CN112267339A - An assembled honeycomb pavement - Google Patents

An assembled honeycomb pavement Download PDF

Info

Publication number
CN112267339A
CN112267339A CN202011295990.8A CN202011295990A CN112267339A CN 112267339 A CN112267339 A CN 112267339A CN 202011295990 A CN202011295990 A CN 202011295990A CN 112267339 A CN112267339 A CN 112267339A
Authority
CN
China
Prior art keywords
connecting layer
honeycomb
pavement
assembled honeycomb
pavement according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011295990.8A
Other languages
Chinese (zh)
Inventor
赵岩
马欢
潘健
张佳玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN202011295990.8A priority Critical patent/CN112267339A/en
Publication of CN112267339A publication Critical patent/CN112267339A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses an assembled honeycomb pavement, which comprises a waterproof stress absorption connecting layer, a secondary unit and a primary unit, wherein the waterproof stress absorption connecting layer is arranged on the waterproof stress absorption connecting layer; the primary unit comprises a regular polygon shell and thin tubes, and the thin tubes are vertically arrayed in the shell; the secondary unit comprises a frame and a base with a plurality of U-shaped grooves; drainage holes communicated with the U-shaped groove are formed in two sides of the frame; the primary unit arrays are arranged in the frame to form a honeycomb structure, and the bottoms of the thin tubes are communicated with the U-shaped grooves; the waterproof stress absorbing and connecting layer is arranged at the bottom of the secondary unit. The road surface has the advantages of water permeability, noise reduction, snow melting, long service life, convenience in installation, easiness in maintenance and the like.

Description

Assembled honeycomb road surface
Technical Field
The invention relates to the field of road engineering equipment, in particular to an assembled honeycomb pavement.
Background
With the popularization of asphalt pavements, the research on the asphalt pavements is also more and more extensive. However, the existing road surface is difficult to meet the increasing traffic demand. The existing asphalt pavement has the problems of short service life, easy water accumulation, long construction period, high maintenance cost and the like.
Disclosure of Invention
In order to solve the problems of complex road surface waterproof structure and difficult construction in the prior art, the invention provides an assembled honeycomb road surface; the pavement structure has the characteristics of water permeability, noise reduction, snow melting, long service life, convenience in installation, easiness in maintenance and the like.
The invention adopts the following technical scheme for realizing the aim:
an assembled honeycomb pavement comprises a waterproof stress absorption connecting layer, a secondary unit and a primary unit;
the primary unit comprises a regular polygon shell and thin tubes, and the thin tubes are vertically arrayed in the shell;
the secondary unit comprises a frame and a base with a plurality of U-shaped grooves; drainage holes communicated with the U-shaped groove are formed in two sides of the frame; the primary unit arrays are arranged in the frame to form a honeycomb structure, and the bottoms of the thin tubes are communicated with the U-shaped grooves;
the waterproof stress absorbing and connecting layer is arranged at the bottom of the secondary unit.
As a further improvement of the invention, water collecting channels are arranged on two sides of the waterproof stress absorption connecting layer and are communicated with the drain holes.
As a further improvement of the invention, the waterproof stress absorption connecting layer is formed by paving asphalt, rubber powder, broken stone, stone chips and fine river sand in a mixed mode.
As a further improvement of the present invention, the regular polygonal housing is a regular hexagonal frame.
As a further improvement of the invention, the thin tube is a regular hexagonal tube.
As a further improvement of the invention, the tube walls of the regular hexagonal tubes are equal in thickness.
As a further improvement of the invention, the shell of the primary unit is provided with a dovetail, the dovetail comprises a dovetail block and a dovetail groove which can be mutually matched and spliced, and the dovetail block and the dovetail groove are arranged on the side wall of the shell at intervals.
As a further improvement of the invention, the base is provided with U-shaped grooves to form a plurality of spaced beams with rectangular sections; the shells of the primary units are limited through the clamp nails, and the clamp nails are connected with the rectangular section beams.
As a further improvement of the invention, the waterproof stress absorption connecting layer is arranged on the bridge girder body.
Compared with the prior art, the invention has the following advantages:
the pavement is formed by splicing a waterproof stress absorption connecting layer, a primary unit of a honeycomb structure and a secondary unit with a U-shaped groove base. During construction, a waterproof stress absorption connecting layer is laid firstly, then a base with a U-shaped groove is installed, and finally a first-stage unit regular hexagon honeycomb structure is installed. Water is introduced into the U-shaped groove through the honeycomb structure and is discharged in time through the U-shaped groove and the water discharge hole. Meanwhile, the invention is a splicing structure, is convenient to construct and solves the problems of poor drainage capacity and complex construction of the asphalt pavement.
Preferably, the primary unit regular hexagonal honeycomb structure consists of regular hexagonal cylinders and smaller regular hexagonal tubes with equal wall thickness inside. The regular hexagonal honeycomb structure can be spliced randomly to realize the construction of pavement evenness, and the aim of construction on a pre-processing site can be realized.
Preferably, the dovetail tenon is detachably connected, so that the spliced road surface is more stable in connection and can bear larger friction force.
Preferably, the primary unit is internally formed by small regular hexagonal pipes with equal wall thickness, rainwater can flow to the U-shaped groove of the base through the regular hexagonal pipes in the primary unit, is discharged from the water discharge holes in the frame of the secondary unit through the U-shaped groove and flows into the water discharge channel, and is discharged out of the pavement structure at a specified place.
Drawings
The drawings herein are for clarity of illustration of embodiments of the present application or of prior art. The drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic diagram of a secondary unit of the present invention;
FIG. 3 is a schematic diagram of the connection of the secondary unit to the secondary unit;
FIG. 4 is a view showing the internal structure of the secondary unit;
FIG. 5 is a schematic diagram of a primary unit of the present invention;
FIG. 6 is a schematic diagram of a primary unit connection;
FIG. 7 is a schematic cross-sectional view of an assembled honeycomb pavement laid on a bridge deck;
FIG. 8 is a top view of the fabricated honeycomb pavement laid on the deck;
the reference numbers in the figures illustrate: 1 ━ waterproof stress absorbing tie layer; 2 ━ secondary unit; 3 ━ primary unit; 4 ━ drain holes; 5 ━ water collecting channel; 11 bridge girder bodies; 21 ━ rectangular section beam; 22 ━ staples; 23 ━ dovetail; 24 ━ drain holes; 31 ━ dovetail; 32 ━ regular hexagonal tubes.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present invention without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 6, the present invention provides an assembled honeycomb pavement, which is characterized in that: the waterproof stress absorption connecting layer comprises a waterproof stress absorption connecting layer 1, a secondary unit 2 and a primary unit 3;
the primary unit 3 comprises a regular polygon shell and thin tubes, and the thin tubes are vertically arrayed in the shell;
the secondary unit 2 comprises a frame and a base with a plurality of U-shaped grooves; drainage holes 4 communicated with the U-shaped groove are formed in two sides of the frame; the primary units 3 are arranged in the frame in an array manner to form a honeycomb structure, and the bottoms of the thin tubes are communicated with the U-shaped grooves;
the waterproof stress absorption connecting layer 1 is arranged at the bottom of the secondary unit 2.
The road surface is formed by laying and splicing a waterproof stress absorption connecting layer 1, a primary unit 3 of a honeycomb structure and a secondary unit 2 with a U-shaped groove base. During construction, the waterproof stress absorption connecting layer 1 is laid firstly, then the base with the U-shaped groove is installed, and finally the first-stage unit regular hexagon honeycomb structure is installed. The pavement structure has the characteristics of water permeability, noise reduction, snow melting, long service life, convenience in installation, easiness in maintenance and the like.
Preferably, the waterproof stress absorption connecting layer 1 of the fabricated honeycomb pavement provided by the invention is composed of (polymer modified asphalt) asphalt, rubber powder, broken stone, stone chips and fine river sand, and is paved on the lowest layer of a honeycomb pavement structure.
Preferably, the primary unit hexagonal honeycomb structure is comprised of a regular hexagonal shell and smaller regular hexagonal tubes 32 of equal internal wall thickness.
Preferably, the assembled honeycomb pavement provided by the invention is characterized in that the primary unit and the secondary unit are connected through the dovetails 31 in a detachable connection mode.
Preferably, the primary unit is internally provided with smaller regular hexagonal tubes 32 with equal wall thickness, rainwater can flow to the U-shaped groove of the base through the regular hexagonal tubes 32 in the primary unit, is discharged from the water discharge holes 24 of the secondary unit frame 23 through the U-shaped groove and is collected into a water discharge channel, and is discharged out of the pavement structure at a specified place.
The primary unit 3 of the honeycomb structure is composed of regular hexagonal cylinders and small regular hexagonal tubes 32 with equal wall thickness inside as a preferred embodiment, and the present invention explains this patent in a regular hexagonal structure, but is not limited to a regular hexagonal shape.
Examples
The embodiment is a great improvement on the traditional bridge deck pavement. As shown in fig. 7, after the construction of the bridge capping beam is completed, a waterproof stress absorption connecting layer 1 is laid on the top surface of the bridge, the waterproof stress absorption connecting layer 1 is formed by mixing polymer modified asphalt, broken stone, stone chips and fine river sand, and the waterproof stress absorption connecting layer 1 has the functions of preventing water, absorbing and diffusing stress transmitted by the honeycomb structure.
As shown in fig. 8, after the waterproof stress absorption connecting layer 1 is paved, a secondary unit can be installed, and the secondary unit is a base with a U-shaped groove. The secondary unit 2 is connected with the secondary unit 2 through a dovetail joint in a detachable connection mode.
In order to realize the quick splicing installation of the road surface, the primary units and the secondary units are connected through dovetails 31 in a detachable connection mode.
After the installation is completed, as shown in fig. 5. The interior of the primary unit is formed by smaller regular hexagonal pipes with equal wall thickness, rainwater can flow to the U-shaped groove of the base through the regular hexagonal pipes in the primary unit, is discharged from the water discharging holes at the bottom of the secondary unit through the U-shaped groove and flows into the water discharging channel, and the rainwater is discharged out of the pavement structure at a specified place.
The fabricated pavement can be applied to bridge floors, highway pavements of various grades, urban road pavements, sidewalk pavements and the like. The purpose of pre-processing site construction can be realized. The waterproof quick construction and assembly of highway are effectively solved.
Further, it is to be understood that the present invention includes, but is not limited to, the above one embodiment. Although the present invention has been described in the foregoing by way of examples, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (9)

1.一种装配式蜂巢路面,其特征在于:包括防水应力吸收连接层、二级单元和一级单元;1. An assembled honeycomb pavement, characterized in that: comprising a waterproof stress absorbing connecting layer, a secondary unit and a primary unit; 所述一级单元包括正多边形壳体和细管,所述细管竖向阵列排布在壳体内;The primary unit includes a regular polygonal housing and thin tubes, and the thin tubes are arranged in a vertical array in the housing; 所述二级单元包括边框和具有多个U型槽的底座;所述边框两侧设置有与U型槽连通的排水孔;所述一级单元阵列排布设置在所述边框内形成蜂巢结构,所述细管底部与U型槽连通;The secondary unit includes a frame and a base with a plurality of U-shaped grooves; both sides of the frame are provided with drainage holes communicating with the U-shaped grooves; the primary unit array is arranged in the frame to form a honeycomb structure , the bottom of the thin tube is communicated with the U-shaped groove; 所述防水应力吸收连接层设置在所述二级单元底部。The waterproof stress absorbing connection layer is arranged at the bottom of the secondary unit. 2.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述防水应力吸收连接层两侧设置有汇水通道,汇水通道与排水孔连通。2 . The assembled honeycomb pavement according to claim 1 , wherein the waterproof stress absorbing connecting layer is provided with a catchment channel on both sides, and the catchment channel is connected with the drainage hole. 3 . 3.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述防水应力吸收连接层由沥青、橡胶粉、碎石、石屑和细河砂混合铺筑而成。3 . The assembled honeycomb pavement according to claim 1 , wherein the waterproof stress-absorbing connecting layer is paved by mixing asphalt, rubber powder, crushed stone, stone chips and fine river sand. 4 . 4.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述正多边形壳体为正六边形框体。4 . The assembled honeycomb pavement according to claim 1 , wherein the regular polygonal shell is a regular hexagonal frame body. 5 . 5.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述细管为正六边形管。5 . The assembled honeycomb pavement according to claim 1 , wherein the thin tubes are regular hexagonal tubes. 6 . 6.根据权利要求5所述的一种装配式蜂巢路面,其特征在于:所述正六边形管的管壁等厚度。6 . The assembled honeycomb pavement according to claim 5 , wherein the pipe wall of the regular hexagonal pipe has the same thickness. 7 . 7.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述一级单元的壳体上设置有燕尾榫,燕尾榫包括能够相互配合插接的燕尾榫块和燕尾榫槽,燕尾榫块和燕尾榫槽间隔设置在壳体侧壁上。7 . The assembled honeycomb pavement according to claim 1 , wherein the housing of the primary unit is provided with a dovetail tenon, and the dovetail tenon comprises a dovetail tenon block and a dovetail tenon groove that can be mated and connected to each other. 8 . , the dovetail tenon block and the dovetail tenon groove are arranged on the side wall of the casing at intervals. 8.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述底座上开设U型槽形成间隔的多个矩形截面梁;多个一级单元的壳体在通过卡钉限位,卡钉与矩形截面梁连接。8 . The assembled honeycomb pavement according to claim 1 , wherein: the base is provided with a plurality of rectangular cross-section beams with U-shaped grooves to form intervals; position, the staples are connected to the rectangular section beams. 9.根据权利要求1所述的一种装配式蜂巢路面,其特征在于:所述防水应力吸收连接层设置在桥梁梁体上。9 . The assembled honeycomb pavement according to claim 1 , wherein the waterproof stress absorbing connecting layer is arranged on the bridge beam body. 10 .
CN202011295990.8A 2020-11-18 2020-11-18 An assembled honeycomb pavement Pending CN112267339A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011295990.8A CN112267339A (en) 2020-11-18 2020-11-18 An assembled honeycomb pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011295990.8A CN112267339A (en) 2020-11-18 2020-11-18 An assembled honeycomb pavement

Publications (1)

Publication Number Publication Date
CN112267339A true CN112267339A (en) 2021-01-26

Family

ID=74339499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011295990.8A Pending CN112267339A (en) 2020-11-18 2020-11-18 An assembled honeycomb pavement

Country Status (1)

Country Link
CN (1) CN112267339A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05331802A (en) * 1992-05-28 1993-12-14 Hayashi Prod Corp Constructive frame body for unit subgrade member
CN204849796U (en) * 2015-08-24 2015-12-09 李家春 Novel compound drain bar of honeycomb plastics
CN109403181A (en) * 2017-08-16 2019-03-01 仁创生态环保科技股份有限公司 A kind of porous pavement
CN209066204U (en) * 2018-11-20 2019-07-05 李平 A kind of hardened structure of road Quick drainage anti-skid surface
CN210737274U (en) * 2019-06-18 2020-06-12 广西北部湾投资集团有限公司 Multi-lane drainage asphalt pavement transverse rapid drainage structure
CN111663398A (en) * 2020-06-05 2020-09-15 浙江大道建设工程有限公司 Noise absorption type road drainage water filtering structure and construction method thereof
CN214116124U (en) * 2020-11-18 2021-09-03 西安公路研究院 An assembled honeycomb pavement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05331802A (en) * 1992-05-28 1993-12-14 Hayashi Prod Corp Constructive frame body for unit subgrade member
CN204849796U (en) * 2015-08-24 2015-12-09 李家春 Novel compound drain bar of honeycomb plastics
CN109403181A (en) * 2017-08-16 2019-03-01 仁创生态环保科技股份有限公司 A kind of porous pavement
CN209066204U (en) * 2018-11-20 2019-07-05 李平 A kind of hardened structure of road Quick drainage anti-skid surface
CN210737274U (en) * 2019-06-18 2020-06-12 广西北部湾投资集团有限公司 Multi-lane drainage asphalt pavement transverse rapid drainage structure
CN111663398A (en) * 2020-06-05 2020-09-15 浙江大道建设工程有限公司 Noise absorption type road drainage water filtering structure and construction method thereof
CN214116124U (en) * 2020-11-18 2021-09-03 西安公路研究院 An assembled honeycomb pavement

Similar Documents

Publication Publication Date Title
CA2650172C (en) Flared leg precast concrete bridge system
US4595314A (en) Precast concrete culvert section
CN204238330U (en) A kind of novel town road discharge structure
CN108547195B (en) Drainage asphalt pavement structure and construction method
CA3107747A1 (en) A system and a method for building a road
ES2460840B2 (en) CONSTRUCTION SYSTEM
CN214116124U (en) An assembled honeycomb pavement
CN111441263A (en) Construction method for widening rigid connection of new and old bridges for keeping traffic passing
CN215800763U (en) Highway asphalt concrete pavement
CN110983907A (en) Assembled self-draining sidewalk
CN108589459B (en) Sponge city assembled polyurethane ecological landscape road and construction method
KR101047930B1 (en) Construction Structure of Road Block and Construction Method of Road Block
CN112267339A (en) An assembled honeycomb pavement
CN110629667B (en) Bridge floor transverse drainage structure and drainage system thereof
CN205741809U (en) The permeable road structure of a kind of footpath and water-permeable brick
CN106522060A (en) Multi-access pipeline and single-cavity drainage curb stone for traffic lane
CN214783250U (en) Station room and inter-bridge deformation joint drainage structure
CN211689726U (en) Permeable pavement
CN214168609U (en) Novel assembled channel type soilless roadbed
KR101248173B1 (en) Bottom-pillar-beam coupling structure of prefab water-storage tank
CN221000421U (en) Road bridge tunnel highway section combined type road surface structure
CN218540256U (en) Integral type concrete pavement slab road surface structure that permeates water
CN212801079U (en) Road structure with retaining wall permeates water
CN215104647U (en) Road and bridge road bed road surface drainage structures
CN213896718U (en) Steel gap bridge structure for protecting pedestrian passage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination