CN112213685A - 一种用于电能表的ct补偿方法 - Google Patents

一种用于电能表的ct补偿方法 Download PDF

Info

Publication number
CN112213685A
CN112213685A CN202010488725.5A CN202010488725A CN112213685A CN 112213685 A CN112213685 A CN 112213685A CN 202010488725 A CN202010488725 A CN 202010488725A CN 112213685 A CN112213685 A CN 112213685A
Authority
CN
China
Prior art keywords
electric energy
energy meter
compensation method
current
change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010488725.5A
Other languages
English (en)
Inventor
刁瑞朋
郭吉宝
李翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Topscomm Communication Co Ltd
Original Assignee
Qingdao Topscomm Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Topscomm Communication Co Ltd filed Critical Qingdao Topscomm Communication Co Ltd
Priority to CN202010488725.5A priority Critical patent/CN112213685A/zh
Publication of CN112213685A publication Critical patent/CN112213685A/zh
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/17Compensating for errors; Adjusting or regulating means therefor

Abstract

本发明公开了一种应用于电能表的CT补偿方法。本发明的技术方案是在充分考虑电能表计量精度和计量范围需求的基础上,使用一种全新的CT补偿方法。电能表电流采样回路中CT二次侧电流随一次输入侧电流的变化而呈现规律性的变化,通过一定的样本测试对这个规律性变化进行数学建模,利用所建数学模型通过软件补偿的方式抵消CT参数变化对电能表精度的影响,以达到电能表全量程的高精度。

Description

一种用于电能表的CT补偿方法
技术领域
本发明涉及电能表技术领域,具体是一种用于电能表的CT补偿方法。
背景技术
近年来,随着智能电网的发展,对电能表计量精度和计量范围的要求越来越高。影响电能表计量精度和计量范围的因素有很多,CT的特性是一个很关键的因素,对于CT来说,最重要的特性就是比差和角差。受限于成本和技术,目前大多数电能表使用的CT在量程范围内的角差和比差随输入电流的变化而发生变化,这种变化是不希望发生的,为了抵消角差和比差变化对电能表计量精度的影响,故研究了一种用于电能表的CT补偿方法。
发明内容
本发明公开了一种应用于电能表的CT补偿方法。
本发明的技术方案是:电能表电流采样回路中CT二次侧电流随一次输入侧电流的变化而呈现规律性的变化,通过一定的样本测试对这个规律性变化进行数学建模,利用所建数学模型通过软件补偿的方式抵消CT参数变化对电能表精度的影响,以达到电能表全量程的高精度。
所述CT,也叫作电流互感器,主要功能是将输入电能表的电流进行一定变比的缩小。
所述CT参数,主要包括角差和比差。
所述数学建模,依据的数据是CT在电能表上表现出的误差特性,不是对单一CT进行的测试。
附图说明
附图1:CT误差曲线拟合图;
具体实施方式
详述具体实施方式如下:
如附图,根据CT在电能表上表现出的误差特性,通过离散误差数据拟合CT 的误差曲线公式:
y=ax3+bx2+cx+d
其中x是CT一次侧电流值,y代表CT侧一次电流是x时的误差,a、b、c、d是常数。a、b、c、d可根据误差离散点数据通过MATLAB工具或excel拟合生成。
根据生成的误差曲线公式,y的值就是需要通过CT补偿减小的值,从程序实现上说,电能表需要在每个电流值x下减掉y的值,从而实现全量程范围内的CT 补偿。

Claims (1)

1.一种用于电能表的CT补偿方法。其特征在于:a、通过离散误差数据拟合CT的误差曲线公式。b、通过软件补偿的方式抵消CT参数变化对电能表精度的影响。
CN202010488725.5A 2020-06-02 2020-06-02 一种用于电能表的ct补偿方法 Withdrawn CN112213685A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010488725.5A CN112213685A (zh) 2020-06-02 2020-06-02 一种用于电能表的ct补偿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010488725.5A CN112213685A (zh) 2020-06-02 2020-06-02 一种用于电能表的ct补偿方法

Publications (1)

Publication Number Publication Date
CN112213685A true CN112213685A (zh) 2021-01-12

Family

ID=74058521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010488725.5A Withdrawn CN112213685A (zh) 2020-06-02 2020-06-02 一种用于电能表的ct补偿方法

Country Status (1)

Country Link
CN (1) CN112213685A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114994382A (zh) * 2022-07-14 2022-09-02 北京智芯半导体科技有限公司 电能计量的温度补偿方法、装置、电能计量装置及介质

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173966A (zh) * 2007-10-11 2008-05-07 窦峭奇 零压降数字光电计量装置
CN103105525A (zh) * 2011-11-15 2013-05-15 华北电力科学研究院有限责任公司 电流钳的精度补偿方法及利用此电流钳的检测方法及系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173966A (zh) * 2007-10-11 2008-05-07 窦峭奇 零压降数字光电计量装置
CN103105525A (zh) * 2011-11-15 2013-05-15 华北电力科学研究院有限责任公司 电流钳的精度补偿方法及利用此电流钳的检测方法及系统

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114994382A (zh) * 2022-07-14 2022-09-02 北京智芯半导体科技有限公司 电能计量的温度补偿方法、装置、电能计量装置及介质

Similar Documents

Publication Publication Date Title
CN108535679B (zh) 基于插值法的电容式电压互感器谐波电压精准测量方法
CN103424728A (zh) 单点校正电能表增益误差和相位误差的方法
CN106053899B (zh) 一种基准信号发生系统及方法
CN106777836A (zh) 一种变压器直流偏磁仿真模拟方法及装置
CN108363295B (zh) 基于系统辨识的火电机组agc性能考核指标计算与预测方法
CN103336255B (zh) 一种高精度故障指示器的校准方法
CN101915903A (zh) 智能电表的功率校表系统及方法
CN105044639A (zh) 一种电力系统合并单元采集通道的校正方法及系统
CN102052233A (zh) 一种电力系统稳定分析用水轮机调节系统模组
CN104569832A (zh) 一种bms电池剩余容量的修正方法
CN112213685A (zh) 一种用于电能表的ct补偿方法
CN104483650A (zh) 一种电表的校表方法
CN103345546A (zh) 频率轨迹与粒子群算法相结合的调速器参数辨识方法
CN106300338A (zh) 基于轨迹灵敏度的受端电网动态频率安全量化评估方法
CN103529388B (zh) 一种测量发电机组调差率的方法及装置
CN102904518A (zh) 一种同步发电机q轴参数在线辨识方法
CN113029512A (zh) 用于暂冲式跨声速风洞的空气流场模型校正控制方法
CN103144109A (zh) 一种用于附加外部轴的机器人系统分站式精度补偿方法
CN109597016A (zh) 计量装置及其校准方法和电表
CN103383443A (zh) 智能电网用模块化三相仪表检定装置
CN103760498B (zh) 一种电源模块自动校准方法
CN100565220C (zh) 补偿电流互感器二次电流幅值和相位误差的方法
CN103884910A (zh) 一种适用于频率偏移的电力系统相量计算方法
CN102129062A (zh) 电能小信号计量校准方法及装置
Gui et al. A novel linear battery energy storage system (BESS) life loss calculation model for BESS-integrated wind farm in scheduled power tracking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210112