CN112127910A - 一种隧道施工超前支护套拱结构 - Google Patents
一种隧道施工超前支护套拱结构 Download PDFInfo
- Publication number
- CN112127910A CN112127910A CN202010993440.7A CN202010993440A CN112127910A CN 112127910 A CN112127910 A CN 112127910A CN 202010993440 A CN202010993440 A CN 202010993440A CN 112127910 A CN112127910 A CN 112127910A
- Authority
- CN
- China
- Prior art keywords
- pipe
- supporting
- tunnel
- concrete
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 28
- 238000009412 basement excavation Methods 0.000 claims description 16
- 239000002002 slurry Substances 0.000 claims description 6
- 238000009792 diffusion process Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 4
- 239000011435 rock Substances 0.000 description 5
- 239000012466 permeate Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010993440.7A CN112127910B (zh) | 2020-09-21 | 2020-09-21 | 一种隧道施工超前支护套拱结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010993440.7A CN112127910B (zh) | 2020-09-21 | 2020-09-21 | 一种隧道施工超前支护套拱结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112127910A true CN112127910A (zh) | 2020-12-25 |
CN112127910B CN112127910B (zh) | 2022-11-08 |
Family
ID=73841697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010993440.7A Active CN112127910B (zh) | 2020-09-21 | 2020-09-21 | 一种隧道施工超前支护套拱结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112127910B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914901A (zh) * | 2021-11-11 | 2022-01-11 | 中国铁建大桥工程局集团有限公司 | 一种隧道支护结构 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202008001291U1 (de) * | 2008-01-30 | 2008-03-27 | Himmel & Henning Bauunternehmen Gmbh | Vortriebsvorrichtung für mit Tübbingausbau ausgebaute Stollen |
CN105298517A (zh) * | 2015-11-21 | 2016-02-03 | 中铁二十局集团第二工程有限公司 | 软弱围岩隧道超前加强支护施工方法 |
KR20160074977A (ko) * | 2014-12-19 | 2016-06-29 | 한국건설기술연구원 | 콘크리트 충전강관을 이용한 피암터널 및 그 시공방법 |
CN105736017A (zh) * | 2015-07-27 | 2016-07-06 | 中铁十二局集团有限公司 | 一种隧道初期支护不对称单元正反布置拱架结构 |
CN108278115A (zh) * | 2017-10-31 | 2018-07-13 | 中南大学 | 一种基于管棚预支护的大拱脚三台阶隧道快速施工方法及结构 |
CN109268042A (zh) * | 2018-10-29 | 2019-01-25 | 中铁十六局集团地铁工程有限公司 | 一种小导洞超前支护设备及施工方法 |
CN210264750U (zh) * | 2019-03-25 | 2020-04-07 | 长安大学 | 一种公路隧道的洞口结构 |
CN110985057A (zh) * | 2019-12-25 | 2020-04-10 | 云南交投公路建设第四工程有限公司 | 盖梁与管棚联合超前支护下隧道暗挖进洞施工工法 |
CN110985066A (zh) * | 2019-12-20 | 2020-04-10 | 中国建筑第四工程局有限公司 | 一种隧道注浆支护方法及结构 |
CN111502696A (zh) * | 2020-04-01 | 2020-08-07 | 广州地铁设计研究院股份有限公司 | 暗挖隧道的密网式超前支护系统及施工方法 |
-
2020
- 2020-09-21 CN CN202010993440.7A patent/CN112127910B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202008001291U1 (de) * | 2008-01-30 | 2008-03-27 | Himmel & Henning Bauunternehmen Gmbh | Vortriebsvorrichtung für mit Tübbingausbau ausgebaute Stollen |
KR20160074977A (ko) * | 2014-12-19 | 2016-06-29 | 한국건설기술연구원 | 콘크리트 충전강관을 이용한 피암터널 및 그 시공방법 |
CN105736017A (zh) * | 2015-07-27 | 2016-07-06 | 中铁十二局集团有限公司 | 一种隧道初期支护不对称单元正反布置拱架结构 |
CN105298517A (zh) * | 2015-11-21 | 2016-02-03 | 中铁二十局集团第二工程有限公司 | 软弱围岩隧道超前加强支护施工方法 |
CN108278115A (zh) * | 2017-10-31 | 2018-07-13 | 中南大学 | 一种基于管棚预支护的大拱脚三台阶隧道快速施工方法及结构 |
CN109268042A (zh) * | 2018-10-29 | 2019-01-25 | 中铁十六局集团地铁工程有限公司 | 一种小导洞超前支护设备及施工方法 |
CN210264750U (zh) * | 2019-03-25 | 2020-04-07 | 长安大学 | 一种公路隧道的洞口结构 |
CN110985066A (zh) * | 2019-12-20 | 2020-04-10 | 中国建筑第四工程局有限公司 | 一种隧道注浆支护方法及结构 |
CN110985057A (zh) * | 2019-12-25 | 2020-04-10 | 云南交投公路建设第四工程有限公司 | 盖梁与管棚联合超前支护下隧道暗挖进洞施工工法 |
CN111502696A (zh) * | 2020-04-01 | 2020-08-07 | 广州地铁设计研究院股份有限公司 | 暗挖隧道的密网式超前支护系统及施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914901A (zh) * | 2021-11-11 | 2022-01-11 | 中国铁建大桥工程局集团有限公司 | 一种隧道支护结构 |
CN113914901B (zh) * | 2021-11-11 | 2024-04-09 | 中国铁建大桥工程局集团有限公司 | 一种隧道支护结构 |
Also Published As
Publication number | Publication date |
---|---|
CN112127910B (zh) | 2022-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7125550B2 (ja) | 逆アーチを備えた2段階高速閉鎖トンネルの支持構造及びその施工方法 | |
CN108204240B (zh) | 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 | |
CN109026026B (zh) | 下穿既有管廊的大断面多线多连拱暗挖隧道群的施工方法 | |
CN109736827B (zh) | 城市地铁硬岩地层联络通道高压气体膨胀致裂开挖的方法 | |
CN110159298B (zh) | 一种地铁暗挖车站初支扣拱施工方法 | |
CN105781582A (zh) | 一种适用于城市敏感区的浅埋隧道新型支护结构及其施工方法 | |
CN105714831A (zh) | 一种支护基坑侧壁的异型双排桩及其施工方法 | |
CN111365017B (zh) | 一种地下互通隧道的施工方法 | |
CN107939415A (zh) | 浅埋大跨软塑粘土隧道留核心土微二台阶施工方法 | |
CN110230497A (zh) | 一种线隧道正洞身双侧壁导坑施工方法 | |
CN108149692B (zh) | 一种适用于非闭合基坑的支护结构 | |
CN112127910B (zh) | 一种隧道施工超前支护套拱结构 | |
CN109578035A (zh) | 钢管排水锁脚桩及施工方法 | |
CN210829267U (zh) | 一种盾构区间的后施工风井结构 | |
CN114718582B (zh) | 一种小净距水平节理页岩地质隧道洞口段的施工方法 | |
CN203373753U (zh) | 基坑桩锚护壁混凝土锚索冠梁结构 | |
CN111997632B (zh) | 一种盾构穿越竖井的方法 | |
CN213175669U (zh) | 一种抗扰动的双连拱隧道结构 | |
CN212003214U (zh) | 一种穿越巨型溶洞的隧道明作衬砌结构 | |
CN109736843B (zh) | 一种小模板拼装浇注二衬的逆作防水方法 | |
CN110080784B (zh) | 一种穿越富水砂性地层的隧洞开挖及加固方法 | |
CN112922031A (zh) | 地下硐室下穿既有建筑时的防护结构及施工方法 | |
CN207177920U (zh) | 一种浅埋暗挖隧道冒顶塌方换拱处理装置 | |
CN112012761A (zh) | 一种抗扰动的双连拱隧道结构的施工方法 | |
CN110714765A (zh) | 一种盾构区间后施工风井的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Sun Jinglai Inventor after: Fang Hui Inventor after: Cao Yi Inventor after: Nie Jia Inventor after: Wang Fan Inventor after: Wu Xu Inventor after: Wang Xinling Inventor after: Zhao Deyuan Inventor after: Yang Hongtao Inventor after: Liu Shuang Inventor after: Zhu Hongfei Inventor after: Zhang Jianfeng Inventor before: Sun Jinglai Inventor before: Wang Fan Inventor before: Wu Xu Inventor before: Wang Xinling Inventor before: Zhang Jianfeng Inventor before: Fang Hui Inventor before: Cao Yi Inventor before: Nie Jia |