CN112186765B - Modeling method of day-ahead scheduling model of unit combination decision - Google Patents
Modeling method of day-ahead scheduling model of unit combination decision Download PDFInfo
- Publication number
- CN112186765B CN112186765B CN202011110581.6A CN202011110581A CN112186765B CN 112186765 B CN112186765 B CN 112186765B CN 202011110581 A CN202011110581 A CN 202011110581A CN 112186765 B CN112186765 B CN 112186765B
- Authority
- CN
- China
- Prior art keywords
- unit
- output
- formula
- day
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 62
- 230000006870 function Effects 0.000 claims description 53
- 238000005070 sampling Methods 0.000 claims description 21
- 230000009194 climbing Effects 0.000 claims description 19
- 238000000354 decomposition reaction Methods 0.000 claims description 14
- 108010074506 Transfer Factor Proteins 0.000 claims description 6
- 230000001174 ascending effect Effects 0.000 claims description 6
- 238000010248 power generation Methods 0.000 claims description 6
- 239000000446 fuel Substances 0.000 claims description 3
- 230000000452 restraining effect Effects 0.000 claims description 2
- 239000011159 matrix material Substances 0.000 description 29
- 238000003462 Bender reaction Methods 0.000 description 11
- 238000004364 calculation method Methods 0.000 description 9
- 230000009466 transformation Effects 0.000 description 6
- 238000005457 optimization Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000009977 dual effect Effects 0.000 description 4
- 238000004422 calculation algorithm Methods 0.000 description 2
- 238000009795 derivation Methods 0.000 description 2
- 208000011580 syndromic disease Diseases 0.000 description 2
- 230000000052 comparative effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000006386 memory function Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/15—Correlation function computation including computation of convolution operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/16—Matrix or vector computation, e.g. matrix-matrix or matrix-vector multiplication, matrix factorization
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/48—Controlling the sharing of the in-phase component
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/10—Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/40—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation wherein a plurality of decentralised, dispersed or local energy generation technologies are operated simultaneously
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Mathematical Physics (AREA)
- Computational Mathematics (AREA)
- Pure & Applied Mathematics (AREA)
- Power Engineering (AREA)
- Data Mining & Analysis (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Computing Systems (AREA)
- Development Economics (AREA)
- Algebra (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Software Systems (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
Abstract
A modeling method of a day-ahead scheduling model of unit combination decision comprises the following steps: step 1, dividing a unit combination decision into a basic scene and a worst scene; step 2, modeling a day-ahead scheduling model in a basic scene by taking the uncertainty factor power predicted value as a basis, taking the minimum total system operation cost as a target and considering conventional constraint conditions in a deterministic environment; and 3, modeling a day-ahead scheduling model in the worst scene by taking the maximum fluctuation output of the uncertain power output as the basis and considering uncertain constraint conditions. The method divides the unit combination decision into a basic scene and a worst scene for modeling respectively, wherein the basic scene takes uncertainty factor power predicted value as a basis, takes the minimum total operation cost of the system as a target, and considers various conventional constraint conditions of the system in a deterministic environment, thereby ensuring the economy of the scheduling decision.
Description
Technical Field
The invention discloses a modeling method of a unit combination decision day-ahead scheduling model, and relates to the field of power system scheduling.
Background
Wind power and photovoltaic are pollution-free and green renewable energy sources, are widely distributed, have high energy density and are suitable for large-scale development, so that wind power and photovoltaic power generation technologies are highly valued by countries in the world. However, because the output of the power grid has the characteristics of randomness and volatility, the large-scale access to the power grid brings great challenges to the traditional scheduling method, and therefore, the research on the day-ahead scheduling method of the power system under the large-scale access of various new energy resources has important theoretical value and practical significance.
At present, a plurality of experts and scholars research the day-ahead scheduling problem of an electric power system under new energy access from different angles, but generally only a single uncertainty variable is considered, however, an actual electric power system comprises multiple uncertainty factors such as wind power output, photovoltaic output and load prediction error, and the existing day-ahead scheduling only considering single uncertainty is obviously difficult to guarantee the decision effectiveness and influence the economical efficiency of system operation. Therefore, considering the influence of multiple uncertainty factors in the scheduling problem has become a hot point for the research of experts in recent years.
Disclosure of Invention
Aiming at the defects of the existing method, the invention provides an improved robust scheduling method which comprehensively considers uncertainty and correlation of load, wind power and photovoltaic.
The technical scheme adopted by the invention is as follows:
a power system day-ahead robust scheduling method considering multiple uncertainties and correlations comprises the following steps:
1) the method comprises the following steps of (1) taking multiple random factors into consideration for day-ahead robust scheduling modeling;
2) solving a worst scenario;
3) solving the model by a Benders decomposition method;
in the step 1), firstly, the day-ahead robust scheduling modeling of multiple random factors is considered; then carrying out day-ahead scheduling modeling in a basic scene; then carrying out day-ahead scheduling modeling in an uncertain scene;
in the step 2), firstly, probability density function modeling of random factors is carried out, then samples are sampled, and then orthogonal transformation matrix derivation is carried out; then, solving a worst scene;
in the step 3), modeling of a UC main problem is firstly carried out, and then modeling of a safety sub-problem in a basic scene is carried out; and then modeling a safety sub-problem considering uncertainty.
In the step 1), multiple random factors comprise wind power, photovoltaic and load prediction error factors.
In the step 1), the unit combination decision is divided into a basic scene and a worst scene for modeling respectively.
The basic scenario is based on the uncertainty factor power predicted value, the minimum total operation cost of the system is taken as a target, and various conventional constraint conditions of the system in a deterministic environment are considered.
The worst scenario is based on the maximum fluctuation output of the uncertain power output, and the uncertain constraint condition is considered.
In step 2), the worst scene is sought, and then robustness check is performed by directly using the worst scene.
Firstly, probability density functions of wind power, photovoltaic and load are respectively constructed by utilizing nonparametric kernel density estimation, then, a Latin hypercube sampling is utilized to generate samples, finally, a Cholesky decomposition method is adopted to convert the random samples with correlation into mutually independent random samples, and the worst scene is determined on the basis of the mutually independent random samples.
If the number of load samples based on the historical data is n, constructing a probability density model of the load based on a non-parametric kernel density estimation method as follows:
in the formula, phi (P)d) Is a probability density function of the load; k (P)dL) is a kernel function; pdmIs the m-th sample value in the load sample, and l is the bandwidth.
Selecting a Gaussian function as a kernel function of the load probability density model, and solving the bandwidth l to obtain a probability density function phi (P) of the system loadd)。
Calculating the probability density function phi (P) of the wind power outputw) And a photovoltaic output probability density function phi (P)v). As shown in formula (2) and formula (3).
In the formula, phi (P)w) Is a probability density function of the load; k (P)wL) is a kernel function; pwmAnd l is the bandwidth, wherein the m is the sample value in the wind power output sample.
In the formula, phi (P)v) Is a probability density function of the load; k (P)vL) is a kernel function; pvmAnd l is the bandwidth, and is the mth sample value in the photovoltaic output sample.
Latin hypercube sampling is adopted for hierarchical sampling.
Let the sampling scale be N, Ym=Fm(Xm) Denotes the m-th random variable XmThe specific sampling process of the probability density function of (1) is as follows: will be interval [0,1]The average is divided into N equal parts, the middle value of each subinterval is selected, and the sampling value is obtained through the inverse function of the middle valueAnd obtaining a sample matrix of all the random variables after sampling of all the random variables is completed.
The method comprises the steps of describing the correlation among loads, wind power and photovoltaic power generation by utilizing a correlation coefficient matrix, and setting a sample matrix obtained by Latin hypercube sampling as W ═ W1,w2,…wl]TThe matrix of correlation coefficients is Cw:
The elements of the matrix can be obtained by equation (5):
in the formula:andare respectively an input variable wiAnd wjStandard deviation of (d); cov(wi,wj) As an input variable wiAnd wjThe covariance of (a).
Correlation coefficient matrix CwIf it is a positive definite matrix, Cholesky decomposition may be performed on the coefficient matrix:
Cw=GGT (6)
in the formula: g is a lower triangular matrix, in which the elements can be found by equation (7):
assuming an orthogonal matrix B, the input random variable W with correlation can be converted into an uncorrelated random variable Y:
Y=BW (8)
correlation coefficient due to uncorrelated random variables YMatrix CYIs an identity matrix I, and thus:
CY=ρ(Y,YT)=ρ(BW,WTBT)=Bρ(W,WT)BT=BCWBT=I (9)
further, it can be obtained from the formula (6):
CY=BCWBT=BGGTBT=(BG)(BG)T=I (10)
derived from the above equation:
B=G-1 (11)
on the premise that the input uncertainty W having correlation is known, it can be changed to an uncorrelated random variable Y by orthogonal transformation matrix.
And converting the load, wind power and photovoltaic output matrixes with correlation into independent matrixes through the obtained orthogonal transformation matrix, eliminating the correlation among the independent matrixes, and further solving the worst scene through a worst scene linear superposition method.
The method comprises the following steps of when modeling of a day-ahead scheduling model of unit combination decision is carried out:
and 3, modeling a day-ahead scheduling model in the worst scene by taking the maximum fluctuation output of the uncertain power output as the basis and considering the uncertain constraint conditions.
When modeling a day-ahead scheduling model in a basic scene, an objective function and constraint conditions of the model are as follows:
1) determining an objective function containing fuel cost and unit start-stop cost of a conventional unit:
wherein:
in the formula:the active output of the unit i at the moment t is represented;representing the state of the unit i at the time t;for the cost of starting up and stopping the machine, ai、bi、ciParameters of a generating cost function of the unit;
2) the constraints contained in the model are established as follows:
(1) system power balance constraint, under the condition of not counting network loss:
in the formula:the predicted values of the wind power output, the load power and the photovoltaic power generation output at the moment t are obtained;
(2) and (3) output constraint of a conventional unit:
in the formula: pi minAnd Pi maxRespectively representing the maximum and minimum active output of the thermal power generating unit i;
(3) unit ramp rate constraint
Ascending and climbing rate constraint
Descent and climb rate constraint
In the formula: URi,DRiLimiting the climbing power of the conventional unit;
(4) conventional unit start-stop time constraints
In the formula:for the on-off time, T, of the unit i at time Ton,iToff,iMinimum boot and downtime constraints;
(5) network security constraints
In the formula:for maximum current constraints of the line, SFl,mA node power transfer factor; u (m), D (m), W (m) and V (m) are respectively the bus bar sets where the conventional unit, the load, the wind power and the photovoltaic are located.
And checking the day-ahead plan by using system constraint conditions in an uncertain environment.
When the day-ahead scheduling model under the worst scene is modeled, the constraint conditions in the established model are as follows:
(1) system power balance constraint, under the condition of not counting network loss:
in the formula:andactual values of wind power output, photovoltaic output and load under uncertain conditions;
(2) and (3) output constraint of a conventional unit:
in the formula:the actual output of the conventional unit under the uncertain condition is obtained;
(3) and (3) restraining the climbing rate of the unit:
ascending and climbing rate constraint
Descending and climbing rate constraint
(4) Rotating reserve capacity constraint:
in the formula:the rotary power machine set is used for standby in positive and negative rotation of a conventional machine set;
(5) network security constraints
In the formula:for maximum current constraints of the line, SFl,mIs a node power transfer factor; u (m), D (m), W (m) and V (m) are respectively the bus bar sets where the conventional unit, the load, the wind power and the photovoltaic are located.
The above uncertainties include uncertainties that account for wind power, photovoltaic, and load prediction errors.
Solving the model by adopting a Benders decomposition method; decomposing an original problem into a main problem and two sub-problems, wherein the main problem is a UC decision main problem in a basic scene, and the two sub-problems are respectively a network security check sub-problem in the basic scene and a robust check sub-problem in a worst scene;
the method comprises the following steps: firstly, modeling a UC main problem; then, modeling a safety subproblem in a basic scene; then, modeling a safety subproblem considering uncertainty;
the method comprises the following specific steps:
1): UC Main problem modeling
The UC major problem includes the target function (1) and the constraint equations (3) through (9), as well as all the Benders cuts generated.
2): safety sub-problem modeling under basic scene
The network security syndrome problem under the basic scene is shown as formula (27), and the network security of the scheduling scheme is ensured by checking the load flow out-of-limit condition of the UC main problem.
vl,t≥0 (27)
In the formula: lambda1,l,t,λ2,l,tIs a dual variable of the network security constraint; v. ofl,tIs the relaxation variable.
Introducing a relaxation variable v into a subprobleml,tThe role of the method is to temporarily relieve the network security constraint by using a relaxation variable when the constraint condition cannot be met so as to ensure that the subproblem is always solved. V obtained if final optimizationl,tIf the maximum value is greater than the given safety threshold value, the optimal unit combination scheme obtained by the main problem cannot meet the network safety constraint, and therefore the Benders cut as follows needs to be returned:
3): uncertainty-aware safety sub-problem modeling
The safety check model under the uncertain scene is shown as a formula (29), and the safety check model is checked in the worst sceneAndwhether the safety constraint can be met.
S.t.
0≤v1,lt,v2t,v3t (29)
In the formula:andthe actual values of the unit output, the wind power output, the photovoltaic output and the load under the worst scene are obtained. Lambda1,it,λ2,it,μ1,it,μ2,it,η1,it,η2,itIs a dual variable of a rotation standby constraint, a unit capacity constraint and a climbing constraint.
And if the safety constraint cannot be met, returning to the Benders cut formula (30) to the main problem, wherein the main problem serves as a constraint condition, so that the unit combination and output scheme can be adaptively adjusted on the worst scene to meet the network safety constraint and the power balance.
Through the steps, the power system day-ahead robust scheduling considering multiple uncertainties and correlations is completed.
The invention has the following technical effects:
1) compared with the traditional method, on one hand, the method can effectively account for multiple uncertain factors and the correlation thereof, thereby improving the economical efficiency of system operation while ensuring the robustness of a scheduling decision scheme; on the other hand, the improved robust scheduling model effectively avoids solving the unit combination problem in a massive scene, and has higher solving efficiency.
2) The robust optimization method is improved by introducing a Cholesky decomposition method, so that the worst scene is directly determined without multi-scene load flow calculation, and the applicability and the solving efficiency of the robust optimization model are effectively improved.
Drawings
FIG. 1 is a block diagram of the overall modeling of the present invention;
FIG. 2 is a flow chart of a worst case scenario extraction of the present invention;
FIG. 3 is a block diagram of the overall algorithm concept of the present invention;
FIG. 4 illustrates wind and photovoltaic active power output curves according to an embodiment of the present invention;
FIG. 5 is a worst case comparison table at time 1;
FIG. 6 is a table of comparison results of scheduling costs from day ahead;
fig. 7 is a table comparing the calculated efficiencies.
Detailed Description
A power system day-ahead robust scheduling method considering multiple uncertainties and correlations comprises the following steps:
step 1: day-ahead scheduling modeling in basic scenarios
The method is based on a robust optimization thought, and a day-ahead scheduling model considering wind power, photovoltaic and load prediction error uncertainty is constructed. The method divides the unit combination decision into a basic scene and a worst scene for respectively modeling, wherein the basic scene takes uncertainty factor power prediction value as a basis, takes the minimum total operation cost of the system as a target, and simultaneously considers various conventional constraint conditions of the system in a deterministic environment, thereby ensuring the economy of the scheduling decision; in the worst scene, the maximum fluctuation output of the uncertain power output is taken as the basis, and the uncertain constraint condition is considered, so that the robustness of the decision scheme in the basic scene in the uncertain environment is ensured. The model block diagram is shown in fig. 1.
Step 1.1: day-ahead scheduling modeling in a basic scenario: including objective functions and constraints
1) Determining an objective function containing fuel cost and unit start-stop cost of a conventional unit:
wherein:
in the formula:the active output of the unit i at the moment t is represented;representing the state of the unit i at the time t;for the cost of starting up and stopping the machine, ai、bi、ciIs a parameter of the generating cost function of the unit.
2) Constraints contained in the model are established, such as:
(1) system power balance constraint, under the condition of not counting network loss:
in the formula:and the predicted values of the wind power output and the load power at the moment t and the photovoltaic power generation output are obtained.
(2) And (3) output constraint of a conventional unit:
in the formula: pi minAnd Pi maxAnd respectively representing the maximum and minimum active output of the thermal power generating unit i.
(3) Ramp rate restraint for unit
Ascending and climbing rate constraint
Descending and climbing rate constraint
In the formula: URi,DRiAnd limiting the climbing power of the conventional unit.
(4) Conventional unit start-stop time constraints
In the formula:for the on-off time, T, of unit i at time Ton,iToff,iAre minimum boot and downtime constraints.
(5) Network security constraints
In the formula:for maximum current constraints of the line, SFl,mIs the node power transfer factor. U (m), D (m), W (m) and V (m) are respectively the bus bar sets where the conventional unit, the load, the wind power and the photovoltaic are located.
Step 1.2: day-ahead scheduling modeling in uncertain scenes
The day-ahead unit combination and the unit output plan obtained in the basic scene should ensure the robustness of the system in the uncertain environment, so the day-ahead plan needs to be checked by using the system constraint conditions in the uncertain environment. It should be noted that in the actual calculation, the worst scenario may be first sought, and then the worst scenario may be directly utilized for robustness check.
Establishing constraints in the model:
(1) system power balance constraint, under the condition of not counting network loss:
in the formula:andthe actual values of wind power output, photovoltaic output and load under uncertain conditions.
(2) The output constraint of the conventional unit is as follows:
in the formula:the actual output of the conventional unit under the uncertain condition is realized.
(3) Unit ramp rate constraint
Ascending and climbing rate constraint
Descending and climbing rate constraint
(4) Rotational reserve capacity constraint
In the formula:the device is used for the positive and negative rotation of the conventional unit for standby.
(5) Network security constraints
In the formula:for maximum current constraints of the line, SFl,mIs the node power transfer factor. U (m), D (m), W (m) and V (m) are respectively the bus bar sets where the conventional unit, the load, the wind power and the photovoltaic are located.
Step 2: worst scenario solution
As can be seen from step 1, in the actual calculation, the worst scenario may be first sought, and then the worst scenario may be directly used for robustness check. Therefore, the invention provides a method for rapidly calculating the worst scene suitable for multiple correlation randomness factors based on the Cholesky decomposition theory. Firstly, probability density functions of wind power, photovoltaic and load are respectively constructed by utilizing nonparametric kernel density estimation, then, a Latin hypercube sampling is utilized to generate samples, finally, a Cholesky decomposition method is adopted to convert the random samples with correlation into mutually independent random samples, and the worst scene is determined on the basis of the mutually independent random samples.
Step 2.1: probability density function modeling of random factors
If the number of load samples based on the historical data is n, constructing a probability density model of the load based on a non-parametric kernel density estimation method as follows:
in the formula, phi (P)d) Is a probability density function of the load; k (P)dL) is a kernel function; pdmIs the m-th sample value in the load sample, and l is the bandwidth.
The invention selects a Gaussian function as a kernel function of the load probability density model and solves the bandwidth l to obtain the probability density function phi (P) of the system loadd)。
The probability density function phi (P) of the wind power output can be obtained by the same methodw) And a photovoltaic output probability density function phi (P)v). As shown in formula (17) and formula (18).
In the formula, phi (P)w) Is a probability density function of the load; k (P)wL) is a kernel function; p iswmAnd l is the bandwidth, wherein the m is the sample value in the wind power output sample.
In the formula, phi (P)v) Is a probability density function of the load; k (P)vL) is a kernel function; pvmAnd l is the bandwidth, wherein the value is the mth sample value in the photovoltaic output sample.
Step 2.2: sample sampling
Latin hypercube sampling is a hierarchical sampling method which has a sample memory function and can avoid the sampling of already appeared samples. Let the sampling scale be N, Ym=Fm(Xm) Represents the m-th random variable XmIs calculated as a function of the probability density of (c). The specific sampling process is as follows: will be interval [0,1]Equally dividing the sampling value into N equal parts, selecting the middle value of each subinterval, and obtaining the sampling value through the inverse function of the middle valueAnd obtaining a sample matrix of all the random variables after sampling of all the random variables is completed.
Step 2.3: orthogonal transformation matrix derivation
The method comprises the steps of describing the correlation among loads, wind power and photovoltaic power generation by utilizing a correlation coefficient matrix, and setting a sample matrix obtained by Latin hypercube sampling as W ═ W1,w2,…wl]TThe matrix of correlation coefficients is Cw:
The elements of the matrix can be obtained by equation (20):
in the formula:andare respectively an input variable wiAnd wjStandard deviation of (d); cov(wi,wj) As an input variable wiAnd wjThe covariance of (a).
As can be seen by definition, the correlation coefficient matrix C of the present inventionwIf it is a positive definite matrix, Cholesky decomposition may be performed on the coefficient matrix:
Cw=GGT (6)
in the formula: g is a lower triangular matrix in which the elements can be found by equation (22).
Assuming an orthogonal matrix B, the input random variable W with correlation can be converted into an uncorrelated random variable Y:
Y=BW (8)
matrix C of correlation coefficients due to uncorrelated random variables YYIs an identity matrix I, and thus:
CY=ρ(Y,YT)=ρ(BW,WTBT)=Bρ(W,WT)BT=BCWBT=I (9)
further, it can be obtained from the formula (21):
CY=BCWBT=BGGTBT=(BG)(BG)T=I (10)
derived from the above equation:
B=G-1 (11)
on the premise that the input uncertainty W having correlation is known, it can be changed to an uncorrelated random variable Y by orthogonal transformation matrix.
Step 2.4: solving a worst scene;
and (3) converting the load, wind power and photovoltaic output matrixes with correlation into independent matrixes through the orthogonal transformation matrix obtained in the step (2.3), eliminating the correlation among the independent matrixes, and further obtaining the worst scene through a method of linear superposition of the worst scene. A worst case scenario retrieval flow diagram is shown in fig. 2.
And step 3: model solution
The invention provides a multistage decomposition algorithm based on Benders decomposition to solve a model.
The traditional Benders decomposition method generally decomposes an original problem into two primary and secondary problems, and decomposes the original problem into a main problem and two sub-problems in consideration of the particularity of the model of the invention, wherein the main problem is a main UC decision problem under a basic scene, and the two sub-problems are respectively as follows: the network safety checking sub-problem under the basic scene and the robust checking sub-problem under the worst scene. The whole frame is shown in figure 1.
Step 3.1: UC Main problem modeling
The main UC problem includes the objective function (1) and constraint equations (3-9) and all the generated Benders cuts.
Step 3.2: safety sub-problem modeling under basic scene
The network security syndrome problem under the basic scene is shown as formula (27), and the network security of the scheduling scheme is ensured by checking the load flow out-of-limit condition of the UC main problem.
vl,t≥0 (27)
In the formula: lambda [ alpha ]1,l,t,λ2,l,tIs a dual variable of the network security constraint; v. ofl,tIs the relaxation variable.
Introducing a relaxation variable v into a subprobleml,tThe role of the method is to temporarily relieve the network security constraint by using a relaxation variable when the constraint condition cannot be met so as to ensure that the subproblem is always solved. V obtained if final optimizationl,tIf the maximum value is greater than the given safety threshold value, the optimal unit combination scheme obtained by the main problem cannot meet the network safety constraint, and therefore the Benders cut as follows needs to be returned:
step 3.3: uncertainty-aware safety sub-problem modeling
The safety check model under the uncertain scene is shown as a formula (29), and the safety check model is checked in the worst sceneAndwhether the safety constraint can be met.
S.t.
0≤v1,lt,v2t,v3t (29)
In the formula:andthe actual values of the unit output, the wind power output, the photovoltaic output and the load under the worst scene are obtained. Lambda [ alpha ]1,it,λ2,it,μ1,it,μ2,it,η1,it,η2,itIs a dual variable of a rotation standby constraint, a unit capacity constraint and a climbing constraint.
And if the safety constraint cannot be met, returning to the Benders cut formula (30) to the main problem, wherein the main problem serves as a constraint condition, so that the unit combination and output scheme can be adaptively adjusted on the worst scene to meet the network safety constraint and the power balance.
And 4, step 4: establishing an operation mode;
in order to comparatively analyze the effectiveness and the correctness of the scheduling model established by the invention, the following two operation modes are established:
mode 1: robust day-ahead scheduling that accounts for multiple uncertainties but does not take correlation into account.
Mode 2: a robust day-ahead scheduling model that accounts for multiple uncertainties and their correlations.
In particular, the invention verifies the correctness of the proposed model with a modified IEEE-118 node system. The system comprises 54 conventional thermal power generating units, 3 wind power plants and 1 photovoltaic power station. The rated power of the wind power plant is respectively 100MW, 200MW and 250MW, and the wind power plant is positioned at nodes No. 5, 9 and 48; the capacity of the photovoltaic power station is 300MW and is positioned at the No. 20 node. The active power output curve of wind power and photovoltaic is shown in fig. 5. The positive rotation standby requirement of a conventional unit in the system is 8% of the maximum load of the system, and the negative rotation standby requirement is 2% of the minimum load of the system. The threshold values of the problem check values of the safety check sub-problems are all 10-3MWh. And adopting Latin hypercube sampling to sample the load, the wind power and the photovoltaic output 100 times per hour, and totaling 2400 groups of samples. The related calculations are all completed on an Intel core i5-4460 processor 3.20GHz, 8G memory computer, and Matlab and Cplex 12.5 are adopted to program and solve the example.
According to the worst scenario solution method of the present invention, the worst scenario comparison result of solving the uncertainty factors of mode 1 and mode 2 is shown in fig. 5.
As can be seen from fig. 5, if the probabilistic correlation between uncertainty factors is not considered, the worst scenario obtained by simple linear superposition is conservative, which will affect the economy of the future scheduling decision, and it can be seen from the precise calculation of the method herein that the worst scenario is actually impossible to occur due to the existence of the correlation between uncertainty factors.
The day-ahead scheduling schemes in mode 1 and mode 2 are calculated separately, and the results are shown in fig. 6.
As can be seen from fig. 6, compared to the conventional day-ahead scheduling method without considering the probability correlation of multiple uncertainty factors, the method proposed in the present invention reduces the day-ahead scheduling cost of the present example by about 38650 $. The method has the advantages that the method fully considers the probability correlation among wind power, photovoltaic and loads, and effectively avoids extreme scenes which are not possible to occur in the robustness checking process, so that the operation cost of the system is reduced while the robustness of the system is ensured by the day-ahead scheduling decision.
In order to compare the advantages of the method of the invention compared with the traditional method, the standard Benders decomposition method and the method of the invention are respectively adopted to simulate the same example, and the calculation efficiency is compared. The comparative results are shown in FIG. 7.
As can be seen from fig. 7: compared with the calculation efficiency, the method provided by the invention is remarkably improved, and the worst scene solving method based on Cholesky decomposition effectively avoids solving problems of unit combination and load flow calculation under a large number of scenes, so that the calculation efficiency is improved by 411.5%.
The present invention has been described in terms of the preferred embodiments, but the above embodiments are not intended to limit the present invention in any way, and all technical solutions obtained by substituting equivalents or equivalent variations fall within the scope of the technical solutions of the present invention.
Claims (8)
1. A modeling method of a day-ahead scheduling model of unit combination decision is characterized by comprising the following steps:
step 1, dividing a unit combination decision into a basic scene and a worst scene;
step 2, modeling a day-ahead scheduling model in a basic scene by taking the uncertainty factor power predicted value as a basis, taking the minimum total system operation cost as a target and considering conventional constraint conditions in a deterministic environment;
step 3, modeling a day-ahead scheduling model in a worst scene by taking the maximum fluctuation output of the uncertain power output as a basis and considering uncertain constraint conditions;
when modeling a day-ahead scheduling model in a basic scene, an objective function and constraint conditions of the model are as follows:
1) determining an objective function containing fuel cost and unit start-stop cost of a conventional unit:
wherein:
in the formula:the active output of the unit i at the moment t is represented;representing the state of the unit i at the time t;for the cost of starting up and stopping the machine, ai、bi、ciParameters of a generating cost function of the unit;
2) the constraints contained in the model are established as follows:
(1) system power balance constraint, under the condition of not counting network loss:
in the formula:the active output of the unit i at the moment t is represented;the predicted values of the wind power output and the load power at the moment t and the photovoltaic power generation output are obtained;
(2) and (3) output constraint of a conventional unit:
in the formula: pi minAnd Pi maxRespectively representing the minimum active output and the maximum active output of the thermal power generating unit i;
(3) unit ramp rate constraint
Ascending and climbing rate constraint
Descending and climbing rate constraint
In the formula: pi minAnd Pi maxRespectively representing the minimum active output and the maximum active output of the thermal power generating unit i; URi,DRiLimiting the climbing power of the conventional unit;the active output of the unit i at the moment t is represented;
(4) conventional unit start-stop time constraints
In the formula:for the on-off time, T, of the unit i at time Ton,iToff,iFor minimum boot and shutdown timeBundling;
(5) network security constraints
2. The modeling method for the day-ahead scheduling model of the unit combination decision as claimed in claim 1, wherein the day-ahead plan is checked using system constraints under an uncertainty environment.
3. The modeling method of the day-ahead scheduling model for unit combination decision according to claim 2, wherein when modeling the day-ahead scheduling model in the worst scenario, the constraint conditions in the established model are:
(1) system power balance constraint, under the condition of not counting network loss:
in the formula:andthe actual values of the wind power output, the photovoltaic output and the load under the uncertain condition are obtained;
(2) and (3) output constraint of a conventional unit:
in the formula:the actual output of the conventional unit under the uncertain condition is obtained; pi minAnd Pi maxRespectively representing the minimum active output and the maximum active output of the thermal power generating unit i;
(3) and (3) restraining the climbing rate of the unit:
ascending and climbing rate constraint
Descending and climbing rate constraint
In the formula, Pi minAnd Pi maxRespectively representing the minimum active output and the maximum active output of the thermal power generating unit i; URi,DRiLimiting the climbing power of the conventional unit;
(4) rotating reserve capacity constraint:
in the formula:the rotary power generating set is used for standby in positive and negative rotation of a conventional set;
(5) network security constraints
In the formula:for maximum current constraints of the line, SFl,mIs a node power transfer factor; u (m), D (m), W (m) and V (m) are bus sets where a conventional unit, a load, wind power and photovoltaic are located respectively;andthe actual values of the wind power output, the photovoltaic output and the load under the uncertain conditions are obtained.
4. The method of modeling a day-ahead scheduling model for a unit portfolio decision of claim 1, wherein the uncertainty comprises uncertainty considering wind power, photovoltaic, and load prediction errors.
5. The modeling method of the day-ahead scheduling model of unit combination decision according to claim 4, characterized in that when solving the worst scenario, firstly, nonparametric kernel density estimation is used to respectively construct probability density functions of wind power, photovoltaic and load, then, Latin hypercube sampling is used to generate samples, and finally, Cholesky decomposition method is used to convert the random samples with correlation into mutually independent random samples, and the worst scenario is determined based on the random samples.
6. The modeling method of the unit combination decision day-ahead scheduling model according to claim 5, wherein if it is known that the number of load samples based on the historical data is n, the probability density model of the load constructed based on the non-parametric kernel density estimation method is:
in the formula, phi (P)d) Is a probability density function of the load; k (P)dL) is a kernel function; pdmIs the m-th sample value in the load sample, and l is the bandwidth.
7. The modeling method of the day-ahead scheduling model of the unit combination decision as claimed in claim 6, wherein: selecting a Gaussian function as a kernel function of the load probability density model, and solving the bandwidth l to obtain a probability density function phi (P) of the system loadd)。
8. The modeling method of the day-ahead scheduling model of the unit combination decision as claimed in claim 5 or 6, wherein: calculating the probability density function phi (P) of the wind power outputw) And a photovoltaic output probability density function phi (P)v) As shown in formula (2) and formula (3):
in the formula, phi (P)w) Is a probability density function of the load; k (P)wL) is a kernel function; p iswmThe m-th sample value in the wind power output sample is obtained, and l is the bandwidth;
in the formula, phi (P)v) Is a probability density function of the load; k (P)vL) is a kernel function; p isvmAnd l is the bandwidth, wherein the value is the mth sample value in the photovoltaic output sample.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011110581.6A CN112186765B (en) | 2017-11-30 | 2017-11-30 | Modeling method of day-ahead scheduling model of unit combination decision |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711238480.5A CN107947164B (en) | 2017-11-30 | 2017-11-30 | Electric power system day-ahead robust scheduling method considering multiple uncertainties and correlations |
CN202011110581.6A CN112186765B (en) | 2017-11-30 | 2017-11-30 | Modeling method of day-ahead scheduling model of unit combination decision |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711238480.5A Division CN107947164B (en) | 2017-11-30 | 2017-11-30 | Electric power system day-ahead robust scheduling method considering multiple uncertainties and correlations |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112186765A CN112186765A (en) | 2021-01-05 |
CN112186765B true CN112186765B (en) | 2022-06-17 |
Family
ID=61947028
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711238480.5A Active CN107947164B (en) | 2017-11-30 | 2017-11-30 | Electric power system day-ahead robust scheduling method considering multiple uncertainties and correlations |
CN202011110581.6A Active CN112186765B (en) | 2017-11-30 | 2017-11-30 | Modeling method of day-ahead scheduling model of unit combination decision |
CN202011112195.0A Active CN112186766B (en) | 2017-11-30 | 2017-11-30 | Multistage decomposition method based on Benders decomposition |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711238480.5A Active CN107947164B (en) | 2017-11-30 | 2017-11-30 | Electric power system day-ahead robust scheduling method considering multiple uncertainties and correlations |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011112195.0A Active CN112186766B (en) | 2017-11-30 | 2017-11-30 | Multistage decomposition method based on Benders decomposition |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN107947164B (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108667010B (en) * | 2018-05-04 | 2019-08-16 | 清华大学 | A kind of power distribution network economic load dispatching method based on distribution robust optimization |
CN109831381B (en) * | 2018-12-15 | 2020-07-10 | 清华大学 | Robust routing optimization method for power communication network considering information physical coupling |
CN109785183A (en) * | 2018-12-26 | 2019-05-21 | 国网山西省电力公司电力科学研究院 | A kind of consideration wind-powered electricity generation and the probabilistic Robust Scheduling method of load prediction |
CN109657385A (en) * | 2018-12-26 | 2019-04-19 | 国网江苏省电力有限公司 | A kind of emulated computation method generated suitable for transmission line of electricity stochastic regime |
CN110535120A (en) * | 2019-08-16 | 2019-12-03 | 华南理工大学 | Consider the interconnection system distributed Optimization Scheduling of electric-gas of air pollution diffusion |
CN110826644B (en) * | 2019-11-21 | 2020-09-29 | 国网江苏省电力有限公司南通供电分公司 | Distributed power supply time sequence joint output typical scene generation method based on Copula function |
CN111932048B (en) * | 2020-04-16 | 2022-08-30 | 贵州电网有限责任公司 | Two-stage monthly transaction security check method based on extreme scene |
CN111711184B (en) * | 2020-05-25 | 2022-02-11 | 国网青海省电力公司 | Power system robust economic dispatching method based on worst scenario identification |
CN112310959A (en) * | 2020-10-13 | 2021-02-02 | 国网湖北省电力有限公司宜昌供电公司 | Power distribution network low voltage comprehensive treatment method considering uncertainty factors and correlation thereof |
CN112668751B (en) * | 2020-11-26 | 2022-06-17 | 广西大学 | Method and device for establishing unit optimization scheduling model |
CN112989536A (en) * | 2021-03-11 | 2021-06-18 | 南方电网科学研究院有限责任公司 | Scene decomposition-based optimal scheduling method for electric multi-energy flow system |
CN113642792A (en) * | 2021-08-12 | 2021-11-12 | 中国南方电网有限责任公司 | Medium-and-long-term unit combination accurate modeling technical method comprehensively considering complex large power grid operation constraint conditions |
CN114862130B (en) * | 2022-04-14 | 2023-03-24 | 山东大学 | Multi-scene random unit combination method and system based on double-layer decomposition algorithm |
CN114759602B (en) * | 2022-04-24 | 2024-04-05 | 国网山东省电力公司潍坊供电公司 | Power distribution network acceptance assessment method considering photovoltaic extreme scenes |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014071862A1 (en) * | 2012-11-09 | 2014-05-15 | 天津大学 | Security constraint economic dispatching method based on security domains |
CN104485665A (en) * | 2014-12-17 | 2015-04-01 | 河海大学 | Dynamic probabilistic power flow (PPF) calculating method considering wind speed predication error temporal-spatial coherence |
CN104809327A (en) * | 2014-09-02 | 2015-07-29 | 长沙理工大学 | New energy contained electric power dispatching moment uncertainty distribution robustness optimization method |
CN106953354A (en) * | 2017-03-10 | 2017-07-14 | 国网山东省电力公司经济技术研究院 | Consider the method for Unit Commitment containing wind-powered electricity generation of voltage support |
CN107039977A (en) * | 2017-06-03 | 2017-08-11 | 广东博慎智库能源科技发展有限公司 | With the uncertain collection construction method of the power system Robust Scheduling of the minimum target of integrated cost |
CN107239863A (en) * | 2017-04-12 | 2017-10-10 | 广东电网有限责任公司电力调度控制中心 | The robust Unit Combination method of power system security constraints |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8606420B2 (en) * | 2011-07-15 | 2013-12-10 | International Business Machines Corporation | Solving large-scale security-constrained economic dispatch problem in real-time |
CN102684224B (en) * | 2012-05-25 | 2014-04-16 | 浙江大学 | Unit combination method for resolving and considering wind power volatility |
CN102832614B (en) * | 2012-08-03 | 2014-12-10 | 国电南瑞科技股份有限公司 | Robust optimizing method for power generation plan under uncertain environment |
KR20150037357A (en) * | 2013-09-30 | 2015-04-08 | 한국전력공사 | System for controlling flexible ac transmission system |
CN104716670B (en) * | 2015-04-01 | 2017-03-29 | 国家电网公司 | Unit Combination method under grid-connected based on Network Security Constraints |
CN106655190A (en) * | 2016-10-19 | 2017-05-10 | 云南电网有限责任公司电力科学研究院 | Method for solving P-OPF (Probabilistic-Optimal Power Flow) of wind power stations |
CN107038292B (en) * | 2017-04-01 | 2020-05-26 | 三峡大学 | Multi-wind-field output correlation modeling method based on self-adaptive multivariate nonparametric kernel density estimation |
CN107330568A (en) * | 2017-08-16 | 2017-11-07 | 东南大学 | Energy storage, distributed power source and the power distribution network coordinated planning method decoupled based on Benders |
-
2017
- 2017-11-30 CN CN201711238480.5A patent/CN107947164B/en active Active
- 2017-11-30 CN CN202011110581.6A patent/CN112186765B/en active Active
- 2017-11-30 CN CN202011112195.0A patent/CN112186766B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014071862A1 (en) * | 2012-11-09 | 2014-05-15 | 天津大学 | Security constraint economic dispatching method based on security domains |
CN104809327A (en) * | 2014-09-02 | 2015-07-29 | 长沙理工大学 | New energy contained electric power dispatching moment uncertainty distribution robustness optimization method |
CN104485665A (en) * | 2014-12-17 | 2015-04-01 | 河海大学 | Dynamic probabilistic power flow (PPF) calculating method considering wind speed predication error temporal-spatial coherence |
CN106953354A (en) * | 2017-03-10 | 2017-07-14 | 国网山东省电力公司经济技术研究院 | Consider the method for Unit Commitment containing wind-powered electricity generation of voltage support |
CN107239863A (en) * | 2017-04-12 | 2017-10-10 | 广东电网有限责任公司电力调度控制中心 | The robust Unit Combination method of power system security constraints |
CN107039977A (en) * | 2017-06-03 | 2017-08-11 | 广东博慎智库能源科技发展有限公司 | With the uncertain collection construction method of the power system Robust Scheduling of the minimum target of integrated cost |
Also Published As
Publication number | Publication date |
---|---|
CN107947164B (en) | 2020-11-17 |
CN112186766B (en) | 2022-07-01 |
CN107947164A (en) | 2018-04-20 |
CN112186765A (en) | 2021-01-05 |
CN112186766A (en) | 2021-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112186765B (en) | Modeling method of day-ahead scheduling model of unit combination decision | |
CN107977744B (en) | Day-ahead robust scheduling method of power system based on traditional Benders decomposition method | |
CN107239863B (en) | Robust unit combination method for power grid safety constraint | |
CN112467807B (en) | Day-ahead optimal scheduling method and system for multi-energy power system | |
Fu et al. | Multiobjective stochastic economic dispatch with variable wind generation using scenario-based decomposition and asynchronous block iteration | |
Li et al. | Adaptive robust tie-line scheduling considering wind power uncertainty for interconnected power systems | |
Bai et al. | A two-level approach to AC optimal transmission switching with an accelerating technique | |
Liu et al. | Computational study of security constrained economic dispatch with multi-stage rescheduling | |
Yang et al. | An improved robust SCUC approach considering multiple uncertainty and correlation | |
CN107316113B (en) | Power transmission network planning method and system | |
CN109886446B (en) | Dynamic economic dispatching method of electric power system based on improved chaotic particle swarm algorithm | |
Avila et al. | Distributed probabilistic ATC assessment by optimality conditions decomposition and LHS considering intermittent wind power generation | |
Hajian et al. | A chance-constrained optimization approach for control of transmission voltages | |
JP2012254007A (en) | Method of solving unit commitment problem for set of generators | |
CN110912205A (en) | Dynamic scheduling optimization method for wind power system operation standby based on scene set | |
WO2019196427A1 (en) | Method and device for optimizing backup on the basis of supporting fault event constrained unit commitment | |
CN110009141B (en) | Climbing event prediction method and system based on SDAE feature extraction and SVM classification model | |
Huang et al. | Joint generation and reserve scheduling of wind‐solar‐pumped storage power systems under multiple uncertainties | |
CN115438964A (en) | Random planning method and equipment for power transmission network and storage medium | |
CN113346484B (en) | Power distribution network elastic lifting method and system considering transient uncertainty | |
Yang | Multi‐objective optimization of integrated gas–electricity energy system based on improved multi‐object cuckoo algorithm | |
CN109861293B (en) | Method for evaluating influence of photovoltaic uncertainty on small signal stability of power system | |
Zhang et al. | Short-Term Power Prediction of Wind Power Generation System Based on Logistic Chaos Atom Search Optimization BP Neural Network | |
CN115146870A (en) | Method, system, equipment and medium for generating day-to-day power supply plan of isolated island | |
Liu et al. | Two-stage robust optimal dispatch method considering wind power and load correlation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20210105 Assignee: Hubei Yunzhihang Drone Technology Co.,Ltd. Assignor: CHINA THREE GORGES University Contract record no.: X2023980044730 Denomination of invention: A modeling method of day ahead scheduling model for unit commitment decision Granted publication date: 20220617 License type: Common License Record date: 20231027 |