CN112160586A - Installation device and installation method of shear wall shaping steel die - Google Patents

Installation device and installation method of shear wall shaping steel die Download PDF

Info

Publication number
CN112160586A
CN112160586A CN202011049918.7A CN202011049918A CN112160586A CN 112160586 A CN112160586 A CN 112160586A CN 202011049918 A CN202011049918 A CN 202011049918A CN 112160586 A CN112160586 A CN 112160586A
Authority
CN
China
Prior art keywords
steel die
steel
shear wall
roller
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011049918.7A
Other languages
Chinese (zh)
Inventor
宋联杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN202011049918.7A priority Critical patent/CN112160586A/en
Publication of CN112160586A publication Critical patent/CN112160586A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
    • E04G19/003Arrangements for stabilising the forms or for moving the forms from one place to another

Abstract

The invention relates to the technical field of building engineering, in particular to a mounting device and a mounting method of a shear wall shaping steel die, which comprises a steel rail and a shaping steel die assembly, wherein a groove-shaped limiting track is arranged in the steel rail, the shaping steel die assembly comprises a steel die body, a roller connecting bracket and a roller, when the mounting device of the shear wall shaping steel die is used for mounting the shaping steel die, the steel rail is laid at a planned position, then the steel die body is arranged on the steel rail, and finally the steel die body is pushed to move to a designed position along the groove-shaped limiting track, so that the primary mounting of the shear wall shaping steel die can be completed, therefore, the mounting device and the mounting method of the shear wall shaping steel die of a tower crane can rapidly complete the primary mounting without matching hoisting operation in the mounting process, the mounting construction is simple, the mounting efficiency is higher, the construction period is shortened, effectively low installation cost that has reduced, installation device repeatedly usable does benefit to extensive use.

Description

Installation device and installation method of shear wall shaping steel die
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a mounting device and a mounting method for a shear wall shaping steel die.
Background
The shaped steel die is one of the widely used templates of the shear wall structure in the construction industry at present. Need contact the producer to do the design steel mould of various models before building shear force wall construction, the design steel mould need in the construction with tower crane cooperation hoist and mount just can accomplish preliminary installation, this kind of mode installation effectiveness is lower, adopts the tower crane expense also higher moreover, leads to the installation cost of shear force wall design steel mould also higher, is unfavorable for using on a large scale.
Disclosure of Invention
The invention aims to provide the mounting device of the shear wall shaping steel die, which has higher mounting efficiency and lower cost.
The technical scheme adopted by the invention for solving the technical problems is as follows: installation device of shear force wall design steel mould, including rail, design steel mould subassembly, be provided with the spacing track of cell type in the rail, design steel mould subassembly includes steel mould body, gyro wheel linking bridge, gyro wheel, and the one end and the steel mould body of gyro wheel linking bridge are connected perpendicularly mutually, and the other end is connected perpendicularly mutually with the gyro wheel, and the gyro wheel can be dismantled and set up in the spacing track of cell type, makes the steel mould body set up on the rail, and the gyro wheel can follow the spacing track removal of cell type.
Further, the steel die body is of a telescopic structure, the shaping steel die assembly further comprises an installation cylinder of a hollow structure, a roller is arranged in the middle of the installation cylinder, the steel die body is wound on the roller, and an outlet is formed in the side wall of the installation cylinder.
Furthermore, one end of the roller connecting bracket is connected with the outer side of the steel die body.
Further, a handle is arranged on the outer side of the steel die body.
Further, the roller connecting support and the steel die body are in rotatable connection, and the roller connecting support and the steel die body can be parallel to each other.
Further, the groove-shaped limiting track comprises a roller part and a connecting bracket part, the rollers can be arranged in the roller part in a matched mode, and the roller connecting bracket can be arranged in the connecting bracket part in a matched mode.
In addition, the invention also aims to solve the technical problem of providing the installation method of the shear wall shaping steel die, which has higher installation efficiency and lower cost.
The installation method of the shear wall shaping steel die uses the installation device of the shear wall shaping steel die for installation, and comprises the following steps:
a. after the floor slab is poured and reaches a certain strength, planning the laying position of the steel rail on the floor slab;
b. laying the steel rail at a planned position;
c. arranging a roller of the shaping steel die assembly in a roller part, and arranging a roller connecting bracket in a connecting bracket part;
d. and pushing the steel die body to move to a designed position along the groove-shaped limiting track.
Preferably, in step a, the planned laying position of the steel rail is determined according to the design position of the steel die body.
Preferably, in step b, before the steel rail is laid at the planned position, leveling treatment is performed on the planned position for laying the steel rail.
The invention has the beneficial effects that: the invention relates to a mounting device of a shear wall shaping steel die, which comprises a steel rail and a shaping steel die component, wherein a groove-shaped limiting track is arranged in the steel rail, the shaping steel die component comprises a steel die body, a roller connecting bracket and a roller, one end of the roller connecting bracket is vertically connected with the steel die body, and the other end of the roller connecting bracket is vertically connected with the roller, when the mounting device of the shear wall shaping steel die is used for mounting the shaping steel die, the primary mounting of the shear wall shaping steel die can be completed only by laying the steel rail at a planned position, then arranging the steel die body on the steel rail and finally pushing the steel die body to move to a designed position along the groove-shaped limiting track, thus the mounting device of the shear wall shaping steel die and the mounting method thereof can rapidly complete the primary mounting without the matching and hoisting operation of a tower crane in the mounting process, the mounting construction is simple, and the mounting efficiency is higher, the construction period is shortened, the installation cost is effectively reduced, and the installation device can be repeatedly used and is beneficial to large-scale use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a steel rail;
FIG. 3 is a schematic structural view of a sizing die assembly;
FIG. 4 is a schematic diagram of the configuration of the shaped steel die assembly after deployment;
FIG. 5 is a schematic view of the laying of the rails in the proposed position;
FIG. 6 is a schematic view of the setting steel die assembly as it is being set on a rail;
FIG. 7 is a schematic view of the shaped steel form after initial installation;
the label is: the steel rail comprises a steel rail 1, a groove-shaped limiting track 11, a roller part 111, a connecting support part 112, a shaping steel die assembly 2, a steel die body 21, a roller connecting support 22, rollers 23, an installation cylinder 24, a roller 25, a handle 26 and a floor slab 3.
Detailed Description
The invention is further described with reference to the following figures and detailed description.
As shown in fig. 1, 2, 3, and 4, the installation device of the shear wall shaping steel die of the present invention includes a steel rail 1 and a shaping steel die assembly 2, a groove-shaped limiting rail 11 is disposed in the steel rail 1, the shaping steel die assembly 2 includes a steel die body 21, a roller connecting bracket 22, and a roller 23, one end of the roller connecting bracket 22 is vertically connected to the steel die body 21, the other end is vertically connected to the roller 23, the roller 23 is detachably disposed in the groove-shaped limiting rail 11, so that the steel die body 21 is disposed on the steel rail 1, and the roller 23 can move along the groove-shaped limiting rail 11.
In order to facilitate transportation and installation of the steel mold body 21 and reduce labor intensity of an installer, as shown in fig. 2, the steel mold body 21 is preferably of a telescopic structure, the telescopic structure is a structure similar to a roller shutter door and can be stretched, unfolded, wound and contracted, the sizing steel mold assembly 2 further comprises an installation cylinder 24 of a hollow structure, a roller 25 is arranged in the middle of the installation cylinder 24, the steel mold body 21 is wound on the roller 25, and an outlet is formed in the side wall of the installation cylinder 24. When the steel die body 21 is transported and not used, the steel die body 21 is wound on the rolling shaft 25, and the mounting cylinder 24 plays a role in protection; when the steel die body 21 is installed, the steel die body 21 is pulled out from the outlet for installation.
In order to facilitate the installation of the steel mold body 21 on the steel rail 1 and the installation of the roller 23 along the groove-shaped limiting rail 11, as shown in fig. 4, one end of the movable roller connecting bracket 22 is connected to the outer side of the steel mold body 21, and a handle 26 is installed on the outer side of the steel mold body 21.
Because the roller connecting support 22 is connected with the steel die body 21, the outer end part of the roller connecting support 22 is also provided with the roller 23, the roller connecting support 22 and the roller 23 can influence the storage and transportation of the steel die body 21, and particularly when the steel die body 21 is of a telescopic structure, the roller connecting support 22 and the steel die body 21 are rotatably connected, so that the roller connecting support 22 and the steel die body 21 can be perpendicular to each other, as shown in fig. 1, the roller connecting support 22 and the steel die body 21 can be parallel to each other, as shown in fig. 4, when the steel die body 21 is stored and transported, the roller connecting support 22 and the steel die body 21 are parallel to each other, and when the steel die body 21 is installed and used, the roller connecting support 22 and the steel die body 21 are perpendicular to each other.
When the roller 23 is arranged in the groove-shaped limiting track 11, the steel die body 21 is arranged on the steel rail 1, in order to improve the stability of the steel die body 21, the groove-shaped limiting track 11 comprises a roller part 111 and a connecting bracket part 112, the roller 23 can be arranged in the roller part 111 in a matching manner, the roller connecting bracket 22 can be arranged in the connecting bracket part 112 in a matching manner, namely, the roller connecting bracket 22 and the roller 23 are both clamped in the groove-shaped limiting track 11, and the roller connecting bracket 22 and the roller 23 can both serve as a supporting and stabilizing structure of the steel die body 21.
The installation method of the shear wall shaping steel die uses the installation device of the shear wall shaping steel die for installation, and comprises the following steps:
a. after the floor slab 3 is poured and reaches a certain strength, planning a laying position of the steel rail 1 on the floor slab 3;
b. laying the rail 1 in the proposed position, as shown in fig. 5;
c. arranging the roller 23 of the sizing steel die assembly 2 in the roller part 111 and the roller connecting bracket 22 in the connecting bracket part 112, as shown in fig. 6;
d. and pushing the steel die body 21 to move to a designed position along the groove-shaped limiting rail 11, as shown in fig. 7, so as to finish the primary fixing of the steel die body 21.
When the number of the steel mold bodies 21 is larger, the steps c-d are repeated.
In step a, the laying position of the steel rail 1 is planned according to the design position of the steel die body 21. In order to ensure the straightness of the steel rail 1 after installation, in the step b, before the steel rail 1 is laid at the planned position, leveling treatment is performed on the planned position of the laid steel rail 1.
In conclusion, the installation device and the installation method of the shear wall shaping steel die can quickly finish primary installation without tower crane matched hoisting operation in the installation process, are simple in installation and construction, high in installation efficiency, short in construction period, low in installation cost effectively, reusable and beneficial to large-scale use.

Claims (9)

1. Installation device of shear force wall design steel mould, its characterized in that: including rail (1), design steel mould subassembly (2), be provided with spacing track of cell type (11) in rail (1), design steel mould subassembly (2) are including steel die body (21), gyro wheel linking bridge (22), gyro wheel (23), the one end and the steel die body (21) of gyro wheel linking bridge (22) are connected perpendicularly mutually, the other end and gyro wheel (23) are connected perpendicularly mutually, gyro wheel (23) can be dismantled and set up in spacing track of cell type (11), make steel die body (21) set up on rail (1), and gyro wheel (23) can be followed spacing track of cell type (11) and removed.
2. The mounting device of the shear wall sizing steel die of claim 1, wherein: the steel die body (21) is of a telescopic structure, the sizing steel die assembly (2) further comprises an installation cylinder (24) of a hollow structure, a rolling shaft (25) is arranged in the middle of the installation cylinder (24), the steel die body (21) is wound on the rolling shaft (25), and an outlet is formed in the side wall of the installation cylinder (24).
3. The mounting device of the shear wall sizing steel die of claim 1, wherein: one end of the roller connecting bracket (22) is connected with the outer side of the steel die body (21).
4. The mounting device for the shear wall shaping steel die of claim 2, wherein: a handle (26) is arranged on the outer side of the steel die body (21).
5. The mounting device of the shear wall sizing steel die of claim 1, wherein: the roller connecting bracket (22) and the steel die body (21) are rotatably connected, and the roller connecting bracket (22) and the steel die body (21) can be parallel to each other.
6. The installation device of the shear wall shaping steel die of any one of claims 1 to 5, wherein: the groove-shaped limiting rail (11) comprises a roller part (111) and a connecting bracket part (112), a roller (23) can be arranged in the roller part (111) in a matched mode, and a roller connecting bracket (22) can be arranged in the connecting bracket part (112) in a matched mode.
7. The mounting method of the shear wall shaping steel die is characterized by comprising the following steps of: the installation method is used for installation by using the installation device of the shear wall sizing steel die of claim 6, and comprises the following steps:
a. after the floor slab (3) is poured and reaches a certain strength, planning the laying position of the steel rail (1) on the floor slab (3);
b. laying the steel rail (1) at a planned position;
c. arranging a roller (23) of the shaping steel die assembly (2) in a roller part (111), and arranging a roller connecting bracket (22) in a connecting bracket part (112);
d. and pushing the steel die body (21) to move to a designed position along the groove-shaped limiting track (11).
8. The method for installing the shear wall sizing steel die as claimed in claim 7, wherein: in the step a, the planned laying position of the steel rail (1) is determined according to the design position of the steel die body (21).
9. The method for installing the shear wall sizing steel die as claimed in claim 7, wherein: in the step b, before the steel rail (1) is laid at the planned position, leveling treatment is firstly carried out on the planned position for laying the steel rail (1).
CN202011049918.7A 2020-09-29 2020-09-29 Installation device and installation method of shear wall shaping steel die Pending CN112160586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011049918.7A CN112160586A (en) 2020-09-29 2020-09-29 Installation device and installation method of shear wall shaping steel die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011049918.7A CN112160586A (en) 2020-09-29 2020-09-29 Installation device and installation method of shear wall shaping steel die

Publications (1)

Publication Number Publication Date
CN112160586A true CN112160586A (en) 2021-01-01

Family

ID=73860625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011049918.7A Pending CN112160586A (en) 2020-09-29 2020-09-29 Installation device and installation method of shear wall shaping steel die

Country Status (1)

Country Link
CN (1) CN112160586A (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2008902A6 (en) * 1987-09-22 1989-08-16 Aba Servicios Comerciales S L Improvements introduced in the construction of modular, folding graders. (Machine-translation by Google Translate, not legally binding)
TW312251U (en) * 1997-02-03 1997-08-01 Gang Yi Co Ltd Positioning structure of mat of chair
TW343661U (en) * 1997-02-03 1998-10-21 Kan Yi Machinery Co Ltd Improved structure of a conduit mold board
DE10018658A1 (en) * 2000-04-14 2001-12-20 Niels Hollmann Circular formwork module
KR20040097080A (en) * 2004-10-25 2004-11-17 김태현 a mold apparatus for the elbow section of watercourse
CN101063332A (en) * 2006-04-29 2007-10-31 邱则有 Opening box for concrete structure
CN101067330A (en) * 2006-05-01 2007-11-07 邱则有 Sandwich member for concrete
CN101240583A (en) * 2007-02-05 2008-08-13 邱则有 Cast-in-situ concrete hollow slab
CN202000667U (en) * 2011-01-30 2011-10-05 中建三局建设工程股份有限公司 Roller wheel traction device for large steel template
CN103774841A (en) * 2012-10-23 2014-05-07 中国葛洲坝集团股份有限公司 Track type sliding formwork device
KR101396434B1 (en) * 2013-07-30 2014-05-20 효동개발 주식회사 Movable mold device
CN104005314A (en) * 2014-05-21 2014-08-27 重庆大学 Variable-span movable subgrade box
CN105065060A (en) * 2015-07-23 2015-11-18 山东安实绿色开采技术发展有限公司 Mine rolling-up curtain type supporting formwork and supporting method
CN105064678A (en) * 2015-09-01 2015-11-18 中民筑友有限公司 Formwork folding and unfolding mechanism, interior cylinder formwork and elevator shaft formwork device
CN106939694A (en) * 2016-01-03 2017-07-11 重庆市万盛区普惠城市建设咨询服务有限公司 Scaffold jacking system
CN108265974A (en) * 2018-04-09 2018-07-10 沭阳八闽木业有限公司 A kind of independent supporting rack of building template
CN209741912U (en) * 2019-03-19 2019-12-06 中铁五局集团第四工程有限责任公司 Rail type movable formwork support
CN209958709U (en) * 2018-12-19 2020-01-17 天津市隆美佳装饰工程有限公司 Prevent fitment of turning on one's side with ascending a height frame

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2008902A6 (en) * 1987-09-22 1989-08-16 Aba Servicios Comerciales S L Improvements introduced in the construction of modular, folding graders. (Machine-translation by Google Translate, not legally binding)
TW312251U (en) * 1997-02-03 1997-08-01 Gang Yi Co Ltd Positioning structure of mat of chair
TW343661U (en) * 1997-02-03 1998-10-21 Kan Yi Machinery Co Ltd Improved structure of a conduit mold board
DE10018658A1 (en) * 2000-04-14 2001-12-20 Niels Hollmann Circular formwork module
KR20040097080A (en) * 2004-10-25 2004-11-17 김태현 a mold apparatus for the elbow section of watercourse
CN101063332A (en) * 2006-04-29 2007-10-31 邱则有 Opening box for concrete structure
CN101067330A (en) * 2006-05-01 2007-11-07 邱则有 Sandwich member for concrete
CN101240583A (en) * 2007-02-05 2008-08-13 邱则有 Cast-in-situ concrete hollow slab
CN202000667U (en) * 2011-01-30 2011-10-05 中建三局建设工程股份有限公司 Roller wheel traction device for large steel template
CN103774841A (en) * 2012-10-23 2014-05-07 中国葛洲坝集团股份有限公司 Track type sliding formwork device
KR101396434B1 (en) * 2013-07-30 2014-05-20 효동개발 주식회사 Movable mold device
CN104005314A (en) * 2014-05-21 2014-08-27 重庆大学 Variable-span movable subgrade box
CN105065060A (en) * 2015-07-23 2015-11-18 山东安实绿色开采技术发展有限公司 Mine rolling-up curtain type supporting formwork and supporting method
CN105064678A (en) * 2015-09-01 2015-11-18 中民筑友有限公司 Formwork folding and unfolding mechanism, interior cylinder formwork and elevator shaft formwork device
CN106939694A (en) * 2016-01-03 2017-07-11 重庆市万盛区普惠城市建设咨询服务有限公司 Scaffold jacking system
CN108265974A (en) * 2018-04-09 2018-07-10 沭阳八闽木业有限公司 A kind of independent supporting rack of building template
CN209958709U (en) * 2018-12-19 2020-01-17 天津市隆美佳装饰工程有限公司 Prevent fitment of turning on one's side with ascending a height frame
CN209741912U (en) * 2019-03-19 2019-12-06 中铁五局集团第四工程有限责任公司 Rail type movable formwork support

Similar Documents

Publication Publication Date Title
CN207109856U (en) Piping lane, culvert construction hydraulic steel formwork jumbo
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN103437782B (en) Hydraulic pressure automatic moving type steel form carrier and construction method thereof
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN205894099U (en) Be applied to underground pipe gallery's portable sliding template device
CN106677542A (en) Construction method of roof base truss structure
CN112900268A (en) Mounting process of full-hall support and template system
CN107460889A (en) Integral movable type rack template and its construction method in underground pipe gallery construction
CN103485574A (en) Method for constructing reinforced concrete structure of tower top of prilling tower
CN112012373A (en) Light steel keel gypsum plasterboard partition wall and construction method
CN103993745A (en) Integral transfer girder hoisting device and hoisting method thereof
CN202430994U (en) Template limiting clamp
CN102653937B (en) Concrete construction template bracket for high speed rotary road of automobile test field and construction method
CN201738305U (en) Butt-joint precision control device for steel reinforcement joint of steel reinforcement cage
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN112160586A (en) Installation device and installation method of shear wall shaping steel die
CN211421171U (en) Cast-in-place utility tunnel movable support platform truck formwork system
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN107642089B (en) Narrow space concrete pouring method
CN216515141U (en) Novel cantilever construction creeping formwork device
CN114855622A (en) External climbing and internal hanging type construction device for hollow high pier construction and use method thereof
CN205296213U (en) Utility tunnel lining cutting platform truck
CN211230492U (en) Hydraulic self-propelled movable formwork support for tunnel center ditch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210101