CN112127599A - Painting equipment for building external wall - Google Patents

Painting equipment for building external wall Download PDF

Info

Publication number
CN112127599A
CN112127599A CN202011098195.XA CN202011098195A CN112127599A CN 112127599 A CN112127599 A CN 112127599A CN 202011098195 A CN202011098195 A CN 202011098195A CN 112127599 A CN112127599 A CN 112127599A
Authority
CN
China
Prior art keywords
cavity
material spraying
spraying pipe
rope wheel
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011098195.XA
Other languages
Chinese (zh)
Inventor
张熙兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jinli Technology Co.,Ltd.
Original Assignee
Guangzhou Jinshuo Crystal Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jinshuo Crystal Co ltd filed Critical Guangzhou Jinshuo Crystal Co ltd
Priority to CN202011098195.XA priority Critical patent/CN112127599A/en
Publication of CN112127599A publication Critical patent/CN112127599A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Spray Control Apparatus (AREA)

Abstract

The invention discloses painting equipment for building exterior walls, which comprises a box body, wherein a U-shaped rotating cavity with a backward opening is arranged in the box body, the box body is provided with a working cavity with a backward opening, the working cavity is positioned in the middle of the rear side of the U-shaped rotating cavity, a coating box is fixedly arranged on the front side wall of the working cavity, a coating cavity is arranged in the coating box, a material spraying pipe is slidably arranged on the rear side wall of the coating cavity, a material spraying cavity is arranged in the material spraying pipe, and baffles which are bilaterally symmetrical by taking the coating cavity as a symmetrical center are fixedly arranged on the front side wall of the coating cavity. Avoiding uneven spraying caused by wind.

Description

Painting equipment for building external wall
Technical Field
The invention relates to the technical field related to building construction, in particular to painting equipment for building outer walls.
Background
When the building outer wall is painted, a manual mode is often adopted, a construction worker stands in a hanging basket to work on the building outer wall, the mode has more dangers and can threaten the life safety of the construction worker, the painting quality depends on the technology of the construction worker, the uniformity of the technology cannot be guaranteed, and secondary repair is difficult due to the particularity of the painting equipment.
Disclosure of Invention
In order to solve the problems, the embodiment designs painting equipment for building outer walls, which comprises a box body, wherein a U-shaped rotating cavity with a backward opening is arranged in the box body, the box body is provided with a working cavity with a backward opening, the working cavity is positioned at the middle and rear section of the U-shaped rotating cavity, a coating box is fixedly arranged on the front side wall of the working cavity, a coating cavity is arranged in the coating box, a material spraying pipe is slidably arranged on the rear side wall of the coating cavity, a material spraying cavity is arranged in the material spraying pipe, baffle plates which are bilaterally symmetrical by taking the coating cavity as a symmetrical center are fixedly arranged on the front side wall of the coating cavity, the material spraying pipe is in sliding fit with the two baffle plates, a connecting spring is fixedly arranged on the material spraying pipe and is fixedly connected with the rear end of the coating box, first racks which are bilaterally symmetrical are fixedly arranged on the left and right side walls of the material spraying pipe, and limiting blocks which are bilaterally symmetrical by taking the material spraying pipe as a, a linking spring is fixedly arranged at the front end of the limiting block, the linking spring is fixedly connected with the rear end of the coating box, a second rack is fixedly arranged at one end, close to the material spraying pipe, of the limiting block, two gear shafts which are bilaterally symmetrical by taking the material spraying pipe as a symmetrical center are rotatably arranged on the bottom wall of the working cavity, a connecting gear is fixedly arranged on each gear shaft and is meshed with the second rack, the connecting gear is meshed with the first rack, a rotating shaft which is bilaterally symmetrical by taking the material spraying pipe as a symmetrical center is fixedly arranged on the bottom wall of the U-shaped rotating cavity, a rolling brush is fixedly arranged on each rotating shaft, a first belt pulley positioned at the upper side of the rolling brush is fixedly arranged on each rolling brush, a motor is fixedly arranged on the left side wall of the U-shaped rotating cavity, the right end of the motor is in power connection with a power shaft, and, the main bevel gear is positioned on the right side of the power gear, the U-shaped rotating cavity top wall is rotatably provided with a connecting shaft, the connecting shaft is fixedly provided with an auxiliary bevel gear and a second belt pulley, the auxiliary bevel gear is meshed with the main bevel gear, the second belt pulley is positioned on the upper side of the auxiliary bevel gear, the first belt pulley is connected with the second belt pulley through a belt, the left side wall and the right side wall of the U-shaped rotating cavity are respectively provided with two through grooves which are bilaterally symmetrical by taking the power gear as a symmetrical center, the through grooves are communicated with each other leftwards and rightwards, two suspension rods are slidably arranged in the through grooves, the suspension rods are rotatably provided with transmission gears, the transmission gears are meshed with the power gear, the lower end of the box body is fixedly provided with a moving rack, the moving rack is provided with a rack, the suspension rods are positioned outside the U-shaped rotating cavity and are fixedly provided, the sleeve shaft front side is rotated and is installed the connecting axle, fixed mounting has driven gear and first rope sheave on the connecting axle, first rope sheave is located the driven gear front side.
Beneficially, there is a building outer wall in the front of the box, bilateral symmetry's backup pad is fixedly installed at the upper end of the building outer wall, a first rope pulley shaft is rotatably installed between the left backup pad and the right backup pad, bilateral symmetry's second rope pulley is fixedly installed on the first rope pulley shaft, a second rope pulley shaft is rotatably installed between the two backup pads, the second rope pulley shaft is located at the lower side of the first rope pulley shaft, a bilateral symmetry's third rope pulley is fixedly installed on the second rope pulley shaft, the third rope pulley is located at the lower side of the second rope pulley, the third rope pulley and the first rope pulley are connected through a steel rope, the driven gear drives the first rope pulley to rotate through the connecting shaft, so as to drive the second rope pulley and the third rope pulley to rotate, and the steel rope is extended to drive the suspension rod to descend.
Beneficially, the side walls of the coating cavity are internally provided with extruding blocks in a sliding mode, the extruding blocks are symmetrical left and right with the material spraying pipe as a symmetrical center, one end, far away from the material spraying pipe, of each extruding block is fixedly provided with an extruding spring, and the extruding springs are fixedly connected with the left side wall and the right side wall of the coating cavity.
Beneficially, be equipped with in the box and be located the alarm groove of coating chamber rear side, alarm groove opening upwards, the coating chamber with through the passageway intercommunication between the alarm groove, it is equipped with the kicking block to slide in the passageway, the kicking block pass through reset spring with the baffle is kept away from spout the one end fixed connection of material pipe, fixed mounting has the fixed axle in the passageway, rotate on the fixed axle and install the dwang, the dwang rear side is equipped with the inclined plane, the passageway with dwang sliding fit, dwang front side commentaries on classics fixed mounting has the connecting block, two the fixed siren that is equipped with between the connecting block, the kicking block to spout material pipe one side and remove, drive the dwang rotates, thereby passes through the connecting block drives the siren shifts up, the siren rises out the alarm groove.
Advantageously, a paint spraying pump is fixedly mounted in the paint spraying cavity.
The invention has the beneficial effects that: the paint spraying device is simple in structure and convenient to use, does not need a construction worker to operate in person, ensures the life safety of the construction worker, reduces labor force, can ensure the consistency of painting effect, avoids influencing the beauty of an outer wall by human factors, prevents the influence of external factors such as wind on equipment working, and avoids uneven spraying due to wind.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a schematic view of the overall structure of a painting facility for exterior walls of buildings according to the present invention;
FIG. 2 is a schematic view of the structure A-A of FIG. 1;
FIG. 3 is a schematic diagram of B-B of FIG. 2;
FIG. 4 is an enlarged schematic view of C in FIG. 2;
fig. 5 is a schematic diagram of the structure of D-D in fig. 1.
Detailed Description
The invention will now be described in detail with reference to fig. 1-5, wherein for ease of description the orientations described hereinafter are now defined as follows: the up, down, left, right, and front-back directions described below correspond to the up, down, left, right, and front-back directions in the projection relationship of fig. 1 itself.
The painting equipment for the building outer wall comprises a box body 64, a U-shaped rotating cavity 19 with a backward opening is arranged in the box body 64, the box body 64 is provided with a working cavity 33, the working cavity 33 is backwards opened, the working cavity 33 is positioned at the middle rear section of the U-shaped rotating cavity 19, a coating box 27 is fixedly arranged on the front side wall of the working cavity 33, a coating cavity 42 is arranged in the coating box 27, a material spraying pipe 43 is slidably arranged on the rear side wall of the coating cavity 42, a material spraying cavity 44 is arranged in the material spraying pipe 43, baffle plates 59 which are symmetrical about the coating cavity 42 are fixedly arranged on the front side wall of the coating cavity 42, the material spraying pipe 43 is in sliding fit with the two baffle plates 59, a connecting spring 38 is fixedly arranged on the material spraying pipe 43, the connecting spring 38 is fixedly connected with the rear end of the coating box 27, first racks 31 which are symmetrical about the left side wall and right side wall of the material spraying pipe 43 are fixedly arranged, the left side wall and the right side wall of the working cavity 33 are slidably provided with limiting blocks 37 which are bilaterally symmetrical by taking the material spraying pipe 43 as a symmetrical center, the front end of each limiting block 37 is fixedly provided with a linking spring 28, the linking spring 28 is fixedly connected with the rear end of the coating box 27, one end of each limiting block 37, which is close to the material spraying pipe 43, is fixedly provided with a second rack 36, the bottom wall of the working cavity 33 is rotatably provided with two gear shafts 30 which are bilaterally symmetrical by taking the material spraying pipe 43 as a symmetrical center, each gear shaft 30 is fixedly provided with a connecting gear 29, each connecting gear 29 is meshed with the second rack 36, each connecting gear 29 is meshed with the first rack 31, the bottom wall of the U-shaped rotating cavity 19 is fixedly provided with a rotating shaft 34 which is bilaterally symmetrical by taking the material spraying pipe 43 as a symmetrical center, each rotating shaft 34 is fixedly provided with a rolling brush 35, and each rolling brush, the U-shaped rotary cavity comprises a U-shaped rotary cavity 19 and is characterized in that a motor 21 is fixedly mounted on the left side wall of the U-shaped rotary cavity 19, a power shaft 22 is connected to the right end of the motor 21 in a power mode, a power gear 23 and a main bevel gear 24 are fixedly mounted on the power shaft 22, the main bevel gear 24 is located on the right side of the power gear 23, a connecting shaft 46 is rotatably mounted on the top wall of the U-shaped rotary cavity 19, an auxiliary bevel gear 48 and a second belt pulley 47 are fixedly mounted on the connecting shaft 46, the auxiliary bevel gear 48 is meshed with the main bevel gear 24, the second belt pulley 47 is located on the upper side of the auxiliary bevel gear 48, the first belt pulley 45 is connected with the second belt pulley 47 through a belt 51, two through grooves 65 which are bilaterally symmetrical with the power gear 23 as a symmetrical center are respectively formed in the left side wall and the right side wall of the U-shaped rotary cavity 19, the, the suspension rod 16 is rotatably provided with a transmission gear 20, the transmission gear 20 is meshed with the power gear 23, the lower end of the box body 64 is fixedly provided with a movable rack 18, the movable rack 18 is provided with a rack, the suspension rod 16 is positioned outside the U-shaped rotating cavity 19 and fixedly provided with two sleeve shafts 17 which are bilaterally symmetrical, the front side of each sleeve shaft 17 is rotatably provided with a connecting shaft 61, the connecting shaft 61 is fixedly provided with a driven gear 63 and a first rope pulley 62, and the first rope pulley 62 is positioned on the front side of the driven gear 63.
Beneficially, there is a building outer wall 50 on the front side of the box 64, a bilaterally symmetrical support plate 11 is fixedly installed on the upper end of the building outer wall 50, a first rope wheel shaft 12 is rotatably installed between the two support plates 11, a bilaterally symmetrical second rope wheel 13 is fixedly installed on the first rope wheel shaft 12, a second rope wheel shaft 14 is rotatably installed between the two support plates 11, the second rope wheel shaft 14 is located at the lower side of the first rope wheel shaft 12, a bilaterally symmetrical third rope wheel 15 is fixedly installed on the second rope wheel shaft 14, the third rope wheel 15 is located at the lower side of the second rope wheel 13, the third rope wheel 15 and the first rope wheel 62 are connected through a steel rope, the driven gear 63 drives the first rope wheel 62 to rotate through the connecting shaft 61, so as to drive the second rope wheel 13 and the third rope wheel 15 to rotate, the suspension rod 16 is lowered by extending the steel cable.
Advantageously, the side wall of the coating cavity 42 is slidably provided with an extruding block 25 which is symmetrical left and right with the material spraying pipe 43 as a symmetrical center, one end of the extruding block 25 far away from the material spraying pipe 43 is fixedly provided with an extruding spring 26, and the extruding spring 26 is fixedly connected with the left and right side walls of the coating cavity 42.
Beneficially, an alarm groove 41 located at the rear side of the paint cavity 42 is arranged in the box body 64, the alarm groove 41 is opened upwards, the paint cavity 42 is communicated with the alarm groove 41 through a channel 55, a top block 57 is slidably arranged in the channel 55, the top block 57 is fixedly connected with one end, far away from the material spraying pipe 43, of the baffle 59 through a return spring 56, a fixed shaft 54 is fixedly installed in the channel 55, a rotating rod 53 is rotatably installed on the fixed shaft 54, an inclined plane is arranged at the rear side of the rotating rod 53, the channel 55 is in sliding fit with the rotating rod 53, a connecting block 60 is fixedly installed at the front side of the rotating rod 53, an alarm 40 is fixedly arranged between the two connecting blocks 60, the top block 57 moves towards one side of the material spraying pipe 43 to drive the rotating rod 53 to rotate, so that the alarm 40 is driven by the connecting block 60 to move upwards, the alarm 40 rises out of the alarm slot 41.
Advantageously, a paint pump 32 is fixedly mounted in the spray chamber 44.
The following will describe in detail the use steps of a painting installation for exterior walls of buildings according to the present invention with reference to fig. 1 to 5: before use, the motor 21 stops, the steel rope is shortened, the suspension rod 16 is positioned at the uppermost side, the box body 64 is positioned at the leftmost side, the moving rack 18 is separated from the driven gear 63, the engaging spring 28 is in an initial state, and the extrusion spring 26 is in a compressed state.
When the device is used, the motor 21 is started, the motor 21 drives the power gear 23 to rotate through the power shaft 22, the power gear 23 drives the transmission gear 20 to rotate, the box body 64 moves rightwards on the suspension rod 16, meanwhile, the box body 64 is close to the building outer wall 50 under the action of the steel rope, the limiting block 37 is pushed to move forwards, the connecting spring 28 is compressed, the limiting block 37 drives the second rack 36 to move forwards, the connecting gear 29 is driven to rotate, the connecting gear 29 drives the first rack 31 to move forwards, the spraying pipe 43 moves forwards, the spraying pipe 43 extends out of the baffle 59, the spraying cavity 44 is communicated with the coating cavity 42, the coating pump 32 sprays coating on the building outer wall 50, meanwhile, the power shaft 22 drives the main bevel gear 24 to rotate, the main bevel gear 24 drives the auxiliary bevel gear 48 to rotate, the auxiliary bevel gear 48 drives the second belt pulley 47 to rotate through the connecting shaft 46, and the second belt pulley 47 drives the first belt pulley 45 to rotate through the belt, thereby driving the rotating shaft 34 and the rolling brush 35 to rotate, leveling the sprayed paint, when the box body 64 moves to the right side of the hanging rod 16, the driven gear 63 on the right side of the rack on the moving rack 18 is meshed to drive the driven gear 63 to rotate, the driven gear 63 drives the first rope pulley 62 to rotate through the connecting shaft 61, the second rope pulley 13 and the third rope pulley 15 are driven to rotate, the steel rope is loosened to enable the hanging rod 16 and the box body 64 to descend, then the motor 21 rotates reversely, the through groove 65 moves leftwards, and the painting work is carried out on the building outer wall 50 of the next floor; when the paint spraying work is carried out, along with the reduction of the paint in the paint cavity 42, the extrusion spring 26 drives the extrusion block 25 to move towards the paint spraying pipe 43, so that the use amount of the paint is maximized, when the extrusion block 25 collides with the top block 57, the top block 57 moves rightwards to push the rotating rod 53 to rotate, and the rotating rod 53 drives the alarm 40 to move upwards through the connecting block 60 to remind a constructor of supplementing the paint; after use, the paint pump 32 is turned off, the cable is retracted, the motor 21 is stopped, and the housing 64 is retracted.
The invention has the beneficial effects that: the paint spraying device is simple in structure and convenient to use, does not need a construction worker to operate in person, ensures the life safety of the construction worker, reduces labor force, can ensure the consistency of painting effect, avoids influencing the beauty of an outer wall by human factors, prevents the influence of external factors such as wind on equipment working, and avoids uneven spraying due to wind.
The above embodiments are merely illustrative of the technical ideas and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the protection scope of the present invention. All equivalent changes and modifications made according to the spirit of the present invention should be covered within the protection scope of the present invention.

Claims (5)

1. A painting equipment for building outer wall is characterized in that: the paint spraying device comprises a box body, wherein a U-shaped rotating cavity with a backward opening is arranged in the box body, the box body is provided with a working cavity, the working cavity is backwards opened and is positioned at the middle and rear section of the U-shaped rotating cavity, a paint box is fixedly arranged on the front side wall of the working cavity, a paint cavity is arranged in the paint box, a material spraying pipe is slidably arranged on the rear side wall of the paint cavity, a material spraying cavity is arranged in the material spraying pipe, baffles which are bilaterally symmetrical by taking the paint cavity as a symmetrical center are fixedly arranged on the front side wall of the paint cavity, the material spraying pipe is in sliding fit with the two baffles, a connecting spring is fixedly arranged on the material spraying pipe, the connecting spring is fixedly connected with the rear end of the paint box, bilaterally symmetrical first racks are fixedly arranged on the left and right side walls of the material spraying pipe, and bilaterally symmetrical limiting blocks which take the material spraying pipe, a linking spring is fixedly arranged at the front end of the limiting block, the linking spring is fixedly connected with the rear end of the coating box, a second rack is fixedly arranged at one end, close to the material spraying pipe, of the limiting block, two gear shafts which are bilaterally symmetrical by taking the material spraying pipe as a symmetrical center are rotatably arranged on the bottom wall of the working cavity, a connecting gear is fixedly arranged on each gear shaft and is meshed with the second rack, the connecting gear is meshed with the first rack, a rotating shaft which is bilaterally symmetrical by taking the material spraying pipe as a symmetrical center is fixedly arranged on the bottom wall of the U-shaped rotating cavity, a rolling brush is fixedly arranged on each rotating shaft, a first belt pulley positioned at the upper side of the rolling brush is fixedly arranged on each rolling brush, a motor is fixedly arranged on the left side wall of the U-shaped rotating cavity, the right end of the motor is in power connection with a power shaft, and, the main bevel gear is positioned on the right side of the power gear, the U-shaped rotating cavity top wall is rotatably provided with a connecting shaft, the connecting shaft is fixedly provided with an auxiliary bevel gear and a second belt pulley, the auxiliary bevel gear is meshed with the main bevel gear, the second belt pulley is positioned on the upper side of the auxiliary bevel gear, the first belt pulley is connected with the second belt pulley through a belt, the left side wall and the right side wall of the U-shaped rotating cavity are respectively provided with two through grooves which are bilaterally symmetrical by taking the power gear as a symmetrical center, the through grooves are communicated with each other leftwards and rightwards, two suspension rods are slidably arranged in the through grooves, the suspension rods are rotatably provided with transmission gears, the transmission gears are meshed with the power gear, the lower end of the box body is fixedly provided with a moving rack, the moving rack is provided with a rack, the suspension rods are positioned outside the U-shaped rotating cavity and are fixedly provided, the sleeve shaft front side is rotated and is installed the connecting axle, fixed mounting has driven gear and first rope sheave on the connecting axle, first rope sheave is located the driven gear front side.
2. A painting installation for exterior walls of buildings according to claim 1, characterized in that: the building outer wall is arranged on the front side of the box body, bilaterally symmetrical supporting plates are fixedly mounted at the upper end of the building outer wall, a first rope wheel shaft is rotatably mounted between the two supporting plates, a bilaterally symmetrical second rope wheel is fixedly mounted on the first rope wheel shaft, a second rope wheel shaft is rotatably mounted between the two supporting plates, the second rope wheel shaft is located on the lower side of the first rope wheel shaft, a bilaterally symmetrical third rope wheel is fixedly mounted on the second rope wheel shaft, the third rope wheel is located on the lower side of the second rope wheel, and the second rope wheel, the third rope wheel and the first rope wheel are connected through steel ropes.
3. A painting installation for exterior walls of buildings according to claim 2, characterized in that: the coating cavity side wall is internally provided with extrusion blocks which are bilaterally symmetrical by taking the material spraying pipe as a symmetrical center in a sliding mode, one end, far away from the material spraying pipe, of each extrusion block is fixedly provided with an extrusion spring, and the extrusion springs are fixedly connected with the left side wall and the right side wall of the coating cavity.
4. A painting installation for exterior walls of buildings according to claim 3, characterized in that: be equipped with in the box and be located the alarm groove of coating chamber rear side, alarm groove opening is upwards, the coating chamber with through the passageway intercommunication between the alarm groove, it is equipped with the kicking block to slide in the passageway, the kicking block pass through reset spring with the baffle is kept away from spout the one end fixed connection of material pipe, fixed mounting has the fixed axle in the passageway, rotate on the fixed axle and install the dwang, the dwang rear side is equipped with the inclined plane, the passageway with dwang sliding fit, dwang front side commentaries on classics fixed mounting has connecting block, two the fixed siren that is equipped with between the connecting block.
5. A painting installation for exterior walls of buildings according to claim 4, characterized in that: and a paint spraying pump is fixedly arranged in the material spraying cavity.
CN202011098195.XA 2020-10-14 2020-10-14 Painting equipment for building external wall Withdrawn CN112127599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011098195.XA CN112127599A (en) 2020-10-14 2020-10-14 Painting equipment for building external wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011098195.XA CN112127599A (en) 2020-10-14 2020-10-14 Painting equipment for building external wall

Publications (1)

Publication Number Publication Date
CN112127599A true CN112127599A (en) 2020-12-25

Family

ID=73852567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011098195.XA Withdrawn CN112127599A (en) 2020-10-14 2020-10-14 Painting equipment for building external wall

Country Status (1)

Country Link
CN (1) CN112127599A (en)

Similar Documents

Publication Publication Date Title
CN110694841B (en) Bicycle frame paint spraying apparatus
CN105615780B (en) Multifunctional high building cleaning device
CN105617545B (en) Multifunctional high-rise escape device with functions
CN105502128B (en) A kind of multifunctional high building lifting gear
CN209227996U (en) A kind of construction wall plastering device
CN105664383B (en) Multifunctional high building fire plant
CN207513114U (en) A kind of construction wall spray equipment
CN110015624A (en) It is a kind of for removing the mobile work platform of high-rise buildings
CN110725514B (en) Wall surface mortar spraying equipment capable of automatically trowelling
CN105640424B (en) Multifunctional high building lowering or hoisting gear
CN111075497A (en) Height-adjustable spraying dust-settling device for underground coal mine
CN110813606A (en) Climb spraying equipment of frame and track robot integration
CN112127599A (en) Painting equipment for building external wall
CN105615781A (en) Combined multifunctional high building washing device
CN114345597B (en) Device is paintd to building construction panel flame retardant paint
CN110185239B (en) A paint device fast for refractory material of wall body
CN210176405U (en) Hanging basket for building
CN111297280A (en) Automatic cleaning device for building wall
CN111305524A (en) Remote control car for painting
CN110328079A (en) A kind of trailer spray booth
CN220504438U (en) External wall plastering device for house construction
CN212105009U (en) Building interior decoration is with machine of plastering a wall
CN216512482U (en) Explosion-proof crane for safe workshop
CN211775583U (en) Interior decoration accessory
CN215948856U (en) Outer wall brushing hanging basket structure for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210127

Address after: No. 11, Fuqian Road, Longhua District, Shenzhen, Guangdong 518109

Applicant after: Shenzhen Jinli Technology Co.,Ltd.

Address before: 6 / F, Guangzhou, Guangdong Province

Applicant before: Guangzhou Jinshuo Crystal Co.,Ltd.

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20201225