CN112095575B - 基于管道机器人的监测实施方法 - Google Patents
基于管道机器人的监测实施方法 Download PDFInfo
- Publication number
- CN112095575B CN112095575B CN202010961009.4A CN202010961009A CN112095575B CN 112095575 B CN112095575 B CN 112095575B CN 202010961009 A CN202010961009 A CN 202010961009A CN 112095575 B CN112095575 B CN 112095575B
- Authority
- CN
- China
- Prior art keywords
- guide rail
- dam
- rail pipe
- pipeline robot
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pipeline Systems (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010961009.4A CN112095575B (zh) | 2020-09-14 | 2020-09-14 | 基于管道机器人的监测实施方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010961009.4A CN112095575B (zh) | 2020-09-14 | 2020-09-14 | 基于管道机器人的监测实施方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112095575A CN112095575A (zh) | 2020-12-18 |
CN112095575B true CN112095575B (zh) | 2022-11-15 |
Family
ID=73751517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010961009.4A Active CN112095575B (zh) | 2020-09-14 | 2020-09-14 | 基于管道机器人的监测实施方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112095575B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113945187A (zh) * | 2021-09-08 | 2022-01-18 | 国网新源控股有限公司 | 堆石坝内部变形测量机器人监测管道埋设方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1043565A3 (de) * | 1999-03-31 | 2002-08-07 | Martin Dr. Schreck | Vorrichtung zum Überwachen der Neigung eines Geländes |
CN100402979C (zh) * | 2004-01-17 | 2008-07-16 | 湖北清江水布垭工程建设公司 | 大坝面板挠度或坝体内部变形的监测管道 |
CN105258670A (zh) * | 2015-11-06 | 2016-01-20 | 三峡大学 | 大坝内观沉降监测管 |
CN110274570A (zh) * | 2019-07-30 | 2019-09-24 | 中国电建集团成都勘测设计研究院有限公司 | 用于堆石坝层间错动变形的监测系统 |
CN110864662B (zh) * | 2019-11-28 | 2020-12-01 | 武汉大学 | 高堆石坝坝体变形的监测方法 |
-
2020
- 2020-09-14 CN CN202010961009.4A patent/CN112095575B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN112095575A (zh) | 2020-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112095575B (zh) | 基于管道机器人的监测实施方法 | |
CN111255439B (zh) | 判断降压井侧壁粘土球封闭质量的自加温光纤装置与方法 | |
CN101806073A (zh) | 基桩上延段的无阻力载荷试验装置及其试验方法 | |
CN105546213B (zh) | 一种柔性复合管快速施工装置及施工方法 | |
CN114838703A (zh) | 一种分层沉降监测装置及其施工工艺 | |
CN113007611B (zh) | 燃气管道穿越河底的监测系统 | |
CN103994753A (zh) | 用于黄土填料高填方路堤的分层沉降装置及测量方法 | |
CN210106788U (zh) | 一种圆形沉井的顶管结构 | |
CN108914995B (zh) | 机场加筋挡土墙光纤光栅监测系统及施工方法 | |
CN115614542B (zh) | 一种以既有水中基坑为起点的顶管施工方法 | |
CN115450267B (zh) | 一种土石坝沉降管接力安装埋设结构及其方法 | |
CN109029346B (zh) | 一种软土地基中渗压及沉降一体化监测装置和测量方法 | |
CN114636046B (zh) | 一种大断面管涵异形玻璃钢内衬带水非开挖穿插修复方法 | |
CN107975376B (zh) | 隧道盾构顶管与竖向管道连接结构及施工方法 | |
JP2007255436A (ja) | 地下埋設多孔管路及びその布設方法 | |
JP3042928B2 (ja) | ガス導管用配管材 | |
CN113585426A (zh) | 一种室外排水管道施工工艺 | |
CN109797762A (zh) | 一种基坑边坡预埋管截渗结构及其施工方法 | |
CN106247007B (zh) | 远距离大直径工业管道自重变位下置铺设直埋施工方法 | |
CN201635099U (zh) | 灌注桩桩顶加长段无阻力载荷试验装置 | |
CN214695956U (zh) | 市政雨污排水管道 | |
CN110777812A (zh) | 一种电力沟道基坑两侧对称回填施工方法 | |
CN114962781B (zh) | 一种在既有管道下方穿设管道的施工方法 | |
CN215330338U (zh) | 一种顶拉管顶进过程中的洞口固定装置 | |
CN218346364U (zh) | 一种便于施工的道路收水支管 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Jin Wei Inventor after: Zhang Kun Inventor after: Peng Juwei Inventor after: Hu Shengwei Inventor after: Sun Quan Inventor after: Wan Yongbo Inventor after: Huang Pan Inventor before: Hu Shengwei Inventor before: Peng Juwei Inventor before: Sun Quan Inventor before: Wan Yongbo Inventor before: Huang Pan Inventor before: Zhang Kun |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |