CN112048959A - A kind of transverse grouting roadbed reinforcement structure and roadbed repair method - Google Patents

A kind of transverse grouting roadbed reinforcement structure and roadbed repair method Download PDF

Info

Publication number
CN112048959A
CN112048959A CN202011018756.0A CN202011018756A CN112048959A CN 112048959 A CN112048959 A CN 112048959A CN 202011018756 A CN202011018756 A CN 202011018756A CN 112048959 A CN112048959 A CN 112048959A
Authority
CN
China
Prior art keywords
roadbed
pile
tree root
grouting
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011018756.0A
Other languages
Chinese (zh)
Inventor
谭玲
岳伟杰
卢辉
阎宗岭
徐峰
李正凯
林海腾
陈超
刘中帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Guangzhou Expressway Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Guangzhou Expressway Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd, Guangzhou Expressway Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN202011018756.0A priority Critical patent/CN112048959A/en
Publication of CN112048959A publication Critical patent/CN112048959A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种横向注浆路基加固结构及路基修复方法中,所述横向注浆路基加固结构包括:路基、树根桩组、软路肩和路面,所述路面设置在所述路基上,所述软路肩设置在所述路基和所述路面两侧,至少所述路基一侧的软路肩上设置有所述树根桩组,所述树根桩组包括多个相互连接的树根桩,所述树根桩从所述软路肩的侧面延伸至所述路基发生病害的部位。本发明设置多个向路基病害部位延伸的树根桩加固路基,树根桩的注浆加固范围覆盖路基病害部位,在不破坏路面结构、不中断交通的情况下进行路基加固,防止路基结构状态恶化,修复路基路面病害。

Figure 202011018756

The invention discloses a transverse grouting roadbed reinforcement structure and a roadbed repair method. The transverse grouting roadbed reinforcement structure comprises a roadbed, a tree root pile group, a soft shoulder and a road surface, and the road surface is arranged on the roadbed, The soft road shoulder is arranged on both sides of the roadbed and the road surface, at least the soft road shoulder on one side of the roadbed is provided with the tree root stump group, and the tree root stump group includes a plurality of interconnected tree root stumps , the tree root stump extends from the side of the soft shoulder to the diseased part of the roadbed. In the present invention, a plurality of tree root piles extending to the diseased part of the roadbed are arranged to reinforce the roadbed, and the grouting reinforcement range of the root piles covers the diseased part of the roadbed. Deterioration, repair roadbed and pavement diseases.

Figure 202011018756

Description

一种横向注浆路基加固结构及路基修复方法A kind of transverse grouting roadbed reinforcement structure and roadbed repair method

技术领域technical field

本发明涉及路基修复技术领域,具体是涉及一种横向注浆路基加固结构及路基修复方法。The invention relates to the technical field of roadbed repair, in particular to a lateral grouting roadbed reinforcement structure and a roadbed repair method.

背景技术Background technique

随着我国公路网的逐步完善,公路在运营维护过程中需要治理的工程病害也随之增多,路基不均匀沉降、路基边坡滑移、路基路面开裂等病害时有发生。在公路病害防治治理过程中,由于注浆加固修复技术机动灵活,施工方便快捷,能适用各种复杂地质条件,常用于公路路基、路面、边坡及隧道等病害的预防与治理。With the gradual improvement of my country's highway network, the engineering diseases that need to be treated in the process of highway operation and maintenance have also increased. In the process of road disease prevention and control, due to the flexibility of grouting reinforcement and repair technology, convenient and fast construction, and suitable for various complex geological conditions, it is often used in the prevention and control of roadbed, pavement, slope and tunnel diseases.

目前,竖向钻孔注浆技术已成功用于多种地层条件下的加固、防渗止水工程,显示出良好的优越性,并在公路路基路面加固、病害治理工程中有许多成功应用。但是竖向钻孔破坏了路面结构及其完整性,在注浆加固完成后,需中断交通进行路面修复与沥青面层加铺以恢复路面功能性。此外,在行车荷载作用下,加固后的路面注浆孔位置材料不均匀性导致应力集中明显,路面结构极易产生新的开裂等早期病害现象,影响路面使用功能与使用寿命。因此,如何在不破坏路面结构、不中断交通的情况下进行路基加固,防止路基结构状态恶化,修复路基路面病害是本领域亟待解决的技术难题。At present, the vertical drilling grouting technology has been successfully used in reinforcement, seepage and water-stop projects under various strata conditions, showing good advantages, and has many successful applications in highway roadbed pavement reinforcement and disease control projects. However, the vertical drilling damages the pavement structure and its integrity. After the grouting reinforcement is completed, it is necessary to interrupt the traffic for pavement repair and asphalt surface overlay to restore the pavement functionality. In addition, under the action of traffic load, the unevenness of materials at the grouting hole position of the reinforced pavement leads to obvious stress concentration, and the pavement structure is prone to new cracks and other early diseases, which affect the function and service life of the pavement. Therefore, how to reinforce the roadbed without destroying the pavement structure and interrupting traffic, preventing the deterioration of the roadbed structure, and repairing the disease of the roadbed and pavement are technical problems to be solved urgently in the art.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种横向注浆路基加固结构及路基修复方法,在不破坏路面结构、不中断交通的情况下进行路基加固,防止路基不均匀沉降、路基边坡滑移,修复路基路面裂纹。The purpose of the present invention is to provide a lateral grouting roadbed reinforcement structure and a roadbed repair method, which can be used to reinforce the roadbed without damaging the pavement structure or interrupting traffic, preventing uneven settlement of the roadbed and slippage of the roadbed slope, and repairing the roadbed and pavement. crack.

为了达到上述目的,本发明提供了一种横向注浆路基加固结构,包括:路基、树根桩组、软路肩和路面,所述路面设置在所述路基上,所述软路肩设置在所述路基和所述路面两侧,至少所述路基一侧的软路肩上设置有所述树根桩组,所述树根桩组包括多个相互连接的树根桩,所述树根桩从所述软路肩的侧面延伸至所述路基发生病害的部位。In order to achieve the above object, the present invention provides a transverse grouting roadbed reinforcement structure, comprising: a roadbed, a tree root pile group, a soft road shoulder and a road surface, the road surface is arranged on the road foundation, and the soft road shoulder is arranged on the On both sides of the roadbed and the road surface, at least the soft shoulder on one side of the roadbed is provided with the tree root stump group, and the tree root stump group includes a plurality of interconnected tree root stumps, and the tree root stumps extend from all the The side surface of the soft shoulder extends to the site where the roadbed is damaged.

可选的,所述树根桩组为多个且沿所述软路肩延伸方向设置。Optionally, the tree root stump groups are multiple and arranged along the extension direction of the soft shoulder.

可选的,所述树根桩组包括多个树根桩和桩头砼墩,所述桩头砼墩设置在所述软路肩上,多个所述树根桩一端通过所述桩头砼墩连接,多个所述树根桩从所述桩头砼墩呈发散状态向所述路基发生病害的部位延伸。Optionally, the tree root stump group includes a plurality of tree root stumps and pile head concrete piers, the pile head concrete piers are arranged on the soft shoulder, and one end of the plurality of tree root stumps passes through the pile head concrete pier. The piers are connected, and a plurality of the tree root stumps extend from the pile head concrete pier in a divergent state to the diseased part of the roadbed.

可选的,所述树根桩与水平面的夹角为0~60°。Optionally, the included angle between the root stump and the horizontal plane is 0-60°.

可选的,所述树根桩与所述路基的横截面的夹角为0~60°。Optionally, the included angle between the tree root stump and the cross section of the roadbed is 0-60°.

可选的,所述软路肩上设置有桩头孔,所述桩头砼墩设置在所述桩头孔内。Optionally, a pile head hole is provided on the soft shoulder, and the pile head concrete pier is arranged in the pile head hole.

可选的,所述树根桩内设置有钢筋,所述钢筋靠近所述桩头孔一端焊接连接。Optionally, a steel bar is arranged in the root stump, and one end of the steel bar close to the pile head hole is welded and connected.

本发明还提供一种横向注浆路基修复方法,包括:The present invention also provides a lateral grouting roadbed repair method, comprising:

从路基一侧或两侧的软路肩向路基病害部位钻桩孔,桩孔为多个且从软路肩上的一点呈发散状态向路基发生病害的部位延伸;Drill pile holes from the soft shoulder on one or both sides of the roadbed to the diseased part of the roadbed, and the pile holes are multiple and extend from a point on the soft shoulder to the diseased part of the roadbed in a divergent state;

根据桩孔深度制作钢筋并将钢筋置于桩孔内;Make reinforcement according to the depth of the pile hole and place the reinforcement in the pile hole;

通过桩孔注浆形成树根桩;The root stump is formed by grouting through the pile hole;

将钢筋靠近软路肩一端焊接连接;Weld the end of the steel bar close to the soft shoulder;

在钢筋焊接连接部位浇筑混凝土形成桩头砼墩。Concrete is poured at the welded joints of steel bars to form pile head concrete piers.

可选的,钻桩孔时采用无水钻进以避免钻孔用水加剧病害的发展。Optionally, waterless drilling is used when drilling the pile holes to avoid the development of diseases caused by drilling water.

可选的,桩孔与水平面的夹角为0~60°,桩孔与路基的横截面的夹角为0~60°。Optionally, the included angle between the pile hole and the horizontal plane is 0 to 60°, and the included angle between the pile hole and the cross section of the roadbed is 0 to 60°.

在本发明提供的一种横向注浆路基加固结构及路基修复方法中,所述横向注浆路基加固结构包括:路基、树根桩组、软路肩和路面,所述路面设置在所述路基上,所述软路肩设置在所述路基和所述路面两侧,至少所述路基一侧的软路肩上设置有所述树根桩组,所述树根桩组包括多个相互连接的树根桩,所述树根桩从所述软路肩的侧面延伸至所述路基发生病害的部位。本发明设置多个向路基病害部位延伸的树根桩加固路基,树根桩的注浆加固范围覆盖路基病害部位,在不破坏路面结构、不中断交通的情况下进行路基加固,防止路基结构状态恶化,修复路基路面病害。In a transverse grouting roadbed reinforcement structure and a roadbed repair method provided by the present invention, the transverse grouting roadbed reinforcement structure comprises: a roadbed, a tree root pile group, a soft shoulder and a road surface, and the road surface is arranged on the roadbed , the soft road shoulder is arranged on both sides of the roadbed and the road surface, at least the soft road shoulder on one side of the roadbed is provided with the tree root stump group, and the tree root stump group includes a plurality of interconnected tree roots The stump, the root stump extends from the side of the soft shoulder to the site where the roadbed is diseased. In the invention, a plurality of tree root piles extending to the diseased part of the roadbed are arranged to reinforce the roadbed, and the grouting reinforcement range of the root piles covers the diseased part of the roadbed. Deterioration, repair roadbed and pavement diseases.

附图说明Description of drawings

为了更清楚地说明本发明具体实施方式,下面将对具体实施方式中所需要使用的附图作简单地介绍。在所有附图中,各元件或部分并不一定按照实际的比例绘制。In order to describe the specific embodiments of the present invention more clearly, the accompanying drawings required for the specific embodiments will be briefly introduced below. In all the drawings, elements or sections are not necessarily drawn to actual scale.

图1是本发明一实施例提供的横向注浆路基加固结构横截面示意图;1 is a schematic cross-sectional view of a transverse grouting roadbed reinforcement structure provided by an embodiment of the present invention;

图2是本发明一实施例提供的横向注浆路基加固结构侧视图。FIG. 2 is a side view of a transverse grouting roadbed reinforcement structure provided by an embodiment of the present invention.

其中:10-路基,101-桩头孔,102-桩孔,20-树根桩组,21-树根桩,22-桩头砼墩,23-钢筋,30-软路肩,40-路面。Among them: 10-subgrade, 101-pile head hole, 102-pile hole, 20-tree root pile group, 21-tree root pile, 22-pile head concrete pier, 23-rebar, 30-soft shoulder, 40-pavement.

具体实施方式Detailed ways

下面将结合附图对本发明技术方案的实施例进行详细的描述。以下实施例仅用于更加清楚地说明本发明的技术方案,因此只作为示例,而不能以此来限制本发明的保护范围。Embodiments of the technical solutions of the present invention will be described in detail below with reference to the accompanying drawings. The following examples are only used to more clearly illustrate the technical solutions of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.

图1是本发明一实施例提供的横向注浆路基加固结构横截面示意图,图2是本发明一实施例提供的横向注浆路基加固结构侧视图,参见图1和图2所示,所述横向注浆路基加固结构包括:路基10、树根桩组20、软路肩30和路面40,所述路面设置在所述路基上,所述软路肩30设置在所述路基10和所述路面40两侧,至少所述路基10一侧的软路肩30上设置有所述树根桩组20,所述树根桩组20包括多个相互连接的树根桩21,所述树根桩21从所述软路肩30的侧面延伸至所述路基10发生病害的部位。本发明设置多个向路基病害部位延伸的树根桩21加固路基,树根桩21的注浆加固范围覆盖路基10病害部位,在不破坏路面40结构、不中断交通的情况下进行路基10加固,防止路基10结构状态恶化,修复路基路面病害。1 is a schematic cross-sectional view of a transverse grouting roadbed reinforcement structure provided by an embodiment of the present invention, and FIG. 2 is a side view of a transverse grouting roadbed reinforcement structure provided by an embodiment of the present invention. Referring to FIGS. 1 and 2 , the The transverse grouting roadbed reinforcement structure includes: a roadbed 10, a tree root pile group 20, a soft road shoulder 30 and a road surface 40, the road surface is provided on the roadbed, and the soft road shoulder 30 is provided on the roadbed 10 and the road surface 40 On both sides, at least the soft shoulder 30 on one side of the roadbed 10 is provided with the tree root stump group 20, the tree root stump group 20 includes a plurality of interconnected tree root stumps 21, the tree root stumps 21 are The side surface of the soft shoulder 30 extends to the site where the roadbed 10 is damaged. In the present invention, a plurality of tree root piles 21 extending to the diseased part of the roadbed are arranged to reinforce the roadbed, and the grouting reinforcement range of the tree root piles 21 covers the diseased part of the roadbed 10, and the roadbed 10 is reinforced without destroying the structure of the road surface 40 and interrupting the traffic. , to prevent the deterioration of the structural state of the subgrade 10, and repair the diseases of the subgrade and pavement.

参见图1和图2所示,所述树根桩组20为多个且沿所述软路肩30延伸方向设置,即沿道路走向设置多个树根桩组20,本实施例中所述树根桩组20之间的间隔设置为3米。所述树根桩组20包括多个树根桩21和一个桩头砼墩22,所述桩头砼墩22设置在所述软路肩30上,多个所述树根桩21一端通过所述桩头砼墩22连接,多个所述树根桩21从所述桩头砼墩22呈发散状态向所述路基10发生病害的部位延伸。所述树根桩21与水平面的夹角为0~60°,所述树根桩21与所述路基10的横截面的夹角为0~60°,即可以软路肩30上的一点向路基10病害部位方向作四棱锥,四棱锥的顶点在软路肩30上,树根桩21在四棱锥下半部分范围内。由于树根桩21呈发散状态布置,因此可以更好地加固路基,修复路基路面病害。Referring to FIG. 1 and FIG. 2 , there are multiple tree root stump groups 20 and are arranged along the extension direction of the soft shoulder 30 , that is, multiple tree root stump groups 20 are arranged along the road. The interval between the root pile groups 20 is set to 3 meters. The tree root pile group 20 includes a plurality of tree root piles 21 and a pile head concrete pier 22, the pile head concrete pier 22 is arranged on the soft shoulder 30, and one end of the plurality of the tree root piles 21 passes through the The pile head concrete piers 22 are connected, and a plurality of the tree root piles 21 extend from the pile head concrete pier 22 in a divergent state to the site where the roadbed 10 is damaged. The included angle between the root stump 21 and the horizontal plane is 0 to 60°, and the included angle between the root stump 21 and the cross section of the roadbed 10 is 0 to 60°, that is, a point on the soft shoulder 30 can reach the roadbed. 10. The direction of the diseased part is a quadrangular pyramid, the vertex of the quadrangular pyramid is on the soft shoulder 30, and the root stump 21 is in the lower half of the quadrangular pyramid. Since the tree root stumps 21 are arranged in a divergent state, the roadbed can be better reinforced and the disease of the roadbed and pavement can be repaired.

参见图1和图2所示,所述软路肩30上设置有桩头孔101,所述桩头砼墩22设置在所述桩头孔101内。所述树根桩21内设置有钢筋23,所述钢筋23靠近所述桩头孔101一端焊接连接,通过钢筋23可以进一步提高树根桩21的结构强度,进一步加固路基。Referring to FIG. 1 and FIG. 2 , the soft shoulder 30 is provided with a pile head hole 101 , and the pile head concrete pier 22 is arranged in the pile head hole 101 . The root pile 21 is provided with a steel bar 23, and one end of the steel bar 23 close to the pile head hole 101 is welded and connected. The steel bar 23 can further improve the structural strength of the tree root pile 21 and further strengthen the roadbed.

本发明还提供一种横向注浆路基修复方法,以在不破坏路面结构、不中断交通的情况下进行路基加固,防止路基不均匀沉降、路基边坡滑移,修复路基路面裂纹。首先从路基10一侧或两侧的软路肩30向路基10病害部位钻桩孔102,桩孔102为多个且从软路肩30上的一点呈发散状态向路基10发生病害的部位延伸。具体从路基10一侧还是两侧的软路肩30钻孔视道路宽度及病害部位在路基10中的位置而定,以树根桩21的注浆加固范围能够覆盖病害部位为准。钻桩孔102时采用无水钻进以避免钻孔用水加剧病害的发展。桩孔102与水平面的夹角为0~60°,桩孔102与路基10的横截面的夹角为0~60°,即可以软路肩30上的一点向路基10病害部位方向作四棱锥,四棱锥的顶点在软路肩30上,树根桩21在四棱锥下半部分范围内。本实施例中桩孔102内径100毫米。The invention also provides a lateral grouting roadbed repairing method to reinforce the roadbed without destroying the pavement structure and interrupting traffic, preventing uneven settlement of the subgrade, slippage of the subgrade slope, and repairing the crack of the subgrade and pavement. First, the pile holes 102 are drilled from the soft shoulder 30 on one or both sides of the roadbed 10 to the diseased part of the roadbed 10 . Specifically, whether to drill the soft shoulder 30 on one side or both sides of the subgrade 10 depends on the width of the road and the position of the diseased part in the subgrade 10, and the grouting reinforcement range of the root pile 21 can cover the diseased part. When drilling the pile hole 102, waterless drilling is adopted to avoid the development of the disease caused by the drilling water. The included angle between the pile hole 102 and the horizontal plane is 0-60°, and the included angle between the pile hole 102 and the cross-section of the roadbed 10 is 0-60°, that is, a point on the soft shoulder 30 can be made into a quadrangular pyramid in the direction of the diseased part of the roadbed 10, The vertex of the quadrangular pyramid is on the soft shoulder 30, and the tree root stump 21 is within the lower half of the quadrangular pyramid. In this embodiment, the inner diameter of the pile hole 102 is 100 mm.

在钻桩孔102后,根据桩孔102深度制作钢筋23并将钢筋23置于桩孔内,钢筋23采用直径25毫米的螺纹钢,在安装钢筋23时安装好注浆管。桩孔102也是注浆孔,通过桩孔102进行化学灌浆,浆液均匀注入路基10土体中,化学灌浆起到渗透填充、压密固结、胶结固化等作用。化学灌浆完成后,更换成浓浆水泥浆进行成桩灌浆形成树根桩21。形成树根桩21后将钢筋23靠近软路肩30一端焊接连接,再在钢筋23焊接连接部位浇筑混凝土形成桩头砼墩22。进一步的,可在软路肩30上设置有桩头孔101,桩头砼墩22浇筑到桩头孔101内,浇筑成500毫米×500毫米×500毫米的桩头砼墩22。灌浆的化学浆液和树根桩21共同起到抑制、治理路基10病害,改善路基受力性状,提高承载能力,抑制并缓解路基不均匀沉降、路基边坡滑移、路基路面开裂等病害的发生发展的作用。After drilling the pile hole 102, make the steel bar 23 according to the depth of the pile hole 102 and place the steel bar 23 in the pile hole. The pile hole 102 is also a grouting hole. Chemical grouting is carried out through the pile hole 102, and the slurry is uniformly injected into the soil body of the roadbed 10. After the chemical grouting is completed, it is replaced with thick grout cement slurry to form pile grouting to form tree root stump 21 . After the tree root pile 21 is formed, one end of the steel bar 23 close to the soft shoulder 30 is welded and connected, and then concrete is poured at the welded connection part of the steel bar 23 to form the pile head concrete pier 22 . Further, a pile head hole 101 can be provided on the soft shoulder 30, and the pile head concrete pier 22 is poured into the pile head hole 101 to form a pile head concrete pier 22 of 500 mm×500 mm×500 mm. The grouting chemical grout and tree root piles 21 work together to inhibit and control the diseases of the subgrade 10, improve the stress properties of the subgrade, improve the bearing capacity, and inhibit and alleviate the occurrence of diseases such as uneven settlement of the subgrade, slippage of the subgrade slope, and cracking of the subgrade and pavement. developmental role.

以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围,其均应涵盖在本发明的权利要求和说明书的范围当中。The above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that the foregoing embodiments can still be used for The recorded technical solutions are modified, or some or all of the technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention, and should be included in the The invention is within the scope of the claims and description.

Claims (10)

1.一种横向注浆路基加固结构,其特征在于,包括:路基、树根桩组、软路肩和路面,所述路面设置在所述路基上,所述软路肩设置在所述路基和所述路面两侧,至少所述路基一侧的软路肩上设置有所述树根桩组,所述树根桩组包括多个相互连接的树根桩,所述树根桩从所述软路肩的侧面延伸至所述路基发生病害的部位。1. A transverse grouting roadbed reinforcement structure is characterized in that, comprising: roadbed, tree root pile group, soft road shoulder and road surface, the road surface is arranged on the road foundation, and the soft road shoulder is arranged on the road foundation and all the roads. On both sides of the road surface, at least the soft shoulder on one side of the roadbed is provided with the tree root stump group, the tree root stump group includes a plurality of interconnected tree root stumps, and the tree root stumps extend from the soft road shoulder. The side of the subgrade extends to the site of the diseased subgrade. 2.根据权利要求1所述的横向注浆路基加固结构,其特征在于,所述树根桩组为多个且沿所述软路肩延伸方向设置。2 . The lateral grouting roadbed reinforcement structure according to claim 1 , wherein the group of tree root piles is plural and arranged along the extension direction of the soft shoulder. 3 . 3.根据权利要求1所述的横向注浆路基加固结构,其特征在于,所述树根桩组包括多个树根桩和桩头砼墩,所述桩头砼墩设置在所述软路肩上,多个所述树根桩一端通过所述桩头砼墩连接,多个所述树根桩从所述桩头砼墩呈发散状态向所述路基发生病害的部位延伸。3 . The lateral grouting roadbed reinforcement structure according to claim 1 , wherein the tree root pile group comprises a plurality of tree root piles and pile head concrete piers, and the pile head concrete piers are arranged on the soft shoulder. 4 . In the above, one end of a plurality of the root stumps is connected by the pile head concrete pier, and a plurality of the tree root stumps extend from the pile head concrete pier in a divergent state to the diseased part of the roadbed. 4.根据权利要求3所述的横向注浆路基加固结构,其特征在于,所述树根桩与水平面的夹角为0~60°。4 . The lateral grouting roadbed reinforcement structure according to claim 3 , wherein the included angle between the root pile and the horizontal plane is 0° to 60°. 5 . 5.根据权利要求4所述的横向注浆路基加固结构,其特征在于,所述树根桩与所述路基的横截面的夹角为0~60°。5 . The transverse grouting roadbed reinforcement structure according to claim 4 , wherein the included angle between the tree root pile and the cross-section of the roadbed is 0° to 60°. 6 . 6.根据权利要求3所述的横向注浆路基加固结构,其特征在于,所述软路肩上设置有桩头孔,所述桩头砼墩设置在所述桩头孔内。6 . The lateral grouting roadbed reinforcement structure according to claim 3 , wherein a pile head hole is provided on the soft shoulder, and the pile head concrete pier is arranged in the pile head hole. 7 . 7.根据权利要求6所述的横向注浆路基加固结构,其特征在于,所述树根桩内设置有钢筋,所述钢筋靠近所述桩头孔一端焊接连接。7 . The transverse grouting roadbed reinforcement structure according to claim 6 , wherein the tree root pile is provided with steel bars, and one end of the steel bars close to the pile head hole is welded and connected. 8 . 8.一种横向注浆路基修复方法,其特征在于,包括:8. A lateral grouting roadbed repair method, characterized in that, comprising: 从路基一侧或两侧的软路肩向路基病害部位钻桩孔,桩孔为多个且从软路肩上的一点呈发散状态向路基发生病害的部位延伸;Drill pile holes from the soft shoulder on one or both sides of the roadbed to the diseased part of the roadbed, and the pile holes are multiple and extend from a point on the soft shoulder to the diseased part of the roadbed in a divergent state; 根据桩孔深度制作钢筋并将钢筋置于桩孔内;Make reinforcement according to the depth of the pile hole and place the reinforcement in the pile hole; 通过桩孔注浆形成树根桩;The root stump is formed by grouting through the pile hole; 将钢筋靠近软路肩一端焊接连接;Weld the end of the steel bar close to the soft shoulder; 在钢筋焊接连接部位浇筑混凝土形成桩头砼墩。Concrete is poured at the welded joints of steel bars to form pile head concrete piers. 9.根据权利要求8所述的横向注浆路基修复方法,其特征在于,钻桩孔时采用无水钻进以避免钻孔用水加剧病害的发展。9 . The lateral grouting roadbed repairing method according to claim 8 , wherein waterless drilling is adopted when drilling the pile holes to avoid the development of diseases aggravated by drilling water. 10 . 10.根据权利要求8所述的横向注浆路基修复方法,其特征在于,桩孔与水平面的夹角为0~60°,桩孔与路基的横截面的夹角为0~60°。10 . The lateral grouting roadbed repair method according to claim 8 , wherein the angle between the pile hole and the horizontal plane is 0-60°, and the angle between the pile hole and the cross section of the roadbed is 0-60°. 11 .
CN202011018756.0A 2020-09-24 2020-09-24 A kind of transverse grouting roadbed reinforcement structure and roadbed repair method Pending CN112048959A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011018756.0A CN112048959A (en) 2020-09-24 2020-09-24 A kind of transverse grouting roadbed reinforcement structure and roadbed repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011018756.0A CN112048959A (en) 2020-09-24 2020-09-24 A kind of transverse grouting roadbed reinforcement structure and roadbed repair method

Publications (1)

Publication Number Publication Date
CN112048959A true CN112048959A (en) 2020-12-08

Family

ID=73604787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011018756.0A Pending CN112048959A (en) 2020-09-24 2020-09-24 A kind of transverse grouting roadbed reinforcement structure and roadbed repair method

Country Status (1)

Country Link
CN (1) CN112048959A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030660A (en) * 2022-06-22 2022-09-09 应急管理部国家自然灾害防治研究院 Drilling device for grouting reinforcement of liquefied layer inside roadbed slope
CN115110523A (en) * 2022-08-04 2022-09-27 中国水利水电科学研究院 Grouting repair method for integrity defects of screw pile
CN116949882A (en) * 2023-08-25 2023-10-27 山东高速股份有限公司 A highway foam lightweight soil narrow-width splicing roadbed structure and construction method
CN119061778A (en) * 2024-10-31 2024-12-03 山西晋阳高速改扩建项目管理有限公司 Composite bridge abutment and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864712A (en) * 2012-10-16 2013-01-09 中铁第四勘察设计院集团有限公司 Method and structure for micro-disturbance renovating of existing high speed railway subgrade deformation disease
CN203296054U (en) * 2013-06-08 2013-11-20 内蒙古科技大学 Side slope reinforcing structure
CN203475490U (en) * 2013-08-29 2014-03-12 中交二公局第四工程有限公司 Root file based foundation reinforcement structure for debris flow gully crossing tunnel
CN104988815A (en) * 2015-07-03 2015-10-21 河海大学 Method for treating post-construction settlement disease of railroad bed
CN109252542A (en) * 2018-11-14 2019-01-22 山东大学 A kind of root pile lightweight barricade and its construction method for road widening
CN212357851U (en) * 2020-09-24 2021-01-15 招商局重庆交通科研设计院有限公司 A transverse grouting roadbed reinforcement structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864712A (en) * 2012-10-16 2013-01-09 中铁第四勘察设计院集团有限公司 Method and structure for micro-disturbance renovating of existing high speed railway subgrade deformation disease
CN203296054U (en) * 2013-06-08 2013-11-20 内蒙古科技大学 Side slope reinforcing structure
CN203475490U (en) * 2013-08-29 2014-03-12 中交二公局第四工程有限公司 Root file based foundation reinforcement structure for debris flow gully crossing tunnel
CN104988815A (en) * 2015-07-03 2015-10-21 河海大学 Method for treating post-construction settlement disease of railroad bed
CN109252542A (en) * 2018-11-14 2019-01-22 山东大学 A kind of root pile lightweight barricade and its construction method for road widening
CN212357851U (en) * 2020-09-24 2021-01-15 招商局重庆交通科研设计院有限公司 A transverse grouting roadbed reinforcement structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030660A (en) * 2022-06-22 2022-09-09 应急管理部国家自然灾害防治研究院 Drilling device for grouting reinforcement of liquefied layer inside roadbed slope
CN115110523A (en) * 2022-08-04 2022-09-27 中国水利水电科学研究院 Grouting repair method for integrity defects of screw pile
CN115110523B (en) * 2022-08-04 2024-05-17 中国水利水电科学研究院 A grouting repair method for screw pile integrity defects
CN116949882A (en) * 2023-08-25 2023-10-27 山东高速股份有限公司 A highway foam lightweight soil narrow-width splicing roadbed structure and construction method
CN119061778A (en) * 2024-10-31 2024-12-03 山西晋阳高速改扩建项目管理有限公司 Composite bridge abutment and construction method thereof

Similar Documents

Publication Publication Date Title
CN112048959A (en) A kind of transverse grouting roadbed reinforcement structure and roadbed repair method
CN106522242B (en) For soft stratum close to underground structure foundation pit supporting system construction method
CN103924501B (en) Reinforcement construction method in the cement pavement local failure reparation of a kind of rural area
CN107190602B (en) River erosion section pile-supported foam concrete light embankment structure and construction method
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN103821060B (en) A kind of construction method of existing highway soft foundation Treating technology
CN110863520A (en) Construction structure and method for reinforcing pile foundation by using pushing steel sleeve
CN110863498A (en) Deep foundation pit combined supporting construction method next to subway station
CN106320120A (en) Construction process for pile slab type non-soil roadbed highway
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN110306559A (en) A kind of construction method of subway entrance support pile
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN211312224U (en) Based on the reconstruction of the existing pavement, it is a steel casing positioning tool for bridge bored piles
CN217479998U (en) Culvert structure
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN103352484A (en) Construction method of shallow bridge foundation of sedan lifting type reinforced bridge pier
CN212357851U (en) A transverse grouting roadbed reinforcement structure
CN114232491B (en) Construction method of multi-span simply supported prestressed bridge span in tunnel
CN113914227B (en) Construction method for viaduct curved section steel box girder supporting system on existing bridge
CN104329118B (en) The integral central of falling convex drainage ditch device in vcehicular tunnel
CN104594331B (en) A kind of method that highway high roadbed culvert foundation is reinforced
CN107460791A (en) Railway karst ground treatment Antipollution method and structure near I grade of potable water source district
CN223793442U (en) Repairing structure for subsidence disease of cement concrete pavement
CN204417945U (en) A kind of road foundation depression prosthetic device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201208