gas and effective utilizing method and device thereof
CN104075103A (en) * 2014-07-15 2014-10-01 中船黄埔文冲船舶有限公司 Fuel adding method for LNG powered ships
CN104482404A (en) * 2014-10-28 2015-04-01 广东珠海金湾液化天然气有限公司 Low-temperature ultra-large-type liquefied natural gas storage tank pre-cooling technology
CN104888582A (en) * 2015-06-10 2015-09-09 浙江海洋学院 Rotary type spraying device for pre-cooling of LNG ship liquid tank and spraying method of rotary type spraying device
CN207005706U (en) * 2017-06-29 2018-02-13 中海石油海南天然气有限公司 A kind of cold cabin gas displacement exhaust system of LNG carrier
CN109404715A (en) * 2018-10-29 2019-03-01 四川美丰化工股份有限公司 A kind of large size LNG tank and its forecooling method
CN110360445A (en) * 2019-07-18 2019-10-22 江南造船(集团)有限责任公司 A kind of gas charging method and device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113357537A (en) * 2021-07-05 2021-09-07 江南造船(集团)有限责任公司 Marine LNG filling system and operation method
CN113357537B (en) * 2021-07-05 2023-02-21 江南造船(集团)有限责任公司 Marine LNG filling system and operation method
CN114110422A (en) * 2022-01-25 2022-03-01 中海油能源发展股份有限公司采油服务分公司 LNG ship debugging ship and debugging method
CN114110422B (en) * 2022-01-25 2022-04-12 中海油能源发展股份有限公司采油服务分公司 LNG ship debugging ship and debugging method
CN115370954A (en) * 2022-07-11 2022-11-22 沪东中华造船(集团)有限公司 Method for carrying out single-cabin replacement, cooling and filling in LNG transport ship
CN115370954B (en) * 2022-07-11 2023-06-30 沪东中华造船(集团)有限公司 Method for single cabin replacement, cooling and filling in LNG transport ship

Similar Documents

Publication Publication Date Title
CN112268221A (en) Filling method of small LNG transport ship
CN109178286B (en) Precooling process for liquefied natural gas transport ship cabin
KR102324848B1 (en) Gas treatment system and ship having the same
KR101559404B1 (en) Replacement apparatus of a liquefied gas storage tank using nitrogen
WO2022131770A1 (en) Boil-off gas management system
KR20180095724A (en) Liquefied natural gas ship
CN104482404A (en) Low-temperature ultra-large-type liquefied natural gas storage tank pre-cooling technology
KR20100008566U (en) Nitrogen Gas Supply Means of Liquefied Gas Carrier
CN105805551B (en) A kind of gas cylinder static evaporation rate detection method with BOG recovery functions
CN218130988U (en) Oil gas recovery device
CN112268220A (en) Filling method for LNG fuel power ship
Wieczorek The Problem of Carrying Insufficiently Optimal Gassing-up Operation after Tanks Inerting with Reference to Ethylene Carriers
CN210266727U (en) Shale gas hydrate thick liquid fast transferring uninstallation device
CN113446512A (en) Ship LPG precooling filling method and ship LPG precooling filling system
CN115370954B (en) Method for single cabin replacement, cooling and filling in LNG transport ship
KR20120060421A (en) Gas trial method of floating ship
CN112815229B (en) Liquid natural gas unloading method and device
CN218510671U (en) Offshore CNG and LNG dual-purpose loading and unloading system
CN115013720B (en) Hydrogen production and hydrogenation station for methanol
KR101483463B1 (en) Liquefaction Process Test Method In Near Shore For Ship
CN117284430A (en) Marine VOC retrieves ship
CN218193277U (en) On-spot system of preparing of carbon dioxide and argon welding protection mist
CN115978433B (en) Filling method of LNG ship
KR101422589B1 (en) Carbon Dioxide Handling System and Method
CN112902016A (en) LNG fuel power ship filling device and filling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210126