CN112031258A - Fiber reinforced cement composite concrete prefabricated member - Google Patents

Fiber reinforced cement composite concrete prefabricated member Download PDF

Info

Publication number
CN112031258A
CN112031258A CN202010873980.1A CN202010873980A CN112031258A CN 112031258 A CN112031258 A CN 112031258A CN 202010873980 A CN202010873980 A CN 202010873980A CN 112031258 A CN112031258 A CN 112031258A
Authority
CN
China
Prior art keywords
frame
plate
underframe
concrete
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010873980.1A
Other languages
Chinese (zh)
Other versions
CN112031258B (en
Inventor
张占群
王陆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yongji Electric Power Equipment Factory Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010873980.1A priority Critical patent/CN112031258B/en
Publication of CN112031258A publication Critical patent/CN112031258A/en
Application granted granted Critical
Publication of CN112031258B publication Critical patent/CN112031258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/40Building elements of block or other shape for the construction of parts of buildings built-up from parts of different materials, e.g. composed of layers of different materials or stones with filling material or with insulating inserts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34331Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by three-dimensional elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention relates to the field of prefabricated parts, in particular to a fiber reinforced cement composite concrete prefabricated part which comprises a prefabricated part body, wherein the prefabricated part body comprises concrete and a plurality of bottom frames, the bottom frames are sequentially and horizontally stacked, the four corners of the top of each bottom frame and the middle part around the top of each bottom frame are respectively connected with a detachable cushion block, a top frame is horizontally arranged above each bottom frame, the bottom of each top frame is clamped with the top of each cushion block, the top of each top frame is clamped with the adjacent bottom frame above the top frame, the bottom frames, the top frames and the cushion blocks are all made of glass fiber reinforced plastics, and through holes are formed in the middle parts of the bottom frames and the top frames. The concrete can be from last to down through holistic inside of entering into the frame that the perforation can be abundant, can cover underframe, top frame and cushion, the inside in loading chamber also can get into the concrete. After receiving external force, the underframe, the top frame, the cushion block and the internal buffer mechanism made of glass fiber reinforced plastic can play a good protection role, and have higher toughness and buffer force.

Description

Fiber reinforced cement composite concrete prefabricated member
Technical Field
The invention relates to the field of prefabricated parts, in particular to a fiber reinforced cement composite concrete prefabricated part.
Background
Concrete is one of the most important civil engineering materials of the present generation. The artificial stone is prepared by a cementing material, granular aggregate, water, an additive and an admixture which are added if necessary according to a certain proportion, and is formed by uniformly stirring, closely compacting, curing and hardening. The concrete has the characteristics of rich raw materials, low price and simple production process, so that the consumption of the concrete is increased more and more. Meanwhile, the concrete also has the characteristics of high compressive strength, good durability, wide strength grade range and the like. And simultaneously, the concrete prefabricated member with various properties is extended.
However, the prior concrete prefabricated member still has certain defects in use. The existing concrete prefabricated member has a simple structure, and the concrete is usually made into a required shape by utilizing a mould. The precast concrete has insufficient toughness, is easy to damage after being subjected to external force, has low safety performance and has large limitation in use. Meanwhile, the frame inside the concrete is troublesome to mount and cannot be quickly adjusted according to actual needs, and after the prefabricated member is manufactured, the exterior is not attractive enough and the limitation is large.
Disclosure of Invention
The invention aims to provide a fiber reinforced cement composite concrete prefabricated part, which can solve the problems that the existing concrete prefabricated part has insufficient toughness, is easy to damage after being subjected to external force, has low safety performance and has large limitation in use. Meanwhile, the frame inside the concrete is troublesome to mount and cannot be rapidly adjusted according to actual needs, and the prefabricated part is not attractive enough and has large limitation after being manufactured.
The purpose of the invention can be realized by the following technical scheme: the utility model provides a compound concrete prefab of fibre reinforced cement, includes the prefab body, and the prefab body includes concrete and a plurality of underframe, a plurality of the underframe is horizontal in proper order and is piled up and place, the top four corners and the top middle part all around of underframe all are connected with the detachable cushion, there is a frame in the top of underframe still horizontal installation, the bottom of frame and the top joint of cushion, the top of frame and the installation of the adjacent underframe joint in top, underframe, top frame and cushion are the glass steel material, and the middle part of underframe, top frame all runs through and is provided with the perforation.
The inside of cushion has been seted up and has been loaded the chamber, and the internally mounted who loads the chamber has detachable buffer gear, and buffer gear includes the bearing plate, and the bearing plate is installed with the inside low side joint that loads the chamber, and the equal vertical elastic telescopic column of installing in top both ends of bearing plate all loads the inside upper end both sides in chamber and all is provided with the shrinkage pool, and the inside at the shrinkage pool is pegged graft on the top of elastic telescopic column.
All install the decoration mechanism around the prefab body, the concrete is filled in the inside of underframe, top frame, loading chamber and the space department between underframe and the decoration mechanism.
Preferably, decorate the mechanism and include the bottom plate, a plurality of tip board is installed at the top of bottom plate, and a plurality of tip board joint installation in proper order, and the top both ends of bottom plate and the top both ends of tip board all are provided with the fixed orifices, and the equal vertical inserted bar that is connected with fixed orifices looks adaptation in the bottom both ends of tip board, the inserted bar is pegged graft in the inside of fixed orifices.
Preferably, one side towards the underframe between end plate and bottom plate and two adjacent end plates all is connected with the connecting plate, and the both ends of connecting plate all are connected with the shank of bolt.
Preferably, the bottom plate and the tip board all are provided with the screw hole with the opposite one side both ends of cushion, and the one end of cushion also is provided with the screw hole towards one side of decorating the mechanism, and the horizontal threaded connection of screw hole has the carriage release lever at the both ends of bottom plate and tip board, and the other end of carriage release lever is pegged graft in telescopic inside, and telescopic one side is connected with fastening bolt, fastening bolt's one end and the outside butt of carriage release lever.
Preferably, the top both sides of top frame and the middle part at both ends all are provided with first spout, and the bottom both sides of top frame and the middle part at bottom both ends all are connected with first buckle, and the top of cushion is provided with the second spout with first buckle looks adaptation, and the top frame is installed with the cushion joint through first buckle and second spout, and the bottom both sides of underframe and the middle part at bottom both ends all are connected with the second buckle with first spout looks adaptation, and the second buckle is installed with first spout joint.
Preferably, the bottom of the cushion block is integrally connected with a raised head, the top edge of the bottom frame is provided with a plurality of jacks matched with the raised head, the raised head is inserted into the jacks, positioning holes are formed in two ends of the inside of the cushion block, screw holes are formed in two ends of each jack in the upper portion of the bottom frame, the screw holes are formed right below the positioning holes, screws are arranged inside the positioning holes, and the bottoms of the screws are connected with the screw holes.
Preferably, the middle part of the flexible end in elastic telescopic column upper portion runs through and is provided with the through-hole, and the bottom middle-end that loads the chamber is provided with the joint groove, and the bottom an organic whole of bearing plate is connected with the third buckle, and the bottom horizontally connect in joint groove has the push pedal, is connected with a plurality of spring between the bottom of push pedal and the inside low side in joint groove, and the top of push pedal is connected with the slipmat, slipmat and third buckle butt.
Preferably, the method for using the concrete prefabricated member comprises the following steps:
the method comprises the following steps: the bottom frames are spliced and installed from bottom to top, and when the bottom frames are installed with each other, the top frame is installed on the upper portion of each bottom frame in a clamping mode through a first sliding groove and a first buckle; when the upper bottom frame and the lower bottom frame are installed, the bottom of the upper bottom frame is clamped and installed with a second sliding groove in the upper portion of the cushion block through a second buckle;
step two: after the installation of the bottom frame and the top frame is finished, installing decorative mechanisms outside the periphery of the integral frame; before the decoration mechanism is installed, a plurality of end plates are spliced and installed; during splicing, the lowermost end plate is fixedly spliced with a fixing hole in the upper part of the bottom plate through an insertion rod at the bottom, two adjacent end plates are fixedly spliced and installed through the insertion rod and the fixing hole, and after the end plates are stacked and installed from bottom to top, connecting plates are installed at the connecting part between the two adjacent end plates and the side, facing the bottom frame, of the connecting part between the lowermost end plate and the bottom plate through bolt rods;
step three: after the whole frame is installed, a buffer mechanism is installed inside the loading cavity, and the bearing plate is clamped with the loading cavity through a third clamp at the bottom and a clamping groove; a spring in the clamping groove pushes the push plate to abut against the bottom of the third clamping buckle, and a telescopic end above the elastic telescopic column is inserted in the concave hole;
step four: after the whole frame and the buffer mechanism are installed, screwing the fastening bolt, adjusting the distance between the decoration mechanism and the bottom frame, putting the whole frame into a mold of a prefabricated part before filling concrete in the frame, and then filling concrete in the bottom frame, the top frame and the space between the bottom frame and the decoration mechanism; the concrete enters the whole frame from top to bottom through the through holes, and covers the bottom frame, the top frame and the cushion blocks.
The invention has the beneficial effects that:
(1) can dismantle the underframe and the underframe of installation through the setting for can select the underframe of suitable quantity according to the size needs of actual prefabricated part during the use, with a plurality of underframe from supreme concatenation installation down. When the underframe was installed each other, at first through first spout and first buckle joint installation top frame on the upper portion of every underframe. And then make the installation dismantlement that a plurality of underframe can be free, and the installation dismantlement is simple swift, can adapt to different work demands, and accommodation is extensive. And can adjust the quantity of underframe upper portion cushion during the installation according to the size and the kind of prefab, can dismantle the cushion in underframe upper portion both sides and both ends middle part, save the cost under the circumstances of guaranteeing the prefab and reaching the demand.
(2) Through setting up the decoration mechanism for the actual demand that can decorate according to the prefab outside in the work, decorate the mechanism at whole frame outside installation all around. Before the decoration mechanism is installed, a proper number of end plates are selected according to the actual decoration size, and the end plates are spliced and installed. During splicing, the end plate at the lowest part is fixedly spliced with the fixing hole at the upper part of the bottom plate through the inserted bar at the bottom, and the two adjacent end plates are fixedly installed through the inserted bar and the fixing hole in an inserted manner. A plurality of end plates and the bottom plate are spliced to form a complete decoration mechanism, and the decoration mechanism is not easy to fall off in use. Make the prefab preparation accomplish the back, decorate the mechanism and can decorate externally for whole prefab is more pleasing to the eye, and the prefab has higher decorative after the installation in the building, need not decorate again in the outside of prefab, has saved the cost of decorating. And the size and the appearance of the decoration mechanism can be manufactured according to actual requirements, the adaptability is good, and the decoration mechanism can be widely used.
(3) Through the internally mounted buffer gear at the cushion for whole frame installation back of finishing, can load the internally mounted buffer gear in the chamber. The bearing plate passes through the third buckle and the joint groove joint of bottom and loads the chamber joint, and then makes the bearing plate can load the internally mounted dismantlement in chamber simple swift. The bearing plate is installed in the inside back of loading the chamber, and the flexible end of the flexible post top is pegged graft in the inside of shrinkage pool. The elastic telescopic column can limit and fix the bearing plate and can play a role in buffering in the loading cavity.
(4) The concrete can be from last to down through holistic inside of entering into the frame that the perforation can be abundant, can cover underframe, top frame and cushion, the inside in loading chamber also can get into the concrete. After the whole concrete prefabricated part receives external force in use, the bottom frame, the top frame, the cushion block and the inner buffer mechanism made of glass fiber reinforced plastic can play a good protection role, have higher toughness and buffer force, are not easy to damage in use and have good safety performance.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of a top frame mounting structure according to the present invention.
FIG. 3 is a schematic view of an installation structure of the bottom frame and the cushion block of the present invention.
FIG. 4 is a schematic diagram of a top frame structure according to the present invention.
FIG. 5 is a schematic diagram of the internal structure of the loading chamber of the present invention.
FIG. 6 is an enlarged view of detail A in FIG. 5 according to the present invention.
FIG. 7 is a schematic view of the decoration device of the present invention.
In the figure: 1. a bottom frame; 2. concrete; 3. a loading chamber; 4. a sleeve; 5. a travel bar; 6. a decoration mechanism; 7. fastening a bolt; 8. a first chute; 9. a top frame; 10. cushion blocks; 11. a threaded hole; 12. a second chute; 13. positioning holes; 14. a raised head; 15. a jack; 16. screw holes; 17. perforating; 18. a first buckle; 19. an elastic telescopic column; 20. concave holes; 21. a through hole; 22. a third buckle; 23. a bearing plate; 24. a spring; 25. pushing the plate; 26. a clamping groove; 27. a connecting plate; 28. a bolt shank; 29. a base plate; 30. inserting a rod; 31. an end plate; 32. and (7) fixing holes.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1-7, a fiber reinforced cement composite concrete prefabricated member, including the prefabricated member body, the prefabricated member body includes concrete 2 and a plurality of underframe 1, a plurality of underframe 1 is horizontal to pile up in proper order and places, the top four corners and the top middle part all around of underframe 1 all are connected with detachable cushion 10, there is a top frame 9 top horizontal installation still of underframe 1, the bottom of top frame 9 and the top joint of cushion 10, the top of top frame 9 and the installation of the adjacent underframe 1 joint in top, underframe 1, top frame 9 and cushion 10 are the glass steel material, and underframe 1, the middle part of top frame 9 all runs through and is provided with perforation 17.
Loading chamber 3 has been seted up to the inside of cushion 10, and the internally mounted who loads chamber 3 has detachable buffer gear, and buffer gear includes bearing plate 23, and bearing plate 23 and the installation of the inside low end joint that loads chamber 3, the equal vertical elastic telescopic column 19 of installing in top both ends of bearing plate 23, the inside upper end both sides that load chamber 3 all are provided with shrinkage pool 20, and the inside at shrinkage pool 20 is pegged graft on the top of elastic telescopic column 19.
All install decoration mechanism 6 around the prefab body, the space department between underframe 1 and decoration mechanism 6 is filled in underframe 1, top frame 9, the inside of loading chamber 3 and underframe 1 to concrete 2.
As a technical optimization scheme of the invention, the decoration mechanism 6 comprises a bottom plate 29, a plurality of end plates 31 are mounted at the top of the bottom plate 29, the end plates 31 are sequentially clamped and mounted, fixing holes 32 are respectively formed at two ends of the top of the bottom plate 29 and two ends of the top of the end plates 31, inserting rods 30 matched with the fixing holes 32 are vertically connected at two ends of the bottom of the end plates 31, the inserting rods 30 are inserted into the fixing holes 32, the end plates 31 and the bottom plate 29 can be spliced into the decoration mechanism 6, and the fixing holes 32 and the inserting rods 30 facilitate mounting and dismounting of the end plates 31.
As a technical optimization scheme of the invention, one side of the bottom frame 1 between the end plate 31 and the bottom plate 29 and between two adjacent end plates 31 is connected with the connecting plate 27, two ends of the connecting plate 27 are connected with the bolt rods 28, and the connecting plate 27 limits the whole decoration mechanism 6, so that the decoration mechanism 6 is more stable in use and is not easy to shake.
As a technical optimization scheme of the invention, threaded holes 11 are respectively formed in two ends of one side of the bottom plate 29 and the end plate 31 opposite to the cushion block 10, a threaded hole 11 is also formed in one side of one end of the cushion block 10 facing the decoration mechanism 6, two ends of the bottom plate 29 and the end plate 31 are horizontally and threadedly connected with the movable rod 5 through the threaded holes 11, the other end of the movable rod 5 is inserted into the sleeve 4, a fastening bolt 7 is connected to one side of the sleeve 4, one end of the fastening bolt 7 is abutted to the outer portion of the movable rod 5, the threaded holes 11 facilitate mounting and dismounting of the movable rod 5 and the sleeve 4, the movable rod 5 can move in the sleeve 4, and the distance between the decoration mechanism 6 and the bottom frame 1 is adjusted.
As a technical optimization scheme of the invention, the two sides of the top frame 9 and the middle parts of the two ends are provided with first sliding grooves 8, the two sides of the bottom of the top frame 9 and the middle parts of the two ends of the bottom are connected with first buckles 18, the top of the cushion block 10 is provided with a second sliding groove 12 matched with the first buckles 18, the top frame 9 is clamped and installed with the cushion block 10 through the first buckles 18 and the second sliding groove 12, the two sides of the bottom frame 1 and the middle parts of the two ends of the bottom are connected with second buckles matched with the first sliding grooves 8, the second buckles are clamped and installed with the first sliding grooves 8, the first sliding grooves 8 can be clamped and installed with the second buckles, and the bottom frame 1 can be conveniently installed.
As a technical optimization scheme of the invention, the bottom of the cushion block 10 is integrally connected with a raised head 14, the top edge of the bottom frame 1 is provided with a plurality of jacks 15 matched with the raised head 14, the raised head 14 is inserted into the jacks 15, two ends of the interior of the cushion block 10 are respectively provided with a positioning hole 13, two ends of each jack 15 on the upper portion of the bottom frame 1 are respectively provided with a screw hole 16, the screw holes 16 are arranged right below the positioning holes 13, screws are arranged inside the positioning holes 13, the bottoms of the screws are connected with the screw holes 16, and the raised head 14, the positioning holes 13 and the screw holes 16 facilitate the mounting and dismounting of the cushion block 10 and the bottom frame 1, so that the number of the cushion blocks 10 can be conveniently.
As a technical optimization scheme of the invention, a through hole 21 is arranged in the middle of the upper telescopic end of the elastic telescopic column 19 in a penetrating manner, a clamping groove 26 is arranged at the middle end of the bottom of the loading cavity 3, a third clamping buckle 22 is integrally connected to the bottom of the bearing plate 23, a push plate 25 is horizontally connected to the bottom of the clamping groove 26, a plurality of springs 24 are connected between the bottom of the push plate 25 and the lower end of the inside of the clamping groove 26, an anti-slip pad is connected to the top of the push plate 25 and abutted against the third clamping buckle 22, and the springs 24 can push the push plate 25 to abut against the bottom of the third clamping buckle 22, so that the bearing plate 23 is not prone to shake and fall off in the loading cavity.
As a technical optimization scheme of the invention, the method for using the concrete prefabricated member comprises the following steps:
the method comprises the following steps: a plurality of bottom frames 1 are spliced and installed from bottom to top, and when the bottom frames 1 are installed with each other, a top frame 9 is installed on the upper portion of each bottom frame 1 in a clamping mode through a first sliding groove 8 and a first buckle 18; when the upper bottom frame 1 and the lower bottom frame 1 are installed, the bottom of the upper bottom frame 1 is clamped and installed with a second sliding groove 12 at the upper part of the cushion block 10 through a second buckle;
step two: after the bottom frame 1 and the top frame 9 are installed, the decoration mechanisms 6 are installed outside the periphery of the whole frame; before the decoration mechanism 6 is installed, the end plates 31 are spliced and installed; during splicing, the lowermost end plate 31 is fixedly inserted into the fixing hole 32 at the upper part of the bottom plate 29 through the insertion rod 30 at the bottom, two adjacent end plates 31 are also fixedly inserted into the fixing hole 32 through the insertion rod 30, and after a plurality of end plates 31 are stacked and mounted from bottom to top, the connecting plate 27 is mounted at the connecting part between the two adjacent end plates 31 and at the side, facing the bottom frame 1, of the connecting part between the lowermost end plate 31 and the bottom plate 29 through the bolt rod 28;
step three: after the whole frame is installed, a buffer mechanism is installed inside the loading cavity 3, and the bearing plate 23 is clamped with the loading cavity 3 through a third clamping buckle 22 and a clamping groove 26 at the bottom; a spring 24 in the clamping groove 26 pushes a push plate 25 to abut against the bottom of the third buckle 22, and a telescopic end above the elastic telescopic column 19 is inserted in the concave hole 20;
step four: after the whole frame and the buffer mechanism are installed, the fastening bolt 7 is screwed, the distance between the decoration mechanism 6 and the bottom frame 1 is adjusted, before the concrete 2 is filled in the frame, the whole frame is placed into a mold of a prefabricated part, and then the concrete 2 is filled in the bottom frame 1, the top frame 9 and the space between the bottom frame 1 and the decoration mechanism 6; the concrete 2 enters the whole frame from top to bottom through the through holes 17, and covers the bottom frame 1, the top frame 9 and the cushion blocks 10.
When the prefabricated member is used, the bottom frames 1 with proper number are selected according to the size requirement of an actual prefabricated member, and the bottom frames 1 are spliced and installed from bottom to top. When the bottom frames 1 are mounted with each other, the top frame 9 is firstly clamped and mounted on the upper portion of each bottom frame 1 through the first sliding chute 8 and the first buckle 18. When the underframe 1 of top and the underframe 1 of below were installed, the installation of second buckle and the second spout 12 joint on cushion 10 upper portion was passed through to the bottom of top underframe 1. And then make the installation dismantlement that a plurality of underframe 1 can be free, and the installation dismantlement is simple swift, can adapt to different work demands, and accommodation is extensive.
Underframe 1 can be according to the size and the kind of prefab adjust the quantity of underframe 1 upper portion cushion 10 before the installation, can dismantle underframe 1 upper portion both sides and the cushion 10 at both ends middle part, saves the cost under the circumstances of guaranteeing the prefab and reaching the demand. And screwing the screw, removing the screw from the screw hole 16, and finally pulling the cushion block 10 out of the inserting hole 15.
After the installation of underframe 1 and top frame 9, according to the actual demand that the prefab outside was decorated, at whole frame outside installation decoration mechanism 6 all around. Before the decoration mechanism 6 is installed, a proper number of end plates 31 are selected according to the size of the actual decoration, and a plurality of end plates 31 are spliced and installed. During splicing, the lowest end plate 31 is fixedly inserted into the fixing hole 32 in the upper part of the bottom plate 29 through the insertion rod 30 in the bottom, and two adjacent end plates 31 are also fixedly inserted into the fixing hole 32 through the insertion rod 30. A plurality of end plate 31 is from supreme the installation back of piling up down, at the junction between two adjacent end plate 31 to and the junction between lowest end plate 31 and the bottom plate 29 all through bolt bar 28 installation connecting plate 27 towards one side of underframe 1, connecting plate 27 is injectd whole decoration mechanism 6, makes decoration mechanism 6 more stable in the use, and difficult emergence is rocked. A plurality of end plates 31 and the bottom plate 29 are spliced to form a complete decoration mechanism 6, and the decoration mechanism 6 is not easy to fall off in use. Make the prefab preparation accomplish the back, decorate mechanism 6 and can decorate externally for whole prefab is more pleasing to the eye, and the prefab has higher decorative after the installation in the building, need not decorate again in the outside of prefab, has saved the cost of decorating. And the size and the appearance of the decoration mechanism 6 can be manufactured according to actual requirements, the adaptability is good, and the decoration mechanism can be widely used.
After the whole frame is installed, a buffer mechanism can be installed inside the loading cavity 3. The bearing plate 23 is clamped with the loading cavity 3 through the third clamping buckle 22 and the clamping groove 26 at the bottom, so that the bearing plate 23 can be simply and quickly mounted and dismounted in the loading cavity 3. The spring 24 in the clamping groove 26 can push the push plate 25 to abut against the bottom of the third clamping buckle 22, so that the bearing plate 23 is not prone to shaking and falling off in the loading cavity 3. After the bearing plate 23 is installed inside the loading cavity 3, the telescopic end above the elastic telescopic column 19 is inserted into the concave hole 20. The elastic telescopic column 19 can limit and fix the bearing plate 23 and can play a role in buffering in the loading cavity 3. When the bearing plate 23 needs to be taken out, a screwdriver is inserted into the through hole 21 and presses the telescopic end of the elastic telescopic column 19 downwards until the telescopic end on the upper part is separated from the concave hole 20, and the bearing plate 23 is pushed to move out of the clamping groove 26.
After the whole frame and the buffer mechanism are installed, the fastening bolt 7 is screwed, the distance between the decoration mechanism 6 and the bottom frame 1 is adjusted, and then the size of the whole prefabricated part is controlled. Before the inside of the frame is filled with concrete, the whole frame is put into a mould of a prefabricated member, and then the bottom frame 1, the top frame 9 and the space between the bottom frame 1 and the decoration mechanism 6 are filled with concrete 2. The concrete 2 can fully enter the whole frame through the through holes 17 from top to bottom, the bottom frame 1, the top frame 9 and the cushion blocks 10 can be covered, and the concrete 2 can also enter the loading cavity 3. After the whole concrete prefabricated part is subjected to external force in use, the bottom frame 1, the top frame 9, the cushion block 10 and the internal buffer mechanism made of glass fiber reinforced plastic can play a good protection role, have higher toughness and buffer force, are not easy to damage in use and have good safety performance.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (8)

1. The utility model provides a fiber reinforced cement composite concrete prefab, includes the prefab body, the prefab body includes concrete (2) and a plurality of underframe (1), its characterized in that, a plurality of underframe (1) is horizontal to be piled up in proper order and is placed, the top four corners and the top middle part all around of underframe (1) all are connected with detachable cushion (10), the top of underframe (1) is still horizontally installed and is pushed up frame (9), the bottom of pushing up frame (9) and the top joint of cushion (10), the top of pushing up frame (9) and the installation of the adjacent underframe (1) joint in top, underframe (1), top frame (9) and cushion (10) are the glass steel material, and the middle part of underframe (1), top frame (9) all runs through and is provided with perforation (17);
the loading cavity (3) is formed in the cushion block (10), the detachable buffer mechanism is installed in the loading cavity (3), the buffer mechanism comprises a bearing plate (23), the bearing plate (23) is clamped and installed with the lower end of the interior of the loading cavity (3), elastic telescopic columns (19) are vertically installed at two ends of the top of the bearing plate (23), concave holes (20) are formed in two sides of the upper end of the interior of the loading cavity (3), and the top ends of the elastic telescopic columns (19) are inserted into the concave holes (20);
all install around the prefab body and decorate mechanism (6), concrete (2) are filled in the inside of underframe (1), top frame (9), loading chamber (3) and underframe (1) and the space department between decoration mechanism (6).
2. The fiber cement composite concrete prefabricated part as claimed in claim 1, wherein the decoration mechanism (6) comprises a bottom plate (29), a plurality of end plates (31) are installed at the top of the bottom plate (29), the end plates (31) are sequentially clamped and installed, fixing holes (32) are formed in both ends of the top of the bottom plate (29) and both ends of the top of the end plates (31), inserting rods (30) matched with the fixing holes (32) are vertically connected to both ends of the bottom of the end plates (31), and the inserting rods (30) are inserted into the fixing holes (32).
3. A fibre reinforced cement composite concrete preform according to claim 2, characterised in that a connecting plate (27) is connected between the end plate (31) and the bottom plate (29) and between two adjacent end plates (31) towards the side of the bottom frame (1), and that bolt bars (28) are connected to both ends of the connecting plate (27).
4. The fiber cement composite concrete precast member according to claim 2, characterized in that both ends of one side of the bottom plate (29) and the end plate (31) opposite to the cushion block (10) are provided with threaded holes (11), one side of one end of the cushion block (10) facing the decoration mechanism (6) is also provided with threaded holes (11), both ends of the bottom plate (29) and the end plate (31) are horizontally and threadedly connected with a movable rod (5) through the threaded holes (11), the other end of the movable rod (5) is inserted into the sleeve (4), one side of the sleeve (4) is connected with a fastening bolt (7), and one end of the fastening bolt (7) is abutted against the outside of the movable rod (5).
5. The fiber cement composite concrete prefabricated part as claimed in claim 1, wherein first sliding grooves (8) are formed in the two sides of the top frame (9) and the middle portions of the two ends of the top, first buckles (18) are connected to the two sides of the bottom of the top frame (9) and the middle portions of the two ends of the bottom of the top, second sliding grooves (12) matched with the first buckles (18) are formed in the top of the cushion block (10), the top frame (9) is installed in a clamping mode with the cushion block (10) through the first buckles (18) and the second sliding grooves (12), second buckles matched with the first sliding grooves (8) are connected to the two sides of the bottom frame (1) and the middle portions of the two ends of the bottom frame, and the second buckles are installed in a clamping mode with the first sliding grooves (8).
6. The fiber reinforced cement composite concrete precast member as recited in claim 1, characterized in that the bottom of the cushion block (10) is integrally connected with a raised head (14), the top edge of the bottom frame (1) is provided with a plurality of insertion holes (15) adapted to the raised head (14), the raised head (14) is inserted into the insertion holes (15), both ends of the inside of the cushion block (10) are provided with positioning holes (13), both ends of each insertion hole (15) on the upper portion of the bottom frame (1) are provided with screw holes (16), the screw holes (16) are arranged right below the positioning holes (13), the inside of the positioning holes (13) is provided with screws, and the bottoms of the screws are connected with the screw holes (16).
7. The fiber reinforced cement composite concrete precast member as recited in claim 1, characterized in that a through hole (21) is provided through the middle of the upper telescopic end of the elastic telescopic column (19), a clamping groove (26) is provided at the bottom middle end of the loading cavity (3), a third buckle (22) is integrally connected to the bottom of the bearing plate (23), a push plate (25) is horizontally connected to the bottom of the clamping groove (26), a plurality of springs (24) are connected between the bottom of the push plate (25) and the inner lower end of the clamping groove (26), a non-slip mat is connected to the top of the push plate (25), and the non-slip mat abuts against the third buckle (22).
8. A fiber cement composite concrete preform as claimed in claim 1, characterized in that it is used in a method comprising:
the method comprises the following steps: splicing and mounting a plurality of bottom frames (1) from bottom to top, wherein when the bottom frames (1) are mounted with each other, a top frame (9) is mounted on the upper portion of each bottom frame (1) in a clamping mode through a first sliding groove (8) and a first buckle (18); when the upper bottom frame (1) and the lower bottom frame (1) are installed, the bottom of the upper bottom frame (1) is clamped and installed with a second sliding groove (12) in the upper portion of the cushion block (10) through a second buckle;
step two: after the bottom frame (1) and the top frame (9) are installed, decorating mechanisms (6) are installed outside the periphery of the whole frame; before the decoration mechanism (6) is installed, a plurality of end plates (31) are spliced and installed; during splicing, the lowermost end plate (31) is fixedly inserted into a fixing hole (32) in the upper part of the bottom plate (29) through an insertion rod (30) at the bottom, two adjacent end plates (31) are fixedly inserted into the fixing hole (32) through the insertion rod (30), and after the end plates (31) are stacked and mounted from bottom to top, a connecting plate (27) is mounted at the connecting part between the two adjacent end plates (31) and at one side of the connecting part between the lowest end plate (31) and the bottom plate (29) facing the bottom frame (1) through a bolt rod (28);
step three: after the whole frame is installed, a buffer mechanism is installed inside the loading cavity (3), and the bearing plate (23) is clamped with the loading cavity (3) through a third clamp (22) and a clamping groove (26) at the bottom; a spring (24) in the clamping groove (26) pushes a push plate (25) to be abutted against the bottom of the third buckle (22), and a telescopic end above the elastic telescopic column (19) is inserted in the concave hole (20);
step four: after the whole frame and the buffer mechanism are installed, the fastening bolt (7) is screwed, the distance between the decoration mechanism (6) and the bottom frame (1) is adjusted, before concrete (2) is filled in the frame, the whole frame is placed into a mold of a prefabricated part, and then the bottom frame (1), the top frame (9) and the space between the bottom frame (1) and the decoration mechanism (6) are filled with concrete (2); the concrete (2) enters the whole frame from top to bottom through the through holes (17), and covers the bottom frame (1), the top frame (9) and the cushion block (10).
CN202010873980.1A 2020-08-26 2020-08-26 Fiber reinforced cement composite concrete prefabricated member Active CN112031258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010873980.1A CN112031258B (en) 2020-08-26 2020-08-26 Fiber reinforced cement composite concrete prefabricated member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010873980.1A CN112031258B (en) 2020-08-26 2020-08-26 Fiber reinforced cement composite concrete prefabricated member

Publications (2)

Publication Number Publication Date
CN112031258A true CN112031258A (en) 2020-12-04
CN112031258B CN112031258B (en) 2022-01-28

Family

ID=73581640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010873980.1A Active CN112031258B (en) 2020-08-26 2020-08-26 Fiber reinforced cement composite concrete prefabricated member

Country Status (1)

Country Link
CN (1) CN112031258B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9151046B1 (en) * 2011-04-21 2015-10-06 Precision Design Llc Concrete slab having integral wall base forms and wall base plates for automated construction and system thereof
CN204898966U (en) * 2015-08-12 2015-12-23 深圳海龙建筑制品有限公司 Compound prefabricated component's curtain unit
CN205369717U (en) * 2016-01-26 2016-07-06 深圳市鹏润装饰工程有限公司 Reinforcing bar keel structure of improvement
CN207363103U (en) * 2017-10-19 2018-05-15 深圳市大众建设集团有限公司 The compound wallboard of one kind building assembling
CN208202142U (en) * 2018-05-15 2018-12-07 天元建设集团有限公司 A kind of prefabricated assembled wall
CN109707099A (en) * 2018-12-14 2019-05-03 青建集团股份公司 A kind of quake-proof precast slab for building and its manufacturing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9151046B1 (en) * 2011-04-21 2015-10-06 Precision Design Llc Concrete slab having integral wall base forms and wall base plates for automated construction and system thereof
CN204898966U (en) * 2015-08-12 2015-12-23 深圳海龙建筑制品有限公司 Compound prefabricated component's curtain unit
CN205369717U (en) * 2016-01-26 2016-07-06 深圳市鹏润装饰工程有限公司 Reinforcing bar keel structure of improvement
CN207363103U (en) * 2017-10-19 2018-05-15 深圳市大众建设集团有限公司 The compound wallboard of one kind building assembling
CN208202142U (en) * 2018-05-15 2018-12-07 天元建设集团有限公司 A kind of prefabricated assembled wall
CN109707099A (en) * 2018-12-14 2019-05-03 青建集团股份公司 A kind of quake-proof precast slab for building and its manufacturing method

Also Published As

Publication number Publication date
CN112031258B (en) 2022-01-28

Similar Documents

Publication Publication Date Title
CN106639068B (en) Support-free cast-in-place reinforced concrete wall form infilled wall and construction method thereof, and manufacturing method of wall form veneer and non-bearing infilled wall
CN215631633U (en) Prefabricated GRC ground beam template of pin-connected panel U type
CN109339320B (en) Rear precast concrete movable core rib and preparation method thereof
CN112031258B (en) Fiber reinforced cement composite concrete prefabricated member
CN113622543B (en) Assembly type building
CN101449009A (en) A wall body structure using hollow plastic modules
CN112282117B (en) Assembled light steel structure composite external wall panel and construction method thereof
CN210086511U (en) Prefabricated member of assembled PC wallboard for building
CN215038504U (en) Pressing equipment for perforated bricks
CN215803213U (en) Building concrete construction template anchor clamps
CN110670797A (en) Assembled concrete prefabricated plate
CN113756540B (en) Glass fiber reinforced cement decorative component and manufacturing method thereof
CN115596113A (en) Shear wall structure for earthquake-resistant energy-saving house and construction method thereof
CN213143853U (en) Template device for light-transmitting material modified rammed earth wall
CN109707085B (en) Reinforced concrete floor and processing method thereof
CN208305325U (en) A kind of precast concrete mold
CN220538955U (en) Quick assembly light-transmitting concrete prefabricated part
CN213626013U (en) Foam concrete roof board and foam concrete house
CN202241550U (en) Adjustable vertical mold for stair flights
CN206328936U (en) A kind of GRC keel structures
CN201728729U (en) Prefabricated mould of pseudo-classic architecture arch
CN219726705U (en) Convenient cement pole production mould of drawing of patterns
CN203514682U (en) Y-type steel plate encased column system
CN117124461B (en) Production equipment for vertical mold of prestressed laminated slab
CN220686300U (en) Stable strong splicing fixed prefabricated component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220113

Address after: 522000 Industrial Park, Lancheng District, Jieyang City, Guangdong Province

Applicant after: GUANGDONG YONGJI ELECTRIC POWER EQUIPMENT FACTORY Co.,Ltd.

Address before: 210000 student dormitory building of Nanjing Forestry University, suojin village, Xuanwu District, Nanjing City, Jiangsu Province

Applicant before: Zhang Zhanqun

TA01 Transfer of patent application right