CN112098222A - LNG ship ballast tank strength test method - Google Patents

LNG ship ballast tank strength test method Download PDF

Info

Publication number
CN112098222A
CN112098222A CN202010800343.1A CN202010800343A CN112098222A CN 112098222 A CN112098222 A CN 112098222A CN 202010800343 A CN202010800343 A CN 202010800343A CN 112098222 A CN112098222 A CN 112098222A
Authority
CN
China
Prior art keywords
water
ballast tank
pipe
temporary
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010800343.1A
Other languages
Chinese (zh)
Inventor
陆书文
何江华
吴建高
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN202010800343.1A priority Critical patent/CN112098222A/en
Publication of CN112098222A publication Critical patent/CN112098222A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a method for testing the strength of a ballast tank of an LNG ship, which comprises the following steps: installing a temporary test pipeline; adding water into the ballast tank to be tested to a test liquid level by using a temporary pump, and carrying out a strength test; opening outlet valves of the ballast tank under the current test and the ballast tank under the next test, enabling water in the ballast tank under the current test to automatically flow into the ballast tank under the next test until liquid levels in the two tanks are equal, and then utilizing a temporary pump to transport residual water in the ballast tank under the current test into the ballast tank under the next test for strength test; repeating the step S3, and sequentially carrying out strength tests on all ballast tanks in the LNG ship; after all ballast tanks in the LNG ship are tested, water in the ballast tanks is emptied by the aid of the temporary pumps. The method greatly accelerates the process of the ballast tank strength test, saves the test time, ensures that the subsequent ship containment system is installed as soon as possible, and shortens the construction period of the LNG ship wharf.

Description

LNG ship ballast tank strength test method
Technical Field
The invention relates to the technical field of ship construction, in particular to a method for testing strength of an LNG ship ballast tank.
Background
In the process of building a large LNG ship, the installation of the cargo hold containment system is a very critical work which most influences the building period, and in order to ensure the construction quality of the cargo hold, the installation of the corresponding containment system can be carried out only after the strength test of the ballast holds arranged on the two sides of the cargo hold is finished. This means that after the vessel is launched, the ballast tank strength test must be completed as soon as possible to shorten the overall vessel construction cycle.
The ballast pump of the large LNG ship is a 6600V motor, and can only be driven by a ship generator and cannot be driven by shore power, but when the ballast tank is subjected to a strength test, power and electric equipment on the ship are not completed, so that the ballast tank cannot be ballasted and discharged by using the ballast pump in the strength test stage.
Disclosure of Invention
In view of the above, the present invention provides a method for testing the strength of a ballast tank of an LNG ship, so as to solve the above problems in the background art.
A method for testing the strength of a ballast tank of an LNG ship specifically comprises the following steps:
s1, installing a temporary test pipeline;
the temporary test pipeline comprises a temporary pump, a water inlet of the temporary pump is connected with a water suction pipe, a water outlet of the temporary pump is respectively connected with a water inlet pipe and a water discharge pipe, the water inlet pipe is connected with a water inlet of a first water delivery pipe, the first water delivery pipe is respectively connected with a ballast main pipe of each ballast tank, and a second water delivery pipe is connected between the water inlet of the first water delivery pipe and the water inlet of the temporary pump;
s2, adding water into the ballast tank to be tested to a test liquid level by using a temporary pump, and carrying out a strength test;
s3, opening outlet valves of the ballast tank of the current test and the ballast tank of the next to-be-tested, enabling water in the ballast tank of the current test to automatically flow into the ballast tank of the next to-be-tested until liquid levels in the two tanks are equal, and then utilizing a temporary pump to transfer residual water in the ballast tank of the current test into the ballast tank of the next to-be-tested for strength test;
s4, repeating the step S3, and sequentially carrying out strength tests on all ballast tanks in the LNG ship;
and S5, after all ballast tanks in the LNG ship are tested, closing the water suction pipe and the water inlet pipe, opening the water discharge pipe and the second water conveying pipe, and emptying water in the ballast tanks by using the temporary pump.
Preferably, the ballast tanks include a left side tank and a right side tank,
the water inlet pipe, the first water pipe and the second water pipe in the temporary test pipeline are all set into a left path and a right path, one end of the left path water inlet pipe and one end of the right path water inlet pipe are connected to an outlet of the temporary pump, the other end of the left path water inlet pipe and the other end of the right path water inlet pipe are connected with the corresponding first water pipe, the left side cabin of all ballast tanks are connected with the left first water pipe, and the right side cabin of all ballast tanks are connected with the right first water pipe.
Preferably, in step S2, the specific steps of adding water to the ballast tank to be tested to the test liquid level by using the temporary pump are as follows:
the water suction pipe and the left and the right water inlet pipes are opened,
and (3) synchronously adding water into the left side cabin and the right side cabin of the ballast tank to be tested by using the temporary pump, and starting to perform the strength test when the water levels in the left side cabin and the right side cabin of the ballast tank to be tested reach the test liquid levels.
Preferably, the specific steps of using the temporary pump to transfer the water remaining in the currently tested ballast tank to the next ballast tank to be tested in step S3 are as follows:
closing the water suction pipe and the water inlet pipe on the left side, opening the second water conveying pipe on the left side, and transferring the residual water in the left side cabin of the ballast tank to be tested to the right side cabin of the next ballast tank to be tested through the first water conveying pipe on the left side, the second water conveying pipe on the left side, the water inlet pipe on the right side and the first water conveying pipe on the right side by using the temporary pump;
and closing the left second water conveying pipe and the right water inlet pipe, opening the left water inlet pipe and the right second water conveying pipe, and transferring the residual water in the right side cabin of the currently tested ballast tank to the left side cabin of the next ballast tank to be tested through the right first water conveying pipe, the right second water conveying pipe, the left water inlet pipe and the left first water conveying pipe by using the temporary pump.
Preferably, after the residual water in the currently tested ballast tank is transferred into the next ballast tank to be tested, if the water level in the next ballast tank to be tested does not reach the test liquid level, the left and right second water conveying pipes can be closed, the water suction pipe and the left and right water inlet pipes are reopened, and water is injected into the next ballast tank to be tested by using the temporary pump until the test liquid level is reached.
Preferably, install first interim valve on the pipe that absorbs water, install the interim valve of second on the left second raceway, install the interim valve of third on the right second raceway, install the interim valve of fourth on the left inlet tube, install the interim valve of fifth on the inlet tube on the right side, install the interim valve of sixth on the drain pipe.
Preferably, the water suction pipe is provided with a filter, and a suction port of the water suction pipe is arranged in seawater or river water at a ship berth, or the suction port of the water suction pipe is connected with a wharf fire-fighting water pipe.
Preferably, the temporary pump can be a 440V shore power driven fire pump or other pump with the same displacement, and the displacement of the temporary pump is at least 10 times of that of the wharf fire pump or the submersible pump.
Preferably, the method is suitable for the ballast tank strength test of a large ship with a 6600V ballast pump.
The invention has the beneficial effects that:
1. the method is suitable for the strength test of the ballast tank of a large ship with the ballast pump of 6600V, can be used for the strength test of all ballast tanks in the ship by installing the temporary test pipeline, overcomes the problem that the ballast pump cannot be used in the test stage so as to cause the loading and unloading of the ballast tank, greatly accelerates the process of the strength test of the ballast tank, saves the test time, ensures the quick installation of a subsequent ship containment system, and shortens the construction period of an LNG ship terminal.
2. The discharge capacity of the temporary pump used in the method is more than 10 times of that of the wharf fire water or the submersible pump, so that a large amount of loading and discharging time can be saved, and meanwhile, the temporary pump, the filter and the temporary valves on all pipelines are all existing equipment on a ship, so that extra construction cost is not generated.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic view of a temporary test line of the present invention.
Fig. 2 is a schematic view of a temporary pump adding water from the outside to the ballast tank.
Fig. 3 is a schematic illustration of the transfer of water remaining in the left side tank of the ballast tank currently being tested to the right side tank of the ballast tank to be tested.
Fig. 4 is a schematic illustration of the transfer of water remaining in the right side tank of the ballast tank currently being tested to the left side tank of the ballast tank to be tested.
Fig. 5 is a schematic view of the discharge of water from the ballast tank.
The reference numerals in the figures have the meaning:
1 is the temporary pump, 2 is the pipe that absorbs water, 3 is the inlet tube, 4 is the drain pipe, 5 is first raceway, 6 is the second raceway, 7 is the ballast house steward, 8 is the left side cabin, 9 is the right side cabin, 10 is the suction inlet of the pipe that absorbs water, 11 is the filter.
Detailed Description
For better understanding of the technical solutions of the present invention, the following detailed descriptions of the embodiments of the present invention are provided with reference to the accompanying drawings.
It should be understood that the described embodiments are only some embodiments of the invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The present application is described in further detail below with reference to specific embodiments and with reference to the attached drawings.
In the description of the present application, unless explicitly stated or limited otherwise, the terms "first", "second", and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; the term "plurality" means two or more unless specified or indicated otherwise; the terms "connected," "fixed," and the like are to be construed broadly and may, for example, be fixedly connected, detachably connected, integrally connected, or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the description of the present application, it should be understood that the terms "left" and "right" used in the description of the embodiments of the present application are used in the angle shown in the drawings, and should not be construed as limiting the embodiments of the present application.
The invention provides a method for testing the strength of a ballast tank of an LNG ship, which comprises the following steps:
and S1, installing a temporary test pipeline.
The temporary test pipeline comprises a temporary pump 1, a water inlet of the temporary pump 1 is connected with a water suction pipe 2, a water outlet of the temporary pump 1 is connected with a water inlet pipe 3 and a water outlet pipe 4 respectively, the water inlet pipe 3 is connected with a water inlet of a first water pipe 5, the first water pipe 5 is connected with a ballast main pipe 7 of each ballast tank respectively, and a second water pipe 6 is connected between the water inlet of the first water pipe 5 and the water inlet of the temporary pump 1.
In order to keep the ship body balanced, ballast tanks are usually arranged on two sides of the cargo hold, namely a left side tank 8 and a right side tank 9, wherein n left side tanks 8 are arranged on the left side of the cargo hold in fig. 1, and n right side tanks 9 are arranged on the right side of the cargo hold.
Therefore, the water inlet pipe 3, the first water delivery pipe 5 and the second water delivery pipe 6 in the temporary test pipeline are arranged into a left path and a right path. One end of the left and right water inlet pipes is connected with the outlet of the temporary pump 1, the other end of the left and right water inlet pipes is connected with the corresponding first water pipe 5, the left side compartment 8 of all ballast compartments is connected with the left first water pipe, and the right side compartment 9 of all ballast compartments is connected with the right first water pipe. And one path of second water conveying pipe is connected between the first water conveying pipe on the left side and the water inlet of the temporary pump, and the other path of second water conveying pipe is connected between the first water conveying pipe on the right side and the water inlet of the temporary pump.
Install first temporary valve (V1) on the tub 2 that absorbs water, install second temporary valve (V2) on the left second raceway, install third temporary valve (V3) on the second raceway on right side, install fourth temporary valve (V4) on the left inlet tube, install fifth temporary valve (V5) on the inlet tube on right side, install sixth temporary valve (V6) on drain pipe 4.
The suction port 10 of the water suction pipe 2 is arranged in seawater or river water at the berth of a ship, or the suction port 10 of the water suction pipe 2 is connected with a wharf fire-fighting water pipe, and a filter 11 is arranged on the water suction pipe 2 for filtering impurities in the water.
Before water is added into the ballast tank, valves on the water suction pipe 2, the two water inlet pipes 3, the two first water conveying pipes 5, the two second water conveying pipes 6 and the water discharge pipe 4 are all in a closed state.
And S2, adding water into the ballast tank to be tested to the test liquid level by using the temporary pump 1, and carrying out strength test.
Specifically, as shown in fig. 2, the suction pipe 2 and the left and right inlet pipes 3 are opened, that is, the first temporary valve (V1), the fourth temporary valve (V4) and the fifth temporary valve (V5) are opened;
utilize temporary pump 1 to add water (water gets into temporary pump 1 from the pipe that absorbs water 2) to the left side cabin and the right side cabin (if first left side cabin and first right side cabin) of the ballast tank of waiting to test in step (water to get into temporary pump 1 from the delivery port of temporary pump 1 respectively, two way inlet tube 3 on the right side, through left inlet tube, left first raceway gets into the left side under-deck of the ballast tank of waiting to test, through the inlet tube on right side, the first raceway on right side gets into the right side under-deck of the ballast tank of waiting to test, when the water level in the left side cabin and the right side under-deck of the ballast tank of waiting to test all reached experimental liquid level, begin to carry out the.
And S3, opening outlet valves of the ballast tank currently tested and the ballast tank to be tested next, and enabling the water in the ballast tank currently tested to automatically flow into the ballast tank to be tested next until the liquid levels in the two tanks are equal.
And then the temporary pump 1 is used for transferring the residual water in the ballast tank of the current test to the next ballast tank to be tested for strength test.
Specifically, the specific steps of lightening the remaining water in the ballast tank to the next ballast tank are as follows:
as shown in fig. 3, the suction pipe 2 and the left water inlet pipe 3 are closed, the left second water pipe is opened, that is, the first temporary valve (V1) and the fourth temporary valve (V4) are closed, the second temporary valve (V2) is opened, and the water remaining in the left tank of the currently tested ballast tank is transferred to the right tank of the next ballast tank to be tested through the left first water pipe, the left second water pipe, the right water inlet pipe and the right first water pipe by using the temporary pump;
as shown in fig. 4, the left second water pipe and the right water inlet pipe are closed, the left water inlet pipe and the right second water pipe are opened, that is, the second temporary valve (V2) and the fifth temporary valve (V5) are closed, the fourth temporary valve (V4) and the third temporary valve (V3) are opened, and the water remaining in the right tank of the currently tested ballast tank is transferred to the left tank of the next ballast tank to be tested through the right first water pipe, the right second water pipe, the left water inlet pipe and the left first water pipe by using the temporary pump.
After the residual water in the ballast tank of the current test is transferred to the next ballast tank to be tested, if the water level in the next ballast tank to be tested does not reach the test liquid level, the left and right second water conveying pipes can be closed, the water suction pipe 2 is opened again, the left and right water inlet pipes 3 are controlled, namely, the second temporary valve (V2) and the third temporary valve (V3) are closed, the first temporary valve (V1), the fourth temporary valve (V4) and the fifth temporary valve (V5) are opened, and water is injected into the next ballast tank to be tested by using the temporary pump until the test liquid level is reached.
And S4, repeating the step S3, and sequentially testing the strength of all ballast tanks in the LNG ship.
S5, after all ballast tanks in the LNG ship are tested, closing the suction pipe 2, the water inlet pipe 3, and opening the water discharge pipe 4 and the second water pipe 6, i.e., closing the first temporary valve (V1), the fourth temporary valve (V4), and the fifth temporary valve (V5), and opening the second temporary valve (V2), the third temporary valve (V3), and the sixth temporary valve (V6), and emptying the ballast tanks with the temporary pump 1, as shown in fig. 5.
The method is suitable for the strength test of the ballast tank of a large ship with a 6600V ballast pump.
In this embodiment, the temporary pump 1 may be a 440V shore power driven fire pump or other pump with the same displacement, and the displacement of the temporary pump is at least 10 times that of the wharf fire pump or submersible pump.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (9)

1. The method for testing the strength of the ballast tank of the LNG ship is characterized by comprising the following steps:
s1, installing a temporary test pipeline;
the temporary test pipeline comprises a temporary pump, a water inlet of the temporary pump is connected with a water suction pipe, a water outlet of the temporary pump is respectively connected with a water inlet pipe and a water discharge pipe, the water inlet pipe is connected with a water inlet of a first water delivery pipe, the first water delivery pipe is respectively connected with a ballast main pipe of each ballast tank, and a second water delivery pipe is connected between the water inlet of the first water delivery pipe and the water inlet of the temporary pump;
s2, adding water into the ballast tank to be tested to a test liquid level by using a temporary pump, and carrying out a strength test;
s3, opening outlet valves of the ballast tank of the current test and the ballast tank of the next to-be-tested, enabling water in the ballast tank of the current test to automatically flow into the ballast tank of the next to-be-tested until liquid levels in the two tanks are equal, and then utilizing a temporary pump to transfer residual water in the ballast tank of the current test into the ballast tank of the next to-be-tested for strength test;
s4, repeating the step S3, and sequentially carrying out strength tests on all ballast tanks in the LNG ship;
and S5, after all ballast tanks in the LNG ship are tested, closing the water suction pipe and the water inlet pipe, opening the water discharge pipe and the second water conveying pipe, and emptying water in the ballast tanks by using the temporary pump.
2. The LNG ship ballast tank strength test method of claim 1, wherein the ballast tank includes a left side tank and a right side tank,
the water inlet pipe, the first water pipe and the second water pipe in the temporary test pipeline are all set into a left path and a right path, one end of the left path water inlet pipe and one end of the right path water inlet pipe are connected to an outlet of the temporary pump, the other end of the left path water inlet pipe and the other end of the right path water inlet pipe are connected with the corresponding first water pipe, the left side cabin of all ballast tanks are connected with the left first water pipe, and the right side cabin of all ballast tanks are connected with the right first water pipe.
3. The method for testing the strength of the ballast tank of the LNG ship according to claim 2, wherein the step S2 of adding water to the ballast tank to be tested to the test level by using the temporary pump comprises the following specific steps:
the water suction pipe and the left and the right water inlet pipes are opened,
and (3) synchronously adding water into the left side cabin and the right side cabin of the ballast tank to be tested by using the temporary pump, and starting to perform the strength test when the water levels in the left side cabin and the right side cabin of the ballast tank to be tested reach the test liquid levels.
4. The method for testing the strength of the ballast tank of the LNG ship according to claim 2, wherein the concrete steps of using the temporary pump to transfer the water remaining in the currently tested ballast tank to the next ballast tank to be tested in step S3 are as follows:
closing the water suction pipe and the water inlet pipe on the left side, opening the second water conveying pipe on the left side, and transferring the residual water in the left side cabin of the ballast tank to be tested to the right side cabin of the next ballast tank to be tested through the first water conveying pipe on the left side, the second water conveying pipe on the left side, the water inlet pipe on the right side and the first water conveying pipe on the right side by using the temporary pump;
and closing the left second water conveying pipe and the right water inlet pipe, opening the left water inlet pipe and the right second water conveying pipe, and transferring the residual water in the right side cabin of the currently tested ballast tank to the left side cabin of the next ballast tank to be tested through the right first water conveying pipe, the right second water conveying pipe, the left water inlet pipe and the left first water conveying pipe by using the temporary pump.
5. The LNG ship ballast tank strength test method according to claim 4, wherein after the remaining water in the currently tested ballast tank is transferred to the next ballast tank to be tested, if the water level in the next ballast tank to be tested does not reach the test liquid level, the left and right second water pipes are closed, the water suction pipe and the left and right water inlet pipes are reopened, and water is injected into the next ballast tank to be tested by the temporary pump until the test liquid level is reached.
6. The LNG ship ballast tank strength test method according to claim 2, wherein the suction pipe is provided with a first temporary valve, the second water pipe on the left side is provided with a second temporary valve, the second water pipe on the right side is provided with a third temporary valve, the water inlet pipe on the left side is provided with a fourth temporary valve, the water inlet pipe on the right side is provided with a fifth temporary valve, and the water outlet pipe is provided with a sixth temporary valve.
7. The method for testing the strength of the ballast tank of the LNG ship as claimed in claim 1, wherein the suction pipe is provided with a filter, and a suction port of the suction pipe is disposed in seawater or river water at a ship berth, or the suction port of the suction pipe is connected with a wharf fire-fighting water pipe.
8. The LNG ship ballast tank strength test method according to claim 1, wherein the temporary pump is a 440V shore power driven fire pump or other pump with the same displacement, and the displacement of the temporary pump is at least 10 times of that of a wharf fire pump or a submersible pump.
9. The LNG ship ballast tank strength test method according to claim 1, wherein the method is applied to a ballast tank strength test of a large ship having a ballast pump of 6600V.
CN202010800343.1A 2020-08-11 2020-08-11 LNG ship ballast tank strength test method Pending CN112098222A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010800343.1A CN112098222A (en) 2020-08-11 2020-08-11 LNG ship ballast tank strength test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010800343.1A CN112098222A (en) 2020-08-11 2020-08-11 LNG ship ballast tank strength test method

Publications (1)

Publication Number Publication Date
CN112098222A true CN112098222A (en) 2020-12-18

Family

ID=73752778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010800343.1A Pending CN112098222A (en) 2020-08-11 2020-08-11 LNG ship ballast tank strength test method

Country Status (1)

Country Link
CN (1) CN112098222A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113148059A (en) * 2021-04-13 2021-07-23 上海外高桥造船有限公司 General section strength test and insulation installation method of gas transport ship
CN113148060A (en) * 2021-04-13 2021-07-23 上海外高桥造船有限公司 Gas transport ship block strength test and insulation installation method
CN114435556A (en) * 2022-02-14 2022-05-06 中交第三航务工程局有限公司 Construction method for injecting water into dock in dock construction
CN117734902A (en) * 2024-02-19 2024-03-22 江苏扬子鑫福造船有限公司 Ballast tank strength test equipment and test method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090020825A (en) * 2007-08-24 2009-02-27 대우조선해양 주식회사 Tank hydro test method a period of dock stage using buoyancy of half diving state
KR20120074382A (en) * 2010-12-28 2012-07-06 대우조선해양 주식회사 Method for inclining test of ship
KR20160012276A (en) * 2014-07-23 2016-02-03 주식회사 파나시아 A total test system and a method for ballasting and de-ballasting of ballst water
CN206704451U (en) * 2017-04-25 2017-12-05 中国船舶工业集团公司第七0八研究所 A kind of medium-and-large-sized ship adjusts the structure refuted with topside bow stern ballast tank
CN107444567A (en) * 2017-07-28 2017-12-08 广船国际有限公司 A kind of Strength Testing Methods of ultra large crude carrier
CN110053755A (en) * 2019-03-18 2019-07-26 上海海事大学 A kind of experimental rig for exempting from Treatment of Ships'Ballast Water system
CN110877705A (en) * 2019-11-19 2020-03-13 沪东中华造船(集团)有限公司 Method for repairing large container bilge ballast tank structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090020825A (en) * 2007-08-24 2009-02-27 대우조선해양 주식회사 Tank hydro test method a period of dock stage using buoyancy of half diving state
KR20120074382A (en) * 2010-12-28 2012-07-06 대우조선해양 주식회사 Method for inclining test of ship
KR20160012276A (en) * 2014-07-23 2016-02-03 주식회사 파나시아 A total test system and a method for ballasting and de-ballasting of ballst water
CN206704451U (en) * 2017-04-25 2017-12-05 中国船舶工业集团公司第七0八研究所 A kind of medium-and-large-sized ship adjusts the structure refuted with topside bow stern ballast tank
CN107444567A (en) * 2017-07-28 2017-12-08 广船国际有限公司 A kind of Strength Testing Methods of ultra large crude carrier
CN110053755A (en) * 2019-03-18 2019-07-26 上海海事大学 A kind of experimental rig for exempting from Treatment of Ships'Ballast Water system
CN110877705A (en) * 2019-11-19 2020-03-13 沪东中华造船(集团)有限公司 Method for repairing large container bilge ballast tank structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚向阳;张仁龙;: "采用水压载进行船舶倾斜试验的方法", 江苏船舶, no. 04, 30 August 2007 (2007-08-30), pages 37 - 42 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113148059A (en) * 2021-04-13 2021-07-23 上海外高桥造船有限公司 General section strength test and insulation installation method of gas transport ship
CN113148060A (en) * 2021-04-13 2021-07-23 上海外高桥造船有限公司 Gas transport ship block strength test and insulation installation method
CN114435556A (en) * 2022-02-14 2022-05-06 中交第三航务工程局有限公司 Construction method for injecting water into dock in dock construction
CN117734902A (en) * 2024-02-19 2024-03-22 江苏扬子鑫福造船有限公司 Ballast tank strength test equipment and test method
CN117734902B (en) * 2024-02-19 2024-05-03 江苏扬子鑫福造船有限公司 Ballast tank strength test equipment and test method

Similar Documents

Publication Publication Date Title
CN112098222A (en) LNG ship ballast tank strength test method
CN112078745A (en) LNG ship ballast tank strength test system
CN105784488A (en) Method for testing hydraulic pressure of welded pipelines
CN112665887B (en) Floating body strength experiment method
CN112078746A (en) Method for carrying out strength test on ballast tank in dock
CN104818164A (en) Cleaning liquid for ship ballast water treatment filter and on-line cleaning device and method
CN213181061U (en) Boiler water pressure test system
US20160376860A1 (en) Subsea filler line system and method for transporting various fluids through a master flow conduit
CN116223229A (en) Method for testing strength of cargo oil tank of finished oil tanker
EP0780341A1 (en) Watercraft waste water treatment system and method
CN211652096U (en) Hydraulic pipe cleaning test device
US2710586A (en) Barge for liquid cargo
JPS5838053B2 (en) Backup pressure device for high voltage cables
CN115783120A (en) Water ballast tank and drainage pipeline thereof
CN110843998A (en) Ship cabin washing water discharge system
CN104296839B (en) The test equipment and method of testing of dehumidifier level alarm for water
CN106697203A (en) Chemical cargo ship sweeping system and using method thereof
CN218617062U (en) Water ballast tank and drainage pipeline thereof
CN117734902B (en) Ballast tank strength test equipment and test method
WO1993021051A1 (en) Method and apparatus for filling and emptying of tank vehicles
RU2610844C1 (en) Underwater unit for fluid loading / unloading without berthing
CN211139567U (en) Ship cabin washing water discharge system
CN219265635U (en) Pipeline hydrostatic test device
CN116717724B (en) Anti-disturbance oil transportation method for sea surface floating hose
CN115748820B (en) Pushing type final joint cavity drainage method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination