CN112101815A - Construction management visualization system for capital construction distribution network project - Google Patents
Construction management visualization system for capital construction distribution network project Download PDFInfo
- Publication number
- CN112101815A CN112101815A CN202011026686.3A CN202011026686A CN112101815A CN 112101815 A CN112101815 A CN 112101815A CN 202011026686 A CN202011026686 A CN 202011026686A CN 112101815 A CN112101815 A CN 112101815A
- Authority
- CN
- China
- Prior art keywords
- module
- construction
- signal connection
- output end
- input end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 60
- 238000009826 distribution Methods 0.000 title claims abstract description 35
- 238000009430 construction management Methods 0.000 title claims abstract description 18
- 238000012800 visualization Methods 0.000 title claims abstract description 16
- 238000007726 management method Methods 0.000 claims abstract description 48
- 239000000463 material Substances 0.000 claims abstract description 18
- 238000012545 processing Methods 0.000 claims abstract description 9
- 230000000007 visual effect Effects 0.000 claims abstract description 7
- 238000012546 transfer Methods 0.000 claims description 8
- 230000017260 vegetative to reproductive phase transition of meristem Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 13
- 238000004519 manufacturing process Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 8
- 238000013461 design Methods 0.000 description 3
- 238000009440 infrastructure construction Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000004590 computer program Methods 0.000 description 2
- 238000000354 decomposition reaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009834 vaporization Methods 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a construction management visualization system for a capital construction distribution network project, which comprises a central processing unit, the output end of the central processing unit is in signal connection with the input end of the field management terminal, the output end of the field management terminal is in signal connection with the input end of the management and control module, the invention calculates the number of teams and personnel required by project implementation through the main project plan planning module and the task issuing module, avoids that projects cannot be completed due to insufficient constructors, plans step-by-step pile handing and supplies materials through the management and control module, the construction pile handing module and the material issuing module, avoids unfavorable management and control of flowering all the time, and avoids remaining construction difficulties, thereby ensuring the visual management of the construction of the infrastructure distribution network project.
Description
Technical Field
The invention relates to the technical field of distribution network project construction, in particular to a construction management visualization system for a capital construction distribution network project.
Background
And the infrastructure project is the infrastructure construction project. The basic facilities mainly comprise transportation, airports, ports, bridges, communication, water conservancy and urban water supply, drainage, air supply, power supply facilities and fixed assets required by departments such as science, education, civilization and the like for providing intangible products or serving for science, education, civilization and the like, are common material foundations of production, operation and life of all enterprises, units and residents, are guarantees of normal operation of urban main facilities, and are important conditions of material production and labor reproduction. Government investment and construction of these aspects is the construction of infrastructure. The urban infrastructure construction of China has a plurality of debts and large gaps. Traffic congestion is becoming more and more severe. Insufficient water supply and falling-behind drainage facilities. The urban vaporization rate is low. The energy supply is insufficient for a long time. The transportation capacity, especially the railway transportation capacity, is seriously insufficient. These are also bottlenecks that limit economic development. The infrastructure construction is reinforced.
The method comprises the following steps that construction management of capital construction distribution network projects is achieved, a design unit does not actually configure field design workers in the project construction process of a plurality of distribution network projects, the problem processing by the design unit in the construction process is often out of time, a supervision unit manages the problems, the supervision personnel and the vehicle configuration do not meet the field control requirements, and the distribution network is characterized by being multi-faceted; the construction unit has insufficient construction force reserve, disordered construction arrangement, disordered material management, severe site safety and quality situation, untimely and distorted process data, and generally, a data clerk asks a team leader for site basic data and arranges the data according to requirements. Data members do not go to the site to collect data, so that deviation exists between the data members and the actual situation of the site, the electronic transfer procedure and the later operation maintenance are influenced, and therefore a capital construction distribution network project construction management visualization system is provided.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a construction management visualization system for a capital construction distribution network project, which aims to solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme:
the construction management visualization system for the capital distribution network project comprises a central processing unit, wherein the output end of the central processing unit is in signal connection with the input end of a site management terminal, the output end of the site management terminal is in signal connection with the input end of a management and control module, the output end of the management and control module is in signal connection with the input end of a scheme planning module, the output end of the management and control module is in signal connection with the input end of a construction pile-handing module, the output end of the construction pile-handing module is in signal connection with the input end of a material distribution module, the output end of the site management terminal is in signal connection with the input end of a main project plan drafting module, the output end of the main project plan drafting module is in signal connection with the input end of a task issuing module, the output end of the task issuing module is in, the output end of the main project plan drafting module is in signal connection with the input end of the personnel management module.
Further, the main project plan drafting module comprises a power-off plan drafting module and a sub project plan drafting module.
Furthermore, the output end of the material distribution module is in signal connection with the input end of the main project plan drafting module.
Further, the task issuing module comprises a week construction plan, a week fund collection plan, a week acceptance plan, a week electronic transfer plan and a week power failure plan.
Furthermore, the output end of the sub-project plan drafting module is in signal connection with the input end of the sub-project work node module, and the sub-project work node module comprises a non-power-off work completion unit, a field acceptance unit, an acceptance unit and an electronic transfer unit.
Further, the output end of the scheme planning module is in signal connection with the input end of the planning control graph module, and the output end of the scheme planning module is in signal connection with the input end of the planning control table module.
Further, the output end of the main project plan drafting module is in signal connection with the input end of the checking module, and the output end of the checking module is in signal connection with the input end of the plan finishing module.
Further, the personnel management output end is in signal connection with the input end of the constructor determination module.
Compared with the prior art, the invention provides a construction management visualization system for a capital construction distribution network project, which has the following beneficial effects:
1. the invention calculates the number of teams and personnel required by project implementation through the main project planning module and the task issuing module, avoids the problem that the project cannot be completed due to the shortage of constructors, plans the step-by-step pile handing and supplies materials according to the control module, the construction pile handing module and the materials issuing module, avoids the unfavorable control of flowering all the times, and eliminates the remaining construction difficulty, thereby ensuring the visual management of the construction of the infrastructure distribution network project, providing decision support for the construction scheduling of the infrastructure distribution network project and providing an effective solution for the visual construction.
2. The invention defines the responsibility and the management and control personnel of each node through the personnel management module, ensures the responsibility to the personnel, and comprehensively cuts off the power through the plan making module during the power cut, thereby avoiding the difficulty of production and customer service caused by repeated power cut and realizing the planned process management. The large-scale construction and production are completed and put into operation by the main line switch section or the whole, and the planned centralized acceptance and production are realized, so that the matching difficulty of the matching department is reduced, and the working efficiency is improved.
Drawings
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be further described in detail with reference to the accompanying drawings, in which:
FIG. 1 is a block diagram of the system of the present invention;
FIG. 2 is a schematic diagram of the sub-project plan making module connections according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Referring to fig. 1-2, the present embodiment provides a technical solution: the construction management visualization system for the capital distribution network projects comprises a central processing unit, wherein the output end of the central processing unit is in signal connection with the input end of a site management terminal, the output end of the site management terminal is in signal connection with the input end of a management and control module, the output end of the management and control module is in signal connection with the input end of a plan management and control graph module, the completion and the production time of each main line project can be planned according to a primary schedule by setting the plan module and combining the distribution and the workload of each main line project, the output end of the plan module is in signal connection with the input end of a plan management and control table module, the output end of the management and control module is in signal connection with the input end of a construction cross pile module, the output end of the construction cross pile module is in signal connection with the input end of a material distribution module, and the output end of the material distribution module is, through according to the management and control module, construction is handed over the stake module and the material is provided the module and is planned substep and handed over the stake, supply the material, avoid the unfavorable management and control of blooming everywhere, stop surplus construction difficult point, plan to plan through the main project and plan to decide module and task and assign the module and calculate team and personnel quantity that the project implementation needs, avoid the engineering can not complete because of constructor is not enough late, the quality of construction has been guaranteed, also avoid constructor to lead to the waste of manpower resources more simultaneously, fine distributes constructor, the practicality is higher.
The output end of the field management terminal is in signal connection with the input end of the main project plan drafting module, the main project plan drafting module is arranged, so that secondary decomposition can be carried out on the completion time of each sub project forming the main project according to the planned completion time of the main project, the completion time of the sub project is determined, the main project plan drafting module comprises a plan drafting module during power failure and a sub project plan drafting module, the power failure is comprehensively carried out through the plan drafting module during power failure, the difficulty of production and customer service caused by repeated power failure is avoided, and the planned process management is realized. The matching difficulty of the matching department is reduced, and therefore the working efficiency is improved.
The output end of the sub-project plan drafting module is in signal connection with the input end of the sub-project work node module, the sub-project work node module comprises a non-power-off work completion unit, a field acceptance unit, an acceptance unit and an electronic transfer unit, the sub-project construction process node is decomposed in three levels through the sub-project completion time drafted according to the sub-project work node module, the completion time of non-power-off work completion, field acceptance, acceptance and electronic transfer in the sub-project work node is determined, the output end of the main project plan drafting module is in signal connection with the input end of the task issuing module, the task issuing module comprises a week construction plan, a week acceptance plan, a week electronic transfer plan and a week power-off plan, the output end of the task issuing module is in signal connection with the input end of the constructor planning module, and the output end of the constructor planning module is in signal connection with, the output end of the main project plan drafting module is in signal connection with the input end of the personnel management module, the person responsible for each node and the management and control personnel are determined through the personnel management module, the responsibility is realized to the person, the personnel management output end is in signal connection with the input end of the construction personnel determining module, the number of construction persons and the person responsible for each sub-project is determined by checking the work content of the power failure part of each sub-project, the power failure work content of all lines is completed by comprehensively cutting off power in a mainline unit, the output end of the main project plan drafting module is in signal connection with the input end of the checking module, and the output end of the checking module is in signal connection with the input end of the plan completing module, so that the visual management of the construction of the infrastructure distribution network project can be ensured, decision support is provided for.
When in use, the site management terminal draws up a plan control chart module and a plan control chart module through a control module and a scheme planning module according to a planning scheme to form a main line comprehensive plan control chart and a main line comprehensive plan control chart, and then the construction rhythm and the control range are effectively controlled by the construction pile-crossing module and the material distribution module through the control module, wherein, a main project plan drafting module is determined by the field management terminal, the completion and production time of each main project is drafted, the main project plan drafting module determines a task issuing module, according to the drafted sub-project completion time, and performing three-level decomposition on the sub-project construction process nodes to determine the completion time of the sub-project work nodes, determining a constructor planning module and a constructor determining module according to a task issuing module, determining the number of construction persons and a responsible person, and completing all power failure work contents on the line.
In conclusion, the number of teams and personnel required by project implementation is calculated through the main project planning module and the task issuing module, the problem that projects cannot be completed due to the fact that construction personnel are insufficient and late is avoided, step-by-step pile handing and material supply are planned according to the control module, the construction pile handing module and the material issuing module, unfavorable control over flowering is avoided, and remaining construction difficulties are eliminated, so that visual management of construction of a infrastructure distribution network project can be guaranteed, decision support is provided for construction scheduling of the infrastructure distribution network project, an effective solution is provided for visual construction, the personnel management module is used for determining the responsible personnel and the control personnel of each node, responsibility is fallen to the personnel, power failure is comprehensively achieved through the planning module during power failure, difficulty in production and client service due to repeated power failure is avoided, and planned process management is achieved. The large-scale construction and production, the complete of the main line switch section or the whole, the concentrated acceptance and production of the production and the planning are realized, the matching difficulty of the matching department is reduced, and the working efficiency is improved.
It should be recognized that embodiments of the present invention can be realized and implemented by computer hardware, a combination of hardware and software, or by computer instructions stored in a non-transitory computer readable memory. The methods may be implemented in a computer program using standard programming techniques, including a non-transitory computer-readable storage medium configured with the computer program, where the storage medium so configured causes a computer to operate in a specific and predefined manner, according to the methods and figures described in the detailed description. Each program may be implemented in a high level procedural or object oriented programming language to communicate with a computer system. However, the program(s) can be implemented in assembly or machine language, if desired. In any case, the language may be a compiled or interpreted language. Furthermore, the program can be run on a programmed application specific integrated circuit for this purpose.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a visual system of capital construction distribution network project construction management, includes central processing unit, its characterized in that: the output end of the central processing unit is in signal connection with the input end of the field management terminal, the output end of the field management terminal is in signal connection with the input end of the management and control module, the output end of the management and control module is in signal connection with the input end of the scheme planning module, the output end of the management and control module is in signal connection with the input end of the construction pile handing module, the output end of the construction pile-handing module is in signal connection with the input end of the material distribution module, the output end of the field management terminal is in signal connection with the input end of the main project plan drafting module, the output end of the main project plan drafting module is in signal connection with the input end of the task assigning module, the output end of the task assigning module is in signal connection with the input end of the constructor planning module, the output end of the constructor planning module is in signal connection with the input end of the constructor determining module, and the output end of the main project plan drafting module is in signal connection with the input end of the personnel management module.
2. The construction management visualization system for the capital construction distribution network project according to claim 1, characterized in that: the main project plan drafting module comprises a plan drafting module and a sub project plan drafting module when power is off.
3. The construction management visualization system for the capital construction distribution network project according to claim 1, characterized in that: the output end of the material distribution module is in signal connection with the input end of the main project plan drafting module.
4. The construction management visualization system for the capital construction distribution network project according to claim 1, characterized in that: the task issuing module comprises a week construction plan, a week fund collection plan, a week acceptance plan, a week electronic transfer plan and a week power failure plan.
5. The construction management visualization system for the capital construction distribution network project according to claim 2, characterized in that: the output end of the sub-project plan drafting module is in signal connection with the input end of the sub-project work node module, and the sub-project work node module comprises a non-power-off work completion unit, a field acceptance unit, an acceptance unit and an electronic transfer unit.
6. The construction management visualization system for the capital construction distribution network project according to claim 1, characterized in that: the output end of the scheme planning module is in signal connection with the input end of the planning control chart module, and the output end of the scheme planning module is in signal connection with the input end of the planning control table module.
7. The construction management visualization system for the capital construction distribution network project according to claim 1, characterized in that: the output end of the main project plan drafting module is in signal connection with the input end of the checking module, and the output end of the checking module is in signal connection with the input end of the plan finishing module.
8. The construction management visualization system for the capital construction distribution network project according to claim 1, characterized in that: and the personnel management output end is in signal connection with the input end of the constructor determination module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011026686.3A CN112101815A (en) | 2020-09-25 | 2020-09-25 | Construction management visualization system for capital construction distribution network project |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011026686.3A CN112101815A (en) | 2020-09-25 | 2020-09-25 | Construction management visualization system for capital construction distribution network project |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112101815A true CN112101815A (en) | 2020-12-18 |
Family
ID=73755667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011026686.3A Pending CN112101815A (en) | 2020-09-25 | 2020-09-25 | Construction management visualization system for capital construction distribution network project |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112101815A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115796563A (en) * | 2023-02-10 | 2023-03-14 | 中建安装集团有限公司 | Steel structure list checking and verifying management system based on big data |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844451A (en) * | 2016-04-15 | 2016-08-10 | 中交上海三航科学研究院有限公司 | Construction informatization management method, system and service terminal |
CN106351086A (en) * | 2016-08-29 | 2017-01-25 | 株洲长远铁路建机有限公司 | Construction operation method for tunnel bed and system equipment thereof |
CN106651653A (en) * | 2016-12-19 | 2017-05-10 | 国家电网公司 | Intelligent power distribution network project auxiliary management system |
CN109149565A (en) * | 2018-09-04 | 2019-01-04 | 周翔 | Electric integrated management-control method, system, server and storage medium |
CN110472933A (en) * | 2019-07-26 | 2019-11-19 | 中国能源建设集团广东省电力设计研究院有限公司 | A kind of marketing programs managing and control system |
-
2020
- 2020-09-25 CN CN202011026686.3A patent/CN112101815A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844451A (en) * | 2016-04-15 | 2016-08-10 | 中交上海三航科学研究院有限公司 | Construction informatization management method, system and service terminal |
CN106351086A (en) * | 2016-08-29 | 2017-01-25 | 株洲长远铁路建机有限公司 | Construction operation method for tunnel bed and system equipment thereof |
CN106651653A (en) * | 2016-12-19 | 2017-05-10 | 国家电网公司 | Intelligent power distribution network project auxiliary management system |
CN109149565A (en) * | 2018-09-04 | 2019-01-04 | 周翔 | Electric integrated management-control method, system, server and storage medium |
CN110472933A (en) * | 2019-07-26 | 2019-11-19 | 中国能源建设集团广东省电力设计研究院有限公司 | A kind of marketing programs managing and control system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115796563A (en) * | 2023-02-10 | 2023-03-14 | 中建安装集团有限公司 | Steel structure list checking and verifying management system based on big data |
CN115796563B (en) * | 2023-02-10 | 2023-04-11 | 中建安装集团有限公司 | Steel structure list checking and verifying management system based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107368951A (en) | A kind of power grid enterprises' technological transformation Overhaul Quality management and control honesty Warning System and its operation method | |
CN111582696A (en) | Engineering construction scheduling management method | |
CN106251069A (en) | Dynamic on-demand routing inspection method based on big data analysis and association | |
CN112668740B (en) | Management platform of wisdom shipyard | |
CN114757797B (en) | Power grid resource service central platform architecture method based on data model drive | |
CN106600240A (en) | Power grid regulation and control and operation management system of power supply enterprise based on big data lean assistance | |
CN104992285A (en) | Enterprise budget cost controlling system | |
CN112101815A (en) | Construction management visualization system for capital construction distribution network project | |
CN116934052A (en) | Project management method and system based on WBS engineering entity splitting and hooking | |
CN110689214A (en) | Material supply intelligent collection management control platform | |
CN111711651A (en) | New energy data sharing method and system | |
Wang et al. | Joint optimization of integrated mixed maintenance and distributed two-stage hybrid flow-shop production for multi-site maintenance requirements | |
CN106022648A (en) | Electric power scheduling report form coordination and generation method | |
CN113283619A (en) | Power failure maintenance planning auxiliary method and system based on knowledge graph | |
CN104616117A (en) | Assets operation supervision and management platform based on PAS55 standard | |
CN115600968A (en) | Regional industry collaborative management method for power generation enterprises | |
CN113962516A (en) | Digital application system based on power supply service command system and result evaluation method | |
CN114139849A (en) | Management platform applied to flow supervision and overall planning of building industry | |
Xie et al. | Data demand model based on ubiquitous power Internet of Things | |
CN202192688U (en) | Automatic control system for networking clusters of commercial concrete mixing plants | |
CN111523828A (en) | Self-adjusting center system of transport vehicle of mobile substation | |
Wang | Application of BIM Technology to project management objectives | |
Wang et al. | Joint Optimization of Integrated Mixed Maintenance and Distributed Two-Stage Hybrid Flow-Shop Production for Multi-Site Maintenance Requirements | |
Xiao et al. | Lean Network Management Based on Power Grid Equipment Operation Efficiency Analysis Platform | |
Liwen et al. | The impact of electric power system reform on power dispatching institution |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201218 |