CN112049399A - Green coating construction device and construction process for surface of outer wall - Google Patents

Green coating construction device and construction process for surface of outer wall Download PDF

Info

Publication number
CN112049399A
CN112049399A CN202010775906.6A CN202010775906A CN112049399A CN 112049399 A CN112049399 A CN 112049399A CN 202010775906 A CN202010775906 A CN 202010775906A CN 112049399 A CN112049399 A CN 112049399A
Authority
CN
China
Prior art keywords
fixedly connected
basket body
rod
hanging basket
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010775906.6A
Other languages
Chinese (zh)
Inventor
孙永生
张栋焜
徐晓辉
伊通
都书海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Civil Construction Engineering Group Co ltd
Original Assignee
Qingdao Civil Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Civil Construction Engineering Group Co ltd filed Critical Qingdao Civil Construction Engineering Group Co ltd
Priority to CN202010775906.6A priority Critical patent/CN112049399A/en
Publication of CN112049399A publication Critical patent/CN112049399A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Coating Apparatus (AREA)

Abstract

The invention discloses an outer wall surface green coating construction device and a construction process thereof. According to the hanging basket body, the vacuum pump, the vacuum chuck and the first electric push rod are arranged, the hanging basket body can be fixed, the safety of constructors can be improved by arranging the guide rod, the fixing sleeve, the movable block, the fixing rod, the safety rope, the stop block, the fixing ring, the clamping rod, the connecting rod, the first spring and the baffle plate, the coating in the coating barrel can be stirred by arranging the second electric push rod, the movable plate, the first motor and the stirring blade, the wall surface can be coated by the feeding barrel, the coating roller, the feeding pipe and the water pump, so that the green coating construction device for the outer wall surface can reduce the labor intensity of workers, improve the working efficiency and is beneficial to use of people.

Description

Green coating construction device and construction process for surface of outer wall
Technical Field
The invention relates to the technical field of building construction, in particular to an exterior wall surface green coating construction device and a construction process thereof.
Background
The coating is a surface treatment technology mainly aiming at beautifying and protecting, and compared with other surface technologies such as plating, glazing and the like, the coating has the widest application field, and the wall surface coating plays roles in decorating and protecting the building wall surface, enabling the building wall surface to be attractive and neat, protecting the building wall surface and prolonging the service life of the building wall surface.
Wherein the construction of applying paint with a brush of many high-rise outer walls, the working method that mostly needs work platform cooperation staff to go up and down in order to carry out the construction goes on, but in the actual work process, stands in the handheld cylinder brush of staff on work platform and apply paint with a brush to the wall, such working method for staff's intensity of labour is big, and inefficiency, is unfavorable for people's use.
Disclosure of Invention
The invention aims to provide an outer wall surface green coating construction device and a construction process thereof, which have the advantage of convenient use of the construction device and solve the problem of inconvenient use of the construction device.
In order to achieve the purpose, the invention provides the following technical scheme: a construction device for green coating of an outer wall surface comprises a hanging basket body, wherein a vacuum pump is fixedly connected to the front bottom of the hanging basket body, the front of the vacuum pump is communicated with a vacuum chuck through a pipeline, a first electric push rod is fixedly connected to the back of the vacuum chuck, the rear end of the first electric push rod is fixedly connected with the front of the hanging basket body, a guide rod is fixedly connected to the inside of the hanging basket body, a fixed sleeve is movably connected to the surface of the guide rod, a movable block is movably connected to the front of the fixed sleeve through a pin shaft, a fixed rod is movably connected to the inside of the movable block, the top end and the bottom of the fixed rod extend to the outside of the movable block and are respectively fixedly connected with a safety rope and a stop block, a fixed ring is fixedly connected to the other end of the safety rope, a jack matched with the fixed ring is formed, the inner part of the clamping rod is fixedly connected with a connecting rod, the surface of the connecting rod is respectively and movably connected with a first spring and a baffle plate, the front and the back of the first spring are respectively and fixedly connected with the baffle plate and the clamping rod, the front end of the clamping rod extends to the outer part of the movable block, both sides of the back of the inner cavity of the hanging basket body are fixedly connected with a fixed plate, the top of the fixed plate is movably connected with a coating barrel, both sides of the top of the hanging basket body are fixedly connected with a fixed frame, the top of the inner cavity of the fixed frame is fixedly connected with a second electric push rod, the bottom end of the second electric push rod is fixedly connected with a movable plate, the back of the movable plate is contacted with the inner wall of the fixed frame, the front of the movable plate is fixedly connected with a first motor, the bottom end of a rotating shaft, the both sides of feed cylinder bottom all are through the top fixed connection of connecting piece with the hanging flower basket body, there is the paint roller inside the feed cylinder through round pin axle swing joint, the back of paint roller extends to the outside of feed cylinder, the positive both sides fixedly connected with water pump of feed cylinder, the front intercommunication of water pump has the inlet pipe, the other end of inlet pipe runs through to the outside of stirring leaf.
Preferably, the equal fixedly connected with second motor in both sides of hanging flower basket body inner chamber bottom, the equal swing joint in both sides of fixed plate inside has the turning block, the top and the bottom of turning block all extend to the outside of fixed plate, the surface of second motor shaft is passed through the belt and is connected with the turning block transmission, the inside threaded connection of turning block has the screw rod, the bottom fixedly connected with guide block of screw rod, the top of screw rod extends to the outside fixedly connected with support frame of turning block, the surface of support frame is through rings and scribble storage bucket swing joint.
Preferably, the top and the bottom of the fixed sleeve are fixedly connected with fixed balls, and the surfaces of the fixed balls are slidably connected with the inner wall of the hanging basket body.
Preferably, both sides of the bottom of the hanging basket body are fixedly connected with roller carriers, and the inside of each roller carrier is movably connected with a roller through a pin shaft.
Preferably, the equal fixedly connected with sleeve in positive both sides of hanging flower basket body, the back fixedly connected with second spring of sleeve inner chamber, the positive fixedly connected with guide cylinder of second spring, the front of guide cylinder extends to telescopic outside and passes through connecting piece fixedly connected with leading truck, the inside of leading truck has the pulley through round pin axle swing joint.
Preferably, the back of the hanging basket body is movably connected with a door plate through a pin shaft, and the back of the door plate is fixedly connected with a handle.
A green coating construction process for the surface of an outer wall comprises the following steps:
s1: the hanging basket body can move up and down under the matching of the steel wire rope and the lifting mechanism, a constructor stands in the hanging basket body, binds the safety rope on the waist, puts the fixing ring on the safety rope into the movable block, and enters the fixing ring through the matching of the connecting rod, the first spring and the baffle plate to fix the safety rope, so that the safety of the constructor is improved;
s2: before coating, the gap of the outer wall needs to be filled, when a base layer or local putty is cleaned, the first electric push rod drives the vacuum chuck to move, so that the vacuum chuck is in contact with the surface of the outer wall, the vacuum pump performs vacuum pumping, and the hanging basket body is fixed on the surface of the outer wall;
s3: the constructor gets into the hanging flower basket body internally, and after the hanging flower basket body removed to the assigned position, the stirring leaf on the second electric putter drove first motor entered into scribbles the storage bucket in, the inlet pipe also followed the stirring leaf and entered into scribbles the storage bucket, and the stirring leaf stirs the coating in the storage bucket, avoids the coating to solidify, and inlet pipe and water pump are with coating suction feed cylinder, and the coating roller contacts with the outer wall surface, when the hanging flower basket body moved down, is scribbled and is adorned outer wall surface.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the hanging basket body, the vacuum pump, the vacuum chuck and the first electric push rod are arranged, the hanging basket body can be fixed, the safety of constructors can be improved by arranging the guide rod, the fixing sleeve, the movable block, the fixing rod, the safety rope, the stop block, the fixing ring, the clamping rod, the connecting rod, the first spring and the baffle plate, the coating in the coating barrel can be stirred by arranging the second electric push rod, the movable plate, the first motor and the stirring blade, the wall surface can be coated by the feeding barrel, the coating roller, the feeding pipe and the water pump, so that the green coating construction device for the outer wall surface can reduce the labor intensity of workers, improve the working efficiency and is beneficial to use of people.
2. According to the invention, the coating barrel can be fixed by arranging the second motor, the rotating block, the screw and the support frame, the fixed sleeve can move more stably by arranging the fixed ball, the hanging basket body can move conveniently by arranging the roller frame and the rollers, and the shock absorption can be realized when the hanging basket body is contacted with an outer wall by arranging the sleeve, the second spring, the guide cylinder, the guide frame and the pulley.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of the structure of the present invention;
FIG. 3 is a partial rear view of the structure of the present invention;
FIG. 4 is a cross-sectional view of a structural movable block of the present invention;
FIG. 5 is a cross-sectional view of a structural feed cylinder of the present invention;
FIG. 6 is an enlarged view of A of FIG. 2 according to the present invention;
fig. 7 is a cross-sectional view of a structural sleeve of the present invention.
In the figure: 1. a basket body; 2. a vacuum pump; 3. a vacuum chuck; 4. a first electric push rod; 5. a guide bar; 6. fixing a sleeve; 7. a movable block; 8. fixing the rod; 9. a safety cord; 10. a stopper; 11. a fixing ring; 12. a clamping rod; 13. a connecting rod; 14. a first spring; 15. a baffle plate; 16. a fixing plate; 17. A paint bucket; 18. a fixed mount; 19. a second electric push rod; 20. a movable plate; 21. a first motor; 22. Stirring blades; 23. a feeding cylinder; 24. a paint roller; 25. a feed pipe; 26. a second motor; 27. rotating the block; 28. a screw; 29. a support frame; 30. fixing the ball; 31. a sleeve; 32. a second spring; 33. A guide cylinder; 34. a guide frame; 35. a pulley; 36. a door panel; 37. and (4) a water pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, a construction device for green coating of an outer wall surface comprises a hanging basket body 1, wherein both sides of the bottom of an inner cavity of the hanging basket body 1 are fixedly connected with a second motor 26, both sides of the inside of a fixed plate 16 are movably connected with rotating blocks 27, the top and the bottom of each rotating block 27 extend to the outside of the fixed plate 16, the surface of a rotating shaft of the second motor 26 is in transmission connection with the rotating blocks 27 through a belt, the inside of each rotating block 27 is in threaded connection with a screw 28, the bottom end of each screw 28 is fixedly connected with a guide block, the top end of each screw 28 extends to the outside of the corresponding rotating block 27 and is fixedly connected with a support frame 29, the surface of each support frame 29 is movably connected with a coating barrel 17 through a hanging ring, both sides of the bottom of the hanging basket body 1 are fixedly connected with roller frames, the insides of the, the back of the inner cavity of the sleeve 31 is fixedly connected with a second spring 32, the front of the second spring 32 is fixedly connected with a guide tube 33, the front of the guide tube 33 extends to the outside of the sleeve 31 and is fixedly connected with a guide frame 34 through a connecting piece, the inside of the guide frame 34 is movably connected with a pulley 35 through a pin shaft, the back of the hanging basket body 1 is movably connected with a door plate 36 through a pin shaft, the back of the door plate 36 is fixedly connected with a handle, the bottom of the front of the hanging basket body 1 is fixedly connected with a vacuum pump 2, the front of the vacuum pump 2 is communicated with a vacuum chuck 3 through a pipeline, the back of the vacuum chuck 3 is fixedly connected with a first electric push rod 4, the rear end of the first electric push rod 4 is fixedly connected with the front of the hanging basket body 1, the inside of the hanging basket body 1 is fixedly connected with a guide rod 5, the surface of the fixed ball 30 is connected with the inner wall of the hanging basket body 1 in a sliding way, the front surface of the fixed sleeve 6 is movably connected with a movable block 7 through a pin shaft, the inside of the movable block 7 is movably connected with a fixed rod 8, the top end and the bottom of the fixed rod 8 both extend to the outside of the movable block 7 and are respectively fixedly connected with a safety rope 9 and a stop block 10, the other end of the safety rope 9 is fixedly connected with a fixed ring 11, the inside of the movable block 7 is provided with a jack matched with the fixed ring 11, the inside of the jack is movably connected with a clamping rod 12, the inside of the clamping rod 12 is fixedly connected with a connecting rod 13, the surface of the connecting rod 13 is respectively and movably connected with a first spring 14 and a baffle 15, the front surface and the back surface of the first spring 14 are respectively and fixedly connected with the baffle 15 and the clamping rod 12, the front, the top of the fixed plate 16 is movably connected with a coating bucket 17, both sides of the top of the hanging basket body 1 are fixedly connected with a fixed frame 18, the top of the inner cavity of the fixed frame 18 is fixedly connected with a second electric push rod 19, the bottom end of the second electric push rod 19 is fixedly connected with a movable plate 20, the back surface of the movable plate 20 is contacted with the inner wall of the fixed frame 18, the front surface of the movable plate 20 is fixedly connected with a first motor 21, the bottom end of the rotating shaft of the first motor 21 is fixedly connected with a stirring blade 22 positioned at the top of the coating bucket 17, the top of the hanging basket body 1 is provided with a feeding cylinder 23, both sides of the bottom of the feeding cylinder 23 are fixedly connected with the top of the hanging basket body 1 through connecting pieces, the interior of the feeding cylinder 23 is movably connected with a coating roller 24 through a pin shaft, the back surface of the coating roller 24, the other end of the feeding pipe 25 penetrates the outside of the stirring blade 22, the coating bucket 17 can be fixed by arranging the second motor 26, the rotating block 27, the screw 28 and the supporting frame 29, the fixed sleeve 6 can be moved more stably by arranging the fixing ball 30, the basket body 1 can be moved conveniently by arranging the roller frame and the roller, the basket body 1 can be damped when contacting with the outer wall by arranging the sleeve 31, the second spring 32, the guide tube 33, the guide frame 34 and the pulley 35, the safety of a constructor can be improved by arranging the vacuum pump 2, the vacuum chuck 3 and the first electric push rod 4, the basket body 1 can be fixed, the guide rod 5, the fixed sleeve 6, the movable block 7, the fixed rod 8, the safety rope 9, the stopper 10, the fixed ring 11, the clamping rod 12, the connecting rod 13, the first spring 14 and the stopper 15, and the safety of a constructor can be improved by arranging the second electric push rod 19, The movable plate 20, the first motor 21 and the stirring blade 22 can stir the paint in the paint bucket 17, and the feeding cylinder 23, the paint roller 24, the feeding pipe 25 and the water pump 37 can paint the wall surface, so that the green coating construction device for the outer wall surface can reduce the labor intensity of workers, improve the working efficiency and be beneficial to people.
A green coating construction process for the surface of an outer wall comprises the following steps:
s1: the hanging basket body 1 can move up and down under the matching of a steel wire rope and a lifting mechanism, a constructor stands in the hanging basket body 1, the safety rope 9 is tied to the waist, the fixing ring 11 on the safety rope 9 is placed in the movable block 7, the clamping rod 12 enters the fixing ring 11 under the matching of the connecting rod 13, the first spring 14 and the baffle 15, the safety rope 9 is fixed, and the safety of the constructor is improved;
s2: before coating, a gap needs to be filled in the outer wall, when a base layer or local putty is cleaned, the first electric push rod 4 drives the vacuum chuck 3 to move, so that the vacuum chuck 3 is in contact with the surface of the outer wall, the vacuum pump 2 performs vacuum pumping, and the hanging basket body 1 is fixed on the surface of the outer wall;
s3: the constructor enters the hanging basket body 1, when the hanging basket body 1 moves to a designated position, the second electric push rod 19 drives the stirring blade 22 on the first motor 21 to enter the paint bucket 17, the feed pipe 25 also follows the stirring blade 22 to enter the paint bucket 17, the stirring blade 22 stirs the paint in the paint bucket 17 to avoid the paint from solidifying, the feed pipe 25 and the water pump 37 draw the paint into the feed cylinder 23, the paint roller 24 contacts with the surface of the outer wall, and the surface of the outer wall is coated while the hanging basket body 1 moves downwards.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction equipment is covered with paint, lacquer, etc. to outer wall surface green, includes hanging flower basket body (1), its characterized in that: the hanging basket is characterized in that a vacuum pump (2) is fixedly connected to the front bottom of the hanging basket body (1), the front of the vacuum pump (2) is communicated with a vacuum sucker (3) through a pipeline, a first electric push rod (4) is fixedly connected to the back of the vacuum sucker (3), the rear end of the first electric push rod (4) is fixedly connected to the front of the hanging basket body (1), a guide rod (5) is fixedly connected to the inside of the hanging basket body (1), a fixing sleeve (6) is movably connected to the surface of the guide rod (5), a movable block (7) is movably connected to the front of the fixing sleeve (6) through a pin shaft, a fixing rod (8) is movably connected to the inside of the movable block (7), the top end and the bottom of the fixing rod (8) both extend to the outside of the movable block (7) and are respectively fixedly connected with a safety rope (9) and a stop block (10), and a fixing, the inner part of the movable block (7) is provided with a jack matched with the fixed ring (11), the inner part of the jack is movably connected with a clamping rod (12), the inner part of the clamping rod (12) is fixedly connected with a connecting rod (13), the surface of the connecting rod (13) is respectively movably connected with a first spring (14) and a baffle (15), the front surface and the back surface of the first spring (14) are respectively fixedly connected with the baffle (15) and the clamping rod (12), the front end of the clamping rod (12) extends to the outer part of the movable block (7), both sides of the back surface of the inner cavity of the hanging basket body (1) are respectively and fixedly connected with a fixed plate (16), the top of the fixed plate (16) is movably connected with a coating barrel (17), both sides of the top of the hanging basket body (1) are respectively and fixedly connected with a fixed frame (18), and the top of the inner cavity of the fixed frame (, the bottom fixedly connected with fly leaf (20) of second electric putter (19), the back of fly leaf (20) and the inner wall contact of mount (18), the first motor (21) of positive fixedly connected with of fly leaf (20), the bottom fixedly connected with of first motor (21) pivot is located stirring leaf (22) at storage bucket (17) top, the top of hanging flower basket body (1) is provided with a feeding section of thick bamboo (23), the both sides of feeding section of thick bamboo (23) bottom all are through the top fixedly connected with of connecting piece with hanging flower basket body (1), there is paint roller (24) inside feeding section of thick bamboo (23) through round pin axle swing joint, the back of paint roller (24) extends to the outside of feeding section of thick bamboo (23), the positive both sides fixedly connected with water pump (37) of feeding section of thick bamboo (23), the front intercommunication of water pump (37) has inlet pipe (25), the other end of the feeding pipe (25) penetrates to the outside of the stirring blade (22).
2. The construction device and the construction process for green coating of the surface of the outer wall according to claim 1, wherein: the equal fixedly connected with second motor (26) in both sides of hanging flower basket body (1) inner chamber bottom, the equal swing joint in both sides of fixed plate (16) inside has turning block (27), the top and the bottom of turning block (27) all extend to the outside of fixed plate (16), the surface of second motor (26) pivot is passed through the belt and is connected with turning block (27) transmission, the inside threaded connection of turning block (27) has screw rod (28), the bottom fixedly connected with guide block of screw rod (28), the top of screw rod (28) extends to outside fixedly connected with support frame (29) of turning block (27), the surface of support frame (29) is through rings and scribble storage bucket (17) swing joint.
3. The construction device and the construction process for green coating of the surface of the outer wall according to claim 1, wherein: the top and the bottom of fixed cover (6) are all fixedly connected with fixing ball (30), the surface of fixing ball (30) and the inner wall sliding connection of hanging flower basket body (1).
4. The construction device and the construction process for green coating of the surface of the outer wall according to claim 1, wherein: the two sides of the bottom of the hanging basket body (1) are fixedly connected with roller carriers, and the inside of each roller carrier is movably connected with a roller through a pin shaft.
5. The construction device and the construction process for green coating of the surface of the outer wall according to claim 1, wherein: the hanging flower basket body (1) positive both sides equal fixedly connected with sleeve (31), the back fixedly connected with second spring (32) of sleeve (31) inner chamber, the positive fixedly connected with guide tube (33) of second spring (32), connecting piece fixedly connected with leading truck (34) is passed through to the outside that the front of guide tube (33) extended to sleeve (31), the inside of leading truck (34) has pulley (35) through round pin axle swing joint.
6. The construction device and the construction process for green coating of the surface of the outer wall according to claim 1, wherein: the back of hanging flower basket body (1) is through round pin axle swing joint door plant (36), the back fixedly connected with handle of door plant (36).
7. A green coating construction process for the surface of an outer wall is characterized by comprising the following steps: the method comprises the following steps:
s1: the hanging basket body (1) can move up and down under the matching of a steel wire rope and a lifting mechanism, a constructor stands in the hanging basket body (1), a safety rope (9) is tied to the waist, a fixing ring (11) on the safety rope (9) is placed in a movable block (7), a clamping rod (12) enters the fixing ring (11) under the matching of a connecting rod (13), a first spring (14) and a baffle (15) to fix the safety rope (9), and the safety of the constructor is improved;
s2: before coating, a gap needs to be filled in the outer wall, when a base layer or local putty is cleaned, the first electric push rod (4) drives the vacuum sucker (3) to move, so that the vacuum sucker (3) is in contact with the surface of the outer wall, the vacuum pump (2) performs vacuumizing, and the hanging basket body (1) is fixed on the surface of the outer wall;
s3: a constructor enters the hanging basket body (1), after the hanging basket body (1) moves to a designated position, a second electric push rod (19) drives a stirring blade (22) on a first motor (21) to enter a paint bucket (17), a feeding pipe (25) also enters the paint bucket (17) along with the stirring blade (22), the stirring blade (22) stirs paint in the paint bucket (17) to avoid solidification of the paint, the feeding pipe (25) and a water pump (37) pump the paint into the feeding cylinder (23), a paint roller (24) is in contact with the surface of an outer wall, and the surface of the outer wall is coated while the hanging basket body (1) moves downwards.
CN202010775906.6A 2020-08-05 2020-08-05 Green coating construction device and construction process for surface of outer wall Pending CN112049399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010775906.6A CN112049399A (en) 2020-08-05 2020-08-05 Green coating construction device and construction process for surface of outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010775906.6A CN112049399A (en) 2020-08-05 2020-08-05 Green coating construction device and construction process for surface of outer wall

Publications (1)

Publication Number Publication Date
CN112049399A true CN112049399A (en) 2020-12-08

Family

ID=73602289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010775906.6A Pending CN112049399A (en) 2020-08-05 2020-08-05 Green coating construction device and construction process for surface of outer wall

Country Status (1)

Country Link
CN (1) CN112049399A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607123A (en) * 2022-03-03 2022-06-10 倪伟 Building wall waterproof layer paints device fast

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1180417A (en) * 1966-06-02 1970-02-04 Michel Daignas Improvements in or relating to Portable Motor-Driven Coating Machines
CN105413085A (en) * 2015-12-29 2016-03-23 国家电网公司 Fall-preventing device on power transmission tower pole
CN107956287A (en) * 2017-12-27 2018-04-24 天津市雷升科技有限公司 A kind of construction hanging basket
CN108005374A (en) * 2017-12-11 2018-05-08 罗艳春 Clear up the hanging basket construction method of glass curtain wall
CN207920516U (en) * 2018-03-07 2018-09-28 张正 A kind of hydraulic engineering maintenance cat ladder
CN208702099U (en) * 2018-05-25 2019-04-05 上海金甸建筑装饰设计有限公司 It is a kind of that there is continuous and efficient performance device of whitewashing a wall automatically for house decoration
WO2019080140A1 (en) * 2017-10-29 2019-05-02 朱美馀 Retractable building exterior wall work platform
CN208809422U (en) * 2018-08-05 2019-05-03 广州耕山小寨农业有限公司 A kind of outdoor leisure entertainment device using rope and lap belt
CN110230389A (en) * 2018-04-26 2019-09-13 金华有成建设有限公司 A kind of finishing hanging basket that security performance for building is high
CN209907875U (en) * 2019-02-21 2020-01-07 崔霞 High-rise building outer wall spraying device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1180417A (en) * 1966-06-02 1970-02-04 Michel Daignas Improvements in or relating to Portable Motor-Driven Coating Machines
CN105413085A (en) * 2015-12-29 2016-03-23 国家电网公司 Fall-preventing device on power transmission tower pole
WO2019080140A1 (en) * 2017-10-29 2019-05-02 朱美馀 Retractable building exterior wall work platform
CN108005374A (en) * 2017-12-11 2018-05-08 罗艳春 Clear up the hanging basket construction method of glass curtain wall
CN107956287A (en) * 2017-12-27 2018-04-24 天津市雷升科技有限公司 A kind of construction hanging basket
CN207920516U (en) * 2018-03-07 2018-09-28 张正 A kind of hydraulic engineering maintenance cat ladder
CN110230389A (en) * 2018-04-26 2019-09-13 金华有成建设有限公司 A kind of finishing hanging basket that security performance for building is high
CN208702099U (en) * 2018-05-25 2019-04-05 上海金甸建筑装饰设计有限公司 It is a kind of that there is continuous and efficient performance device of whitewashing a wall automatically for house decoration
CN208809422U (en) * 2018-08-05 2019-05-03 广州耕山小寨农业有限公司 A kind of outdoor leisure entertainment device using rope and lap belt
CN209907875U (en) * 2019-02-21 2020-01-07 崔霞 High-rise building outer wall spraying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607123A (en) * 2022-03-03 2022-06-10 倪伟 Building wall waterproof layer paints device fast
CN114607123B (en) * 2022-03-03 2023-08-08 龙达建设(珠海)有限公司 Quick device of paining of building wall waterproof layer

Similar Documents

Publication Publication Date Title
CN207430584U (en) A kind of curtain wall rock cotton board spray-painting plant
CN109433454B (en) Semi-automatic tree whitewashing machine and whitewashing method
CN112049399A (en) Green coating construction device and construction process for surface of outer wall
CN110449296B (en) Spraying device is used in production of electronic product shell
CN214885227U (en) Building energy-saving coating spraying device
CN214834469U (en) Novel spraying type wall plastering equipment
CN214132367U (en) A apply paint device with a brush for trunk
CN210788013U (en) Device for maintaining ancient building
CN211691326U (en) Automatic painting mechanism for water-based exterior wall paint
CN218945392U (en) Spraying device for hardware fitting machining
CN212576659U (en) Vertical spraying device of aluminum product with raising and lowering functions
CN110314796A (en) A kind of scaffold semi-finished product entirety appearance spray equipment
CN215088251U (en) Environmental protection formula spraying device that aluminium alloy processing was used
CN212883118U (en) Quick spraying device of panel beating
CN210049543U (en) Architectural coatings spraying device with purification performance
CN211989356U (en) Hardware surface paint spraying treatment device
CN207296316U (en) A kind of building wall flush coater
CN210001532U (en) lifting device for pressure tank sand blasting and paint spraying production line
CN210482919U (en) High efficiency wall whitewashes device for building decoration
CN213418378U (en) Movable ceiling painting device
CN220301737U (en) Paint spraying device for building
CN220395106U (en) Emulsion spraying equipment for building coating
CN220027441U (en) Uniform painting device
CN221205280U (en) Intelligent wall climbing machine
CN218492999U (en) Interior wall whitewashes device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201208

RJ01 Rejection of invention patent application after publication