CN112163842B CN202011351260.5A CN202011351260A CN112163842B CN 112163842 B CN112163842 B CN 112163842B CN 202011351260 A CN202011351260 A CN 202011351260A CN 112163842 B CN112163842 B CN 112163842B
Authority
CN
China
Prior art keywords
recording
intelligent
block chain
electric power
power engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011351260.5A
Other languages
Chinese (zh)
Other versions
CN112163842A (en
Inventor
柯峰
柯永达
余向阳
彭陶峰
洪伟槟
蔡烨帆
敬伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhongwang Electric Power Co ltd
Guangzhou Zhichain Technology Co ltd
South China University of Technology SCUT
Original Assignee
Guangdong Zhongwang Electric Power Co ltd
Guangzhou Zhichain Technology Co ltd
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhongwang Electric Power Co ltd, Guangzhou Zhichain Technology Co ltd, South China University of Technology SCUT filed Critical Guangdong Zhongwang Electric Power Co ltd
Priority to CN202011351260.5A priority Critical patent/CN112163842B/en
Publication of CN112163842A publication Critical patent/CN112163842A/en
Application granted granted Critical
Publication of CN112163842B publication Critical patent/CN112163842B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/64Protecting data integrity, e.g. using checksums, certificates or signatures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Databases & Information Systems (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Data Mining & Analysis (AREA)
  • Marketing (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Computing Systems (AREA)
  • Primary Health Care (AREA)
  • Quality & Reliability (AREA)
  • Bioethics (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the field of electric power engineering, in particular to a false-proof system for reporting material measurement and recording on the internet in an electric power system, and particularly provides an intelligent material measurement and recording false-proof system for the electric power engineering. The invention adopts big data technology and block chain technology, has multiple guarantees of step-by-step approval, early warning reminding and the like, and intelligent automatic inspection and verification, can ensure that no problem occurs in the material recording and reporting process, so that the material recording is correct, and the non-compliant data and key nodes are automatically inspected and fed back to business personnel in time, thereby improving the engineering construction efficiency and reducing the generation of electric power engineering construction loss; the material measuring and recording efficiency can be greatly improved, the labor cost and the time cost are saved, and the intelligent power grid intelligent measuring and recording system plays an important role in promoting the development of the intelligent power grid.

Description

Intelligent material measuring and recording error prevention system for electric power engineering
Technical Field
The invention relates to the field of electric power engineering, in particular to a false-proof system for reporting material measurement and recording on the internet in an electric power system, and particularly provides an intelligent material measurement and recording false-proof system for the electric power engineering.
Background
Along with the requirements of the country on the aspects of promoting energy transformation and upgrading, realizing high-quality development of the power industry, improving the power safety guarantee capability, promoting the planning and construction of supporting basic power supply projects and the like, the implementation of power planning needs to be matched with the implementation and construction of power projects with various voltage levels, and particularly for the mass construction of distribution networks (including urban and rural distribution networks), the purchase of various devices and engineering materials is bound to be involved.
The requirement that a design unit participates in the measurement and recording work of the materials of the electric power engineering is provided when the design and the standard of each electric power engineering are met, so that the approved equipment material table needs to be reported on the network in the electric power system when each engineering design reaches a certain stage, but a plurality of problems often occur when the measurement and recording report is carried out: (1) the designed equipment material is not uniform with the model specification of a material database on the system intranet; (2) the unit (including length, weight and the like) of the designed equipment material is not uniform with the unit on the system intranet, for example, the unit of length on the design drawing is meter, the unit of weight on the design drawing is kilogram, the unit of weight on the design drawing is ton, the quantity is often wrong, and an intelligent detection and correction mechanism is lacked; (3) because the engineering progress requirement is tight, procedures for checking, auditing and approving signature and gate checking are almost not available, but more inconsistent problems are inexplicably caused, so that the construction period is delayed and the tracing cannot be realized; (4) for some emerging high-tech energy-saving products and replaceable and substitute products, no interface which can be filled and connected exists; these problems are likely to cause the situations of wrong type number specification, wrong number of orders, inaccurate treatment of replacement, substitution and the like, thereby bringing about great economic loss, influencing the progress of electric power engineering and the like.
Disclosure of Invention
Aiming at the defects of a plurality of problems and the like in the electric power engineering material measuring and recording work in the prior art, the electric power engineering intelligent material measuring and recording error prevention system adopting the safe and controllable block chain bottom technology is provided.
The technical scheme adopted by the invention for solving the technical problems is as follows: intelligent material of electric power engineering surveys and records mistake and prevents system, its characterized in that: the system comprises a standard material database, a block chain network and a central system; the block chain network comprises a block chain platform and a plurality of block chain nodes, distributed consensus is formed among the plurality of block chain nodes, the block chain platform is used for receiving uploaded data of the standard material database, and the data of the standard material database are stored through the plurality of block chain nodes to form a uniform block chain material catalog; the central system is used for performing flow modeling when an administrator performs engineering design, generating an intelligent contract and issuing the intelligent contract to the block chain network, generating a material table, uploading the material table to the block chain network after being checked and confirmed by multiple parties, and completing evidence storage.
Preferably, the standard material database comprises different voltage grade data, different professional category data, different application data, main performance data of various equipment materials and technical index data of various equipment materials.
Preferably, the intelligent contract issued to the blockchain network can provide a dynamic configuration function for the structure, the quantity and the type of the blockchain material catalog, and add a flow of automatic rule checking to timely detect and feed back non-compliant service data.
Preferably, the blockchain platform can also issue blockchain identity certificates for the participants and responsible persons and complete binding with the users, and each blockchain identity certificate can specify roles and units and add specific labels.
Preferably, when the participating party and the responsible person perform the related service circulation in the central system, the participating party and the responsible person perform updating and control through an intelligent contract in the block chain network, automatically check material information of a specific process node, automatically check validity according to a signature rule, and initiate event notification for a service exceeding a time node.
More preferably, the service flow includes the following steps: the material table is automatically checked through the intelligent contract, and whether the material table is subjected to authorization, check, audit and signature step-by-step approval is judged;
if not, automatically issuing an event for reminding and early warning, and ensuring that the user cannot continuously report;
if yes, automatically verifying whether the material table is consistent with the block chain material catalog or not;
if the verification is consistent, copying the material table to a declaration network to complete the measurement and recording work;
if the verification is inconsistent, reminding and early warning, interrupting reporting, adjusting and filling materials, changing and replacing the materials, authorizing, checking, auditing, gradually reviewing the signatures and other multi-party signature approval steps, and finally copying the material table to a reporting network to complete the measuring and recording work.
Preferably, the process modeling includes abstracting a uniform model according to the processes of the material recording of the power engineering, the material requirements of each process node, the participation roles, and the signature rules, and recording the uniform model into the central system.
Preferably, the asset list is determined by review of a plurality of parties, including an owner, a designer, and a defined third party authority.
Preferably, the data attribute of the material table is automatically verified through the intelligent contract, and the data attribute of the material table completely conforms to the data attribute in the standard material database; and if the data attribute of the material table is not consistent with the data attribute declared by the online measuring and recording, converting the data attribute of the material table into the data attribute consistent with the data attribute declared by the online measuring and recording.
Preferably, the standard material database and the material table have the steps of authorization, checking, auditing and signature checking step by step.
The intelligent material measuring and recording error prevention system for the power engineering adopts a big data technology and a block chain technology, has multiple guarantees of step-by-step approval, warning and early warning, and the like, can ensure no problem in the material measuring and recording reporting process by intelligent automatic check and verification, ensures that the material measuring and recording is correct, automatically inspects non-compliant data and key nodes, and feeds back the non-compliant data and the key nodes to business personnel in time, improves the engineering construction efficiency, and reduces the generation of the construction loss of the power engineering; the material measuring and recording efficiency can be greatly improved, the labor cost and the time cost are saved, and the intelligent power grid intelligent measuring and recording system plays an important role in promoting the development of the intelligent power grid.
Drawings
FIG. 1 is a system flow chart of the intelligent material recording error prevention system for electric power engineering according to the present invention;
fig. 2 is a service flow chart of the intelligent material recording error prevention system for electric power engineering according to the present invention.
Detailed Description
The invention will be further explained with reference to the accompanying drawings.
As shown in fig. 1, the intelligent material measuring and recording error prevention system for power engineering includes a standard material database, a block chain network and a central system; the standard material database is used as a standard material database, comprises various types of data such as different voltage grade data, different professional category data, different use data, main performance data of various equipment materials, technical index data of various equipment materials and the like, and can be conveniently used and consulted in a number matching way; the block chain network comprises a block chain platform and a plurality of block chain nodes, distributed consensus is formed among the plurality of block chain nodes, the block chain platform is used for receiving uploaded data of the standard material database, and the data of the standard material database are stored through the plurality of block chain nodes to form a uniform block chain material catalog; the block chain platform can also issue block chain identity certificates for participants and responsible persons and finish binding with users, so that uniqueness and resistance to repudiation are ensured, each block chain identity certificate can designate roles and units, and a specific label can be added; the central system is used for performing flow modeling when an administrator performs engineering design, generating an intelligent contract and issuing the intelligent contract to the block chain network, generating a material table, uploading the material table to the block chain network after being checked and confirmed by multiple parties, and completing evidence storage. The intelligent material measuring and recording error prevention system for the electric power engineering adopts a safe and controllable block chain network to standardize a material database and store evidence in a credible mode to form a uniform block chain material catalogue, so that the condition that the attribute (including model specification quantity and the like) of equipment materials is inconsistent with the attribute of a standard material database in measuring and recording declaration is prevented, the error measuring and recording is avoided, and the delay of the progress of the electric power engineering construction is prevented, and even serious loss is caused; the system can ensure that no problem occurs in the process of reporting the material measuring and recording, so that the material measuring and recording is correct, non-compliant data and key nodes are automatically checked and fed back to business personnel in time, the engineering construction efficiency is improved, and the generation of electric power engineering construction loss is reduced; the material measuring and recording efficiency can be greatly improved, the labor cost and the time cost are saved, and the intelligent power grid intelligent measuring and recording system plays an important role in promoting the development of the intelligent power grid.
The process modeling comprises abstracting a uniform model according to the processes of material measurement and recording of the power engineering, material requirements of each process node, participation roles and signature rules, and recording the uniform model into the central system; the process engine of the central system automatically establishes an intelligent contract meeting the requirements according to the information and issues the intelligent contract into the block chain network; the material table is checked and determined by multiple parties, wherein the multiple parties comprise an owner party, a design party and a specified third party authority; the data attributes of the material table such as various types and specifications are automatically verified through the intelligent contract, and the data attributes of the material table completely accord with the data attributes in the standard material database; the data attribute of the material table is consistent with the data attribute declared by the online measuring and recording, if not, the data attribute of the material table is converted into the data attribute consistent with the data attribute declared by the online measuring and recording, so that the material table can be copied to the declaration network without any loss; the standard material database and the material table also have the steps of authorization, checking, auditing and signature checking step by step, and the left space for filling and the room for adjusting are also considered.
The intelligent contracts in the block chain network can also provide a dynamic configuration function for the information such as the structure, the quantity, the type and the like of the block chain material catalog, and add a flow of automatic rule checking to timely detect and feed back the service data which are not in compliance. When the participator and the responsible person perform related business circulation in the central system, the participator and the responsible person can perform updating and control through an intelligent contract in the block chain network, automatically check the material information of a specific process node, and automatically check the legality according to a signature rule; and the service exceeding the time node can initiate event notification and feed back to relevant units and individuals in time, so that the efficiency and the safety are improved.
The intelligent contract in the block chain network can encode the responsibility range work of a responsible person and is bound with the user identity and the user role to realize unified restriction; as shown in fig. 2, the material table is automatically verified through the intelligent contract, and whether the authorization, the verification, the step-by-step signature verification and other multi-party signature approval steps are performed is judged;
if not, automatically issuing an event for reminding and early warning, and ensuring that the user cannot continuously report;
if yes, automatically verifying whether the material table is consistent with the block chain material catalog or not;
if the verification is consistent, copying the material table to a declaration network to complete the measurement and recording work;
if the verification is inconsistent, for example, the model specification is not standard, the unit is not matched and other attributes do not meet the requirements, reminding and early warning are carried out, declaration is interrupted, then the steps of filling materials, changing and replacing the materials are adjusted, authorization, checking, auditing, signature step-by-step verification and other multi-party signature approval are carried out, and finally the material table is copied to a declaration network, and the measuring and recording work is completed;
therefore, when the material table finishes measuring and recording work, the material table can be accurately and intelligently integrated into a standard material ordering warehouse in the system, prompt and early warning can be immediately realized when abnormity is found, and responsibility tracing and analysis are implemented to be clear.
The above contents are further detailed descriptions of the intelligent material recording and error-preventing system for power engineering, and do not limit the scope of the present invention, and various modifications and improvements made by those skilled in the art according to the technical solutions of the present invention without departing from the concept of the present invention should be considered as belonging to the protection scope of the present invention.

Claims (9)

1. Intelligent material of electric power engineering surveys and records mistake and prevents system, its characterized in that: the system comprises a standard material database, a block chain network and a central system; the block chain network comprises a block chain platform and a plurality of block chain nodes, distributed consensus is formed among the plurality of block chain nodes, the block chain platform is used for receiving uploaded data of the standard material database, and the data of the standard material database are stored through the plurality of block chain nodes to form a uniform block chain material catalog; the central system is used for performing flow modeling when an administrator performs engineering design, generating an intelligent contract and issuing the intelligent contract to the block chain network, generating a material table, uploading the material table to the block chain network after being checked and confirmed by multi-party signing, and finishing evidence storage;
the material table is automatically verified through the intelligent contract; the intelligent contract can provide a dynamic configuration function for the structure, the quantity and the type of the block chain material catalog, and adds a flow of automatic rule checking to timely detect and feed back non-compliant service data; the intelligent contract can encode the responsibility range work of the responsible person and is bound with the user identity and the user role to realize unified restriction.
2. The intelligent material recording error prevention system for electric power engineering according to claim 1, characterized in that: the standard material database comprises data of different voltage grades, data of different professional categories, data of different purposes, main performance data of various equipment materials and technical index data of various equipment materials.
3. The intelligent material recording error prevention system for electric power engineering according to claim 1, characterized in that: the blockchain platform can also issue blockchain identity certificates for the participants and responsible persons and complete binding with the users, and each blockchain identity certificate can specify roles and units and add specific labels.
4. The intelligent material recording error prevention system for electric power engineering according to claim 3, characterized in that: when the participator and the responsible person perform related business circulation in the central system, the participator and the responsible person can perform updating and control through an intelligent contract in the block chain network, automatically check the material information of the specific process node, automatically check the legality according to a signature rule, and initiate event notification for the business exceeding the time node.
5. The intelligent material recording error prevention system for electric power engineering according to claim 4, characterized in that: the service flow comprises the following steps: the material table is automatically checked through the intelligent contract, and whether the material table is subjected to authorization, check, audit and signature step-by-step approval is judged;
if not, automatically issuing an event for reminding and early warning, and ensuring that the user cannot continuously report;
if yes, automatically verifying whether the material table is consistent with the block chain material catalog or not;
if the verification is consistent, copying the material table to a declaration network to complete the measurement and recording work;
if the verification is inconsistent, reminding and early warning, interrupting reporting, adjusting and filling materials, changing and replacing the materials, authorizing, checking, auditing, gradually reviewing the signatures and other multi-party signature approval steps, and finally copying the material table to a reporting network to complete the measuring and recording work.
6. The intelligent material recording error prevention system for electric power engineering according to claim 1, characterized in that: and the process modeling comprises abstracting a uniform model according to the processes of material measurement and recording of the power engineering, material requirements of each process node, participation roles and signature rules, and recording the uniform model into the central system.
7. The intelligent material recording error prevention system for electric power engineering according to claim 1, characterized in that: the material table is determined by the examination of multiple parties, including an owner party, a designer party and a specified third party authority.
8. The intelligent material recording error prevention system for electric power engineering according to claim 1, characterized in that: the data attribute of the material table is automatically verified through the intelligent contract, and the data attribute of the material table completely conforms to the data attribute in the standard material database; and if the data attribute of the material table is not consistent with the data attribute declared by the online measuring and recording, converting the data attribute of the material table into the data attribute consistent with the data attribute declared by the online measuring and recording.
9. The intelligent material recording error prevention system for electric power engineering according to claim 1, characterized in that: the standard material database and the material table have the steps of authorization, checking, auditing and signature checking step by step.
CN202011351260.5A 2020-11-27 2020-11-27 Intelligent material measuring and recording error prevention system for electric power engineering Active CN112163842B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011351260.5A CN112163842B (en) 2020-11-27 2020-11-27 Intelligent material measuring and recording error prevention system for electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011351260.5A CN112163842B (en) 2020-11-27 2020-11-27 Intelligent material measuring and recording error prevention system for electric power engineering

Publications (2)

Publication Number Publication Date
CN112163842A CN112163842A (en) 2021-01-01
CN112163842B true CN112163842B (en) 2021-03-19

Family

ID=73865882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011351260.5A Active CN112163842B (en) 2020-11-27 2020-11-27 Intelligent material measuring and recording error prevention system for electric power engineering

Country Status (1)

Country Link
CN (1) CN112163842B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113222360A (en) * 2021-04-23 2021-08-06 南京航空航天大学 Recording method and device for power material quality detection critical weight information

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852595A (en) * 2019-11-07 2020-02-28 国网浙江省电力有限公司 Electric power material full life cycle management mechanism based on alliance chain
CN111461917A (en) * 2020-02-11 2020-07-28 江苏荣泽信息科技股份有限公司 Power system material contract management system based on block chain
CN111695851A (en) * 2020-05-11 2020-09-22 宁波奥克斯电气股份有限公司 Material management method based on block chain
CN111861285A (en) * 2020-08-07 2020-10-30 浙江华电器材检测研究所有限公司 Power distribution network material quality data high-reliability real-time management and control method and system based on block chain technology
CN111858757A (en) * 2020-07-01 2020-10-30 国网电力科学研究院武汉南瑞有限责任公司 Power grid material detection resource sharing method based on block chain technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852595A (en) * 2019-11-07 2020-02-28 国网浙江省电力有限公司 Electric power material full life cycle management mechanism based on alliance chain
CN111461917A (en) * 2020-02-11 2020-07-28 江苏荣泽信息科技股份有限公司 Power system material contract management system based on block chain
CN111695851A (en) * 2020-05-11 2020-09-22 宁波奥克斯电气股份有限公司 Material management method based on block chain
CN111858757A (en) * 2020-07-01 2020-10-30 国网电力科学研究院武汉南瑞有限责任公司 Power grid material detection resource sharing method based on block chain technology
CN111861285A (en) * 2020-08-07 2020-10-30 浙江华电器材检测研究所有限公司 Power distribution network material quality data high-reliability real-time management and control method and system based on block chain technology

Also Published As

Publication number Publication date
CN112163842A (en) 2021-01-01

Similar Documents

Publication Publication Date Title
CN111210104A (en) Construction drawing digital combined collaborative inspection system and method based on cloud platform
CN105653442A (en) Method for satisfying evaluation target of DO-178C standard
CN113822605A (en) Block chain-based carbon asset management system and method and electronic equipment
CN113361937B (en) Integrated quality evaluation method for electronic government system
CN114862280B (en) Carbon emission data processing method and device based on block chain
CN111429100A (en) Construction project cost system and cost method
CN112163842B (en) Intelligent material measuring and recording error prevention system for electric power engineering
CN112052033A (en) Power distribution automation master station version management method and system based on process and block chain
CN114596101A (en) Traffic product authentication tracing system and method based on block chain technology
CN114255073A (en) Marketing census method based on data center station
CN107146166B (en) Distribution network planning auxiliary system
CN115099775A (en) Calibration management system for metering equipment
CN114429299A (en) Engineering quality safety management method
Immawan et al. Escalation proposal of supply chain management performance of oil and gas upstream industry in PT. XYZ by using SCOR model approach
CN111709703A (en) Project review management system capable of accurately guiding project design
CN113709098A (en) Data transmission method and device
Barokah et al. E-Government development: Online industrial business license services system in Indonesia
US20050102153A1 (en) System and method for management of data requests in a regulatory proceeding
Hu et al. Primary Discussion on Standardized Management of Purchasing Large Equipments for Measurement Technology Institution
Zhao et al. Research on the power equipment quality inspection industry based on the theory of value chain: A case study of zhejiang province
CN113409027B (en) Power grid material reserve management system
Lezhniuk et al. DEVISING A METHOD FOR ESTIMATING THE SHARE OF ELECTRICITY CONSUMPTION BY A GIVEN CONSUMER, WHICH IS PROVIDED FROM RENEWABLE ENERGY SOURCES.
Han Study on the risk of green building design phase based on ANP
Rohleder The role of third-party verification in emissions trading systems: developing best practices
CN112990708A (en) Government affair service evaluation processing method and system

Legal Events

Date Code Title Description