CN112086918A - Integrated suspension system of city railway inspection library integrated pipeline - Google Patents

Integrated suspension system of city railway inspection library integrated pipeline Download PDF

Info

Publication number
CN112086918A
CN112086918A CN202011065088.7A CN202011065088A CN112086918A CN 112086918 A CN112086918 A CN 112086918A CN 202011065088 A CN202011065088 A CN 202011065088A CN 112086918 A CN112086918 A CN 112086918A
Authority
CN
China
Prior art keywords
bridge
pipe gallery
layer
axial
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011065088.7A
Other languages
Chinese (zh)
Inventor
周明星
李经伟
杜运国
熊盛
郑青松
林飞
李加祺
黎雄智
刘高坤
葛钰
焦博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN202011065088.7A priority Critical patent/CN112086918A/en
Publication of CN112086918A publication Critical patent/CN112086918A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0462Tubings, i.e. having a closed section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/06Pits or building structures for inspection or services
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/34Installations of cables or lines on walls, floors or ceilings using separate protective tubing

Abstract

The invention discloses an integrated hanging system for a comprehensive pipeline of a city railway inspection warehouse, which is characterized in that: the pipe rack comprises a pipe rack bridge and a pipe rack maintenance platform, wherein the pipe rack bridge comprises a pipe rack bridge layer and a vertical rod, and the pipe rack maintenance platform is fixed at the lower end of the vertical rod; the pipe gallery bridge comprises an axial pipe gallery bridge, an axial middle pipe gallery bridge, an axial side span pipe gallery bridge and a transverse pipe gallery bridge, the cross section structures of the pipe gallery bridges are different, and the types of the loaded pipe galleries are different; the pipe rack maintenance platform comprises an axial pipe rack maintenance platform, an axial middle pipe rack maintenance platform and a transverse pipe rack maintenance platform; the system is hung in the first check storehouse, the second check storehouse side by side of the urban railway, the axial and horizontal of side span and interconnection for each professional pipeline is neatly and regularly arranged, and the indoor elevation of the pipeline is unified. The invention realizes reasonable distribution and resource sharing of complicated and complicated pipeline installation space in the warehouse, can reduce the coordination workload among professions, and improves the construction work efficiency.

Description

Integrated suspension system of city railway inspection library integrated pipeline
Technical Field
The invention belongs to the field of comprehensive pipelines of urban railway vehicle section inspection storehouses, and particularly relates to an integrated hanging system of the comprehensive pipelines of the urban railway inspection storehouses.
Background
In order to adapt to and promote the development of the industry, the urban railway is developed as a novel traffic mode. Correspondingly, the rapid development of urban railway construction puts a brand-new requirement on the safety of urban vehicle operation and maintenance. The urban railway construction city needs a large number of vehicle section inspection storehouses to carry out the operation and maintenance work of the urban motor train unit so as to ensure the safe and punctual operation of the urban motor train unit. In the inspection storehouses of railway vehicle sections in various urban areas, the major and minor electric fields, indoor fire control and water supply and drainage major fields need a large amount of pipeline and cable support, and the major fields are process compressed air, electric power closed buses, power main lines, heating and ventilation water supply and fire control pipelines, communication cables, signals, information cables and the like.
The existing arrangement form of the comprehensive pipeline in the urban railway inspection warehouse has the following defects:
1. generally, the conventional urban rail transit vehicle base and the national railway vehicle application institute are referred to, most of the conventional urban rail transit vehicle base and national railway vehicle application institute are laid by adopting cable trenches, the installation mode standard is low, the installation planning is lacked, and the integrated concept is not introduced.
2. The professional pipelines and cables occupy the advantage space in the building in advance, the layout is messy, the stress is uneven, and the stress safety of the whole structure of the building is affected. Moreover, the mode has a rough installation process, has higher requirements on civil engineering quantity, waterproof grade, drainage and forced drainage equipment and ventilation and lighting, has higher engineering investment cost and operation cost, and has poorer maintenance convenience for the installation of pipeline equipment in the construction period and the operation period.
3. Various pipelines and cables are installed in a closed underground space, are easily damaged by underground water, are not easy to radiate heat, and influence the use safety of the pipelines and the cables. Because the maintenance operation easily causes the damage of ditch cover board in the storehouse, and easily infiltration in the ditch, breed mosquito and bacterium, bring adverse effect to the production environment in the storehouse.
Disclosure of Invention
Aiming at least one of the defects or the improvement requirements in the prior art, in order to ensure the running safety of the urban railway vehicle and improve the operation environment and the operation space in the urban railway vehicle section inspection warehouse, the invention provides the integrated pipeline hanging system for the urban railway vehicle section inspection warehouse, which coordinates and integrates various professional pipelines, realizes the reasonable distribution and the resource sharing of pipeline installation and improves the utilization rate of the limited space in the inspection warehouse.
To achieve the above object, according to one aspect of the present invention, there is provided an integrated hanging system for a comprehensive pipeline of a local railway inspection library, comprising:
the pipe rack comprises a pipe rack bridge frame and a pipe rack maintenance platform, wherein the pipe rack bridge frame comprises a pipe rack bridge frame layer and a vertical rod, and the lower end of the vertical rod is fixed with the pipe rack maintenance platform;
the pipe gallery bridge comprises an axial pipe gallery bridge, an axial middle pipe gallery bridge, an axial side span pipe gallery bridge and a transverse pipe gallery bridge, the cross section structures of the pipe gallery bridges are different, and the types of the loaded pipe galleries are different;
the pipe rack maintenance platform comprises an axial pipe rack maintenance platform, an axial middle pipe rack maintenance platform and a transverse pipe rack maintenance platform;
a first checking warehouse, a second checking warehouse and a side span of the urban railway are adjacently arranged side by side; the upper parts of the inner sides of the stand columns on the two sides of the first inspection warehouse are fixedly connected with the axial pipe gallery bridge; the upper parts of the inner sides of the stand columns on the two sides of the second inspection warehouse are fixedly connected with the axial pipe gallery bridge, and the middle part of the roof beam is fixedly connected with the axial middle pipe gallery bridge; the upper parts of the first inspection warehouse and the second inspection warehouse are transversely provided with a plurality of transverse pipe gallery bridges which are communicated and extend in the same direction; the middle part of the upright column at the inner side of the side span is fixedly connected with the axial side span pipe gallery bridge, and the end part of the axial side span pipe gallery bridge is transversely communicated with the middle part of the axial pipe gallery bridge of the adjacent second inspection warehouse;
the axial pipe gallery bridge frame and the axial middle pipe gallery bridge frame are respectively provided with an axial pipe gallery maintenance platform and an axial middle pipe gallery maintenance platform; the axial side span pipe gallery bridge frame is not provided with a pipe gallery maintenance platform.
Preferably, first inspection storehouse, the vertical both ends of second inspection storehouse are equallyd divide and are provided with first horizontal pipe gallery crane span structure respectively, first horizontal pipe gallery crane span structure does not dispose horizontal pipe gallery maintenance platform.
Preferably, the vertical middle part of first inspection storehouse, second inspection storehouse has set gradually the horizontal pipe gallery crane span structure of second, the horizontal pipe gallery crane span structure of third, the horizontal pipe gallery crane span structure of fourth, the horizontal pipe gallery crane span structure of fifth to dispose the horizontal pipe gallery maintenance platform of second, the horizontal pipe gallery maintenance platform of third, the horizontal pipe gallery maintenance platform of fourth, the horizontal pipe gallery maintenance platform of fifth respectively.
Preferably, a plurality of axial pipe gallery bridge frame layers of the axial pipe gallery bridge frame are divided into a left side and a right side, and a communication bridge frame layer, a safety interlocking bridge frame layer, a water bubble bridge frame layer, a fire-fighting bridge frame layer and a water supply air compression same-layer bridge frame layer are sequentially arranged on one side from top to bottom; the other side is an emergency lighting bridge layer, a lighting trunk bridge layer, a communication bridge layer, a safety monitoring bridge layer and a reserved bridge layer from top to bottom in sequence.
Preferably, a plurality of axial middle pipe gallery bridge layers of the axial middle pipe gallery bridge are divided into a left side and a right side, one side of each axial middle pipe gallery bridge is a communication bridge layer from top to bottom, and an upper safety interlock and a lower lifting water supply share the bridge layer; the other side is sequentially provided with a power bridge layer and an air compression fire-fighting same-layer bridge layer from top to bottom.
Preferably, the first transverse pipe gallery bridge frame is provided with an upper layer of a first transverse pipe gallery bridge frame layer and a lower layer of a first transverse pipe gallery bridge frame layer, the upper layer is an electric power trunk and an illumination bridge frame layer, and the lower layer is a bridge frame layer on the same layer of safety monitoring, communication and safety interlocking.
Preferably, a plurality of second transverse pipe gallery bridge layers of the second transverse pipe gallery bridge frame are of a unilateral vertical arrangement structure and are a water supply air compression same-layer bridge layer, a fire-fighting bridge layer and a water cannon bridge layer from top to bottom in sequence.
Preferably, a plurality of third transverse pipe gallery bridge layers of the third transverse pipe gallery bridge frame are of a unilateral vertical arrangement structure, and are a communication bridge layer, an electric power and illumination same-layer bridge layer from top to bottom in sequence, and then the upper surface of the third transverse pipe gallery maintenance platform and the upper surface of the third transverse pipe gallery maintenance platform are also used as the electric power and illumination same-layer bridge layer.
Preferably, the single fourth transverse pipe gallery bridge layer of the fourth transverse pipe gallery bridge is a power bridge layer.
Preferably, a plurality of fifth transverse pipe gallery bridge frames of the fifth transverse pipe gallery bridge frame are of a unilateral vertical arrangement structure and sequentially comprise a safety interlocking bridge frame layer, a water supply air compression same-layer bridge frame layer, a fire-fighting bridge frame layer and a water cannon bridge frame layer from top to bottom.
Preferably, a plurality of axial limit stride pipe gallery crane span structure strides pipe gallery crane span structure layer and is unilateral range structure from top to bottom, is power trunk bridge span layer, communication bridge span layer in proper order from the top down.
Preferably, the same type of tube lanes are interconnected in axial and transverse directions.
The above-described preferred features may be combined with each other as long as they do not conflict with each other.
Generally, compared with the prior art, the above technical solution conceived by the present invention has the following beneficial effects:
1. the integrated hanging system for the comprehensive pipelines of the urban railway inspection warehouse realizes reasonable distribution and resource sharing of complicated and complicated pipeline installation spaces in the warehouse, can reduce the coordination workload among the professions, and improves the construction work efficiency. The installation of the comprehensive pipelines in the warehouse adopts a hanging centralized structure, thereby effectively utilizing the ground space of the inspection warehouse and facilitating the maintenance and replacement of the pipelines in each specialty. In addition, the integrated gallows system of pipeline for whole storehouse effect is unobstructed bright, and the impression is of high quality, and visual effect is outstanding, satisfies the vehicle and overhauls the demand.
2. The integrated hanging system for the comprehensive pipelines of the urban railway inspection warehouse utilizes combined components and assembly type construction, does not need welding during field installation, can be conveniently disassembled, modified and adjusted, can be recycled, and can reserve space for the expansion of a long-term pipeline bridge.
3. According to the integrated hanging system for the comprehensive pipelines of the urban railway inspection warehouse, all the axial bridges and the transverse bridges are interconnected and communicated, so that all professional pipelines are regularly and regularly arranged, and the pipelines are unified with indoor elevation. The complex pipelines of the traditional inspection warehouse are integrated on the platform, the indoor space utilization rate of the inspection warehouse is effectively utilized, and the space and resource sharing of each pipeline is realized.
Drawings
FIG. 1 is a schematic cross-sectional view of an integrated hanging system for integrated pipelines of a city railway inspection warehouse according to an embodiment of the present invention;
FIG. 2 is a schematic plane structure diagram of the integrated hanging system for the comprehensive pipeline of the urban railway inspection warehouse according to the embodiment of the present invention;
FIG. 3 is a schematic cross-sectional structure diagram of an axial pipe gallery bridge of the integrated suspension system of the comprehensive pipeline of the urban railway inspection warehouse and a pipe gallery maintenance platform thereof according to the embodiment of the invention;
FIG. 4 is a schematic cross-sectional structure diagram of an axial middle pipe gallery bridge frame and a pipe gallery maintenance platform of the integrated hanging system of the comprehensive pipeline of the urban railway inspection library according to the embodiment of the invention;
FIG. 5 is a schematic cross-sectional view of a first transverse piping lane bridge of the integrated pipeline hanging system of the urban railway inspection warehouse according to the embodiment of the present invention;
FIG. 6 is a schematic cross-sectional view of a second transverse piping lane bridge of the integrated hanging system for integrated pipelines of the urban railway inspection warehouse according to the embodiment of the present invention;
FIG. 7 is a schematic cross-sectional view of a third transverse piping lane bridge of the integrated hanging system for integrated pipelines of the urban railway inspection warehouse according to the embodiment of the present invention;
FIG. 8 is a schematic cross-sectional view of a fourth transverse piping lane bridge of the integrated hanging system for integrated pipelines of the urban railway inspection warehouse according to the embodiment of the present invention;
FIG. 9 is a schematic cross-sectional view of a fifth transverse piping lane bridge of the integrated hanging system for integrated pipelines of the urban railway inspection warehouse according to the embodiment of the present invention;
FIG. 10 is a schematic cross-sectional view of an axial side-span pipe rack of the integrated pipeline hanging system of the city railway inspection warehouse according to the embodiment of the present invention;
FIG. 11 is an enlarged schematic view of a generally upper left portion of FIG. 2;
FIG. 12 is an enlarged schematic view of a generally lower left portion of FIG. 2;
FIG. 13 is an enlarged schematic view of a generally upper right portion of FIG. 2;
fig. 14 is an enlarged schematic view of a substantially lower right portion of fig. 2.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. In addition, the technical features involved in the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other. The present invention will be described in further detail with reference to specific embodiments.
As a preferred embodiment of the present invention, as shown in fig. 1 to 14, the present invention provides an integrated hanging system for a comprehensive pipeline of a municipal railway inspection warehouse, which mainly comprises a pipe rack bridge and a pipe rack maintenance platform, wherein the pipe rack bridge comprises a pipe rack bridge layer and a vertical rod, and the lower end of the vertical rod is fixed to the pipe rack maintenance platform;
the pipe rack bridge comprises an axial pipe rack bridge 101, an axial middle pipe rack bridge 201, an axial side span pipe rack bridge 801 and a transverse pipe rack bridge, the cross section structures of all the pipe rack bridges are different, and the types of the loaded pipe racks are different;
the pipe rack maintenance platform comprises an axial pipe rack maintenance platform 1012, an axial middle pipe rack maintenance platform 2012 and a transverse pipe rack maintenance platform;
the integrated hanging system of the comprehensive pipeline is connected through bolts and hung on a steel framework truss at the top of the inspection warehouse, the cross section directions are respectively arranged at two sides of a column net of the inspection warehouse, and the total plane is respectively arranged at the warehouse-in end, the middle part and the warehouse-out section of the inspection warehouse, as shown in the specific figures 1-2 and 11-14; specifically, a first inspection warehouse 1, a second inspection warehouse 2 and a side span 3 of the urban railway are adjacently arranged side by side; the upper parts of the inner sides of the upright columns 10 at the two sides of the first inspection warehouse 1 are fixedly connected with the axial pipe gallery bridge frame 101; the upper parts of the inner sides of the upright columns 10 at the two sides of the second inspection warehouse 2 are fixedly connected with the axial pipe gallery bridge frame 101, and the middle part of the roof beam 20 is fixedly connected with the axial middle pipe gallery bridge frame 201; the upper parts of the first inspection warehouse 1 and the second inspection warehouse 2 are transversely provided with a plurality of transverse pipe gallery bridges which are communicated and extend in the same direction; the middle part of the upright post 10 at the inner side of the side span 3 is fixedly connected with the axial side span pipe gallery bridge frame 801, and the end part of the axial side span pipe gallery bridge frame 801 is transversely communicated with the middle part of the axial pipe gallery bridge frame 101 of the adjacent second inspection warehouse 2;
the axial pipe gallery bridge frame 101 and the axial middle pipe gallery bridge frame 201 are respectively provided with an axial pipe gallery maintenance platform 1012 and an axial middle pipe gallery maintenance platform 2012; the axial side span pipe rack bridge 801 is not equipped with a pipe rack maintenance platform.
Wherein, "axial piping lane crane span structure" and "pipe gallery crane span structure in the middle of the axial" total 2 section patterns, the concentrated bearing contains fire control, pneumatics, feedwater, bubble axial piping lane, communication, emergency lighting, power main, safety monitoring, reservation crane span structure, passes through bolted connection according to the demand respectively, arranges in the overhead truss structure of overhaul storehouse along the station track direction "total 2 section patterns" axial piping lane maintenance platform "and" pipe gallery maintenance platform in the middle of the axial "total 2 section patterns. When each professional pipe gallery and bridge break down, the maintenance platform can be used for climbing to maintain.
Wherein, "horizontal piping lane crane span structure" always has 5 section patterns, and "horizontal piping lane maintenance platform" always has 4 section patterns, concentrates to bear and contains fire control, pneumatics, water supply, the horizontal piping lane of bubble, communication, emergency lighting, power main, safety monitoring, reserve the crane span structure, passes through bolted connection according to the demand respectively, and the perpendicular to stock road direction arranges in the overhead truss structure of overhaul storehouse. When each professional pipe gallery and bridge break down, the maintenance platform can be used for climbing to maintain.
As shown in fig. 3, a plurality of axial pipe gallery bridge frames 1011 of the axial pipe gallery bridge frame 101 are divided into a left side and a right side, and one side of each axial pipe gallery bridge frame is sequentially provided with a communication bridge frame layer, a safety interlocking bridge frame layer, a water bubble bridge frame layer, a fire fighting bridge frame layer and a water supply air compression same-layer bridge frame layer from top to bottom; the other side is an emergency lighting bridge layer, a lighting trunk bridge layer, a communication bridge layer, a safety monitoring bridge layer and a reserved bridge layer from top to bottom in sequence.
As shown in fig. 4, a plurality of axial intermediate pipe gallery bridge layers 2011 of the axial intermediate pipe gallery bridge 201 are divided into a left side and a right side, one side is a communication bridge layer from top to bottom, and an upper safety interlock and a lower lifting water supply share the bridge layer; the other side is sequentially provided with a power bridge layer and an air compression fire-fighting same-layer bridge layer from top to bottom.
As shown in fig. 5, the longitudinal ends of the first and second inspection storehouses 1 and 2 are respectively provided with a first transverse pipe gallery bridge frame 301, and the first transverse pipe gallery bridge frame 301 is not provided with a transverse pipe gallery maintenance platform. First horizontal pipe gallery crane span structure 301 is equipped with two-layer first horizontal pipe gallery bridge floor from top to bottom, and the upper strata is electric power main and illumination bridge floor, and the lower floor is safety monitoring, communication, safety interlock with the bridge floor.
As shown in fig. 6-9, the longitudinal middle parts of the first and second inspection storehouses 1 and 2 are sequentially provided with a second transverse pipe gallery bridge 401, a third transverse pipe gallery bridge 501, a fourth transverse pipe gallery bridge 601 and a fifth transverse pipe gallery bridge 701, and are respectively provided with a second transverse pipe gallery maintenance platform 4012, a third transverse pipe gallery maintenance platform 5012, a fourth transverse pipe gallery maintenance platform 6012 and a fifth transverse pipe gallery maintenance platform 7012.
As shown in fig. 6, a plurality of second transverse pipe gallery bridge layers 4011 of the second transverse pipe gallery bridge 401 are of a unilateral vertical arrangement structure, and are a water supply air compression layer bridge layer, a fire fighting bridge layer and a water cannon bridge layer from top to bottom in sequence.
As shown in fig. 7, a plurality of third transverse pipe gallery bridge layers 5011 of the third transverse pipe gallery bridge 501 are of a unilateral vertical arrangement structure, and sequentially include a communication bridge layer, and an electric power and lighting same-layer bridge layer from top to bottom, and then the upper surface of the downward third transverse pipe gallery maintenance platform 5012 also serves as an electric power and lighting same-layer bridge layer.
As shown in fig. 8, a single fourth transverse pipe gallery bridge deck 6011 of the fourth transverse pipe gallery bridge 601 is a power bridge deck.
As shown in fig. 9, a plurality of fifth transverse pipe gallery bridge frames 7011 of the fifth transverse pipe gallery bridge frame 701 are of a unilateral vertical arrangement structure, and sequentially include a safety interlocking bridge frame layer, a water supply air compression layer bridge frame layer, a fire fighting bridge frame layer and a water cannon bridge frame layer from top to bottom.
As shown in fig. 10, a plurality of axial side-span pipe gallery bridge layers 8011 of the axial side-span pipe gallery bridge 801 are in a structure of being arranged up and down on a single side, and are a power trunk bridge layer, a communication bridge layer, and a communication bridge layer from top to bottom in sequence.
11-14, the same type of pipe racks are interconnected in both the axial and lateral directions, such as the axial blisters, fire, water supply, air compression pipe racks on the axial pipe rack 101 of FIG. 3, with the lateral blisters, fire, water supply, air compression pipe racks on the first 301, second 401, third 501, fourth 601, and fifth 701 transverse pipe rack; and the axial endbay piping lane bridge 801 of endbay 3 introduces the power mains and communication cables from outdoors into the inspection chamber.
In summary, compared with the prior art, the scheme of the invention has the following significant advantages:
1. the integrated hanging system for the comprehensive pipelines of the urban railway inspection warehouse realizes reasonable distribution and resource sharing of complicated and complicated pipeline installation spaces in the warehouse, can reduce the coordination workload among the professions, and improves the construction work efficiency. The installation of the comprehensive pipelines in the warehouse adopts a hanging centralized structure, thereby effectively utilizing the ground space of the inspection warehouse and facilitating the maintenance and replacement of the pipelines in each specialty. In addition, the integrated gallows system of pipeline for whole storehouse effect is unobstructed bright, and the impression is of high quality, and visual effect is outstanding, satisfies the vehicle and overhauls the demand.
2. The integrated hanging system for the comprehensive pipelines of the urban railway inspection warehouse utilizes combined components and assembly type construction, does not need welding during field installation, can be conveniently disassembled, modified and adjusted, can be recycled, and can reserve space for the expansion of a long-term pipeline bridge.
3. According to the integrated hanging system for the comprehensive pipelines of the urban railway inspection warehouse, all the axial bridges and the transverse bridges are interconnected and communicated, so that all professional pipelines are regularly and regularly arranged, and the pipelines are unified with indoor elevation. The complex pipelines of the traditional inspection warehouse are integrated on the platform, the indoor space utilization rate of the inspection warehouse is effectively utilized, and the space and resource sharing of each pipeline is realized.
It will be appreciated that the embodiments of the system described above are merely illustrative, in that elements illustrated as separate components may or may not be physically separate, may be located in one place, or may be distributed over different network elements. Some or all of the modules can be selected according to actual needs to achieve the purpose of the scheme of the embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
In addition, it should be understood by those skilled in the art that in the specification of the embodiments of the present invention, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
In the description of the embodiments of the invention, numerous specific details are set forth. It is understood, however, that embodiments of the invention may be practiced without these specific details. In some instances, well-known methods, structures and techniques have not been shown in detail in order not to obscure an understanding of this description. Similarly, it should be appreciated that in the foregoing description of exemplary embodiments of the invention, various features of the embodiments of the invention are sometimes grouped together in a single embodiment, figure, or description thereof for the purpose of streamlining the disclosure and aiding in the understanding of one or more of the various inventive aspects.
However, the disclosed method should not be interpreted as reflecting an intention that: that is, the claimed embodiments of the invention require more features than are expressly recited in each claim. Rather, as the following claims reflect, inventive aspects lie in less than all features of a single foregoing disclosed embodiment. Thus, the claims following the detailed description are hereby expressly incorporated into this detailed description, with each claim standing on its own as a separate embodiment of an embodiment of this invention.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the embodiments of the present invention, and not to limit the same; although embodiments of the present invention have been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (12)

1. The utility model provides an integrated suspension system of city railway inspection storehouse comprehensive pipeline which characterized in that:
the pipe rack comprises a pipe rack bridge frame and a pipe rack maintenance platform, wherein the pipe rack bridge frame comprises a pipe rack bridge frame layer and a vertical rod, and the lower end of the vertical rod is fixed with the pipe rack maintenance platform;
the pipe rack bridge comprises an axial pipe rack bridge (101), an axial middle pipe rack bridge (201), an axial side span pipe rack bridge (801) and a transverse pipe rack bridge, the cross section structures of all the pipe rack bridges are different, and the types of the loaded pipe racks are different;
the pipe rack maintenance platform comprises an axial pipe rack maintenance platform (1012), an axial middle pipe rack maintenance platform (2012) and a transverse pipe rack maintenance platform;
a first checking warehouse (1), a second checking warehouse (2) and a side span (3) of the urban railway are adjacently arranged side by side; the upper parts of the inner sides of the upright columns (10) at two sides of the first inspection warehouse (1) are fixedly connected with the axial pipe gallery bridge (101); the upper parts of the inner sides of the upright columns (10) on the two sides of the second inspection warehouse (2) are fixedly connected with the axial pipe gallery bridge (101), and the middle part of the roof beam (20) is fixedly connected with the axial middle pipe gallery bridge (201); the upper parts of the first inspection warehouse (1) and the second inspection warehouse (2) are transversely provided with a plurality of transverse pipe gallery bridges which are communicated and extend in the same direction; the middle part of the upright post (10) at the inner side of the side span (3) is fixedly connected with the axial side span pipe gallery bridge (801), and the end part of the axial side span pipe gallery bridge (801) is transversely communicated with the middle part of the axial pipe gallery bridge (101) of the adjacent second inspection warehouse (2);
the axial pipe gallery bridge frame (101) and the axial middle pipe gallery bridge frame (201) are respectively provided with an axial pipe gallery maintenance platform (1012) and an axial middle pipe gallery maintenance platform (2012); the axial side span pipe rack bridge (801) is not provided with a pipe rack maintenance platform.
2. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 1, wherein:
first inspection storehouse (1), the vertical both ends in second inspection storehouse (2) are equallyd divide and do not are provided with first horizontal piping lane crane span structure (301), first horizontal piping lane crane span structure (301) do not dispose horizontal piping lane maintenance platform.
3. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 2, wherein:
first inspection storehouse (1), the vertical middle part of second inspection storehouse (2) have set gradually second horizontal pipe gallery crane span structure (401), the horizontal pipe gallery crane span structure of third (501), the horizontal pipe gallery crane span structure of fourth (601), the horizontal pipe gallery crane span structure of fifth (701) to dispose the horizontal pipe gallery of second respectively and maintain platform (4012), the horizontal pipe gallery of third and maintain platform (5012), the horizontal pipe gallery of fourth (6012), the horizontal pipe gallery of fifth and maintain platform (7012).
4. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 1, wherein:
a plurality of axial pipe gallery bridge layers (1011) of the axial pipe gallery bridge (101) are divided into a left side and a right side, and a communication bridge layer, a safety interlocking bridge layer, a water bubble bridge layer, a fire fighting bridge layer and a water supply air compression same-layer bridge layer are sequentially arranged on one side from top to bottom; the other side is an emergency lighting bridge layer, a lighting trunk bridge layer, a communication bridge layer, a safety monitoring bridge layer and a reserved bridge layer from top to bottom in sequence.
5. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 1, wherein:
a plurality of axial middle pipe gallery bridge layers (2011) of the axial middle pipe gallery bridge (201) are divided into a left side and a right side, one side of each axial middle pipe gallery bridge is a communication bridge layer from top to bottom, and an upper safety interlock and a lower lifting water supply share the bridge layer; the other side is sequentially provided with a power bridge layer and an air compression fire-fighting same-layer bridge layer from top to bottom.
6. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 2, wherein:
two-layer first horizontal pipe gallery bridge floor about first horizontal pipe gallery crane span structure (301) is equipped with, and the upper strata is electric power main and illumination bridge floor, and the lower floor is the bridge floor on the same layer of safety monitoring, communication, safety interlock.
7. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 3, wherein:
a plurality of second horizontal pipe gallery bridge layer (4011) of second horizontal pipe gallery crane span structure (401) are the unilateral and arrange the structure from top to bottom, from the top down be water supply air compression with layer bridge layer, fire control bridge layer, water cannon bridge layer in proper order.
8. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 3, wherein:
a plurality of third horizontal pipe gallery bridge layers (5011) of the third horizontal pipe gallery bridge frame (501) are of a unilateral vertical arrangement structure, and sequentially comprise a communication bridge layer, electric power and illumination same-layer bridge layer from top to bottom, and then the upper surface of a downward third horizontal pipe gallery maintenance platform (5012) is also used as the electric power and illumination same-layer bridge layer.
9. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 3, wherein:
and a single fourth transverse pipe gallery bridge layer (6011) of the fourth transverse pipe gallery bridge (601) is a power bridge layer.
10. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 3, wherein:
a plurality of fifth transverse pipe gallery bridge frames (7011) of the fifth transverse pipe gallery bridge frame (701) are of a unilateral vertical arrangement structure and sequentially comprise a safety interlocking bridge frame layer, a water supply air compression same-layer bridge frame layer, a fire fighting bridge frame layer and a water cannon bridge frame layer from top to bottom.
11. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 3, wherein:
a plurality of axial side span pipe gallery bridge layers (8011) of the axial side span pipe gallery bridge (801) are of a unilateral up-down arrangement structure and sequentially comprise a power main line bridge layer, a communication bridge layer and a communication bridge layer from top to bottom.
12. The integrated hanging system for the city railway inspection library comprehensive pipeline according to claim 3, wherein:
the same type of tube lane is interconnected in the axial and transverse directions.
CN202011065088.7A 2020-09-30 2020-09-30 Integrated suspension system of city railway inspection library integrated pipeline Pending CN112086918A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011065088.7A CN112086918A (en) 2020-09-30 2020-09-30 Integrated suspension system of city railway inspection library integrated pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011065088.7A CN112086918A (en) 2020-09-30 2020-09-30 Integrated suspension system of city railway inspection library integrated pipeline

Publications (1)

Publication Number Publication Date
CN112086918A true CN112086918A (en) 2020-12-15

Family

ID=73730480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011065088.7A Pending CN112086918A (en) 2020-09-30 2020-09-30 Integrated suspension system of city railway inspection library integrated pipeline

Country Status (1)

Country Link
CN (1) CN112086918A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112559544A (en) * 2020-12-21 2021-03-26 南京市测绘勘察研究院股份有限公司 Professional pipeline and comprehensive pipeline fusion database building and updating method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112559544A (en) * 2020-12-21 2021-03-26 南京市测绘勘察研究院股份有限公司 Professional pipeline and comprehensive pipeline fusion database building and updating method

Similar Documents

Publication Publication Date Title
CN101761344B (en) Preparation method of prefabricated pipe section for shield tunnel
CN104912004B (en) Hold rail-type track transportation bridge evacuation maintenance platform
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
CN106223595A (en) A kind of rack high altitude bulk sliding platform and high altitude bulk construction method
CN110107972A (en) Cabin-type refrigerating plant room and its construction method
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN110847062A (en) Construction method for whole-hole assembly double-width erection in 80-meter-span wide steel box girder factory
CN110360488A (en) Single storey industry workshop inner lighting system and laying method
CN113235972A (en) Trolley for dismantling existing station canopy and construction method
CN112086918A (en) Integrated suspension system of city railway inspection library integrated pipeline
CN104878867A (en) Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
CN204728554U (en) The integral structure of channel and double-deck operation platform
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN202611714U (en) Tunnel assembly type construction trolley without welding
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN212695656U (en) Integrated suspension system of city railway inspection library integrated pipeline
CN205955185U (en) Mould is hung in subway station tread wind channel special use
CN109505225B (en) Safe and stable suspension bridge and construction process thereof
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN204728225U (en) A kind of rail rail traffic bridge of embracing evacuates inspection platform
CN104533114A (en) Seacoast flexible direct-current convertor station valve hall combined building structural system
CN214273648U (en) Three-circle shield constructs construction subway station structure
CN106545192A (en) A kind of suspension type pipe gallery and maintenance platform system
CN204311791U (en) Seashore flexible direct current converter station valve Room associating architectural structure system
CN212249263U (en) Mounting structure of roof truss and arc multilayer packway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination