CN112265128B - Sidewalk cement brick forming device for reprocessing raw materials - Google Patents

Sidewalk cement brick forming device for reprocessing raw materials Download PDF

Info

Publication number
CN112265128B
CN112265128B CN202011156058.7A CN202011156058A CN112265128B CN 112265128 B CN112265128 B CN 112265128B CN 202011156058 A CN202011156058 A CN 202011156058A CN 112265128 B CN112265128 B CN 112265128B
Authority
CN
China
Prior art keywords
plate
groove
shielding plate
fixing
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011156058.7A
Other languages
Chinese (zh)
Other versions
CN112265128A (en
Inventor
葛成娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Special Zone Construction Engineering Energy Construction Group Co.,Ltd.
Original Assignee
Shenzhen Tianjian Pingshan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Tianjian Pingshan Construction Engineering Co ltd filed Critical Shenzhen Tianjian Pingshan Construction Engineering Co ltd
Priority to CN202011156058.7A priority Critical patent/CN112265128B/en
Publication of CN112265128A publication Critical patent/CN112265128A/en
Application granted granted Critical
Publication of CN112265128B publication Critical patent/CN112265128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units

Landscapes

  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention discloses a sidewalk cement brick molding device for reprocessing raw materials, which comprises a brick making box, a first handle, an installation rod and a metal handle, wherein a first clamping groove is formed in the top of the brick making box, and a first shielding plate is movably installed on the top of the first clamping groove. This cement brick forming device for sidewalk to raw materials reprocessing, through the brickmaking box that sets up, first shielding plate and second shielding plate, make this cement brick forming device for sidewalk can once only produce the cement brick for sidewalk of the same size, go into in first draw-in groove and the second draw-in groove through blocking first shielding plate and second shielding plate in proper order, make the inside area of same size equidimension of cutting out of brickmaking box, pour the brickmaking raw materials who will prepare in proper order into the space of keeping apart in succession, just can once only produce polylith cement brick for sidewalk, very big reduction people's the preparation time in the batch production, effectual brickmaking efficiency that has improved the workman also very big reduction user's manufacturing cost promptly.

Description

Sidewalk cement brick forming device for reprocessing raw materials
Technical Field
The invention relates to the technical field of cement brick forming devices, in particular to a sidewalk cement brick forming device for reprocessing raw materials.
Background
The cement brick is a novel wall material which is manufactured by using fly ash, cinder, coal gangue, tailing slag, chemical slag or natural sand, coastal mud and the like (one or more of the raw materials) as main raw materials and cement as a coagulant without high-temperature calcination, is called as the cement brick, has heavier dead weight and higher strength, does not need to be fired, uses pollutant fly ash of a power plant as a material, is environment-friendly, is widely popularized by the country, has the unique defect that the building block is combined with plastering mortar unlike a red brick, is easy to generate cracks on a wall surface and influence the attractiveness, fully sprays water during construction, can consider that a steel wire mesh is hung on a full wall in villas with higher requirements, can effectively prevent cracks, is generally used as the cement brick on a sidewalk at present, generally needs a forming device to form the cement brick when the cement brick is reproduced, but the existing cement brick forming device for the sidewalk has certain defect, such as:
1. the existing cement brick forming device for the sidewalk can only manufacture one cement brick by a single device, a large amount of time of workers is easily consumed in long-term batch production, and the production cost of a user is easily increased by purchasing a large amount of forming devices, so that certain use defects exist;
2. the existing cement brick molding device for the sidewalk can only produce cement bricks with fixed sizes generally, but the sizes of bricks required by different road sections are different at present, but the size of the cement brick molding device for the sidewalk can not be adjusted, so that a user can only purchase the cement brick molding device for the sidewalk with different sizes to meet the use requirements of people, and the production cost of the user is easily increased;
3. the existing cement brick forming device for the sidewalk does not generally manufacture grains of the cement brick, because the living standard of people is improved, the cement brick on the sidewalk needs good grains to meet the aesthetic feeling of people, the cement brick with the grains is convenient for blind people to use a blind guiding stick to visit the road, the grains on the common cement brick are directly cut by a chopper through experience, and if workers who are born by hands cut the cement brick, the brick is easy to be damaged, and further the waste of the cement brick is easy to cause;
4. the existing sidewalk cement brick forming device can not change grain molds generally, and due to different aesthetic feelings of people, the demands for grains on the surface of a cement brick are different, the grain molds are changed by replacing the whole brick making tools, so that the production cost of a user is increased easily, and further, the operation of the user is inconvenient.
Aiming at the problems, innovative design is urgently needed on the basis of the structure of the original sidewalk cement brick forming device.
Disclosure of Invention
The invention aims to provide a sidewalk cement brick forming device for reprocessing raw materials, which solves the problems that a common single device provided in the background technology can only manufacture one cement brick, the time of workers is easy to waste in long-term batch production, the production cost of a user is easy to increase due to the mass purchase of the forming device, the cement brick can only be produced in a fixed size, but the brick size required by the road section is different at present, but the sidewalk cement brick forming device can not adjust the size, the user can only purchase sidewalk cement brick forming devices in different sizes to meet the use requirements of people, the production cost of the user is easy to increase, the texture manufacture of the cement brick is not required, the aesthetic feeling of people is met due to the improvement of the living standard of people, and the cement brick that has the line is convenient for the blind person to use and leads blind rod to visit the way, line on general cement brick is that the workman directly cuts out with the hacking knife by virtue of experience, if the workman of hand student goes to cut the damage that leads to the fact the fragment of brick easily, and then cause the waste of cement brick easily, generally can't change the line mould, because people's aesthetic difference now, the demand to cement brick surface line is also different, change that general all is whole brickmaking utensil to the change of line mould, increase user's manufacturing cost's problem easily.
In order to achieve the purpose, the invention provides the following technical scheme: a sidewalk cement brick forming device for reprocessing raw materials comprises a brick making box, a first handle, an installation rod and a metal handle, wherein a first clamping groove is formed in the top of the brick making box, a first baffle plate is movably mounted at the top of the first clamping groove, a first clamping strip is movably connected to the top of the first clamping groove, a second clamping groove is formed in the top of the brick making box, a second baffle plate is movably mounted at the top of the second clamping groove, a third clamping groove is formed in the top of the second baffle plate, a second clamping strip is movably connected to the top of the second clamping groove, an installation groove is formed in the top of the brick making box, a fixing rod is fixedly connected to the side of the brick making box, a rubber handle is fixedly mounted on the inner wall of the fixing rod, a first fixing block is fixed to the end of the brick making box, a cover plate is fixedly mounted at the bottom of the first handle, and a hinge is fixedly mounted on the end of the cover plate, and one side fixedly connected with fixed plate of hinge, and the tip fixed mounting of fixed plate has the fixture block, the fixed slot has been seted up to the bottom of apron, and the inner wall fixed mounting of fixed slot has buffer spring to buffer spring's bottom fixedly connected with roof, and the bottom of roof is fixed with rubber backing plate, rubber backing plate's bottom movable mounting has the line mould, and the bottom of line mould has seted up the mounting hole to the inner wall swing joint of mounting hole has fastening bolt, the bottom welding of line mould has the line piece, the top fixedly connected with mounting panel of installation pole, and the avris fixed mounting of mounting panel has the second handle, the avris of mounting panel is fixed with the second fixed block, the tip fixedly connected with connecting rod of metal handle, and the tip fixed mounting of connecting rod has circular wood piece.
Preferably, the first shielding plate and the brick making box form a clamping structure through the first clamping groove, and the external dimension of the first shielding plate is completely matched with the internal dimension of the first clamping groove.
Preferably, the number of the first fixed blocks is 4, and 2 of the 4 first fixed blocks are 1 group, and the 2 groups of the first fixed blocks are symmetrically arranged by taking the perpendicular bisector of the brick making box as a symmetry axis.
Preferably, the end part of the fixing rod is fixedly connected with the outer wall of the brick making box, and the brick making box and the rubber handle form an integrated structure through the fixing rod.
Preferably, the end of the cover plate is fixedly connected with the outer wall of the hinge, and the cover plate and the fixing plate form a rotating structure through the hinge.
Preferably, the top of the buffer spring is fixedly connected with the bottom of the cover plate through a fixing groove, and the cover plate and the top plate form an elastic structure through the buffer spring.
Preferably, the quantity of line piece is 5, and 5 equidistant settings of line piece are in the bottom of line mould to line mould and line piece structure as an organic whole.
Preferably, one end of the fastening bolt penetrates through the bottom of the grain die through the mounting hole and extends to the top of the grain die, one end of the fastening bolt is in threaded connection with the inner portion of the rubber base plate, and the rubber base plate is connected with the grain die through the fastening bolt.
Preferably, the number of the installation rods is 4, and each 2 of the 4 installation rods is 1 group, and the 2 groups of installation rods are symmetrically arranged by taking the perpendicular bisector of the installation plate as a symmetry axis, and the external dimension of the installation rods is completely matched with the internal dimension of the installation groove.
Preferably, the inner wall of the third clamping groove is movably connected with the outer wall of the first shielding plate, and the first shielding plate and the second shielding plate form a clamping structure through the third clamping groove.
Compared with the prior art, the invention has the beneficial effects that: the sidewalk cement brick molding device reprocessed by the raw materials;
1. the sidewalk cement brick forming device is provided with the second shielding plate with completely matched size, the sidewalk cement bricks with the same size can be produced at one time through the arranged brick making box, the first shielding plate and the second shielding plate are sequentially clamped into the first clamping groove and the second clamping groove, so that the areas with the same size and the same size are partially cut in the brick making box, then, prepared brick making raw materials are sequentially poured into the separated space, a plurality of sidewalk cement bricks can be produced at one time, the production time of workers in batch production is greatly reduced, the brick making efficiency of the workers is effectively improved, the production cost of a user is greatly reduced, and the user does not need to purchase the sidewalk cement brick forming device to produce the sidewalk cement bricks;
2. the brick making box is provided with the first shielding plate which is installed in an embedded mode, the brick making box can produce cement bricks of a sidewalk with most of sizes by adjusting the number of the first shielding plate and the second shielding plate in the brick making box 1, the height of the brick making box is adjusted by holding the second handle and placing the installation rod into the installation groove, the brick making box can produce cement bricks of sidewalks with different heights, the first shielding plate and the second shielding plate are adjusted by the aid of the first clamping strip and the second clamping strip, cement is poured into the brick making box, the cement cannot penetrate into the first clamping groove and the second clamping groove, and therefore the practicability of the device is effectively improved;
3. the brick making box is characterized in that a buffer spring is arranged in an embedded mode, after cement is poured into the brick making box, a first handle is grasped, a fixing plate is aligned to the outer portion of the brick making box to place a cover plate downwards, the cover plate and the brick making box are closed through clamping between a clamping block and a first fixing block, grain pressing is conducted on the top of a sidewalk cement brick through a grain piece at the bottom of a grain die, grains can be pressed on sidewalk cement bricks with more sizes through the arranged buffer spring and a top plate, and the cement is enabled not to flow out of a gap between the brick making box and the cover plate easily when the cover plate is closed through the arranged rubber base plate;
4. be provided with the line mould that the integration set up, rotate fastening bolt and take out fastening bolt from the mounting hole, take off the line mould from rubber backing plate bottom after that, take out the line mould that will need use on one side from, put into the mounting hole and rotate it into rubber backing plate with fastening bolt after that for rubber backing plate is connected with the line mould, through changing the line mould, make this pavement cement brick forming device can produce the pavement cement brick of different decorative patterns in batches and satisfy people's different outward appearance demands.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic structural view of a brick making box according to the present invention;
FIG. 3 is a schematic top view of the brick making box according to the present invention;
FIG. 4 is a front cross-sectional structural view of the cover plate of the present invention;
FIG. 5 is a front cross-sectional structural schematic view of the mounting plate of the present invention;
FIG. 6 is a front view of a second shielding plate according to the present invention;
FIG. 7 is a schematic view of the connection between the metal handle and the connecting rod structure according to the present invention.
In the figure: 1. making a brick box; 2. a first card slot; 3. a first shielding plate; 4. a first clip strip; 5. a second card slot; 6. a second shielding plate; 7. a second card strip; 8. a first fixed block; 9. fixing the rod; 10. a rubber grip; 11. mounting grooves; 12. a cover plate; 13. a first handle; 14. a hinge; 15. a fixing plate; 16. A clamping block; 17. fixing grooves; 18. a buffer spring; 19. a top plate; 20. a rubber pad; 21. mounting holes; 22. a grain mold; 23. grain pieces; 24. fastening a bolt; 25. mounting a rod; 26. mounting a plate; 27. a second handle; 28. a second fixed block; 29. a metal handle; 30. a connecting rod; 31. a round wood block; 32. and a third card slot.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a sidewalk cement brick forming device for reprocessing raw materials comprises a brick making box 1, a first clamping groove 2, a first baffle plate 3, a first clamping strip 4, a second clamping groove 5, a second baffle plate 6, a second clamping strip 7, a first fixing block 8, a fixing rod 9, a rubber handle 10, a mounting groove 11, a cover plate 12, a first handle 13, a hinge 14, a fixing plate 15, a clamping block 16, a fixing groove 17, a buffer spring 18, a top plate 19, a rubber base plate 20, a mounting hole 21, a grain die 22, a grain sheet 23, a fastening bolt 24, a mounting rod 25, a mounting plate 26, a second handle 27, a second fixing block 28, a metal handle 29, a connecting rod 30, a round wood block 31 and a third clamping groove 32, wherein the first clamping groove 2 is formed in the top of the brick making box 1, the first baffle plate 3 is movably mounted on the top of the first clamping groove 2, the first clamping strip 4 is movably connected to the top of the first clamping groove 2, the top of the brick making box 1 is provided with a second clamping groove 5, the top of the second clamping groove 5 is movably provided with a second baffle plate 6, the top of the second baffle plate 6 is provided with a third clamping groove 32, the top of the second clamping groove 5 is movably connected with a second clamping strip 7, the top of the brick making box 1 is provided with a mounting groove 11, the lateral side of the brick making box 1 is fixedly connected with a fixing rod 9, the inner wall of the fixing rod 9 is fixedly provided with a rubber handle 10, the end part of the brick making box 1 is fixedly provided with a first fixing block 8, the bottom of the first handle 13 is fixedly provided with a cover plate 12, the end part of the cover plate 12 is fixedly provided with a hinge 14, one side of the hinge 14 is fixedly connected with a fixing plate 15, the end part of the fixing plate 15 is fixedly provided with a clamping block 16, the bottom of the cover plate 12 is provided with a fixing groove 17, the inner wall of the fixing groove 17 is fixedly provided with a buffer spring 18, and the bottom of the buffer spring 18 is fixedly connected with a top plate 19, and the bottom of roof 19 is fixed with rubber backing plate 20, the bottom movable mounting of rubber backing plate 20 has line mould 22, and mounting hole 21 has been seted up to line mould 22's bottom, and the inner wall swing joint of mounting hole 21 has fastening bolt 24, the bottom welding of line mould 22 has line piece 23, the top fixedly connected with mounting panel 26 of installation pole 25, and the avris fixed mounting of mounting panel 26 has second handle 27, the avris of mounting panel 26 is fixed with second fixed block 28, the tip fixedly connected with connecting rod 30 of metal handle 29, and the tip fixed mounting of connecting rod 30 has circular wood piece 31.
The first shielding plate 3 and the brick making box 1 form a clamping structure through the first clamping groove 2, the external dimension of the first shielding plate 3 is completely matched with the internal dimension of the first clamping groove 2, the first shielding plate 3 and the brick making box 1 which are arranged into the clamping structure enable the first shielding plate 3 to be mounted and dismounted more conveniently by workers, and the external dimension of the first shielding plate 3 is completely matched with the internal dimension of the first clamping groove 2, so that when the workers pour cement into the brick making box 1, the cement cannot block the inside of the first clamping groove 2;
the number of the first fixing blocks 8 is 4, 2 of the 4 first fixing blocks 8 are 1 group, the 2 groups of the first fixing blocks 8 are symmetrically arranged by taking the perpendicular bisector of the brick making box 1 as a symmetry axis, and the clamping effect between the clamping block 16 and the first fixing blocks 8 is better when a worker installs the cover plate 12 by arranging the first fixing blocks 8 which are bilaterally symmetrical;
the end part of the fixing rod 9 is fixedly connected with the outer wall of the brick making box 1, the brick making box 1 and the rubber handle 10 form an integrated structure through the fixing rod 9, and the brick making box 1 and the rubber handle 10 which are arranged into the integrated structure enable a worker to more conveniently overturn the brick making box 1 to dump out cement bricks inside after cement bricks on a sidewalk inside the brick making box 1 are manufactured;
the end part of the cover plate 12 is fixedly connected with the outer wall of the hinge 14, the cover plate 12 and the fixing plate 15 form a rotating structure through the hinge 14, and the cover plate 12 and the fixing plate 15 which are arranged into the rotating structure enable workers to install and take down the cover plate 12 more conveniently;
the top of the buffer spring 18 is fixedly connected with the bottom of the cover plate 12 through the fixing groove 17, the cover plate 12 and the top plate 19 form an elastic structure through the buffer spring 18, and the grain sheet 23 can press grains on sidewalk cement bricks with various heights through the cover plate 12 and the top plate 19 which are arranged into the elastic structure;
the number of the grain pieces 23 is 5, the 5 grain pieces 23 are equidistantly arranged at the bottom of the grain die 22, the grain die 22 and the grain pieces 23 are of an integrated structure, and the grain die 22 and the grain pieces 23 which are arranged into the integrated structure enable workers to replace the grain pieces 23 more conveniently and quickly;
one end of a fastening bolt 24 penetrates through the bottom of the grain mold 22 through the mounting hole 21 and extends to the top of the grain mold 22, one end of the fastening bolt 24 is in threaded connection with the inner portion of the rubber base plate 20, the rubber base plate 20 is connected with the grain mold 22 through the fastening bolt 24, and the fastening bolt 24 is arranged to penetrate through the grain mold 22, so that the overall fixing effect of the grain mold 22 is better, and the cement brick cannot easily fall off when grains are pressed;
the number of the mounting rods 25 is 4, 2 of the 4 mounting rods 25 are 1 group, the 2 groups of mounting rods 25 are symmetrically arranged by taking the perpendicular bisector of the mounting plate 26 as a symmetry axis, the external dimension of the mounting rods 25 is completely matched with the internal dimension of the mounting groove 11, the mounting plate 26 is more stably mounted on the top of the brick making box 1 by a worker through the mounting rods 25 arranged in bilateral symmetry, and the mounting plate 26 is more firmly mounted on the top of the brick making box 1 without a gap in the middle through the external dimension of the mounting rods 25 is completely matched with the internal dimension of the mounting groove 11;
the inner wall of third draw-in groove 32 and the outer wall swing joint of first shielding plate 3, and first shielding plate 3 constitutes the block structure through third draw-in groove 32 and second shielding plate 6, through setting to first shielding plate 3 and the second shielding plate 6 of block structure for the workman is more convenient to the regulation between first shielding plate 3 and the second shielding plate 6.
The working principle is as follows: when the sidewalk cement brick molding device processed by the pair of raw materials is used, according to the figures 2, 3 and 6, the first shielding plate 3 and the first clamping strip 4 are installed in the first clamping groove 2, the second shielding plate 6 and the second clamping strip 7 are installed in the second clamping groove 5, so that the spacing area inside the brick making box 1 is adjusted, and finally, the prepared cement is poured into the brick making box 1;
according to the figures 1 and 4, a first handle 13 is grasped, a cover plate 12 is placed at the top of a brick making box 1, the cover plate 12 and the brick making box 1 are closed through clamping between a clamping block 16 and a first fixing block 8, grain pressing is carried out on cement bricks with different heights through a grain piece 23 by stretching and retracting of a buffer spring 18 in a fixing groove 17, a fixing plate 15 is opened through rotation of a hinge 14 after pressing is finished, and the cover plate 12 is removed through the first handle 13;
according to fig. 4 and 5, the mounting plate 26 is mounted by clamping the mounting rod 25 into the mounting groove 11 by holding the second handle 27, so as to adjust the height of the brick making box 1, the fastening bolt 24 is rotated and taken out of the mounting hole 21, the grain die 22 is taken down from the bottom of the rubber backing plate 20, and the grain die 22 to be used is fixed at the bottom of the rubber backing plate 20 through the fastening bolt 24;
according to the figures 3 and 7, after cement in the brick making box 1 is solidified into bricks, the brick making box 1 is lifted and rotated by holding the rubber handle 10 through the fixing rod 9, the brick making box 1 is buckled on the ground after the rotation is finished, and the round wood block 31 is forced to knock the bottom of the brick making box 1 by holding the metal handle 29 through the connecting rod 30, so that the cement bricks in the brick making box 1 slide out.
Those not described in detail in this specification are within the skill of the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a pavement cement brick forming device to raw materials reprocessing, includes brickmaking box (1), first handle (13), installation pole (25) and metal handle (29), its characterized in that: first draw-in groove (2) has been seted up at the top of brickmaking box (1), and the top movable mounting of first draw-in groove (2) has first shielding plate (3), the top swing joint of first draw-in groove (2) has first card strip (4), second draw-in groove (5) has been seted up at the top of brickmaking box (1), and the top movable mounting of second draw-in groove (5) has second shielding plate (6), and the top of second shielding plate (6) has seted up third draw-in groove (32), the top swing joint of second draw-in groove (5) has second card strip (7), mounting groove (11) have been seted up at the top of brickmaking box (1), the avris fixedly connected with dead lever (9) of brickmaking box (1), and the inner wall fixed mounting of dead lever (9) has rubber handle (10), the end fixing of brickmaking box (1) has first fixed block (8), the bottom of the first handle (13) is fixedly provided with a cover plate (12), the end part of the cover plate (12) is fixedly provided with a hinge (14), one side of the hinge (14) is fixedly connected with a fixing plate (15), the end part of the fixing plate (15) is fixedly provided with a clamping block (16), the bottom of the cover plate (12) is provided with a fixing groove (17), the inner wall of the fixing groove (17) is fixedly provided with a buffer spring (18), the bottom of the buffer spring (18) is fixedly connected with a top plate (19), the bottom of the top plate (19) is fixedly provided with a rubber backing plate (20), the bottom of the rubber backing plate (20) is movably provided with a grain die (22), the bottom of the grain die (22) is provided with a mounting hole (21), the inner wall of the mounting hole (21) is movably connected with a fastening bolt (24), and the bottom of the grain die (22) is welded with a grain sheet (23), the top fixedly connected with mounting panel (26) of installation pole (25), and the avris fixed mounting of mounting panel (26) has second handle (27), the avris of mounting panel (26) is fixed with second fixed block (28), the tip fixedly connected with connecting rod (30) of metal handle (29), and the tip fixed mounting of connecting rod (30) has circular wooden piece (31).
2. The apparatus of claim 1, wherein the apparatus further comprises: the first shielding plate (3) and the brick making box (1) form a clamping structure through the first clamping groove (2), and the external size of the first shielding plate (3) is completely matched with the internal size of the first clamping groove (2).
3. The apparatus of claim 1, wherein the apparatus further comprises: the number of the first fixing blocks (8) is 4, 2 of the 4 first fixing blocks (8) are 1 group, and the 2 groups of the first fixing blocks (8) are symmetrically arranged by taking the perpendicular bisector of the brick making box (1) as a symmetry axis.
4. The apparatus of claim 1, wherein the apparatus further comprises: the end part of the fixing rod (9) is fixedly connected with the outer wall of the brick making box (1), and the brick making box (1) and the rubber handle (10) form an integrated structure through the fixing rod (9).
5. The apparatus of claim 1, wherein the apparatus further comprises: the end part of the cover plate (12) is fixedly connected with the outer wall of the hinge (14), and the cover plate (12) and the fixing plate (15) form a rotating structure through the hinge (14).
6. The apparatus of claim 1, wherein the apparatus further comprises: the top of the buffer spring (18) is fixedly connected with the bottom of the cover plate (12) through the fixing groove (17), and the cover plate (12) and the top plate (19) form an elastic structure through the buffer spring (18).
7. The apparatus of claim 1, wherein the apparatus further comprises: the quantity of line piece (23) is 5, and 5 equidistant settings in the bottom of line mould (22) of line piece (23) to line mould (22) and line piece (23) are integrated structure.
8. The apparatus of claim 1, wherein the apparatus further comprises: one end of the fastening bolt (24) penetrates through the bottom of the grain die (22) through the mounting hole (21) and extends to the top of the grain die (22), one end of the fastening bolt (24) is in threaded connection with the inner portion of the rubber base plate (20), and the rubber base plate (20) is connected with the grain die (22) through the fastening bolt (24).
9. The apparatus of claim 1, wherein the apparatus further comprises: the number of the installation rods (25) is 4, every 2 of the 4 installation rods (25) are 1 group, the 2 groups of installation rods (25) are symmetrically arranged by taking the perpendicular bisector of the installation plate (26) as a symmetry axis, and the external dimension of the installation rods (25) is completely matched with the internal dimension of the installation groove (11).
10. The apparatus of claim 1, wherein the apparatus further comprises: the inner wall of the third clamping groove (32) is movably connected with the outer wall of the first shielding plate (3), and the first shielding plate (3) and the second shielding plate (6) form a clamping structure through the third clamping groove (32).
CN202011156058.7A 2020-10-26 2020-10-26 Sidewalk cement brick forming device for reprocessing raw materials Active CN112265128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011156058.7A CN112265128B (en) 2020-10-26 2020-10-26 Sidewalk cement brick forming device for reprocessing raw materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011156058.7A CN112265128B (en) 2020-10-26 2020-10-26 Sidewalk cement brick forming device for reprocessing raw materials

Publications (2)

Publication Number Publication Date
CN112265128A CN112265128A (en) 2021-01-26
CN112265128B true CN112265128B (en) 2022-01-04

Family

ID=74341343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011156058.7A Active CN112265128B (en) 2020-10-26 2020-10-26 Sidewalk cement brick forming device for reprocessing raw materials

Country Status (1)

Country Link
CN (1) CN112265128B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201824459U (en) * 2010-10-21 2011-05-11 济源市金通源科技建材有限公司 Automatic green brick separating mould
CN102166786A (en) * 2010-02-25 2011-08-31 湖南湘江管桩有限公司 Process for producing residual slurry brick by using residual slurry of PHC pipe pile
CN206066663U (en) * 2016-08-31 2017-04-05 天津市龙建丰液压机械有限公司 A kind of brickmaking machine mould
CN108608562A (en) * 2018-07-12 2018-10-02 太仓富莱克斯模具科技有限公司 A kind of locking mold core component of brick-making mould
CN108678267A (en) * 2018-07-28 2018-10-19 石狮邦信企业咨询服务有限公司 A kind of spliced wall adobe and preparation method
CN111300588A (en) * 2020-03-09 2020-06-19 河南科技大学 Preparation method of archaized brick and special mould thereof
CN211306702U (en) * 2019-10-12 2020-08-21 海安市恒安建材有限公司 Cement brick manufacturing and forming equipment
CN211389341U (en) * 2019-10-12 2020-09-01 台州绿茵市政园林有限公司 Concrete precast block mould

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102166786A (en) * 2010-02-25 2011-08-31 湖南湘江管桩有限公司 Process for producing residual slurry brick by using residual slurry of PHC pipe pile
CN201824459U (en) * 2010-10-21 2011-05-11 济源市金通源科技建材有限公司 Automatic green brick separating mould
CN206066663U (en) * 2016-08-31 2017-04-05 天津市龙建丰液压机械有限公司 A kind of brickmaking machine mould
CN108608562A (en) * 2018-07-12 2018-10-02 太仓富莱克斯模具科技有限公司 A kind of locking mold core component of brick-making mould
CN108678267A (en) * 2018-07-28 2018-10-19 石狮邦信企业咨询服务有限公司 A kind of spliced wall adobe and preparation method
CN211306702U (en) * 2019-10-12 2020-08-21 海安市恒安建材有限公司 Cement brick manufacturing and forming equipment
CN211389341U (en) * 2019-10-12 2020-09-01 台州绿茵市政园林有限公司 Concrete precast block mould
CN111300588A (en) * 2020-03-09 2020-06-19 河南科技大学 Preparation method of archaized brick and special mould thereof

Also Published As

Publication number Publication date
CN112265128A (en) 2021-01-26

Similar Documents

Publication Publication Date Title
CN106382023B (en) Pseudo-classic architecture and its manufacturing method
CN109797901A (en) A kind of prefabricated framework and prefabricated board
CN103467002B (en) Method for producing resin type artificial stones by using tile polishing residues
CN112265128B (en) Sidewalk cement brick forming device for reprocessing raw materials
CN205818107U (en) A kind of quick process units of non-light tight concrete modularity
CN103979889A (en) Method for making river shore-based root stones by utilizing Yellow River silt and construction dregs
CN206733365U (en) A kind of high ceramic tile cutter of sharpnes of cuts
CN102926526A (en) Red mud smoke exhaustion air flue, production method thereof and special mould
CN107663074A (en) A kind of manufacturing process of regeneration aggregate art brick
CN108002753A (en) A kind of prepacked aggregate architectural concrete stair and preparation method thereof
CN208786539U (en) A kind of building waste grinding device
CN112459342B (en) Brick and tile and preparation process thereof
CN210263952U (en) Special cast-in-place concrete separator for CL
CN102873751B (en) Method for manufacturing exhaust passage
CN206264131U (en) A kind of high tenacity cement industry goods of furniture for display rather than for use production equipment
CN216266654U (en) Semi-dry pressing forming die for artificial granite production
CN106316328A (en) Method for producing autoclaved aerated concrete building blocks
CN206289966U (en) A kind of novel water dropping line construction formwork
CN205600935U (en) Split formula single mode block mold
CN206158168U (en) Slidable formula constructional column aluminum mould board
CN216042221U (en) Novel prefabricated roof flashing component
CN201106283Y (en) Olecranon type water-dripping line construction mould plate for building eaves
CN213647990U (en) Full-automatic brickmaking machine matching mould convenient to install
CN213617349U (en) Flue cap and prefabricated mould of base thereof
CN108756225A (en) Decorate the seamless spiral paper matrix plate construction of fair-faced concrete cylindrical

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right

Effective date of registration: 20211222

Address after: No. a1201-a1206, block a, innovation Plaza, 2007 Pingshan Avenue, Malian street, Pingshan District, Shenzhen, Guangdong 518000

Applicant after: SHENZHEN TIANJIAN PINGSHAN CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: Room 3-102-5, xinwan science and Technology Innovation Park, dajiangdong industrial cluster, Hangzhou, Zhejiang 311200

Applicant before: Hangzhou Dongyuan Technology Co.,Ltd.

TA01 Transfer of patent application right
CP03 Change of name, title or address

Address after: 518000, 2007 Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen City, Guangdong Province, China Innovation Plaza A1201-A1206

Patentee after: Shenzhen Special Zone Construction Engineering Energy Construction Group Co.,Ltd.

Country or region after: China

Address before: No. a1201-a1206, block a, innovation Plaza, 2007 Pingshan Avenue, Malian street, Pingshan District, Shenzhen, Guangdong 518000

Patentee before: SHENZHEN TIANJIAN PINGSHAN CONSTRUCTION ENGINEERING Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address