CN112070849B - Flood inundation range dynamic display method based on BIM and GIS - Google Patents

Flood inundation range dynamic display method based on BIM and GIS Download PDF

Info

Publication number
CN112070849B
CN112070849B CN202011253847.2A CN202011253847A CN112070849B CN 112070849 B CN112070849 B CN 112070849B CN 202011253847 A CN202011253847 A CN 202011253847A CN 112070849 B CN112070849 B CN 112070849B
Authority
CN
China
Prior art keywords
water level
range
grid
gis
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011253847.2A
Other languages
Chinese (zh)
Other versions
CN112070849A (en
Inventor
张李荪
丁维馨
张建华
徐俊
刘杨
李喻鑫
卢聪飞
张云茜
李梦楚
张国文
孙文萍
冯佳
胡燕
邓超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Water Resources Information Technology Co ltd
Original Assignee
Jiangxi Wuda Yangfan Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Wuda Yangfan Technology Co ltd filed Critical Jiangxi Wuda Yangfan Technology Co ltd
Priority to CN202011253847.2A priority Critical patent/CN112070849B/en
Publication of CN112070849A publication Critical patent/CN112070849A/en
Application granted granted Critical
Publication of CN112070849B publication Critical patent/CN112070849B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/90Determination of colour characteristics

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Mathematical Optimization (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Structural Engineering (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Remote Sensing (AREA)
  • Architecture (AREA)
  • Computer Graphics (AREA)
  • Alarm Systems (AREA)

Abstract

A flood inundation range dynamic display method based on BIM and GIS comprises the following steps: constructing a BIM and GIS three-dimensional fusion model; processing submerging range data, namely dividing a flow channel by arranging a reference water level control line with preset interval length on the flow channel on DEM data of an area where a hydro-junction project is located, interpolating each grid, and comparing the size relation between the water level and the elevation of the grid interpolation position to obtain a submerging range; and analyzing the inundation range to obtain raster data of the inundated area, and visualizing the inundation range. The invention integrates BIM and GIS, visually and accurately reflects the flood submerging range, provides powerful support for flood prevention decision of hydraulic engineering, and achieves the purposes of reducing loss and protecting life and property safety of people.

Description

Flood inundation range dynamic display method based on BIM and GIS
Technical Field
The invention relates to the field of BIM and GIS dynamic display, in particular to a flood submerging range dynamic display method based on BIM and GIS.
Background
The GIS technology which takes management of geographic spatial data as a core function is mainly characterized in that description of landform and distribution of corresponding constructional engineering is completed, and plays an important role in aspects of project planning and design line selection, construction general arrangement and the like, but the GIS technology is slightly insufficient in consideration of functional requirements of mass data storage and analysis in subsequent design, construction and operation management of the engineering; the BIM technology can perform three-dimensional fine management on the self frame and the internal information of the building in a world coordinate system, and enables the information of the whole life cycle of the project to be completely recorded in a single model through model unification and information standardization.
Because flood disasters occur frequently and are extremely harmful every year in China, in order to effectively avoid loss caused by flood risks, a flood risk graph needs to be dynamically displayed, but the BIM technology has slightly insufficient capacity of processing and analyzing large-range geospatial data, and the BIM and GIS fusion is applied to dynamic display and visual representation of a flood submerging range, so that technical support is provided for decision-making of decision makers.
Disclosure of Invention
According to the problems brought forward by the background technology, the invention provides a dynamic display method of the flood inundation range based on the BIM and the GIS, the BIM and the GIS are integrated, the flood inundation range is intuitively and accurately reflected, powerful support is provided for flood prevention decision of hydraulic engineering to solve, and the method is further explained.
A flood inundation range dynamic display method based on BIM and GIS is characterized by comprising the following steps:
s1, building BIM and GIS three-dimensional fusion models, respectively building BIM models of all hydro-junction projects in a drainage basin and three-dimensional terrain models of the drainage basin, rasterizing finite elements of the three-dimensional terrain models to obtain DEM digital terrain models, and fusing the BIM models of the hydro-junction projects and the DEM digital terrain models to obtain BIM and GIS three-dimensional fusion models;
s2, processing submerging range data, dividing a flow channel by arranging a datum water level control line with preset interval length on the flow channel on DEM data of an area where the hydro-junction project is located, interpolating each grid, and comparing the size relation between the water level at the grid interpolation position and the elevation thereof to obtain a submerging range;
s3, analyzing the submerging range to obtain grid data of a submerged area, analyzing the submerging range by a static water surface method, storing grid points passed by a water level control line and interpolated water level control lines and expressed water level information, and storing in a unit partition mode by using a drainage basin in the current water level control line;
and S4, visualizing the submerging range, carrying out model construction on the obtained raster data, selecting corresponding colors according to different water level information to display, finally superposing the colors into the GIS to finally display the submerging range, and dynamically displaying the submerging range by changing the water level or flow of flood.
Preferably, in the step of constructing the BIM and GIS three-dimensional fusion model,
the BIM model of the hydro-junction engineering is built by utilizing Bentley Microstation software, parameters of various hydraulic engineering in a drainage basin are obtained in advance, and the parameters are used as input of the Bentley Microstation software for building;
the DEM digital terrain model is constructed by obtaining a three-dimensional terrain model through a GIS technology in advance, extracting parameters of contour lines, elevation points and river bank characteristic lines represented by data to serve as input of Bentley Geopaksite software, generating an irregular triangular grid tin file through the Bentley Geopaksite software, and outputting the irregular triangular grid tin file to obtain the DEM digital terrain model.
Preferably, the water level control lines are perpendicular to the center line of the flow channel, and interpolation is carried out on grid points positioned between any adjacent water level control lines as a reference, and the magnitude relation between the water level at the grid interpolation position and the elevation thereof is compared: if the water level is greater than the elevation of the terrain, the grid belongs to the submerging range, and the water level or the water depth is recorded; if the water level is less than the elevation of the terrain, the water level does not belong to the submerging range.
Preferably, the interpolation is linear interpolation.
Preferably, the distance between the water level control lines is set according to geographical features, the hydro-junction project is set as a reference water level control line, and the water level is set as a breakpoint at the reference water level control line and comprises two water level values.
Preferably, the grid points which are not in the submerging range and have the water level smaller than the terrain elevation are set to be invalid values, the grid points which are set to be the invalid values reduce the subsequent calculation intensity, and any invalid values with continuous relations in the invalid values are deleted, namely the continuous grid points are deleted, so that the rate of removing the non-submerged grids is increased, and discrete effective grid data in the submerged area are prevented from being deleted.
Preferably, the static surface method is divided into two categories, passive flooding and active flooding: the passive flooding is to regard the elevation value in the DEM data of the flooding analysis area lower than the set water level as a flooding point; the active flooding is to regard a grid, which is in communication with a specified position and has an elevation value lower than a set water level, of DEM data of a flooding analysis area as a flooding point.
Preferably, in the step of visualizing the inundation range, the following steps are included:
s41, processing the raster data to obtain a color picture under the combined working condition of the characterization water level and the flow, processing the raster data to obtain a png-format picture by adopting a model builder tool in an ArcGIIS10.5 platform, and performing color unified characterization on the picture display under the working conditions of different water levels and flows;
s42, mapping data, converting the grid data of the inundation range into color pictures, and then overlaying the color pictures into a GIS (geographic information System), thereby finally obtaining the display effect of the color representation inundation range;
and S43, dynamically displaying, namely changing the water level of the reference water level control line on the whole section of the flow channel or different selected flow sections, and/or changing the flow rate on the whole section or different selected flow sections so as to dynamically display the water level change or the change condition of the submerged range in the drainage basin after the water supply of the hydro-junction project is switched off.
Has the advantages that: compared with the prior art, the invention integrates the BIM and the GIS, intuitively and accurately reflects the flood submerging range, provides powerful support for flood prevention decision of hydraulic engineering, and achieves the purposes of reducing loss and protecting life and property safety of people.
Drawings
FIG. 1: the invention discloses a flow chart of a dynamic display method;
FIG. 2: and (4) visualizing the flooding scope by using a flow diagram.
Detailed Description
The invention is explained in detail below with reference to fig. 1-2.
A flood submergence range dynamic display method based on BIM and GIS is disclosed, a visual three-dimensional model of flood submergence ranges under different water levels is obtained based on BIM and GIS technology fusion, and the method comprises the following steps with reference to the attached figure 1:
s1, building BIM and GIS three-dimensional fusion models, respectively building BIM models of all hydro-junction projects in a drainage basin and three-dimensional terrain models of the drainage basin, rasterizing finite elements of the three-dimensional terrain models to obtain DEM digital terrain models, and fusing the BIM models of the hydro-junction projects and the DEM digital terrain models to obtain BIM and GIS three-dimensional fusion models;
s2, processing submerging range data, dividing a flow channel by arranging a datum water level control line with preset interval length on the flow channel on DEM data of an area where the hydro-junction project is located, interpolating each grid, and comparing the size relation between the water level at the grid interpolation position and the elevation thereof to obtain a submerging range;
s3, analyzing the submerging range to obtain grid data of a submerged area, analyzing the submerging range by a static water surface method, storing grid points passed by a water level control line and interpolated water level control lines and expressed water level information, and storing in a unit partition mode by using a drainage basin in the current water level control line;
and S4, visualizing the submerging range, carrying out model construction on the obtained raster data, selecting corresponding colors according to different water level information to display, finally superposing the colors into the GIS to finally display the submerging range, and dynamically displaying the submerging range by changing the water level or flow of flood.
In the step of constructing the BIM and GIS three-dimensional fusion model, the BIM model of the hydro-junction engineering is constructed by using Bentley Microstation software, parameters of various hydraulic engineering in a drainage basin are obtained in advance, and the parameters are constructed as the input of the Bentley Microstation software; the DEM digital terrain model is constructed by obtaining a three-dimensional terrain model through a GIS technology in advance, extracting parameters of contour lines, elevation points and river bank characteristic lines represented by data to serve as input of Bentley Geopaksite software, generating an irregular triangular grid tin file through the Bentley Geopaksite software, and outputting the irregular triangular grid tin file to obtain the DEM digital terrain model.
For the data processing of the submerging range, the invention arranges a water level control line on the flow channel for division, the water level control line is vertical to the central line of the flow channel, and the interpolation is carried out at the grid point between the adjacent water level control lines as the reference, the interpolation of the embodiment adopts a linear interpolation method, and the size relation between the water level at the grid interpolation position and the elevation thereof is compared: if the water level is greater than the elevation of the terrain, the grid belongs to the submerging range, and the water level or the water depth is recorded; if the water level is less than the elevation of the terrain, the water level does not belong to the submerging range. The water level control lines and the water level control lines interpolated between the water level control lines extend to two sides of the flow channel to obtain a boundary line of a subarea, wherein the water level on the boundary line is equal to the terrain elevation, namely the current water level can submerge the farthest distance between two banks of the flow channel, and the boundary line of the subarea and the water level control lines enclose a submerging range.
The interval of the water level control lines is set according to geographical features, the interval is set to be smaller in a watershed with large terrain difference such as a mountainous area, and the interval is larger in an area with small terrain difference such as a plain area.
In the step of obtaining the grid data of the submerged area through the analysis of the submerging range, in order to improve the simulation calculation rate, the grid which is not in the submerging range and has the water level smaller than the terrain elevation is changed into an invalid value, so that the number of the grids which subsequently participate in the calculation is greatly reduced.
In the analysis of the submerging range, the submerging range is analyzed by adopting a static water surface method, and the static water surface method is divided into passive submerging and active submerging: the passive flooding is to regard the elevation value in the DEM data of the flooding analysis area lower than the set water level as a flooding point; the active flooding is to regard a grid, which has an elevation value lower than a set water level and is communicated with a specified position, in the DEM data of the flooding analysis area as a flooding point.
In the step of visualizing the inundation range, referring to fig. 2, the following steps are included:
s41, processing raster data to obtain color pictures under the combined working conditions of characteristic water level and flow rate, wherein the method adopts a 'model builder' tool in an ArcGIS10.5 platform to process the raster data to obtain a png-format picture, so that the severity of flood inundation can be displayed more intuitively, and the picture display under the working conditions of different water levels and flow rates is subjected to color unified characterization;
s42, mapping data, converting the grid data of the inundation range into color pictures, and then overlaying the color pictures into a GIS (geographic information System), so as to finally obtain the display effect of the color representation inundation range;
and S43, dynamically displaying, namely changing the water level of the reference water level control line on the whole section of the flow channel or different selected flow sections, and/or changing the flow rate on the whole section or different selected flow sections so as to dynamically display the water level change or the change condition of the submerged range in the drainage basin after the water supply of the hydro-junction project is switched off.
The invention integrates BIM and GIS, visually and accurately reflects the flood submerging range, provides powerful support for flood prevention decision of hydraulic engineering, and achieves the purposes of reducing loss and protecting life and property safety of people.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (1)

1. A flood inundation range dynamic display method based on BIM and GIS is characterized by comprising the following steps:
s1, building BIM and GIS three-dimensional fusion models, respectively building BIM models of all hydro-junction projects in a drainage basin and three-dimensional terrain models of the drainage basin, rasterizing finite elements of the three-dimensional terrain models to obtain DEM digital terrain models, and fusing the BIM models of the hydro-junction projects and the DEM digital terrain models to obtain BIM and GIS three-dimensional fusion models;
s2, processing submerging range data, dividing a flow channel by arranging a datum water level control line with preset interval length on the flow channel on DEM data of an area where a hydro-junction project is located, interpolating each grid, comparing the size relation between the water level at the grid interpolation position and the elevation of the grid to obtain a submerging range, setting grid points, which are smaller than the terrain elevation and do not belong to the submerging range, as invalid values, and deleting any invalid values with continuous relations from the invalid values;
s3, analyzing the submerging range to obtain grid data of a submerged area, analyzing the submerging range by a static water surface method, storing grid points passed by a water level control line and interpolated water level control lines and expressed water level information, and storing in a unit partition mode by using a drainage basin in the current water level control line;
s4, visualizing the submerging range, carrying out model construction on the obtained raster data, selecting corresponding color display according to different water level information, finally superposing the color display into a GIS, finally displaying the submerging range, and dynamically displaying the submerging range by changing the water level or flow of flood;
in the step of constructing the BIM and GIS three-dimensional fusion model,
the BIM model of the hydro-junction engineering is built by utilizing Bentley Microstation software, parameters of various hydraulic engineering in a drainage basin are obtained in advance, and the parameters are used as input of the Bentley Microstation software for building;
the method comprises the steps of constructing a DEM digital terrain model, obtaining a three-dimensional terrain model through a GIS technology in advance, simultaneously extracting parameters of contour lines, elevation points and river bank characteristic lines represented by data to serve as input of Bentley Geopaksite software, generating an irregular triangular grid tin file by the Bentley Geopaksite software, and outputting to obtain the DEM digital terrain model;
the water level control lines are vertical to the central line of the flow channel, any adjacent water level control line is used as a reference, interpolation is carried out on grid points positioned between the water level control lines, and the size relation between the water level at the grid interpolation position and the elevation thereof is compared: if the water level is greater than the elevation of the terrain, the grid belongs to the submerging range, and the water level or the water depth is recorded; if the water level is less than the terrain elevation, the water level does not belong to the submerging range; the water level control lines and the water level control lines interpolated between the water level control lines extend to two sides of the flow channel to obtain a partition boundary line, wherein the water level on the boundary line is equal to the terrain elevation, namely the current water level can submerge the farthest distance between two banks of the flow channel, and the partition boundary line and the water level control line enclose a submerging range;
the interpolation adopts a linear interpolation method;
the interval of the water level control lines is set according to geographical features, the interval of a basin with large terrain difference is set to be smaller, the interval of a region with small terrain difference is larger, the arrangement of the hydro-junction project changes the continuity of the water potential difference of the flow channel, the hydro-junction project is set as a reference water level control line, and the water level is set as a breakpoint at the reference water level control line and comprises two water level values;
the static water surface method is divided into passive flooding and active flooding: the passive flooding is to regard the elevation value in the DEM data of the flooding analysis area lower than the set water level as a flooding point; the active flooding is to regard a grid, which is in communication with a specified position and has an elevation value lower than a set water level, of DEM data of a flooding analysis area as a flooding point;
in the step of visualizing the inundation range, the method comprises the following steps:
s41, processing the raster data to obtain a color picture under the combined working condition of the characterization water level and the flow, processing the raster data to obtain a png-format picture by adopting a model builder tool in an ArcGIIS10.5 platform, and performing color unified characterization on the picture display under the working conditions of different water levels and flows;
s42, mapping data, converting the grid data of the inundation range into color pictures, and then overlaying the color pictures into a GIS (geographic information System), thereby finally obtaining the display effect of the color representation inundation range;
s43, dynamically displaying, namely changing the water level of a reference water level control line on the whole section of the flow channel or different selected flow sections and/or changing the flow rate on the whole section or different selected flow sections so as to dynamically display the change of the water level or the change of the submerged range in the drainage basin after the water is drained after the water is opened in a certain hydraulic junction project;
in the step of obtaining the grid data of the submerged area through the analysis of the submerging range, in order to improve the simulation calculation rate, grids which are not in the submerging range and have the water level smaller than the terrain elevation are changed into invalid values, so that the number of the grids which subsequently participate in calculation is greatly reduced, and the deleted grid points are continuous string values, so that the rate of removing the grids which are not submerged is improved, and the deletion of the effective grid data in the submerged area in a discrete state is avoided.
CN202011253847.2A 2020-11-11 2020-11-11 Flood inundation range dynamic display method based on BIM and GIS Active CN112070849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011253847.2A CN112070849B (en) 2020-11-11 2020-11-11 Flood inundation range dynamic display method based on BIM and GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011253847.2A CN112070849B (en) 2020-11-11 2020-11-11 Flood inundation range dynamic display method based on BIM and GIS

Publications (2)

Publication Number Publication Date
CN112070849A CN112070849A (en) 2020-12-11
CN112070849B true CN112070849B (en) 2021-07-09

Family

ID=73655899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011253847.2A Active CN112070849B (en) 2020-11-11 2020-11-11 Flood inundation range dynamic display method based on BIM and GIS

Country Status (1)

Country Link
CN (1) CN112070849B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113127969A (en) * 2021-03-24 2021-07-16 东风柳州汽车有限公司 Automobile damping plate simulation modeling method, device, equipment and storage medium
CN113297663B (en) * 2021-06-11 2022-06-24 中国五冶集团有限公司 BIM technology-based park water flow visualization analysis method
CN115511390B (en) * 2022-11-14 2023-06-27 南方科技大学 Coastal river-along vulnerability assessment method, system, terminal and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109145376A (en) * 2018-07-19 2019-01-04 华北电力大学 A kind of reservoir flood area based on CAD topographic map determines method
CN111612908A (en) * 2020-05-26 2020-09-01 江西省水利规划设计研究院 Hydraulic engineering inundation range display method, device, equipment and storage medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104460343B (en) * 2014-11-13 2017-08-08 长江水利委员会长江科学院 A kind of river flood flooding inundation simulation method based on water level monitoring data
CN106599140A (en) * 2016-12-06 2017-04-26 河海大学 GIS-based fast processing method of flood risk factors
KR101912627B1 (en) * 2017-05-30 2018-10-30 에스지에이블록체인 주식회사 Method for Integration Visualizing GIS based Runoff-Hydraulic Model Analysis result
CN108197283B (en) * 2018-01-12 2021-11-30 河南省水利勘测设计研究有限公司 Method for carrying out flood two-dimensional and three-dimensional dynamic display by utilizing actually measured water level of river channel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109145376A (en) * 2018-07-19 2019-01-04 华北电力大学 A kind of reservoir flood area based on CAD topographic map determines method
CN111612908A (en) * 2020-05-26 2020-09-01 江西省水利规划设计研究院 Hydraulic engineering inundation range display method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN112070849A (en) 2020-12-11

Similar Documents

Publication Publication Date Title
CN112070849B (en) Flood inundation range dynamic display method based on BIM and GIS
CN108052776A (en) Based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method
CN106296779A (en) A kind of threedimensional model rendering indication method and system
CN112328929B (en) People stream density dynamic visualization method based on vector tile map release technology
CN110570491B (en) Thermodynamic diagram generation method and device
CN115983162B (en) Drainage basin modeling method based on digital twinning
Cornel et al. Interactive visualization of flood and heavy rain simulations
CN114820990A (en) Digital twin-based drainage basin flood control visualization method and system
CN113744402A (en) Urban four-dimensional geological environment visualization system and urban four-dimensional geological environment visualization method
CN113158451A (en) Large-area river three-dimensional simulation method based on one-dimensional flood routing model
CN114020943B (en) Basin water surface mixing drawing method and system, electronic equipment and storage medium
JP2019127818A (en) Earth-flow disaster prediction device, computer program, earth-flow disaster prediction method and map information
CN114722647A (en) GIS-based multi-situation scenic flood flooding and submerging analysis method and device
KR101782559B1 (en) Method for planning of constructing a dam based on a digital elevation model, apparatus, and recording medium thereof
CN115795974A (en) Air-ground integrated monitoring method for evolution of underground water seepage field of deep-buried tunnel
CN111612908A (en) Hydraulic engineering inundation range display method, device, equipment and storage medium
CN116385693A (en) Offshore wind power visual display method, offshore wind power visual display system and computer-readable storage medium
CN116486027A (en) Digital twin deduction method for urban flood
CN115908733A (en) Real-time segmentation and three-dimensional visualization method for angular point grid geological model
Yang et al. Predicting flood inundation and risk using GIS and hydrodynamic model: a case study at Eskilstuna, Sweden
CN114399405A (en) Large-scale hydraulic engineering management method and system based on GIS and BIM
CN103544675B (en) Seimic wave propagation methods of exhibiting
CN112948949A (en) Dynamic modeling method, device and equipment for hydro-junction engineering
CN110598302B (en) Inundation analysis method, module and system based on three-dimensional live-action
Yang et al. Predicting flood inundation and risk using geographic information system and hydrodynamic model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 330000 No.89 Huoju street, high tech Industrial Development Zone, Nanchang City, Jiangxi Province

Patentee after: China Railway Water Resources Information Technology Co.,Ltd.

Address before: 330000 No.89 Huoju street, high tech Industrial Development Zone, Nanchang City, Jiangxi Province

Patentee before: JIANGXI WUDA YANGFAN TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder