CN110230389A CN201810382307.0A CN201810382307A CN110230389A CN 110230389 A CN110230389 A CN 110230389A CN 201810382307 A CN201810382307 A CN 201810382307A CN 110230389 A CN110230389 A CN 110230389A
Authority
CN
China
Prior art keywords
hanging basket
building
bolted
upright post
security performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810382307.0A
Other languages
Chinese (zh)
Inventor
徐丹
丰理有
孙勋响
杨爽
丁觉
叶文德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Youcheng Construction Co Ltd
Original Assignee
Jinhua Youcheng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Youcheng Construction Co Ltd filed Critical Jinhua Youcheng Construction Co Ltd
Priority to CN201810382307.0A priority Critical patent/CN110230389A/en
Publication of CN110230389A publication Critical patent/CN110230389A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds

Abstract

The invention belongs to technical field of buildings, especially a kind of finishing hanging basket that security performance for building is high, for finishing hanging basket, usually because the effect of wind-force is led to the problem of, shaking, there are electricity consumption inconveniences, now propose following scheme, including pedestal, the top side both ends of the pedestal are welded with the first upright post rod being vertically arranged, and the top other side both ends of pedestal are welded with the second upright post rod being vertically arranged, and are welded with the backplate being vertically arranged between first upright post rod and the second upright post rod.The present invention avoids staff from touching plug and power supply base when in use; so that finishing hanging basket electricity consumption is simple and convenient; security performance is high simultaneously; avoid staff be exposed to the sun heatstroke the phenomenon that generation; shutter can be folded by damp hinge simultaneously, so that shutter is easy to use, be contacted using rubber roll with building or structures facade; building facade is protected, while to fit up the steady of hanging basket or more operation.

Description

A kind of finishing hanging basket that security performance for building is high
Technical field
The present invention relates to technical field of buildings more particularly to a kind of finishing hanging baskets that security performance for building is high.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, currently, many is built The height built is higher, it is therefore desirable to and it uses hanging basket and is fitted up, and hanging basket is the building machinery of architectural engineering high altitude operation, effect It is installed in curtain wall, outside Wall Cleaning, overhanging mechanism rack is set on building or structures, suspension platform is driven using hoisting mechanism, The construction installation run up and down by wirerope along building or structures facade, and the operation horizontal for operator's setting Platform, therefore, in skyscraper commonly using finishing hanging basket, still, existing finishing barrel structure is simple, uses in finishing hanging basket When, it is suspended on building surface by gravity, usually because the effect of wind-force generates shaking, meanwhile, staff is in finishing hanging basket On, there is a problem of electricity consumption inconvenience, so that poor safety performance when finishing hanging basket uses.
Summary of the invention
Based on finishing hanging basket, usually because the effect of wind-force generates, shaking, there are the technical problem of electricity consumption inconvenience, this hairs It is bright to propose a kind of finishing hanging basket that security performance for building is high.
A kind of high finishing hanging basket of security performance for building proposed by the present invention, including pedestal, the top one of the pedestal Side both ends are welded with the first upright post rod being vertically arranged, and the top other side both ends of pedestal are welded be vertically arranged Two upright post rods are welded with the backplate being vertically arranged, the top one of the pedestal between first upright post rod and the second upright post rod The electric pushrod being vertically arranged is bolted in middle side part, and the top of two second upright post rods offers to be set vertically The slot set, and the inner tip of two slots is plugged with inserted link, the top of two inserted links is connected by damp hinge There is a same shutter, the side that two backplates are located remotely from each other is bolted that there are two horizontally disposed first liquid Compressing cylinder and the second hydraulic cylinder, and two the second hydraulic cylinders are located between two the first hydraulic cylinders, described first is hydraulic Spring buffer, and the bullet being located on the first hydraulic cylinder has been bolted in the piston rod of oil cylinder and the second hydraulic cylinder Rubber roll has been bolted in spring buffer end, and the spring buffer end on the second hydraulic cylinder passes through bolt It is connected with sucker.
Preferably, the bottom four corners of the pedestal are bolted the damper being vertically arranged, and damper Universal wheel has been bolted in bottom.
Preferably, two first upright post rod sides close to each other offer the sliding slot of T-type structure, and two cunnings The inside of slot slidably connects the sliding block equidistantly distributed, is bolted between two sliding blocks high positioned at same level There is guard bar, and the interlude of guard bar offers slide opening, guard bar is slidably connected by the outer circumferential walls of slide opening and electric pushrod, adjacent Two guard bars between the protective rope equidistantly distributed is bolted, the bottom end center positioned at the guard bar at top passes through spiral shell The connection of the motion bar of bolt and electric pushrod.
Preferably, it is welded with the same fence between two second upright post rods, and is welded at the top of fence equidistant Shell made of plastic material, and the inside of shell has been bolted in safety rope system link from distribution, the inside of fence Power supply base has been bolted in bottom end, opening is offered at the top of shell, and opening is hinged with capping, shell is close to electricity One lateral roof of dynamic push rod offers the wiring duct equidistantly distributed, and the top of wiring duct and open communication, wiring duct it is interior Portion is bonded with the guard ring of U-shaped structure.
Preferably, the side of two inserted links offers the lock slots equidistantly distributed, and two the second upright post rods Top side dead bolt has been bolted, bolt rod and the lock slots of dead bolt match.
Preferably, the same hanger, and the inside of hanger are welded at the top of first upright post rod and the second upright post rod Elevator is installed, safety lock has been bolted at the top of hanger.
Preferably, the side of the fence offers rectangular aperture, and the side of rectangular aperture is hinged with protective door, protection The other end of door is bonded by pin lock and fence.
Preferably, non-slip mat made of rubber material has been bolted in the center of top of the pedestal, and is located at bottom The bottom end of the guard bar in portion is connect by bolt with pedestal.
Preferably, two first upright post rod lateral roofs close to each other are hinged with locking level, and two lockings The side of bar offers the locking slot equidistantly distributed, is hinged with self-lock pin, locking slot and guard bar phase at the top of the notch of locking slot Matching.
Preferably, the volume of the top of the pedestal one time is provided with electric cabinet, and the side of electric cabinet is by bolt and wherein One backplate connection, the first hydraulic cylinder, electric pushrod, the second hydraulic cylinder and elevator are connected with controller by switch, Switch is installed on the inside of electric cabinet with controller.
Having the beneficial effect that in the present invention
1, the high finishing hanging basket of security performance for building proposed by the present invention is equipped with power supply base in the inside of shell, so that Staff is simple and convenient in finishing hanging basket power inside, while plug passes through wiring duct and connect with power supply base, so that power supply Line card is fixed inside wiring duct, and staff is avoided to touch plug and power supply base when in use, so that finishing hanging basket is used Electricity is simple and convenient, while security performance is high.
2, the high finishing hanging basket of security performance for building proposed by the present invention, the top of the second upright post rod by slot and Inserted link is equipped with shutter, and shutter can keep the sun off for staff, avoid staff be exposed to the sun heatstroke the phenomenon that generation, Shutter can be folded by damp hinge simultaneously, so that shutter is easy to use.
3, the high finishing hanging basket of security performance for building proposed by the present invention is installed in finishing hanging basket close to the side of building There is rubber roll, runs above and below building or structures facade in finishing hanging basket, using rubber roll and building or construct The contact of object facade, protects building facade, while to fit up the steady of hanging basket or more operation.
4, the high finishing hanging basket of security performance for building proposed by the present invention, is equipped with sucker, in construction, utilizes sucker It adsorbs and fixes with building facade, finishing hanging basket can effectively be avoided to generate shaking in the effect of wind-force, so that finishing hanging basket Security performance increases, and works at the same time personnel and safety belt is fixed on safety rope system link, can effectively avoid because of safety The safety of safety belt is influenced with sliding.
5, the high finishing hanging basket of security performance for building proposed by the present invention, pedestal are equipped with universal wheel by damper, So that finishing hanging basket movement is simple and convenient, while damper can eliminate trembling of being subject to when finishing hanging basket landing ground, can be with Effectively avoid preventing staff from falling.
Detailed description of the invention
Fig. 1 is a kind of schematic view of the front view of the high finishing hanging basket of security performance for building proposed by the present invention;
Fig. 2 is a kind of backsight structural representation of the high finishing hanging basket of security performance for building proposed by the present invention;
Fig. 3 is a kind of side structure schematic view of the high finishing hanging basket of security performance for building proposed by the present invention;
Fig. 4 is a kind of local overlooking structural schematic diagram of the high finishing hanging basket of security performance for building proposed by the present invention;
Fig. 5 is the shutter and hinge pedestal structure schematic diagram of a kind of high finishing hanging basket of security performance for building proposed by the present invention.
In figure: 1 universal wheel, 2 dampers, 3 pedestals, 4 first upright post rods, 5 sliding slots, 6 sliding slots, 7 guard bars, 8 protective ropes, 9 electricity Dynamic push rod, 10 locking levels, 11 first hydraulic cylinders, 12 second hydraulic cylinders, 13 slots, 14 inserted links, 15 lock slots, 16 shells, 17 shutters, 18 fence, 19 safety rope system links, 20 cappings, 21 cappings, 22 power supply bases, 23 rubber rolls, 24 suckers, 25 Spring buffer, 26 backplates, 27 hangers, 28 non-slip mats, 29 second upright post rods.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-5, a kind of finishing hanging basket that security performance for building is high, including pedestal 3, the top side two of pedestal 3 End is welded with the first upright post rod 4 being vertically arranged, and the top other side both ends of pedestal 3 are welded with second be vertically arranged Upright post rod 29 is welded with the backplate 26 being vertically arranged, the top side of pedestal 3 between first upright post rod 4 and the second upright post rod 29 The electric pushrod 9 being vertically arranged is bolted in middle part, and the top of two the second upright post rods 29, which offers, to be vertically arranged Slot 13, and the inner tip of two slots 13 is plugged with inserted link 14, and the top of two inserted links 14 passes through damp hinge and connects It is connected to the same shutter 17, the side that two backplates 26 are located remotely from each other is bolted that there are two horizontally disposed first Hydraulic cylinder 11 and the second hydraulic cylinder 12, and two the second hydraulic cylinders 12 are located between two the first hydraulic cylinders 11, the Spring buffer 25 has been bolted in the piston rod of one hydraulic cylinder 11 and the second hydraulic cylinder 12, and is located at the first liquid Rubber roll 23 has been bolted in 25 end of spring buffer on compressing cylinder 11, the bullet on the second hydraulic cylinder 12 Sucker 24 has been bolted in 25 end of spring buffer.
The bottom four corners of pedestal 3 are bolted the damper 2 being vertically arranged in the present invention, and damper 2 Universal wheel 1 has been bolted in bottom, and two the first upright post rod 4 sides close to each other offer the sliding slot of T-type structure 5, and the inside of two sliding slots 5 slidably connects the sliding block 6 equidistantly distributed, two sliding blocks 6 high positioned at same level it Between be bolted guard bar 7, and the interlude of guard bar 7 offers slide opening, and guard bar 7 passes through the circle of slide opening and electric pushrod 9 All outer walls are slidably connected, and the protective rope 8 equidistantly distributed is bolted between two adjacent guard bars 7, are located at top The bottom end center of guard bar 7 connect with the motion bar of electric pushrod 9 by bolt;
It is welded with the same fence 18 between two the second upright post rods 29, and the top of fence 18 is welded with the peace equidistantly distributed Full rope is link 19, and shell 16 made of plastic material, and the inner bottom of shell 16 has been bolted in the inside of fence 18 Power supply base 22 has been bolted in end, and the top of shell 16 offers opening, and opening is hinged with capping 20, shell 16 A lateral roof close to electric pushrod 9 offers the wiring duct 21 equidistantly distributed, and the top of wiring duct 21 and open communication, The inside of wiring duct 21 is bonded with the guard ring of U-shaped structure;
The side of two inserted links 14 offers the lock slots 15 equidistantly distributed, and the top side of two the second upright post rods 29 Dead bolt is bolted, bolt rod and the lock slots 15 of dead bolt match, and the first upright post rod 4 and second is vertical The top of mast 29 is welded with the same hanger 27, and the inside of hanger 27 is equipped with elevator, and the top of hanger 27 passes through spiral shell It tethers and is connected to safety lock, the side of fence 18 offers rectangular aperture, and the side of rectangular aperture is hinged with protective door, protective door The other end be bonded with fence 18 by pin lock, the center of top of pedestal 3 has been bolted rubber material and has been made Non-slip mat 28, and the bottom end for being located at the guard bar 7 of bottom is connect by bolt with pedestal 3;
Two the first upright post rod 4 lateral roofs close to each other are hinged with locking level 10, and the side of two locking levels 10 is opened Equipped with the locking slot equidistantly distributed, it is hinged with self-lock pin at the top of the notch of locking slot, locking slot matches with guard bar 7, pedestal 3 The volume of top one time be provided with electric cabinet, and the side of electric cabinet is connect by bolt with one of backplate 26, and first is hydraulic Oil cylinder 11, electric pushrod 9, the second hydraulic cylinder 12 and elevator are connected with controller by switch, and switch is installed with controller In the inside of electric cabinet.
In use, power supply base 22 is equipped in the inside of shell 16, so that staff is in finishing hanging basket power inside It is simple and convenient, while plug passes through wiring duct 21 and connect with power supply base 22, fixes so that power supply line is stuck in inside wiring duct 21, It avoids staff from touching plug and power supply base 22 when in use, passes through slot 13 and inserted link at the top of the second upright post rod 14 are equipped with shutter 17, and shutter 17 can keep the sun off for staff, avoid staff be exposed to the sun heatstroke the phenomenon that hair It is raw, while shutter 17 can be folded by damp hinge, be equipped with rubber roll 23 close to the side of building in finishing hanging basket, It runs above and below building or structures facade in finishing hanging basket, is connect using rubber roll 23 and building or structures facade Building facade is protected in touching, in construction, is fixed using sucker 24 and the absorption of building facade, can effectively be avoided fitting up Hanging basket generates shaking in the effect of wind-force, so that finishing hanging basket security performance increases, works at the same time personnel and is fixed on safety belt On safety rope system link 19, pedestal 3 is equipped with universal wheel 1 by damper 2, so that finishing hanging basket movement is simple and convenient, simultaneously Damper 2 can eliminate finishing hanging basket landing ground when be subject to tremble, can effectively avoid preventing staff from falling.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of finishing hanging basket that security performance for building is high, including pedestal (3), which is characterized in that the top of the pedestal (3) Side both ends are welded with the first upright post rod (4) being vertically arranged, and the top other side both ends of pedestal (3) are welded with vertically The second upright post rod (29) being arranged is welded with the shield being vertically arranged between first upright post rod (4) and the second upright post rod (29) The electric pushrod (9) being vertically arranged is bolted in the top side middle part of plate (26), the pedestal (3), described in two The top of second upright post rod (29) offers the slot (13) being vertically arranged, and the equal grafting of inner tip of two slots (13) Have inserted link (14), the top of two inserted links (14) is connected with the same shutter (17) by damp hinge, described in two The side that backplate (26) is located remotely from each other is bolted there are two horizontally disposed first hydraulic cylinder (11) and the second liquid Compressing cylinder (12), and two the second hydraulic cylinders (12) are located between two the first hydraulic cylinders (11), first hydraulic oil The piston rod of cylinder (11) and the second hydraulic cylinder (12) has been bolted spring buffer (25), and it is hydraulic to be located at first Rubber roll (23) have been bolted in spring buffer (25) end on oil cylinder (11), are located at the second hydraulic cylinder (12) On spring buffer (25) end sucker (24) have been bolted.
2. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that the pedestal (3) damper (2) being vertically arranged is bolted in bottom four corners, and the bottom of damper (2) is connected by bolt It is connected to universal wheel (1).
3. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that two described One upright post rod (4) side close to each other offers the sliding slot (5) of T-type structure, and the inside company of sliding of two sliding slots (5) It is connected to the sliding block (6) equidistantly distributed, guard bar (7) have been bolted between two sliding blocks (6) high positioned at same level, And the interlude of guard bar (7) offers slide opening, guard bar (7) is slidably connected by the outer circumferential walls of slide opening and electric pushrod (9), phase The protective rope (8) equidistantly distributed is bolted between two adjacent guard bars (7), positioned at the bottom of the guard bar (7) at top End center is connect by bolt with the motion bar of electric pushrod (9).
4. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that two described It is welded between two upright post rods (29) the same fence (18), and is welded with the safety rope equidistantly distributed at the top of fence (18) It is link (19), the inside of fence (18) has been bolted shell made of plastic material (16), and shell (16) is interior Portion bottom end has been bolted power supply base (22), opening is offered at the top of shell (16), and opening is hinged with capping (20), shell (16) offers the wiring duct (21) equidistantly distributed, and wiring duct close to a lateral roof of electric pushrod (9) (21) inside on top and open communication, wiring duct (21) is bonded with the guard ring of U-shaped structure.
5. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that two described slotting The side of bar (14) offers the lock slots (15) equidistantly distributed, and the top side of two the second upright post rods (29) is logical It crosses and has been bolted dead bolt, bolt rod and the lock slots (15) of dead bolt match.
6. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that described first is vertical It is welded with the same hanger (27) at the top of mast (4) and the second upright post rod (29), and the inside of hanger (27) is equipped with promotion Safety lock has been bolted at the top of (27) in machine, hanger.
7. a kind of high finishing hanging basket of security performance for building according to claim 4, which is characterized in that the fence (18) side offers rectangular aperture, and the side of rectangular aperture is hinged with protective door, and the other end of protective door passes through bolt Lock is bonded with fence (18).
8. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that the pedestal (3) center of top has been bolted non-slip mat made of rubber material (28), and is located at the bottom end of the guard bar (7) of bottom It is connect by bolt with pedestal (3).
9. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that two described One upright post rod (4) lateral roof close to each other is hinged with locking level (10), and the side of two locking levels (10) offers The notch top of the locking slot equidistantly distributed, locking slot is hinged with self-lock pin, and locking slot matches with guard bar (7).
10. a kind of high finishing hanging basket of security performance for building according to claim 1, which is characterized in that the pedestal (3) the volume of top one time is provided with electric cabinet, and the side of electric cabinet is connect by bolt with one of backplate (26), and first Hydraulic cylinder (11), electric pushrod (9), the second hydraulic cylinder (12) and elevator are connected with controller by switch, switch with Controller is installed on the inside of electric cabinet.
CN201810382307.0A 2018-04-26 2018-04-26 A kind of finishing hanging basket that security performance for building is high Pending CN110230389A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810382307.0A CN110230389A (en) 2018-04-26 2018-04-26 A kind of finishing hanging basket that security performance for building is high

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810382307.0A CN110230389A (en) 2018-04-26 2018-04-26 A kind of finishing hanging basket that security performance for building is high

Publications (1)

Publication Number Publication Date
CN110230389A true CN110230389A (en) 2019-09-13

Family

ID=67862280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810382307.0A Pending CN110230389A (en) 2018-04-26 2018-04-26 A kind of finishing hanging basket that security performance for building is high

Country Status (1)

Country Link
CN (1) CN110230389A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236611A (en) * 2020-01-19 2020-06-05 温州职业技术学院 Fitment hanging flower basket that security performance is high for building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150041252A1 (en) * 2013-08-08 2015-02-12 Safway Services, Llc Access structure integration assembly and integrated access systems and methods of using the same
CN204645577U (en) * 2015-04-21 2015-09-16 杨雪飞 The working hanging basket of a kind of external wall
CN204676869U (en) * 2015-04-23 2015-09-30 中国建筑第八工程局有限公司 For the travelling cradle of curtain wall construction
GB2533141B (en) * 2014-12-11 2017-04-12 Ischebeck Titan Ltd Hydraulic lifting arrangement
CN107313585A (en) * 2017-05-10 2017-11-03 秦皇岛中燕机械设备有限公司 Hang indigo plant in a kind of intelligent high-altitude
CN206784894U (en) * 2017-06-13 2017-12-22 青岛中嘉建设集团有限公司 A kind of finishing hanging basket for building
CN207002159U (en) * 2017-08-03 2018-02-13 蓝静 A kind of higher hanging basket of stability

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150041252A1 (en) * 2013-08-08 2015-02-12 Safway Services, Llc Access structure integration assembly and integrated access systems and methods of using the same
GB2533141B (en) * 2014-12-11 2017-04-12 Ischebeck Titan Ltd Hydraulic lifting arrangement
CN204645577U (en) * 2015-04-21 2015-09-16 杨雪飞 The working hanging basket of a kind of external wall
CN204676869U (en) * 2015-04-23 2015-09-30 中国建筑第八工程局有限公司 For the travelling cradle of curtain wall construction
CN107313585A (en) * 2017-05-10 2017-11-03 秦皇岛中燕机械设备有限公司 Hang indigo plant in a kind of intelligent high-altitude
CN206784894U (en) * 2017-06-13 2017-12-22 青岛中嘉建设集团有限公司 A kind of finishing hanging basket for building
CN207002159U (en) * 2017-08-03 2018-02-13 蓝静 A kind of higher hanging basket of stability

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨嗣信: "《建筑业重点推广新技术应用手册》", 30 April 2003, 中国建筑工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236611A (en) * 2020-01-19 2020-06-05 温州职业技术学院 Fitment hanging flower basket that security performance is high for building

Similar Documents

Publication Publication Date Title
CN204662105U (en) The electric clothes hanger that a kind of lifting drive is large
CN201261693Y (en) Multifunctional small-sized conveyor
CN102943609B (en) High-rise self-rescue escape window
CN102397039B (en) Folding window cleaning equipment
CN100480481C (en) Quadrangular pyramid sphere net case falsework-free constructing and mounting method and hoisting machine tool
CN102987991B (en) Single-rail window wiping machine
CN203043352U (en) High-rise escape slow descent device
CN204342301U (en) Hanging
CN104295080A (en) External wall hanging basket installing structure
CN104314299A (en) Foldable hanging basket
CN209494203U (en) Barrel structure is used in a kind of construction of external wall
CN104027895A (en) Quick descending support suitable for high-rise escape
CN102166390B (en) High-rise fire safety escape device with escape hatch
CN206784894U (en) A kind of finishing hanging basket for building
CN101869457A (en) Building cleaning equipment
CN103924777A (en) Suspension platform special for building exterior wall decoration construction
CN206785088U (en) A kind of band illumination functions construction guard rail
CN109638749A (en) A kind of overhead transmission line line protection device
CN204714397U (en) A kind of vehicle-mounted tower crane of energy-conserving and environment-protective
CN206837251U (en) A kind of security escape system
CN103950874A (en) Foldable type high-altitude fire-fighting rescuing device
CN202313138U (en) Folding window cleaning equipment
CN206472234U (en) A kind of intelligent elevator supervising device
CN201649678U (en) Semi-automatic safety protective shed for high-rise building construction
CN209653266U (en) A kind of balcony guardrail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination